!=ताप्लेजुङग lhNnfsf] b}lgs Hofnf tyf 9'jfgLsf] b//]6 cf=a=)&$.

)&%,
b//]6 ?
cf=g+= laj/0f OsfO k|lt =cf=a=)&८.)
&९
1.01 *sdL{, gsdL{, jh| sdL{, l;sdL{ k]G^/ bIf k|lt lbg 900.00
1.02 *sdL{, gsdL{, jh| sdL{, l;sdL{, k]G^/ cw{bIf k|lt lbg 680.00
1.03 HofdL, r]gDofg, ju}rf dfln k|lt lbg 600.00
1.04 lbp;f]sf] sfd ug] kfn] k|lt lbg 510.00
1.05 /ftLsf] sfd ug] kfn] k|lt lbg 550.00
1.06 KnDj/ bIf k|lt lbg 800.00
1.07 KnDj/ cw{bIf 700.00
1.08 On]lS^\|l;og bIf k|lt lbg 775.00
1.09 On]lS^\|l;og ;xfos k|lt lbg 645.00
1.10 x]Nk/÷d]sflgsn x]Nk/÷nfO{g Dofg x]Nk/ k|lt lbg 600.00
1.11 g;{/L gfOs] ,, 440.00
1.12 jg x]/fn' k|lt lbg 385.00
1.02 sG;N6]G6 lgo'Qm ug'{ kbf{
1.02.01 ;e]{ -s_ ;e]{o/ lj1 / Engineer Specialist k|lt lbg 1420.00
1.02.02 -v_;e]{o/ clws[t :t/ / Engineer k|lt lbg 1155.00
1.02.03 -u_ P]= gf=;'=:t/ k|lt lbg 960.00
1.02.04 -3_ P]= vl/bf/ :t/ k|lt lbg 905.00
1.02.05 -ª_ r]g Dofg, :6fkmDofg k|lt lbg 700.00
-r_ ;e]{ x]Nk/ -lkog, k]uDofg, Instrumentman k|lt lbg 550.00
1.02.06
cflb_
1.03 sfof{no k|of]hgdf
k|lt lbg
1.03.01 ;e]{ -s_ ;e]{o/ lj1/ Engineer Specialist÷Geologist 1365.00

1.03.02 -v_;e]{o/ clws[t :t// Engineer/Geologist k|lt lbg 1225.00


1.03.03 -u_ P]= gf=;'=:t/ k|lt lbg 840.00
1.03.04 -3_ P]= vl/bf/ :t/ k|lt lbg 785.00
1.03.05 -ª_ r]g Dofg, :6fkmDofg k|lt lbg 630.00
-r_ ;e]{ x]Nk/ -lkog, k]uDofg, Instrumentman k|lt lbg 525.00
1.03.06
cflb_ k|lt lbg
-5_ lhof]8]l6s g]6js{ ;Fu ;DalGwt ;e]{sf] nflu dfq 585.00
1.03.07
x]Nk/ ÷ HofdL
1.03.08 -h_cGt/fli6«o l;df ;e]{If0fsf nflu bIf HofdL k|lt lbg 630.00
-em_cGt/fli6«o l;df ;e]{If0fsf nflu cw{bIf x]Nk/ k|lt lbg
1.03.09
÷HofdL
1.04 8«fOe/
1.04.01 nfO6 e]lxsn k|lt lbg 680.00
1.04.02 x]eL e]lxsn k|lt lbg 765.00
1.04.03 vnf;L k|lt lbg 495.00
1.04.04 l8«n/ k|lt lbg 630.00
1.04.05 Jnfi6/ k|lt lbg 735.00
1.05 h]g]/]6/÷d]lzg
k|lt lbg jf cf7
1.05.01 -s_ ck/]6/ 605.00
306f
1.05.02 -v_ x]Nk/ ,, 495.00
1.06 ;'k/efO{h/
k|lt lbg jf cf7
1.06.01 -s_ clws[t :t/ -k|fljlws_ 1050.00
306f
1.06.02 -v_ gf=;'= :t/ ,, 815.00
1.06.03 -u_ vl/bf/ :t/ ,, 700.00
1.06.04 -3_ d'lvof :t/ ,, 555.00
1.06.05 -8=_ n]Gy js{/ ;'k/efO{h/ ,,
1.06.06 wfjs -/g/_ ,, 500.00
1.07 sDKo'6/ ck/]6/ 480.00
k|lt lbg jf cf7
1.07.01 -s_ gf=;'= :t/ 815.00
306f
1.07.02 -v_ vl/bf/ :t/ ,, 700.00
1.08 kmnfd] k''n h8fg ug]{
k|lt lbg jf cf7
1.08.01 bIf 835.00
306f
k|lt lbg jf cf7
1.08.02 cw{ bIf 660.00
306f
1.09 6\o"aj]nsf] sfd
1.09.01 k"/fgf] 6\o"aj]n pv]Ng] k|lt lkm6
1.09.02 $) lkm6 ;Dd uf8\g] ,,
1.09.03 $) b]lv ^) lkm6 ;Dd uf8\g] ,,
1.09.04 ^) b]lv *) lkm6 ;Dd uf8\g] ,,
1.09.05 ;j} kb÷>]l)fsf
*) lkm6 Hofnfbf/L sfdbf/x?sf] xsdf ;+jlGwt
eGbf dfly ,,
kb÷>]l)fsf] nflu g]kfn ;/sf/sf] k|rlnt tnj dfgnfO 30
n] efu ubf{ x"gcfpg] /sdnfO b}lgs Hofnfb/
2 ('jfgL÷ef*f
dfGg"kg]{ b//]^
%.
b//]6 ?
dhb'/ 4f/f lgdf{0f afx]ssf pkef]Uo ;fdfgx?sf]
2.01 PsfO{ =cf=a=)&$.)
9'jfgL -Onfd g=kf= If]q leq_
&%
2.01.01 rf}sahf/ b]lv uf]nal:t ;Dd %) s]=hL=/k6s]
2.01.02 km"nuf5L ;Dd Æ
2.01.03 b]p/fnL ;Dd Æ
2.01.04 ;}gLs SofDk ;Dd Æ
2.01.05 sf/fuf/ ;Dd Æ
2.01.06 kfgL 6\ofÍL ;Dd Æ
2.01.07 afng uf+p ;Dd Æ
2.01.08 ) ls=dL= ;Dd Æ
2.01.09 lkknaf]6] ;Dd Æ
2.01.10 wf]aLwf/f ;Dd Æ
2.01.11 6'l8v]n ;Dd Æ
2.01.12 gf/fo0f :yfg ;Dd Æ
2.01.13 ;fdfg nf]8÷cgnf]8 -;lhnf] ;fdfg_ SjL06n 26.00
2.01.14 ;fdfg nf]8÷cgnf]8 -c;lhnf] ;fdfg_ SjL06n 37.00
2.01.15 kf]n nf]8 / cgnf]8 k|lt uf]6f 40.00
k|lt 6g k|lt sRrL ;*s
2.02 !=6«s af6 9'jfgL
sL=dL= c;f/÷ebf}
-s_ ;lhnf] ;fdfg ,, 75.00
2.02.01
-v_ c;lhnf] ;fdfg-lkml6Ë,h:tfkftf,kmlg{r/ cfbL_ ,, 100.00
-u_ laz]if c;lhnf] ;fdfg -kfOk,808L cfbL ,, 120.00
2.02.02

-3_ hf]lvdk"0f ;fdfg -cf}ifwL, lzzf cfbL_ ,, 125.00

2.03 -ª_ latf{df]8 O{nfd -^ 6g _ k|lt l6«k


k|lt 6g k|lt
2.04 @ xn'sf ;jf/L ;fwgaf6 9'jfgL -sRrL ;8s_
sL=dL=
k|lt s]=hL=k|lt
2.05 -s_ el/of 4f/f 9'jfgL -nfdf] b"/L_
sf]if
2.05.01 -s_ ;lhnf] ;fdfg ,, 4.40 / 5.25

2.05.02 -v_ c;lhnf] ;fdfg -lkml6Ë,h:tfkftf,kmlg{r/ cflb_ ,, 5.80 / 7.15

2.05.03 -u_ laz]if c;lhnf] ;fdfg -kfOk, 808L cflb_ ,, 5.80 / 7.15

2.05.04 -3_ hf]lvdk"0f ;fdfg -cf}ifwL,lzzf cflb_ ,, 6.20 / 7.05

2.05.05 ª_ 3f+;sf lj?jf tyf laplahg cflb ,, 5.80 / 7.15

2.05.06 -r_ el/of Hofnf k|ltlbg


2.06 !=kz' 9'jfgL
s_ 7"nf] hgfj/-ufO{,;fF8],ax/,e};L,/fFuf]_s[ifssf]
2.06.01 3/ b]vL a9Ldf @ ls=dL=;Dd kSsL jf df]6/ k|lt lhp मूल्यको १२ प्रतिशत
af6f] ;Dd
v_;fgf] hgfj/-e]8f,afv||f,af]sf,y'Daf_s[ifssf] 3/
2.06.02 k|lt % lhp मूल्यको १२ प्रतिशत
b]vL a9Ldf @ ls=dL=;Dd kSsL jf df]6/ af6f] ;Dd
u_ c;lhnf] hgfj/ -;+u'/,a+u'/_s[ifssf] 3/ b]vL
2.06.03 k|lt lhp मूल्यको १२ प्रतिशत
a9Ldf =dL=;Dd kSsL jf df]6/ af6f] ;Dd
2.07 @=kz' lx8fP/ nf+bf
k|lt lhp k|lt
2.07.01 s_ 7"nf] hgfj/-ufO{,;fF8],ax/,e};L,/fFuf]_ 56.00
ls=ld=
k|lt % lhp k|lt
2.07.02 v_;fgf] hgfj/-e]8f,afv|f,af]sf,y'Daf_ 57.00
ls=ld=
k|lt lhp k|lt
2.07.03 u_ c;lhnf] hgfj/ -;+u'/,a+u'/_ 58.00
ls=ld=
2.08 nf]8 cgnf]8 -hgfj/_
2.08.01 s_ 7"nf] hgfj/ k|lt lhp 170.00
2.08.02 v_ ;fgf] hgfj/ ,, 15.00
9''jfgL ÷ef8f b//]6 -xn'sf ;jf/L ;fwg ÷ 6ofS6/ af6
2.09
_
2.09.01 !_ kf]n 9'jfgL - nf]8 ÷ cgnf]8 ;lxt _
2.09.01.01 s_ gu/ If]q leq k|lt kf]n
2.09.01.02 v_ sf7sf] kf]n k|lt kf]n 485.00
2.09.01.03 u_lk=P;=;L= kf]n k|lt kf]n 610.00
2.09.01.04 3_ kmnfdsf] kf]n k|lt kf]n 980.00
2.09.02 @_ kf]n nf]8 / cgnf]8 k|lt uf]6f
2.09.03 #_ Transformer 9'jfgL - nf]8 ÷ cgnf]8 ;lxt _
2.09.03.01 s_ gu/ If]q leq k|lt Transformer

2.09.03.02 v_ (15 K.V.A-25 K.V.A) k|lt Transformer

2.09.03.03 u_ (50 K.V.A-100 K.V.A) k|lt Transformer

2.09.03.04 3_ (200 K.V.A-250 K.V.A) k|lt Transformer


$_ cGo ljB'lto ;fdfu|L-Og;'n]6/,sG8S6/,:6] ;]6 k|lt 6g k|lt
2.09.03.05
cfbL_ sL=dL=
3 d]lzg cf}hf/sf] b/ -OGwg afx]s _ cf=a=072.073

