VERTICAL ANALYSIS Figure 1

Loads:
Load Factor for Vertical Loads= 1.0
Load Factor for Lateral Loads= 1.0
Loads Supported by Pile Cap= 0 %
Shear Condition: Static

Vertical Load, Q= 200.0 -kN


Shear Load, P= 0.0 -kN
Slope Restain St= 0.00 -cm/-cm

Profile:
Pile Length, L= 7.0 -m
Top Height, H= 0 -m
Slope Angle, As= 0
Batter Angle, Ab= 0

Fixed Head Condition


Nocontributing Zone, Ln1=Ln2=Ln3=0.

Drilled Shaft (dia >24 in. or 61 cm)

Soil Data: Pile Data:


Depth Gamma Phi C K e50 or Dr Nspt Depth Width Area Per. I E Weight
-m -kN/m3 -kN/m2 -MN/m3 % -m -cm -cm2 -cm -cm4 -MP -kN/m
0 9.2 27.9 16.5 31.5 1.25 6 0.0 80 5026.5 251.3 2010619.3 20683 11.863
0.2 11.2 0.0 143.0 278.5 0.51 24 7.0
0.8 12.2 37.6 160.7 714.9 0.31 54
6.5 11.7 42.1 0.0 53.5 95.94 60
10 11.7 42.1 0.0 53.5 95.94 60

Vertical capacity:
Weight above Ground= 0.00 Total Weight= 48.56-kN *Soil Weight is not included
Side Resistance (Down)= 2824.221-kN Side Resistance (Up)= 2696.205-kN
Tip Resistance (Down)= 4917.917-kN Tip Resistance (Up)= 0.000-kN
Total Ultimate Capacity (Down)= 7742.138-kN Total Ultimate Capacity (Up)= 2744.764-kN
Total Allowable Capacity (Down)= 2580.713-kN Total Allowable Capacity (Up)= 947.294-kN
OK! Qallow > Q

Settlement Calculation:
At Q= 200.00-kN Settlement= 0.01525-cm
At Xallow= 0.20-cm Qallow= 2317.69458-kN

Note: If program can't find result or the result exceeds the up limits. The result shows 9999.