3.01 lJxn 8f]h/ -OGwg afx]s _ k|lt 306f


3.02 6«ofs 8f]h/ -OGwg afx]s _ !*! b]lv @#) x=kf= ,, 150.00
3.03 6«ofs 8f]h/ -OGwg afx]s _ !@^ b]lv !*) x=kf= k|lt 306f 110.00
3.04 6«ofs 8f]h/ -OGwg afx]s _ *) b]lv !@% x=kf= ,, 90.00
3.05 6«ofs 8f]h/ -OGwg afx]s _ ) b]lv &( x=kf= ,, 75.00
3.06 6|\ofs :sfe]]6/ -! b]lv !!) x=kf=_ O{Gwg afx]s k|lt 306f
3.07 6|\ofs :sfe]]6/ -!!! b]lv !%) x=kf=_ O{Gwg afx]s ,,
3.08 u|]8/ -!#% x=kf=_ Ogwg jfx]s ,, 2700.00
lJxn nf]8/ -OGwg afx]s _ -!=@ b]lv @=#
3.09 ,, 1850.00
3=dL=_
lJxn nf]8/ -OGwg afx]s _ -)=#% b]lv )=*
3.1 ,, 1850.00
3=dL=_
3.11 # kf+u|] /f]8 /f]n/ -O{Gwg afx]s_ !@ 6g ;Ddsf] ,, 1250.00
3.12 3f]6\g] d]lzg - dfj{n, lrK; cflb_ k|lt 306f 300.00
3.13 /f]n/ -* – !) 6g_ Ogwg jfx]s ,, 1000.00
3.14 /f]n/ -xft]]_ Ogwg jfx]s ,, 450.00

3.15 l6k/÷6«s -^ 6g_ -OGwg afx]s _ ,, 850.00

3.16 6«s -#– ^ 6g_ -OGwg afx]s _ k|lt 306f 850.00


3.17 l6|k/ -#– !) 6g_ -OGwg afx]s _ k|lt 306f 850.00
3.18 6«ofS6/ -OGwg afx]s _ k|lt lbg 3000.00
ldS;r/ d]lzg -!÷@ Aofu l;d]G6 ;Dd sf] _ Ogwg
3.19 k|lt lbg 2000.00
jfx]s
3.20 Vibrator d]lzg k|lt lbg 110.00
dlxGb|f, xfO{nS;, lg;fg jf ;f] ;/xsf] ef*f -kmf]/
3.2 k|lt lbg 4725.00
JxLn ;lxt,O{Gwg jfx]s_
3.21 ;'df], jf]n]/f] jf ;f ;/xsf] ef*f -O{Gwg jfx]s_ k|lt lbg 4200.00
3.22 df?lt Eofgsf] ef*f -O{Gwg jfx]s_ k|lt lbg 3675.00
4 jg tk{msf] uf]nLof sf& s^fg, d"%fg, ("jfgL, nf]* cgnf]*, kfOnLª, #f^ ub\bL, r^\^f nufpg] sfd

4.01 s= uf]nLof sf& cf=a=072.073

4.01.01 1) s^fg, d"%fg #=lkm= 16.20


4.01.02 2) kfOnLª #=lkm= 4.70
4.01.03 3) nf]*Lª, cgnf]*Lª #=lkm= 20.80
4.02 v= uf]nLof sf& ("jfgL
4.02.01 1) 0 b]lv 10 ls=ld= ;Dd k|=#=lkm= 52.00
4.02.02 2) 11 b]lv 20 ls=ld= ;Dd k|=#=lkm= 64.70
4.02.03 3) 21 ls=dL= b]lv dfly k|=#=lkm= 71.65
u= bfp/f s^fg, d"%fg, ("jfgL tyf r^\^fnufpg] sfd ;fOh 20'0"x
4.03 k|= r^\^f 10857.00
5'0"x 5'0"

4.04 #= %kfg vr{ -Ogfd]n, JnLhL¬, gDj/Lª,d;nGb vr{ _ k|lt ?v 13.90

4.05 ª= 200 u]hsf] kf]lnlyg y}nf k|lt s]=hL= 438.90


5 laB'tsf] KjfOG6 u0fgf
S.n. Particulars

A. FOR SURFACE AND CONCEALED WIRING


5.01 One way switch 1
5.02 Two way switch 2
5.03 Two Pin / Three Pin Socket 1
5.04 Five Pin Socket /Five in One Switch 1
5.05 Bell push switch 1
5.06 Five Pin Power Socket 3
5.07 Five - in - one socket universal with fuse indicator 3
5.08 Indicator only 1
5.09 Main switch 3
5.1 Main switch 3
5.11 Main switch 3
5.12 Main Circuit Bracker (M.C.B.) 3
5.13 Main Circuit Bracker (M.C.B.) 3
5.14 Five Kitkat (Board Fuse) 2
5.15 Three Pin Power Socket 3
5.16 Junction Board 1
5.17 Low Circuit Bracker (L.C.B.) 3
5.18 Low Circuit Bracker (L.C.B.) 3
5.19 Low Circuit Bracker (L.C.B.) 3
5.2 M.C.C.B. 5
5.21 E.L.C.B. 5
5.22 Distribution Board 5
5.23 Television Socket 1
5.24 Telephone Socket 1

5.25 City Cable Socket 1

6 #/ d'NofÍg tyf #/ ef*fsf] gof+ :jLs[t b/ laj/)f M


leq sf+rf] aflx/ kfsf] O{^fdf df^f]sf] hf]*fO{, %fgf h:tf,
6.01.01 k|lt au{ ld^/ 19965.00
lemu^L, ^fon jf P:a]:^;\ ePsf]
leq aflx/ kfsf] O{^fdf df^f]sf] hf]*fO{, %fgf h:tf, lemu^L,
6..01.02 k|lt au{ ld^/ 27830.00
^fon jf P:a]:^;\ ePsf]

leq aflx/ kfsf] O{^fdf df^f]sf] hf]*fO{, %fgf h:tf, lemu^L,


6.01.02 k|lt au{ ld^/ 26015.00
^fon jf P:a]:^;\ ePsf] / aflx/ l;d]G^ Knfi^/ ePsf]

leq aflx/ kfsf] O{^fdf df^f]sf] hf]*fO{, %fgf


6..01.03 k|lt au{ ld^/ 29947.50
cf/.l;.;L.÷cf/.la.;L. ePsf]
leq aflx/ kfsf] O{^fdf ah|sf] hf]*fO{df, %fgf h:tf, lemu^L,
6.01.03 k|lt au{ ld^/ 30129.00
^fon jf P:a]:^;\ ePsf]
leq aflx/ kfsf] O{^fdf ah|sf] hf]*fO{df, %fgf h:tf, lemu^L,
6..01.04 k|lt au{ ld^/
^fon jf P:a]:^;\ ePsf] / l;d]G^ Knfi^/ ePsf]
leq aflx/ kfsf] O{^fdf ah|sf] hf]*fO{df, %fgf
6.01.04 k|lt au{ ld^/
cf/.l;.;L.÷cf/.la.;L. ePsf]] / l;d]G^ Knfi^/ ePsf]

6..01.05 l;d]G^ hf]*fO{ %fgf M h:tf, lemu^L, ^fon jf P:a]:^; ePsf] k|lt au{ ld^/

6.01.05 l;d]G^ hf]*fO{ %fgf M cf/.l;.;L.÷cf/.la.;L. ePsf] k|lt au{ ld^/


6..01.06 cf/.l;.;L. km|]d :^|Sr/ k|lt au{ ld^/
6.01.06 cf/.l;.;L. km|]d :^|Sr/ eO{ lnkm\^ h*fg ePsf] k|lt au{ ld^/

6..01.07 sf&} sf&sf] #/ %fgfM h:tf, ^fon, lemu^L jf P:a]:^;\ ePsf] k|lt au{ ld^/

6.02 l*k|l;P;gsf] nflu b]xfo adf]lhd ug]{


k|lt aif{ #^fpg' kg]{
l;.g+. :^|Sr/sf] lsl;d
b/ (%)
6.02.01 ;a} k|sf/sf df^f]af^ lgld{t :^|Sr/x? -1–4_ 2 30
6.02.02 ;a} k|sf/sf s+lqm^ af^ lgld{t :^|Sr/x? -5–7_ 1.25 40
6.02.03 ;a} k|sf/sf l;d]G^ d;nfaf^ lgld{t :^|Sr/x? -8–9_ 0.75 67
6.02.04 ;a} k|sf/sf km|]d :^|Sr/af^ lgld{t :^|Sr/x? -10–11_ 0.5 100
6.02.05 ;a} k|sf/sf sf&af^ ag]sf :^|Sr/x? -12_ 2.5 32

v=lgdf{)f ;fdfu|Lsf] b//]^ 2072÷073


cf=j=
l;=g+= laj/0f PsfO{ @)&$÷)&
%
7 :yfgLo tyf afx\o lgdf{0f ;fdfu|Lx?
7.01.01 v/ -@) d'7f sf] ! Eff/L _ ef/L 293.00
7.01.02 k/fn -3/ 5fpg]_ -@) d'7f sf] ! Eff/L _ ,, 100.00
7.01.03 bfp/f s]=hL= 10.00
7.01.04 e"; ,, 8.20
7.02 uf]j/
7.02.01 uf]a/ ,, 25.75
7.02.02 uf]a/ dn ,, 3.00
7.03 df6f],sf]Onf 0.00
7.03.01 /ftf] df6f] s]=hL= 10.30
7.03.02 ;fwf/0f df6f] 3=dL= 5.15
7.03.03 sf7sf] sf]Onf s]=hL= 25.75
7.04 afF; 0.00
7.04.01 dfnafF; uf]6f 175.00
7.04.02 efn'afF; ,, 255.00
7.04.03 rf]of afF; ,, 155.00
7.04.04 aflaof] s]=hL= 30.50
7.04.05 rf]of, aftf ,, 30.50
7.05 afF;sf] ;fdfg uf]6f 0.00
7.05.01 af+;sf] lrqf -$ x ^ lkm6_ 309.00
7.05.02 af+;sf] dfGb|f] -#=% x $=% lkm6_ ,, 329.00
7.05.03 af+;sf] dfGb|f] -^ x ^ lkm6_ ,, 360.00
7.05.04 8f]sf] ,, 206.00
7.05.05 9sL uf]6f 103.00
7.06 9+'uf 0.00
7.06.01 kmf]?jf 9+'uf 3=dL= 2650.00
7.06.02 vf]nfsf] 9+'uf ,, 1600.00
7.06.03 8«];L8= u/]sf] 9+'uf ,, 0.00
7.07 afn'jf 0.00
7.07.01 vfgLsf] jfn'jf 3=dL= 1400.00
7.07.02 vf]nfsf] afn'jf ,, 4600.00
7.08.01 lu§L -:yfgLo _ 0.00
7.08.01.01Avf]nfsf] kmf]/]sf] lu§L -$) ldld ;Ddsf]_ 3=dL= 3700.00
7.08.01.01Bvf]nfsf] kmf]/]sf] lu§L -@% ldld ;Ddsf]_ 3850.00
7.08.01.02ldS; u|fe]n (River Bed ) ,, 2500.00
7.08.01.03d]l;gn] km'6fPsf] -$) ldld ;Ddsf]_ ,, 1350.00
7.08.01.04vf]nfsf] 5fg]sf] lu6L -$) ldld ;Ddsf]_ ,, 3600.00
7.08.01.05 vfgLsf] u|fe]n ,, 1700.00
7.08.01.06 9'+ufsf] w'nf] (Stonedust) ,, 3150.00
7.08.02 lu§L -पाँचथर_ 0.00

7.08.02.01 d]l;gn] km'6fPsf] -!)—$) ldld ;Ddsf]_ ,, 1200.00

7.08.02.02 d]l;gn] km'6fPsf] -!)—@%_ ldld ;Ddsf]_ ,, 1400.00


7.08.02.03 vf]nfsf] 5fg]sf] lu6L -!)—@%_ ldld ;Ddsf]_ ,, 1450.00
7.08.02.04 l;Nsg lu6L -!) ldld ;Ddsf]_ rfn]sf] ,, 1150.00
7.08.02.05 l;Nsg lu6L -!) ldld ;Ddsf]_ kmf]/]sf] 3=dL= 1200.00
d]l;gn] km'6fPsf] -!) b]lv !$ ldld ;Ddsf]_
7.08.02.06 ,, 1550.00
/f]8 ;km]{; 8|]l;Ësf] nflu
rfn]sf] lu6L] -!) b]lv !$ ldld ;Ddsf]_ /f]8 ;km]{;
7.08.02.07 ,, 1600.00
8|]l;Ësf] nflu
d]l;gn] km'6fPsf] -@) ldld ;Ddsf]_ /f]8 ;km]{;
7.08.02.08 ,, 1650.00
8|]l;Ësf] nflu
vf]nfsf] 5fg]sf] -@) ldld ;Ddsf]_ /f]8 ;km]{;
7.08.02.09 ,, 1600.00
8|]l;Ësf] nflu
7.08.02.10 9'+ufsf] w'nf] (Stonedust) ,, 0.00
7.09 sf7 0.00
7.09.01 :yfgLo s8f ljd ef6f cflb 3=dL= 42000.00
7.09.02 :yfgLo s8f tVtf ,, 42500.00
7.09.03 :yfgLo g/d ljd ef6f cflb ,, 30000.00
7.09.04 :yfgLo g/d tVtf ,, 30500.00
7.09.05 ;fn / ;v'jf lr/fg sf7 -lad ef6f cflb_ ,, 93000.00
7.09.06 ;fn / ;v'jf lr/fg tVtf sf7 ,, 93500.00
7.10 O{6f -:yfgLo tyf afX\o_ 0.00
7.10.01 sfFrf] O{6f -:yfgLo_ k|lt xhf/ 0.00
7.10.02 kfs]sf] O{6f -:yfgLo_ k|lt xhf/ 20000.00
7.10.03 O6f t/fO{sf] -k|yd >]0fL_ -lrDgL e6\6fsf]_ k|lt xhf/ 28500.00
7.10.04 lks]6 O{6f -lrDgL e6\6fsf]_ k|lt xhf/ 23000.00
7.11 Hollow Concrete Block 0.00
7.11.01 Size 5"x8"x16" uf]6f 45.00
7.11.02 Size 6"x8"x16" uf]6f 50.00
7.11.03 Size 8"x8"x16" uf]6f 60.00
7.11.04 Size 4"x8"x16" uf]6f 40.00
7.12 l;d]06 0.00
7.12.01 cl8{g/L kf]6{Nof08 l;d]G6 af]/f 1050.00
7.12.02 cGo l;d]G6 af]/f 950.00
7.12.03 ;]tf] l;d]06 $) s]=hL= 1400.00
7.12.04 l;lnsf l;d]06 Admixture s]=hL= 400.00
7.12.05 kmfo/ l;d]G6 s]=hL= 75.00
7.13 Pr=l8=kL= kfO{k 0.00
7.13.01 Pr=l8=lk= kfO{k laleGg ;fO{h / ;]l/hsf] s]=hL= 280.00
8 kmnfdsf lgdf{0f ;fdfu|Lx? 0.00
8.01.01 laleGg ;fOhsf kmnfd] 58x? (Fe 415 kg/cm2) s]=hL= 82.50
8.01.02 laleGg ;fOhsf (TMT) kmnfd] 58x? (Fe 500 kg/cm2) s]=hL= 85.00
8.02.01 808L afFWg] tf/ 0.00
8.02.01.01 808L afFWg] sfnf] tf/ ,, 125.00
8.02.01.02 808L afFWg] ;]tf] tf/ ,, 140.00
8.03 g6\ jf]N6 0.00
8.03.01 h] jf]N6g6 # ;'t] g6af]N6 cflb s]=hL= 190.00
8.03.02 g6\ jf]N6 km"n y]|8]8 ,, 215.00
8.04 cGo kmnfd] dfn;fdfgx? 0.00
8.04.01 !/@Æ,!Æ,@Æ,#Æ,$Æ ;fO{hsf] kmnfd] lsnf ,, 135.00
8.04.02 Pnx's, o'g]n ,, 145.00
8.04.03 afnzL/L sfF6L ,, 215.00
8.04.04 lkg sfF6L ,, 235.00
8.04.05 s+ls|6 sfF6L ,, 260.00
8.04.06 laleGg ;fO{hsf] k]rlsnf -;fgf]_ !)) u|fd 115.00
8.04.07 7"nf] -@Æ, #Æ, $Æ_ ;os8f 400.00
8.04.08 jl;nf -laleGg ;fO{hsf] rf/kf6]_ k|lt s]=hL= 285.00
8.04.09 xf]N8 kmfi6 uf]6f 45.00
8.04.10 13mm dia.Cable (Suspension Bridge) /=dL= 110.00
8.04.11 26mm dia.Cable (Suspension Bridge) /=dL= 383.00
8.04.12 32mm dia.Cable (Suspension Bridge) /=dL= 593.00
8.04.13 13mm dia. Bulldog Grip uf]6f 73.00
8.04.14 26mm dia. Bulldog Grip uf]6f 257.00
8.04.15 32mm dia. Bulldog Grip uf]6f 346.00
:6|Sr/n l:6n Parts -emf]=k"= tyf cGo k|of]hgsf]
8.04.16 k|lt s]=hL= 150.00
nflu_
8.04.17 lh+s sf]l68= -UofNegfO{h];gsf] nflu_ ,, 70.00
8.04.18 kmnfd] ;'ln; kftf k|lt s]=hL= 135.00
8.05 lh=cfO{= Nk]g l;6 -#Ú x ^Ú_ 0.00
8.05.01 lh=cfO{= Nk]g l;6 -#Ú x ^Ú_ @@ u]h a=dL= 400.00
8.05.02 lh=cfO{= Nk]g l;6 -#Ú x ^Ú_ @$ u]h ,, 600.00
8.05.03 lh=cfO{= Nk]g l;6 -#Ú x ^Ú_ @^ u]h ,, 500.00
8.05.04 lh=cfO{= Nk]g l;6 -#Ú x ^Ú_ @* u]h ,, 400.00
8.05.05 lh=cfO{= Nk]g l;6 -#Ú x ^Ú_ #) u]h ,, 300.00
8.05.06 lh=cfO{= Nk]g l;6 -#Ú x ^Ú_ #@ u]h ,, 250.00
8.06 kmnfd] Kn]g l;6 0.00
8.06.01 kmnfd] Kn]g l;6 !* u]h k|lt j=dL= 926.00
8.06.02 kmnfd] Kn]g l;6 @) u]h ,, 835.00
8.07 jf/j]8 jfo/ laleGg ;fOhsf] 0.00
8.07.01 jf/j]8 jfo/ * u]hsf] s]=hL= 125.00
8.07.02 jf/j]8 jfo/ ( u]hsf] s]=hL= 125.00
8.07.03 jf/j]8 jfo/ !) u]hsf] s]=hL= 125.00
8.07.04 jf/j]8 jfo/ !@ u]hsf] s]=hL= 125.00
8.07.05 jf/j]8 jfo/ !$ u]hsf] s]=hL= 125.00
8.07.06 sG8]lG;Ë jfo/ s]=hL= 125.00
8.08 lh=cfO{= tf/ 0.00
8.08.01 lh=cfO{= tf/ -nfO{6 sf]6]8_ 0.00
8.08.01.01 * u]h nfO{6 sf]6]8 ,, 94.00
8.08.01.02 ( u]h nfO{6 sf]6]8 ,, 94.00
8.08.01.03 !) u]h nfO{6 sf]6]8 ,, 94.00
8.08.01.04 !! u]h nfO{6 sf]6]8 ,, 94.00
8.08.01.05 !@ u]h nfO{6 sf]6]8 ,, 94.00
8.08.02 lh=cfO{= tf/ -d]l8od sf]6]8_Commercial 0.00
8.08.02.01 * u]h d]l8od sf]6]8 s]=hL= 95.00
8.08.02.02 ( u]h d]l8od sf]6]8 ,, 95.00
8.08.02.03 !) u]h d]l8od sf]6]8 ,, 95.00
8.08.02.04 !! u]h d]l8od sf]6]8 ,, 95.00
8.08.02.05 !@ u]h d]l8od sf]6]8 ,, 95.00
8.08.03 lh=cfO{= tf/ -x]eL sf]6]8_ 0.00
8.08.03.01 * u]h x]eL sf]6]8 s]=hL= 101.00
8.08.03.02 ( u]h x]eL sf]68 ,, 101.00
8.08.03.03 !) u]h x]eL sf]6]8 ,, 101.00
8.08.03.04 !! u]h x]eL sf]68 ,, 101.00
8.08.03.05 !@ u]h x]eL sf]6]8 ,, 101.00
8.08.04 hfnL 0.00
8.08.04.01 hfnL () ;]=dL= rf}8fO{sf] 0.00
8.08.04.02 hfnL () ;]=dL= ˆnfO{ k|'km jfo/ d]; @$ u]h a=dL= 182.00
8.08.04.03 hfnL () ;]=dL= dl:Sj6f] k|'km d]; @$ u]h a=dL= 198.00
8.08.04.04 hfnL () ;]=dL= lrs]g jfo/ d]; @) u]h ,, 182.00
8.08.04.05 hfnL () ;]=dL= PS:k]08]8 d]6n jfo/ d]; ,, 241.00
8.09 kmnfd] kfO{k 0.00
8.09.01 kmnfd] :Sjfo/ kfO{k 0.00
8.09.01.01 kmnfd] :Sjfo/ kfO{k !÷@Æ k|lt /=dL= 139.50
8.09.01.02 kmnfd] :Sjfo/ kfO{k #÷$Æ ,, 193.00
8.09.01.03 kmnfd] :Sjfo/ kfO{k !Æ ,, 225.00
8.09.01.04 kmnfd] :Sjfo/ kfO{k !=%Æ ,, 343.00
8.09.01.05 kmnfd] :Sjfo/ kfO{k @Æ ,, 423.00
8.09.02 kmnfd] /fp08 kfO{k -ldl8od _ 0.00
8.09.02.01 kmnfd] /fp08 kfO{k -ldl8od _ $Æ 8fold6/ k|lt /=dL= 1092.00
8.09.02.02 kmnfd] /fp08 kfO{k -ldl8od _ #Æ 8fold6/ k|lt /=dL= 953.00
8.09.02.03 kmnfd] /fp08 kfO{k -ldl8od _ @=%Æ 8fold6/ k|lt /=dL= 867.00
8.09.02.04 kmnfd] /fp08 kfO{k -ldl8od _ @Æ 8fold6/ ,, 675.00
8.09.02.05 kmnfd] /fp08 kfO{k -ldl8od _ !=%Æ 8fold6/ ,, 503.00
8.09.02.06 kmnfd] /fp08 kfO{k -ldl8od _ !Æ 8fold6/ ,, 337.50
8.09.02.07 kmnfd] /fp08 kfO{k -ldl8od _ #÷$Æ 8fold6/ ,, 225.00
8.09.02.08 kmnfd] /fp08 kfO{k -ldl8od _ )=%Æ 8fold6/ ,, 193.00
8.09.02.09 laleGg ;fO{hsf] dfO{N8 l:6n/:d"y l:6n kfO{k s]=hL= 145.00

8.10.00 lu|n, 6\|; / kmnfdsf cGo ;fdfgx? 0.00


8.10.01.01 tof/L lu|n -Kn]g,cgf{d]06n,:k]zn / cGo_ 0.00

8.10.01.02 # x @) ld=ld= ;fO{hsf] kmnfd]kftfs]f Kn]g l8hfO{gdf j=dL=


-!# s]=hL= k|lt a=dL=_
172.00

8.10.01.03 # x @) ld=ld= ;fO{hsf] kmnfd]kftfs]f cgf{d]G6n l8hfO{gdf


j=dL=-!( s]=hL=182.00
k|lt a=dL=_
$=% x @) ld=ld= Kn]g l8hfO{gdf
8.10.01.04 j=dL= 172.00
-!&=%) s]=hL=k|tL j=dL=_
$=% x @) ld=ld= cgf{d]G6n l8hfO{gdf
8.10.01.05 j=dL= 182.00
-@%=%) s]=hL=k|tL j=dL=_
sl6Ë, j]lN8Ë / k|fO{d/ sf]6 ;d]t u/L cfaZos ;fO{h
tyf :k]l;lkms];g cg';f/sf] r]g u]6 % x %)
8.10.01.06 j=dL= 192.00
ld=ld=;fO{h / %) ld=ld= Uofk ePsf] -@&
s]=hL=k|tL
sDkfp08 u]6,j=dL=_
Kn]g l8hfO{g lu|nsf] -#) s]=hL=k|
8.10.01.07 j=dL= 197.00
tL j=dL=_
Kn]g l;6 ;lxt -$) s]=hL=k|tL j=dL=_
8.10.01.08 ,, 192.00
8.10.01.09 Kn]g l;6 / lu|n ;lxt -#% s]=hL=k|tL j=dL=_ ,, 182.00
8.10.01.10 sf]NoflK;an $Æ Uofk ,, 5300.00
8.10.01.11 sf]NoflK;an #Æ Uofk ,, 6000.00
!* ÷@)÷ @@ u]hsf] kmnfd] kftf tyf kmnfd]
lkml6Ë;\, sl6Ë, j]lN8Ë tyf k|fO{d sf]6 ;d]tsf]
8.10.01.12 ,, 192.00
tof/L /f]lnª ;6/ lkmlS;Ë ;d]t -k|lt au{ ld= #)
s]=hL=_
8.10.02 6«; 0.00
8.10.02.01 Rofgn (Channel) s]=hL= 210.00
8.10.02.02 Pd=P;=PËn (M.S. Angel) ,, 175.00
8.10.02.03 kmnfd] 6\o'jn/ 6«; (Truss) ,, 160.00
8.10.02.04 6«; kln{g :6«Sr/ lkml6Ë rfh{ ,, 53.00
8.10.02.05 u|Ln u]6 cflb sf] lkml6Ë rfh{ ,, 53.00
9 5fgfsf ;fdfgx? 0.00
9.01 l;=lh=cfO{= ;L6 -ss{6kftf_ x'nf; jf ;f] ;/x 0.00
9.01.01 l;=lh=cfO{= ;L6 -;fwf_ 0.00
9.01.01.01 l;=lh=cfO{= ;L6 @^ u]h -)=$! ldld_ x]eL a08n 8600.00
9.01.01.02 l;=lh=cfO{= ;L6 @^ u]h -)=#* ldld=_ d]l8od ,, 7800.00
9.01.01.03 l;=lh=cfO{= ;L6 @^ u]h -)=#% ldld=_ nfO{6 ,, 7500.00
9.01.01.04 l;=lh=cfO{= ;L6 @* u]h -)=#! ldld_ x]eL ,, 6800.00
9.01.01.05 l;=lh=cfO{= ;L6 @* u]h -)=@* ldld_ d]l8od ,, 6100.00
9.01.01.06 l;=lh=cfO{= ;L6 @* u]h -)=@^ ldld_ nfO{6 ,, 5700.00
9.01.01.07 l;=lh=cfO{= ;L6 #) u]h -)=@$ ldld_ x]eL ,, 5600.00
9.01.01.08 l;=lh=cfO{= ;L6 #) u]h -)=@@ ldld_ d]l8od ,, 5200.00
9.01.01.09 l;=lh=cfO{= ;L6 #) u]h -)=@) ldld_ nfO{6 ,, 4700.00
9.01.02 l;=lh=cfO{= ;L6 /+lug -x'nf; jf ;f] ;/x_ 0.00
9.01.02.01 l;=lh=cfO{= ;L6 /+lug @^ u]h -)=$! ldld_ x]eL a08n 10500.00
l;=lh=cfO{=;L6 /+lug @^ u]h -)=#* ldld=_
9.01.02.02 ,, 9700.00
d]l8od
l;=lh=cfO{=;L6 /+lug @^ u]h -)=#% ldld=_
9.01.02.03 ,, 9200.00
nfO{6
9.01.02.04 l;=lh=cfO{= ;L6 /+lug @* u]h -x]eL_ ,, 8400.00
9.01.02.05 l;=lh=cfO{= ;L6 /+lug @* u]h -ldl8od_ ,, 7800.00
9.01.02.06 l;=lh=cfO{= ;L6 /+lug @* u]h -nfO6_ ,, 7300.00
9.01.02.07 l;=lh=cfO{= ;L6 /+lug #) u]h -x]eL_ ,, 7000.00
9.01.02.08 l;=lh=cfO{= ;L6 /+lug #) u]h -d]l8od_ ,, 6600.00
9.01.02.09 l;=lh=cfO{= ;L6 /+lug #) u]h -nfO{6_ ,, 6100.00
9.01.03 l;=lh=cfO{= w'/L 0.00
9.01.03.01 l;=lh=cfO{= w'/L ;fwf/0f 0.00

9.01.03.01.01 l;=lh=cfO{= w'/L ;fwf/0f -)=@* ldld_ /=dL= 176.00

9.01.03.01.02 l;='lh=cfO{= w'/L ;fwf/0f -)=#! ldld_ ,, 200.00

9.01.03.01.03 l;=lh=cfO{= w'/L ;fwf/0f -)=#% ldld_ ,, 220.00

9.01.03.02 l;=lh=cfO{= w'/L /+lug 0.00

9.01.03.02.01 l;=lh=cfO{= w'/L /+lug -)=@* ldld_ /=dL= 250.00

9.01.03.02.02 l;=lh=cfO{= w'/L /+lug -)=#) ldld_ ,, 320.00

9.01.03.02.03 l;=lh=cfO{= w'/L /+lug -)=#% ldld_ ,, 390.00

9.01.03.02.04 kmfO{j/ Unf; sf]/f]u]6]8 l;6 j=dL= 1050.00

9.01.03.02.05 cfNd'lgod Nk]g l;6 -@) u]h_ ,, 430.00

9.01.03.02.06 l;d]06 6fon uf]6f 59.00

9.01.03.02.07 l;d]06 w'/L ,, 81.00

9.01.03.02.08 Sn] 6foN; ,, 43.00

9.01.03.02.09 Sn] w'/L ,, 65.00

9.02.00 Carbon Fibre UPVC Roofing Sheet 0.00


Poly Carbonate Sheet (6mm thick) UV resistance
9.02.01
-:sfO{nfO{6 k|of]u ug{sf] nflu_ au{lkm6 281.00

2 mm thick Carbon Fibre UPVC Roofing Sheet


9.02.02 Including the cost of material and labour fitting, fixing au{lkm6 147.00
all complete job.
3 mm thick Carbon Fibre UPVC Sunrise brand or
9.02.03
Eqv,Roofing Sheet .
a=ld= 212.00
3 mm thick Carbon Fibre UPVC Sunrise brand or
9.02.04
Eqv,Ridge cover Sheet. a=ld= 135.00

9.03.00 6f/km]N6 0.00


9.03.01 6f/km]N6 ;fwf/0f a08n 1873.00
9.03.02 6f/km]N6 8\ofDk|'km j=dL= 150.00
9.04.00 ss{6kftfdf 7f]Sg] lsnf 0.00
9.04.01 ss{6kftfdf 7f]Sg] sLnf s]=hL= 198.00
9.04.02 ss{6kftfdf 7f]Sg] sLnf uf]6f 3.50
9.04.03 d]6n jf;/ s]=hL= 188.00
9.04.04 la6'ldg jf;/ -Kofs]6_ !)) uf]6f 236.00
9.04.05 lkr jf;/ -Kofs]6_ ,, ,, 49.00
10 em\ofn 9f]sfsf] ;fdfgx? 0.00
10.01 sJhf 0.00
10.01.01 sJhf #Æ uf]6f 43.00
10.01.02 sJhf $Æ ,, 54.00
10.01.03 sJhf %Æ ,, 70.00
10.01.04 sJhf ^Æ ,, 86.00
10.01.05 sJhf *Æ ,, 225.00
10.01.06 sJhf !)Æ ,, 279.00
10.02 5]l:sgL 0.00
10.02.01 5]l:sgL kmnfd] 0.00
10.02.01.01 5]l:sgL kmnfd] #Æ uf]6f 41.00
10.02.01.02 5]l:sgL kmnfd] $Æ ,, 48.50
10.02.01.03 5]l:sgL kmnfd] ^Æ ,, 70.00
10.02.01.04 5]l:sgL kmnfd] *Æ ,, 86.00
10.02.01.05 5]l:sgL kmnfd] !)Æ ,, 139.50
10.02.02 5]l:sgL lkQnsf] 0.00
10.02.02.01 5]l:sgL lkQnsf] #Æ uf]6f 123.50
10.02.02.02 5]l:sgL lkQnsf] $Æ ,, 177.00
10.02.02.03 5]l:sgL lkQnsf] %Æ ,, 225.00
10.02.02.04 5]l:sgL lkQnsf] ^Æ ,, 257.00
10.02.02.05 5]l:sgL lkQnsf] *Æ ,, 289.00
10.02.02.06 5]l:sgL lkQnsf] !)Æ ,, 326.50
10.02.02.07 5]l:sgL lkQnsf] !@Æ ,, 396.00
10.02.03 5]l:sgL cfNd'lgodsf] 0.00
10.02.03.01 5]l:sgL cfNd'lgodsf] #Æ uf]6f 64.50
10.02.03.02 5]l:sgL cfNd'lgodsf] $Æ ,, 75.00
10.02.03.03 5]l:sgL cfNd'lgodsf] %Æ ,, 80.50
10.02.03.04 5]l:sgL cfNd'lgodsf] ^Æ ,, 91.00
10.02.03.05 5]l:sgL cfNd'lgodsf] *Æ ,, 102.00
10.02.03.06 5]l:sgL cfNd'lgodsf] !@Æ ,, 112.50
10.03.00 x]G8n -lvrfgL_ 0.00
10.03.01 x]G8n -lvrfgL_ lkQn uf]6f 182.00
10.03.02 x]G8n -lvrfgL_ cfNd'lgod ,, 139.50
10.03.03 x]G8n -lvrfgL_ kmnfd] ,, 75.00
10.04.00 nlsË;]6 -l:6nsf]_ 0.00
10.04.01 nlsË;]6 ;fwf/0f ^Æ uf]6f 193.00
10.04.02 nlsË;]6 ;fwf/0f *Æ ,, 214.00
10.04.03 nlsË;]6 ;fwf/0f !)Æ ,, 235.50
10.04.04 nlsË;]6 ;fwf/0f !@Æ ,, 241.00
10.04.05 nlsË;]6 ;fwf/0f !%Æ ,, 305.00
10.04.06 ns uf]nfsf/ vfnsf] ,, 562.00
10.04.07 dl6{{; ns ,, #N/A
10.04.08 lglsn Nk]6]8 !%Æ ,, 428.00
10.04.09 cNd'lgod nlsË ;]6 !%Æ ,, 294.50
10.04.10 c6f]d]l6s :nfO{l8Ë nlsË ;]6 ,, 1156.00
10.04.11 ODnL ,, 38.00
10.05.00 8f]/ l:k|Ë 0.00
10.05.01 8f]/ l:k|Ë !@Æ uf]6f 231.00
10.05.02 8f]/ l:k|Ë !%Æ ,, 231.00
10.05.03 xfO8«\lns l:k|Ë ,, 1557.00
10.06.00 lz;f (Glass) 0.00
10.06.01 ‰ofn 9f]sfsf] ;fwf/0f lzzf 0.00
10.06.01.01 ‰ofn 9f]sfsf] ;fwf/0f lzzf @ ld=ld= j=dL= 429.50
10.06.01.02 ‰ofn 9f]sfsf] ;fwf/0f lzzf # ld=ld= ,, 530.00
10.06.01.03 ‰ofn 9f]sfsf] ;fwf/0f lzzf $ ld=ld= ,, 609.00
10.06.01.04 ‰ofn 9f]sfsf] ;fwf/0f lzzf % ld=ld= ,, 819.00
10.06.01.05 ‰ofn 9f]sfsf] ;fwf/0f lzzf ^ ld=ld= ,, 1027.50
10.06.02 cGo lzzfx? lk|G6]8 0.00
10.06.02.01 lk|G6]8 lzzfx? @ ld=ld= j=dL= 391.00
10.06.02.02 lk|G6]8 lzzfx? # ld=ld= ,, 428.00
10.06.02.03 lk|G6]8 lzzfx? $ ld=ld= ,, 674.50
10.06.03 kmf]:6]8 lz;f 0.00
10.06.03.01 kmf]:6]8 lzzf # ld=ld= j=dL= 610.00
10.06.04 lkgx]8 lzzf 0.00
10.06.04.01 lkgx]8 lzzf # ld=ld= j=dL= 359.00
10.06.04.02 lkgx]8 lzzf $ ld=ld= ,, 369.50
10.06.05 jfo/ lzzf 0.00
10.06.05.01 jfo/ lzzf ^ ld=ld= ,, 910.00
10.07.00 tof/L ‰ofn 9f]sf 0.00
10.07.01 #@ ld=ld= xf8{af]8{sf] tof/L kNnf 0.00
10.07.01.01 #@ ld=ld= xf8{af]8{sf] tof/L kNnf ;fwf/0f j=dL= 2301.00
10.07.01.02 #@ ld=ld= xf8{af]8{sf] tof/L kNnf jf6/ k|'km ,, 3210.00
10.07.02 lk=le=l;= ‰ofn 9f]sf k|m]d 0.00
10.07.02.01 k|m]d -rf}s;_ 9f]]sf /=dL= 465.50
10.07.02.02 k|m]d -rf}s;_ ‰ofn ,, 674.50
10.07.03 Kofgn 0.00
10.07.03.01 Nkfli6s p8 ePsf] Kofgn 0.00
10.07.03.02 Nkfli6s p8 ePsf] Kofgn n]ldg]6]8 j=dL= 5724.50
10.07.03.03 Nkfli6s p8 ePsf] Kofgn gg\n]ldg]6]8 ,, 4291.00
10.07.03.04 Nkfli6s p8 ePsf] Kofgn ;fwf/0f ,, 3253.00
10.07.04 lzzf ePsf] Kofgn 0.00
10.07.04.01 lzzf ePsf] Kofgn n]ldg]6]8 j=dL= 4494.00
10.07.04.02 lzzf ePsf] Kofgn gg\n]ldg]6]8 ,, 4045.00
10.07.04.03 lzzf ePsf] Kofgn ;fwf/0f ,, 3595.50
10.07.05 ‰ofn 9f]sfsf] :6k/ 0.00
10.07.05.01 9f]sfsf] :6k/ uf]6f 123.50
10.07.05.02 ‰ofnsf] :6k/ ,, 64.50
10.08.00 NkfO{p8 sd/l;{on 0.00
10.08.01 NkfO{p8 sd/l;{on # ld=ld= j=dL= 241.00
10.08.02 NkfO{p8 sd/l;{on $ ld=ld= ,, 310.50
10.08.03 NkfO{p8 sd/l;{on ^ ld=ld= ,, 359.00
10.08.04 NkfO{p8 sd/l;{on !@ ld=ld= ,, 535.00
10.08.05 NkfO{p8 sd/l;{on !* ld=ld= ,, 803.00
10.09.00 6Ls KnfO{p8 0.00
10.09.01 6Ls KnfO{p8 # ld=ld= j=dL= 669.00
10.09.02 6Ls KnfO{p8 $ ld=ld= ,, 1124.00
10.09.03 6Ls KnfO{p8 ^ ld=ld= ,, 1338.00
10.09.04 ;6\l/Ësf] nflu 6Ls KnfO{p8 !@ ld=ld= ,, 1659.00
10.09.05 ;6\l/Ësf] nflu jf6/ k'km KnfO{p8 !( ld=ld= ,, 1352.50
10.10.00 k'l6Ë 0.00
10.10.01 k'l6Ë -;fwf/0f_ s]=hL= 112.50
10.10.02 k'l6Ë -:k]l;on_ s]=hL= 139.50
10.11.00
UPVC ‰ofn 9f]sf (Including nylon net & 5mm thick 0.00
Glass)
2 Slider Sliding Window with Insect Net- Single
10.11.01 Glazing with 80x50 Frame & 55x36 Sash white j=dL= 7757.50
colored
2 Slider Sliding Window with Insect Net- Double
10.11.02 Glazing with 80x50 Frame & 55x36 Sash white j=dL= 9266.50
colored
Vertical Sliding-single glazing with 80x50 Frame &
10.11.03
55x36 Sash white colored
j=dL= 7704.00

vertical Sliding-double glazing with 80x50 Frame &


10.11.04
55x36 Sash white colored
j=dL= 9266.50
Balcony Sliding door with net-single glazing with
10.11.05
80x50 Frame & 55x36 Sash white colored
j=dL= 8667.00
Balcony Sliding door with net-double glazing with
10.11.06
80x50 Frame & 55x36 Sash white colored j=dL= 10593.00

Sliding Door with net-single glazing with 80x50


10.11.07
Frame and 66x36 Sash white Colored
j=dL= 8667.00
Sliding Door with net-doubleglazing 80x50 Frame
10.11.08
and 66x36 Sash white Colored
j=dL= 10593.00

casement with net Frame 60x60 Sash 78x60 mulllion


10.11.09
72x60 white colored-single glazed
j=dL= 9202.00

casement with net Frame 60x60 Sash 78x60 mulllion


10.11.10
72x60 white colored-Double glazed
j=dL= 11342.00

casement Door with Frame 60x60 Frame 104x60


10.11.11 Sash & 72x60 mullion 100x25 Door, 5mm th Glass j=dL= 9523.00
Pannel White Colored-Single Glazed
casement Door with Frame 60x60 Frame 104x60
10.11.12 Sash & 72x60 mullion 100x25 Door, 5mm th Glass j=dL= 11770.00
Pannel White Colored-Double Glazed
Bay Window with Frame 60x60 Frame & Sash 78x60
10.11.13 Corner Connector 41x23 white colored- Single j=dL= 8560.00
Glazing
Bay Window with Frame 60x60 Frame & Sash 78x60
10.11.14 Corner Connector 41x23 white colored- Double j=dL= 9823.00
Glazing
Full or Half Glass & Laminated Particle Board
10.11.15 Partition with Frame 60x60 and laminated board j=dL= 6045.50
9mm th , glass 5mm white colored
10.11.16 tLg dL= dL= o'lkle;L kftf j=dL= 0.00
10.12.00 cfNd'lgod ‰ofn 9f]sf tof/L -h8fg vr{ ;lxt_ 0.00
(a) Aluminium Framed Sliding window without
Ventilater and Flymesh at sliding Windows with
10.12.01 materials in the section of 88x38 x1.30 mm in a=dL 9523.00
Naturally Anodized Colour including 5 mm thick
Glass
(b)Aluminium Framed Sliding Windows with Ventilator
but without flymesh shutter in the section of 88 x 38 x
10.12.02
1.30 mm with Naturally Anodized Colour including 5
a=dL 9737.00
mm thick Glass
(c)Aluminium Framed Sliding Windows with out
Ventilator & with flymesh shutter in the section of 88 x
10.12.03
38 x 1.30 mm with Naturally Anodized Colour
a=dL 11128.00
including 5 mm thick Glass
(d)Aluminium Framed Sliding Windows with Ventilator
& with flymesh shutter in the section of 101 x 38 x
10.12.04
1.30 mm with Naturally Anodized Colour including 5
a=dL 11551.00
mm thick Glass

(e) Aluminium Framed Casement Windows with


10.12.05 Ventilator Naturally Anodized Colour in the Section of a=dL 8132.00
38x34 x1.5 mm including 5 mm thick Glass

(f) Aluminium Framed Sliding Door with Naturally


10.12.06 anodized Colour in the Section of 101 x 45 x 1.5 mm a=dL 10379.00
with 5 mm thick Glass.

(g) Aluminium Framed Casement Door one way openable


10.12.07 with Naturally Anodized Colour in the Section of 101x45 a=dL 9737.00
x1.5 mm including 5 mm thick Glass

(h) Aluminium Framed Swing Door Two way


openable with Naturally Anodized Colour in the
10.12.08
Section of 101 x 45 x 1.5 mm including 5 mm thick
a=dL 7490.00
Glass & Board 9mm Laminated
(i) Aluminium Framed Fixed Partition with Naturally
Anodized Colour in the Section of 101 x 45 x 1.5 mm
10.12.09
including 5 mm thick Glass or Board 9mm
a=dL 8774.00
Laminated
10.12.10 Aluminium grill a=dL= 696.00
False Ceiling by Gypsum, (Gypsum Board : 12 mm
10.13.00
thick) a=dL= 1434.00

10.14.00 PVC Door (3' x 6'-6") uf]6f 4708.00


10.15.00 Readymade Door 0.00
38 mm thick solid flush door (Both side
10.15.01
Teak) au{lkm6 414.50

38 mm thick solid flush door (Out side


10.15.02
Teak)
au{lkm6 391.00

10.16.00 Readymade RCC Door Window and arc Frame 0.00

Readymade RCC Door and Window Frame of


Section 4"X 2.75" with concrete mix design of 1:1:1
10.16.01 Proportion and 2 nos 7mm dia. Rebar including lkm6 0.00
arrangement of necessary holes and safety plate all
complete.

Readymade RCC Ventilation Frame of Section 4"X


2.75" with concrete mix design of 1:1:1 Proportion
10.16.02
and 2 nos 7mm dia. Rebar including arrangement of
lkm6 0.00
necessary holes and safety plate all complete.

Readymade RCC Door and Window Arc


Frame(Semi-circular) of Section 4"X 2.75" with
10.16.03 concrete mix design of 1:1:1 Proportion and 2 nos lkm6 0.00
7mm dia. Rebar including arrangement of necessary
holes and safety plate all complete.
11 ˆnf]l/Ësf ;fdfgx? 0.00
11.01.01 g]df]Kofs]{6 j=dL= 900.00
11.01.02 lhK;d jf]8{ ,, 1250.00
11.01 6fon 0.00
11.01.01 dfj{n !÷@Æ / !Æ df]6fO{ j=dL= 900.00
11.01.02 df]Hofs !÷@Æ / !Æ df]6fO{ ,, 1250.00
11.01.03 u|]gfO6 !÷@Æ / !Æ df]6fO{ ,, 4780.00
11.01.04 6]l/hf @) ld=ld= ,, 1350.00
11.01.05 dfa{n ;fbf a=dL= 2300.00
11.01.06 dfa{n /+lug ,, 2500.00
11.01.07 :n]6 j=dL= 430.00
11.02 Interlocking Tiles 0.00
11.02.01 M20 40mm thick uf]6f 25.00
11.02.02 M20 40mm thick Colored uf]6f 29.00
11.02.03 M20 60mm thick uf]6f 29.00
11.02.04 M20 60mm thick Colored uf]6f 33.00
11.03 Un]h\8\ kf]/]fl;lng 6fon 0.00
11.03.01 Un]h\8\ kf]/]fl;lng ;]tf] ;fwf/0f 0.00
11.03.01.01 Un]h\8\ kf]/]fl;lng ;]tf] ;fwf/0f $Æ x *Æ uf]6f 23.00
11.03.01.02 Un]h\8\ kf]/]fl;lng ;]tf] ;fwf/0f ^Æ x *Æ ,, 30.00
11.03.01.03 Un]h\8\ kf]/]fl;lng ;]tf] ;fwf/0f *Æ x *Æ ,, 41.00
11.03.01.04 Un]h\8\ kf]/]fl;lng ;]tf] ;fwf/0f *Æ x !)Æ ,, 47.00
11.03.01.05 Un]h\8\ kf]/]fl;lng ;]tf] ;fwf/0f *Æ x !@Æ ,, 47.00
11.03.01.06 Un]h\8\ kf]/]fl;lng ;]tf] ;fwf/0f !@Æ x !@Æ 77.00
11.03.02 Un]h\8\ kf]/]fl;lng /+lug 0.00
11.03.02.01 Un]h\8\ kf]/]fl;lng /+lug $Æ x *Æ ,, 26.00
11.03.02.02 Un]h\8\ kf]/]fl;lng /+lug ^Æ x *Æ ,, 35.00
11.03.02.03 Un]h\8\ kf]/]fl;lng /+lug *Æ x *Æ ,, 47.00
11.03.02.04 Un]h\8\ kf]/]fl;lng /+lug *Æ x !)Æ ,, 65.00
11.03.02.05 Un]h\8\ kf]/]fl;lng /+lug *Æ x !@Æ ,, 65.00
11.03.02.06 Un]h\8\ kf]/]fl;lng /+lug !@Æ x !@Æ 86.00
11.03.03 Un]h\8\ kf]/]fl;lng l8hfOg 0.00
11.03.03.01 Un]h\8\ kf]/]fl;lng l8hfOg ^Æ x *Æ ,, 50.00
11.03.03.02 Un]h\8\ kf]/]fl;lng l8hfOg $Æ x *Æ ,, 24.00
11.03.03.03 Un]h\8\ kf]/]fl;lng l8hfOg ^Æ x *Æ ,, 33.00
11.03.03.04 Un]h\8\ kf]/]fl;lng l8hfOg *Æ x *Æ ,, 46.00
11.03.03.05 Un]h\8\ kf]/]fl;lng l8hfOg !)Æ x !)Æ ,, 61.00
11.03.03.06 dfj{n lrK;\ -;a} /+u_-k|lt 3=dL=!^)) s]=hL=_ @% s]=hL= 700.00
11.03.03.07 dfj{n kfp8/ @% s]=hL= 450.00
11.03.03.08 Knfi6/ ckm k]l/; s]=hL= 56.00
11.04.00 kf]lnlyg l;6 0.00
11.04.01 kf]lnlyg l;6 %)) u]h () ;]=dL rf}8fO{ /=dL= 32.50
11.04.02 kf]lnlyg l;6 %)) u]h () ;]=dL rf}8fO{ s]=hL= 209.00
11.04.03 kf]lnlyg l;6 @)) u]h () ;]=dL rf}8fO{ /=dL= 31.50
11.05.00 jf6/ k|'lkmË l;d]06 sDkfp08 s]=hL= 332.00
11.06.00 Knfi6/ DofhLs !)) Pd=Pn= uf]6f 70.00
11.07.00 :s6 g+= !!)) Pd=Pn= uf]6f 102.00
11.08.00 sfaf]{/]08d 9+'uf 0.00
11.08.01 sfaf]{/]08d 9+'uf ;fO{h $) uf]6f 171.50
11.08.02 sfaf]{/]08d 9+'uf ;fO{h ^) ,, 177.00
11.08.03 sfaf]{/]08d 9+'uf ;fO{h *) ,, 166.00
11.08.04 sfaf]{/]08d 9+'uf ;fO{h !@) ,, 225.00
11.09.00 8f]/ Dof6 0.00
11.09.01 8f]/Dof6 -!=%" x #_ uf]6f 374.50
11.09.02 8f]/Dof6 -!=%" x @Æ_ uf]6f 262.50
11.09.03 8f]/Dof6 -!=%" x !=%Æ_ uf]6f 305.00
11.09.04 :kfl6{s gg\ Un]h 6fon j=dL= 785.00
12 /+u/f]ug ;DalGw 0.00
12.01.00 vfS;L -;/];_ k]k/ 0.00
12.01.01 vfS;L -;/];_ k]k/ sf7df k|of]u x'g] bh{g 89.00
12.01.02 vfS;L -;/];_ k]k/ kmnfddf k|of]u x'g] ,, 337.50
12.02.00 k]lG6Ë d]6]l/o;\ (Paints) 0.00
12.02.01 k|fOd/ pm8 ln6/ 465.50
12.02.02 k|fOd/ l;d]06 ,, 358.50
12.02.03 k|fOd/ Knfli6s OdN;g ,, 481.50
12.02.04 k|fOd/ d]6n ,, 267.50
12.02.05 l8:6]Dk/ kfp8/ s]=hL= 246.50
12.02.06 l8:6]Dk/ jf;]jn Ps|f]lns ln6/ 407.00
12.02.07 :gf];]d k]G6 s]=hL= 107.00
12.02.08 tof/L u]? /+u ,, 37.50
12.02.09 g]kfn /]8 ln6/ 439.00
12.02.10 r'gf ;]tf] s]=hL= 32.50
12.02.11 cnsqf ln6/ 112.50
12.02.12 Ogfd]n k]G6 Kn]g ln6/ 428.00
12.02.13 SjLs 8«fO{Ë Ogfd]n k]G6 ,, 428.00
12.02.14 l;Gy]l6s Ogfd]n k]G6 ,, 579.00
12.02.15 cfNd'lgod k]G6 ,, 556.50
12.02.16 Knfli6s OdN;g k]G6 ,, 535.00
12.02.17 PG6L sf]/f]l;e k]G6 ,, 535.00
12.02.18 PNnf] lhGs s|f]d]6 ,, 401.50
12.02.19 /]gl;n k]G6 ,, 524.50
12.02.20 100% Acrylic Exteroir Paint $ ln6/ 2140.00
12.02.21 Road Marking Paint ln6/ 920.50
12.02.22 Chloro Rubber base Road Marking Paint ln6/ 765.50
12.02.23 rk|f s]=hL= 1316.50
12.02.24 jfg]{; ln6/ 439.00
12.02.25 d}g kfln; s]=hL= 439.00
12.02.26 uF'b ,, 171.50
12.02.27 gL/ /fd|f] vfnsf] s]=hL= 278.50
12.02.28 r'gfdf ld;fpg] /+u ,, 225.00
12.02.29 :6]g/ /+u !)) u|fd 225.00
12.02.30 l;d]06 ls|DrL /+u s]=hL= 353.50
12.02.31 lng l;8 cfon ln6/ 182.00
12.02.32 :k|L6 ,, 177.00
12.02.33 tf/lkg t]n ,, 171.50
12.02.34 lhGs cS;fO8 ;]tf] ,, 407.00
12.02.35 /]8 cS;fO{8 ,, 444.50
12.02.36 6]/f sf]6f ,, 118.00
12.02.37 cSHoflns Pl;8 ln6/ 230.50
12.02.38 Pl;8 ,, 171.50
12.02.39 ;'sL{ 3=dL= 420.00
12.03 a|; 0.00
12.03.01 tf/ a|; 59.00
12.03.02 r'gf a|; uf]6f 59.00
12.03.03 l;d]G6 tf/ a|; ,, 59.00
12.04.00 k]G6 a|; 0.00
12.04.01 k]G6 a|; @Æ uf]6f 91.00
12.04.02 k]G6 a|; #Æ ,, 134.00
12.04.03 k]G6 a|; $Æ ,, 182.00
12.04.04 k]G6 a|; ^Æ ,, 332.00
12.04.05 Nkfli6s OdN;g jf l8:6]Dk/ j|; ,, 332.00
13 lsrg,jfy?d tyf zf}rfnosf ;fdfgx? 0.00
13.01.00 8Jn'=;L= Kofg;]6 -km'6/]]i6 ;lxt_ 0.00
13.01.01 8Jn'=;L= Kofg;]6 -km'6/]]i6 ;lxt_ !*Æ ;]6 1038.00
13.01.02 8Jn'=;L= Kofg;]6 -km'6/]]i6 ;lxt_ @)Æ ,, 984.50
13.01.03 8Jn'=;L= Kofg;]6 -km'6/]]i6 ;lxt_ @!Æ ,, 1123.50
13.01.04 8Jn'=;L= Kofg;]6 -km'6/]]i6 ;lxt_ @#Æ ,, 1284.00
13.02.00 Kofg;]6 /fd|f] vfnsf] -:t/ o'Qm_ 0.00
13.02.01 Kofg;]6 /fd|f] vfnsf] -:t/ o'Qm_ !*Æ ;]6 3798.50
13.02.02 Kofg;]6 /fd|f] vfnsf] -:t/ o'Qm_ @)Æ ,, 3905.50
13.02.03 Kofg;]6 /fd|f] vfnsf] -:t/ o'Qm_ @!Æ ,, 4012.50
13.02.04 Kofg;]6 /fd|f] vfnsf] -:t/ o'Qm_ @#Æ ,, 4226.50
13.03.00 sdf]8 Kofg 0.00
13.03.01 sdf]8 Kofg ˆnl;ª l;i6d /lxt 0.00
13.03.02 sdf]8 Kofg ˆnl;ª l;i6d /lxt ;]tf] ;]6 2247.00
13.03.03 sdf]8 Kofg ˆnl;ª l;i6d /lxt /+lug ,, 2782.00
13.04.00 sdf]8 Kofg ˆnl;ª l;i6d ;lxt 0.00
13.04.01 sdf]8 Kofg ˆnl;ª l;i6d ;lxt ;fwf/0f ;]6 8000.00
13.04.02 sdf]8 Kofg ˆnl;ª l;i6d ;lxt km];g]jn ,, 12000.00
13.05 o"l/gn 0.00
13.05.01 o"l/gn ;fwf/0f ;]6 1712.00
13.05.02 o"l/gn dlxnfsf] nflu ,, 1370.00
13.05.03 o"l/gn :Sj]l68= 6fOk ,, 1819.00
13.06 jf;a]l;g 0.00
13.06.01 jf;a]l;g !^Æ x @@Æ ;]6 1979.50
13.06.02 jf;a]l;g !^Æ x @)Æ ,, 1632.00
13.06.03 jf;a]l;g !@Æ x !*Æ ,, 1284.00
13.06.04 jf;a]l;g PË'n/ ,, 1049.00
13.06.05 jf;a]l;g lkn/ ss uf]6f 407.00
13.06.06 jf;a]l;g hfnL 6\ofk ,, 193.00
13.06.07 jf;a]l;g ! !÷@Æ cfp6 n]6 kfO{k ,, 310.50
13.06.08 jf;a]l;g !÷@Æ cfp6 n]6 kfO{k ,, 198.00
13.07 lsrg l;+s 0.00
13.07.01 lsrg l;+s df]Hofs 0.00
13.07.01.01 lsrg l;+s df]Hofs !*Æ x !*Æ ;]6 642.00
13.07.01.02 lsrg l;+s df]Hofs @)Æ x @$Æ ,, 653.00
13.07.02 lsrg l;+s l:6n 0.00
13.07.02.01 lsrg l;+s l:6n !*Æ x #^Æ ,, 2568.00
13.07.02.02 lsrg l;+s l:6n @)Æ x !*Æ ,, 2033.00
13.07.02.03 lsrg l;+s l:6n @)Æ x !$Æ ,, 1926.00
13.07.02.04 ;h{g l;+s ,, 3745.00
13.08.01 ˆnl;Ë l;i6g{ 0.00
13.08.01.01 ˆnl;Ë l;i6g{ nf]–n]en lrlgofF df6f] ;]6 4601.00
13.08.01.02 ˆnl;Ë l;i6g{ nf]–n]en Knffli6s ,, 2140.00
13.08.01.03 ˆnl;Ë l;i6g{ nf]–n]en kmfOj/ Unf; ,, 3531.00
13.08.01.04 ˆnl;Ë l;i6g{ xfO–n]en sfi6cfO/g ,, 2033.00
13.08.01.05 sdf]8 se/ uf]6f 695.50
13.09 6\jfOn]6 k]k/ xf]N8/ 0.00
13.09.01 6\jfOn]6 k]k/ xf]N8/ ;fwf/0f uf]6f 374.50
13.09.02 6\jfOn]6 k]k/ xf]N8/ se/ ;lxt ,, 481.50
13.10 ;k\ l8S; 0.00
13.10.01 ;k\ l8S; Nkfli6s uf]6f 267.50
13.10.02 ;k\ l8S; cfNd'lgod ,, 246.50
13.10.03 ;ks]; -l;=lk=_ ,, 342.50
13.10.04 ;f]k 6|] -laleGg ;fO{hdf_ ,, 503.00
13.11 P]gf -jfy?dsf]_ uf]6f 792.00
13.12 6fjn /8 0.00
13.12.01 cfNd'lgod !*Æ uf]6f 407.00
13.12.02 cfNd'lgod @$Æ ,, 428.00
13.12.03 l:6n !*Æ ,, 300.00
13.12.04 l:6n @$Æ ,, 535.00
13.12.05 l/ª ,, 481.50
13.14 ;fj/ 0.00
13.14.01 ;fj/ !÷@Æ l:6n uf]6f 722.50
13.14.02 ;fj/ !÷@Æ Nkfli6s ,, 492.50
13.14.03 $" 6]lnkmf]lgs s8{ ;lxt ,, 3477.50
13.14.04 x]08 :k|] ,, 792.00
13.15 jf; a]l;g 0.00
13.15.01 jf; a]l;g 6\ofk -x6 ÷ sf]N8_ ,, 2322.00
13.15.02 !÷@Æ lk=le=;L= jf; j]]l;g tyf sg]S;g kfOk uf]6f 2247.00
13.15.03 ! !÷@Æ lk=le=;L= jf; j]]l;g tyf j]i6 kfOk ,, 535.00
13.15.04 !÷@Æ lk=le=;L= kfO{k k|lt !) kmL= 364.00
13.15.05 #÷$Æ lk=le=;L= kfO{k ,, 364.00
13.15.06 ! Æ lk=le=;L= kfO{k 395.00
13.15.07 ! !÷$Æ lk=le=;L= kfO{k ,, 439.00
13.15.08 ! !÷@Æ lk=le=;L= kfO{k ,, 460.50
13.15.09 o"l/gn kfO{k uf]6f 391.00
13.16 jf6/ 6]+s 0.00
13.16.01 jf6/ 6]+s lh=cfO{= @) u]h !)) Uofn]g 5671.00
13.16.02 jf6/ 6]+s @) u]h @)) Uofn]g 8132.00
13.16.03 kf]lnlyg jf6/ 6]+s ln6/ 14.50
jfy?d ;]lg6/L ;]6 -6fjn /8,l/Ë
13.16.04 ;]6 2568.00
;ks];,P]gf,k]k/xf]N8/,;]Nkm,XØfË/ ;lxt_
13.17 6\jfOn]6sf lalaw kf]lnlyg kfO{kx? 0.00
13.17.01 %) mm PVC pipe !) kmL= 481.50
13.17.02 &% mm PVC pipe ,, 695.50
13.17.03 !)) mm PVC pipe ,, 1391.00
13.18 a]08 PVC 0.00
13.18.01 a]08 kL eL ;L %) mm uf]6f 70.00
13.18.02 a]08 kL eL ;L &% mm ,, 107.00
13.18.03 a]08 kL eL ;L !)) mm ,, 171.50
13.19 sfjn 0.00
13.19.01 sfjn &% mm uf]6f 91.00
13.19.02 sfjn !)) mm ,, 139.50
13.20 ;s]6 0.00
13.20.01 ;s]6 &% mm uf]6f 107.00
13.20.02 ;s]6 !)) mm ,, 171.50
13.21 l;d]06 kfOk ^ lkm6sf] 0.00
13.21.01 l;d]06 kfOk ^ lkm6sf] @Æ ^ kmL= 96.50
13.21.02 l;d]06 kfOk ^ lkm6sf] #Æ ,, 112.50
13.21.03 l;d]06 kfOk ^ lkm6sf] $Æ ,, 102.00
13.22 a]08 0.00
13.22.01 a]08 @Æ uf]6f 53.50
13.22.02 a]08 #Æ ,, 53.50
13.22.03 a]08 $Æ ,, 59.00
13.23 6L 0.00
13.23.01 6L @Æ uf]6f 53.50
13.23.02 6L #Æ ,, 59.00
13.23.03 6L $Æ ,, 59.00
13.24 sfjn 0.00
13.24.01 sfjn @Æ uf]6f 70.00
13.24.02 sfjn #Æ ,, 80.50
13.24.03 sfjn $Æ ,, 80.50
13.25 ck;]6 0.00
13.25.01 ck;]6 @Æ uf]6f 53.50
13.25.02 ck;]6 #Æ ,, 70.00
13.25.03 ck;]6 $Æ ,, 80.50
13.26 ;s]6 0.00
13.26.01 ;s]6 @Æ uf]6f 32.50
13.26.02 ;s]6 #Æ ,, 32.50
13.26.03 ;s]6 $Æ ,, 32.50
13.27 hS;g 0.00
13.27.01 hS;g @Æ uf]6f 59.00
13.27.02 hS;g #Æ ,, 64.50
13.27.03 hS;g $Æ ,, 70.00
13.28 ˆnf]/ 6\ofk ;]/f uf]6f 321.00
13.28.01 ˆnf]/ 6\ofk ;]/f l;=cfO{= ,, 107.00
13.28.02 ˆnf]/ 6\ofk ;]/f lk=le=l;= ,, 342.50
13.28.03 ˆnf]/ 6\ofk ;]/f d]6n ,, 144.50
13.29 jf6/ :6k /j/ l;n s]=hL= 225.00
13.3 jfn lkmS;r/ ,, 2782.00
13.31.00 af]6n 6\ofk ,, 695.50
13.32 ˆn; eNe ;]6 3531.00
13.33 ˆnf]l6Ë eNj ,, 749.00
13.34 kmfOj/ Unf; -^Æ × (Æ_ ,, 481.50
13.35 k|];/ l/lnkm eNj uf]6f 6848.00
13.36 wf/f se/ l:6nsf] ,, 64.50
13.37. CP (1.25" x 24") Flushing pipe with CP Coupling uf]6f 321.00

13.38 PVC (0.5" x 1.8") Pipe Connector with CP Coupling uf]6f 300.00

13.39 GI 1.25" Flushing Pipe with Couples uf]6f 321.00


13.40. O{gf/ tyf rkL{sf] l/+8= uf]6f 610.00
13.41 km]lG; ;]lg6/L ;fdfgx? (Fency Sanitary Fittings) 0.00
580mm Porcelian White Glazed Orrisa Pan
13.41.01
(Hindustan, Paryrware,classica or eqvt) uf]6f 2728.50

13.41.02 P or S Trap " 546.00


13.41.03 32mm PVC bottle trop including 32mm CP waste " 407.00
13.41.04 32mm Waste Couplin " 203.50
13.41.05 1.5 cm dia CP sink Cock " 3424.00
10 Lit Porcelian Clay low level flushing cistern with
13.41.06
complete accessories
uf]6f 5029.00

13.41.07 32mm-60mm Flusing CP pipe " 342.50


13.41.08 1.5x45 cm PVC pipe Connector " 337.50
500mm Porcelian White Glazed Orrisa Pan
13.41.09 " 2488.00
(Hindustan, Paryrware,classica or eqvt)
530mm Porcelian White Glazed Orrisa Pan
13.41.10 " 2600.50
(Hindustan, Paryrware,classica or eqvt)
13.41.11 Conscellation type with commode set " 18190.00
13.41.12 Commode Ordinary Colour " 7918.00
13.41.13 15 mm C.P. Pillor cock " 1070.00
13.41.14 15 mm C.P. Angle cock " 1070.00
13.41.15 15 mm C.P. sink cock " 1658.50
13.41.16 15mm C. P. Push cock " 1123.50
13.41.17 Spreader , flush pipe " 567.50
13.41.18 15 mm C. P. Shower rose with arm " 3798.50
13.41.19 C. P. Bath wall Mixer " 8239.00
13.41.20 C.P. Comod Spray " 1712.00
13.41.21 15 mm C.P. Long boby Bib cock " 1819.00
13.41.22 P. V.C. multi floor trap " 428.00
13.41.23 C. P. Robe hook " 802.50
13.41.24 15 mm GM gate valve Leader or Equivalent " 1337.50
13.41.25 20 mm GM gate valve Leader or Equivalent " 1979.50
13.41.26 25 mm GM gate valve Leader or Equivalent " 2782.00
13.41.27 32 mm GM gate valve Leader or Equivalent " 3317.00
13.41.28 40 mm GM gate valve Leader or Equivalent " 4922.00
13.42.00 UPVC Pipe 0.00
13.42.01 50mm 4Kg/m ld6/ 96.50
13.42.02 63mm 4Kg/m " 185.00
13.42.03 75mm 4Kg/m " 260.00
13.42.04 90mm 4Kg/m " 370.00
13.42.05 110mm 4Kg/m " 510.00
13.42.06 160mm 4Kg/m " 1155.00
13.43 Solar Water Heater 300 Ltr uf]6f 58850.00
13.44 SS scrub Sink (1500x450)mm " 74900.00
13.45 Laboratory Sink (530x430x180) " 4708.00
13.46 Stainless steel bowl kitchen sink (1015 x 510) " 10941.00
13.47 Stainless steel bowl kitchen sink (610 x 455) " 8560.00
13.48 Flat Back Urinal Porcelian(630x410x380) " 5350.00
13.49 Squating Pan " 3103.00
14 jfy?d lkml^+u\;\ tyf cGo dfn;fdfgx? 0.00
14.01.01 1.5cm (½" ) dia.CP Sink cock No 1084.50
14.01.02 Bracket No 95.50
45x30x15 Cm (18"x12"x6") White glaze sink with C I
14.01.03 bracket (Hindustan, Parryware, Classica, cera or Set 1545.00
equivalent)
53x43x18 (21"x17"x7") White glaze sink with C I
14.01.04 bracket (Hindustan, Parryware, Classica, cera or Set 1854.00
equivalent )
60x45x25Cm (24"x18"x10") White glaze sink with
14.01.05 bracket (Hindustan, Parryware, Classica, cera or Set 2668.50
equivalent )
14.01.06 C P Guard rail with glass No 466.50
14.01.07 15mm, concealed stop cock No 730.50
14.01.08 99% Pure lead Kg 309.00

25.0 Ltr water heater including copper pipe connector


14.01.09 Set 12471.00
with coupling and other necessary fittings complete.

35.0 Ltr wate heater including copper pipe connector


14.01.10 Set 14100.00
with coupling and other necessary fittings complete.

50.0 Ltr wate heater including copper pipe connector


14.01.11 Set 21993.00
with coupling and other necessary fittings complete.

70.0 Ltr wate heater including copper pipe connector


14.01.12 Set 26487.00
with coupling and other necessary fittings complete.

100.0 Ltr wate heater including copper pipe


14.01.13 connector with coupling and other necessary fittings Set 33228.00
complete
14.01.14 Bath tub 5"-6"x2"-6" with complete fittings. No 9072.50
Bath tub spout (Hot and cold) with Telephonic
14.01.15 No 7949.00
shower.
Acrylic Type shower tray70x70cm (29"x29") with
14.01.16 No 0.00
complete fittings.
14.01.17 Sink mixture complete set. No 2078.50
14.01.18 CI Cover 45x45cm (18" X 18") No 2022.50
14.01.19 CI Cover 22" X 22" No 2275.50
14.01.20 ½" push valve No 449.50
14.01.21 Spreader No 697.00
Euro Guard Water purification set (one litre per
14.01.22 Set 26487.00
minute)
Stainless steel, 90x45 size Bowl with drain board.
14.01.23 Set 1445.00
Ordinary type
Stainless steel, 62" x 20" size Bowl with drain
14.01.24 Set 1882.00
board.Ordinary type
Water spray (Health faucet) with 1.2 m. long flexible
14.01.25 Set 1264.00
pipe.
5 kg Fire extingusher ABC type minimax or
14.01.26 No 8454.50
equivalent
14.01.27 208 kg CI heavy Manhole cover. Set 24829.50
14.02.00 PVC Specials 0.00
14.02.01 50 mm Bend 45 degree No 53.00
14.02.02 75 mm Plain Door tee No 126.00
14.02.03 75 mm Door bend No 103.50
14.02.04 75 mm Bend 45 degree No 64.50
14.02.05 75 mm Y- Branch No 120.50
14.02.06 75 mm Cross tee No 249.50
14.02.07 75 mm Pipe clip No 19.50
14.02.08 110 mm Door tee No 204.50
14.02.09 110 mm Door bend No 165.50
14.02.10 110 mm Bend 45 degree No 115.00
14.02.11 110 mm Y- Branch No 227.00
14.02.12 110 mm Cross tee No 395.50
14.02.13 110 mm Pipe clip No 24.00
14.02.14 110 mm Gully trap No 188.00
14.03 Special Sanitary Fittings 0.00
14.03.01 Wash Basin Pedastal White Glazed No 2191.00
14.03.02 Wash Basin Pedastal White Glazed Color No 2168.50
14.04.00 d]g xf]n se/ l;=cfO{= d]6]l/on 0.00
14.04.01 $% ;]=dL= Aof;sf] uf]6f 2064.00
14.04.02 %% ;]=dL= Aof;sf] Æ 2724.50
14.04.03 ^) ;]=dL= Aof;sf] Æ 3421.50
14.04.04 () ;]=dL= Aof;sf] Æ 4099.00
14.05.00 d]g xf]n se/ dfO{N8 l:6n (MS Steel) 0.00
14.05.01 ^) ;]=dL= Aof;sf] uf]6f 1592.00
14.05.02 () ;]=dL= Aof;sf] Æ 3008.00
14.06 jf; cfp6 :6|]g/ Æ 371.00
14.07 kfO{k Sn]Dk $Æ Æ 100.00
14.08 kmfO{a/ Unf; -^Æ x (Æ_ Æ 425.00
14.09 Geo-Filter Fabric a=dL= 100.00
14.10 Steel Plate s]=hL= 135.00
14.11 Spindle For Gate s]=hL= 153.00
14.12 Joint Sealer a=dL= 94.50
14.13 Joint filler a=dL= 153.00
15 lah"nLsf ;fdfgx? 0.00
15.01 :jLr -% PlDko/_ 0.00
15.01.01 :jLr -% PlDko/_ PstkmL{ uf]6f 32.50
15.01.02 :jLr -% PlDko/_ b"O{tkmL{ ,, 32.50
15.01.03 :jLr -% PlDko/_ j]8 :jLr ,, 32.50
15.02 xf]N8/ 0.00
15.02.01 xf]N8/ PËn uf]6f 27.83
15.02.02 xf]N8/ Aof6]g ,, 27.00
15.02.03 xf]N8/ k]G8]G6 ,, 21.50
15.03 ;s]6 -% PlDko/_ 0.00
15.03.01 ;s]6 -% PlDko/_ @ lkg uf]6f 32.50
15.03.02 ;s]6 -% PlDko/_ # lkg ,, 43.00
15.03.03 ;s]6 -% PlDko/_ % lkg -o'lge;{n_ ,, 48.50
15.04 kfj/ ;s]6 0.00
15.04.01 kfj/ ;s]6 -!%P=_ # Og jg ,, 214.00
15.04.02 kfj/ ;s]6 -!%P=_ % Og jfg ,, 246.50
15.04.03 Ol08s]6/ ,, 32.50
15.04.04 l;lnË /f]h ,, 27.83
15.04.05 ˆo'h ;fwf/0f ,, 53.50
15.05 ls6Sof6 0.00
15.05.01 ls6Sof6 !^ PlDko/ ,, 59.00
15.05.02 ls6Sof6 #@ PlDko/ ,, 70.00
15.05.03 ls6Sof6 ^) PlDko/ ,, 203.50
15.06 a]n 0.00
15.06.01 a]n ;fwf/0f ,, 267.50
15.06.02 a]n P;L=l8=;L= ePsf] ,, 283.50
15.07 d]g :jLr d]6n 0.00
15.07.01 l8=lk=d]g :jLr -!^ PlDko/_ ,, 321.00
15.07.02 !^ Pldko/ d]g :jLr d]6n ,, 621.00
15.07.03 #@ PlDko/d]g :jLr d]6n ,, 824.00
15.07.04 ^# PlDko/d]g :jLr d]6n ,, 2247.00
15.07.05 6' lkg -% PlDko/_ ,, 27.00
15.07.06 # lkg -% Pldko/_ ,, 43.00
15.07.07 d]n lkmd]n ,, 32.50
15.07.08 @ lkg dN6L ,, 32.50
15.07.09 # lkg dN6L ,, 32.50
15.08.00 lk=le=l;= se/ tf+df tf/ 0.00
15.08.01 lk=le=l;= tf+df tf/ &÷!* Sjfon 5835.00
15.08.02 lk=le=l;= tf+df tf/ &÷@) ,, 4532.00
15.08.03 lk=le=l;= tf+df tf/ &÷@@ ,, 2833.00
15.08.04 lk=le=l;= tf+df tf/ #÷@) ,, 1700.00
15.08.05 lk=le=l;= tf+df tf/ #÷@@ ,, 1133.00
15.08.06 lk=le=l;= tf+df tf/ !÷!* ,, 1110.00
15.09.00 ˆn]lS;jn tf/ 0.00
15.09.01 ˆn]lS;jn ldl8od !$÷^) Sjfon 588.50
15.09.02 ˆn]lS;jn P;=lk=6L= ,, 722.50
15.10.00 sG;]G6«Ls 0.00
15.10.01 sG;]G6«Ls $ ld=ld= dL= 32.50
15.10.02 sG;]G6«Ls ^ ld=ld= dL= 37.50
15.10.03 sG;]G6«Ls !) ld=ld= dL= 48.50
15.10.04 sG;]G6«Ls !^ ld=ld= dL= 75.00
15.10.05 sG;]G6«Ls @% ld=ld= dL= 96.50
15.10.06 l6=eL=slS;on tf/ Sjfon 1284.00
15.10.07 6]lnkmf]g tf/ dL= 43.00
15.10.08 lk=le=l;=6]k /f]n 21.50
15.10.09 g]zgn lk=le=l;=kfOk !) lkm6] uf]nf] vfnsf] uf]6f 59.00
15.10.10 uf]nf] vfnsf] PNjf] !)) lk; 198.00
15.10.11 6L !)) lk; 321.00
15.10.12 hS;g bh{g 182.00
15.10.13 :of8n !)) lk; 198.00
15.11.00 Sofl;ª aL6 ^ lkm6] 0.00
15.11.01 Sofl;ª aL6 ^ lkm6] !÷@Æ uf]6f 86.00
15.11.02 Sofl;ª aL6 ^ lkm6] #÷$Æ ,, 112.50
15.11.03 Sofl;ª aL6 ^ lkm6] !Æ ,, 134.00
15.11.04 Sofl;ª aL6 ^ lkm6] ! !÷@Æ ,, 193.00
15.11.05 6L ,, 27.00
15.11.06 ;s]6 ,, 27.00
15.11.07 :of8n ,, 27.00
15.11.08 Pn 27.00
15.12.00 lk=le=l;= ;s'{n/ aS; 0.00
15.12.01 lk=le=l;= ;s'{n/ aS; @ j]= uf]6f 91.00
15.12.02 lk=le=l;= ;s'{n/ aS; $ j]= ,, 128.50
15.12.03 lk=le=l;= ;s'{n/ aS; ^ j]= ,, 160.50
15.13.00 aNj (Bulb) 0.00
15.13.01 aNj ) jf6 uf]6f 32.50
15.13.02 aNj @% jf6 ,, 32.50
15.13.03 aNj $) jf6 ,, 41.00
15.13.04 aNj ^) jf6 ,, 43.00
15.13.05 aNj !)) jf6 ,, 48.50
15.13.06 aNj @)) jf6 ,, 64.50
15.13.07 aNj %)) jf6 ,, 171.50
15.13.08 efk/ nfO{6 ;]6 ;]6 2247.00
15.14.00 x]nf]lhg ;]6 0.00
15.14.01 x]nf]lhg ;]6 -rfOlgh_ ;]6 1016.50
15.14.02 x]nf]lhg ;]6 -cGo _ ,, 2300.50
15.15.00 8]sf]/]l6e a|fs]6 0.00
15.15.01 8]sf]/]l6e jfn a|fs]6 -;fwf/0f_ uf]6f 909.50
15.15.02 8]sf]/]l6e jfn a|fs]6 -:k]l;on_ ,, 1337.50
15.15.03 8]sf]/]l6e l;lnË a|fs]6 -:k]l;on_ ,, 1979.50
15.16.00 6\o'j nfO{6 0.00
15.16.01 6\o'j nfO{6 $ lkm= -!! ld=ld= 8fo_ ;]6 642.00
15.16.02 6\o'j nfO{6 $ lkm= -@) ld=ld= 8fo_ ;]6 642.00
15.16.03 6\o'j nfO{6 @ lkm= -!! ld=ld= 8fo_ ,, 535.00
15.16.04 6\o'j nfO{6 @ lkm= -@) ld=ld= 8fo_ ,, 535.00
15.16.05 6\o'j nfO{6 ;]6 $ lkm= -8]sf]/]l6e ;fwf/0f_ ,, 856.00
15.16.06 6\o'j nfO{6 ;]6 $ lkm= -8]sf]/]l6e :k]l;on_ ,, 1337.50
15.16.07 6\o'j nfO{6 ;]6 @ lkm= -8]sf]/]l6e ;fwf/0f_ ,, 856.00
15.16.08 6\o'j nfO{6 ;]6 @ lkm= -8]sf]/]l6e :k]l;on_ ,, 1016.50
15.17.00 6\o'j nfO{6sf ;fdfgx? 0.00
15.17.01 ;fwf/0f rf]s $) jf6 uf]6f 160.50
15.17.02 On]S6«f]lgs rf]s $) jf6 ,, 300.00
15.17.03 :6f6{/ ,, 21.50
15.17.04 6\o'a xf]N8/ ,, 27.00
15.17.05 6\o'j $ lkm= -!! ld=ld=8fold6/_ ,, 91.00
15.17.06 6\o'j $ lkm= -@) dL=ld=8fold6/_ ,, 96.50
15.17.07 6\o'j @ lkm= -!! ld=ld=8fold6/_ ,, 91.00
15.17.08 6\o'j @ lkm= -@)dL=ld=8fold6/_ ,, 91.00
15.17.09 6\o'j nfO{6 k|m]d @ lkm= ,, 214.00
15.17.10 6\o'j nfO{6 k|m]d $ lkm= ,, 294.50
15.18.00 Pd=l;=la= 0.00
15.18.01 Pd=l;=la= -^, !), !^ PlDko/_ Ol08og ,, #N/A
15.18.02 #@ PlDko/ Ol08og ,, 535.00
15.18.03 $) PlDko/ Ol08og ,, 695.50
15.18.04 Pd=l;=la= aS; ! j]= lklel; ,, 107.00
15.18.05 Pd=l;=la= aS; @ j]= lklel; ,, 107.00
15.18.06 Pd=l;=la= aS; # j]= lklel; ,, 139.50
15.18.07 Pd=l;=la= aS; $ j]= lklel; ,, 139.50
15.18.08 Pd=l;=la= aS; % j]= d]6n ,, 1070.00
15.18.09 Pd=l;=la= aS; ^ j]= d]6n ,, 1123.50
15.18.10 Pd=l;=la= aS; & j]= d]6n ,, 1177.00
15.18.11 Pd=l;=la= aS; * j]= d]6n ,, 8132.00
15.18.12 Cable Gland for Incoming & Outgoing Power ld6/ 535.00
15.19.00 Uofª l:jr 0.00
15.19.01 Uofª l:jr ! j]= uf]6f 150.00
15.19.02 Uofª l:jr @ j]= ,, 214.00
15.19.03 Uofª l:jr # j]= ,, 214.00
15.19.04 Uofª l:jr $ j]= ,, 428.00
15.19.05 Uofª l:jr % j]= ,, 535.00
15.19.06 Uofª l:jr ^ j]= ,, 567.50
15.19.07 Uofª l:jr & j]= ,, 642.00
15.19.08 Uofª l:jr * j]= ,, 1016.50
15.20 aS; sf7sf] 0.00
15.20.01 aS; sf7sf] $Æ x $Æ uf]6f 37.50
15.20.02 aS; sf7sf] $Æ x ^Æ ,, 48.50
15.20.03 aS; sf7sf] ^Æ x *Æ ,, 64.50
15.20.04 aS; sf7sf] *Æ x !)Æ ,, 96.50
15.20.05 aS; sf7sf] *Æ x !@Æ ,, 134.00
15.20.06 aS; sf7sf] !)Æ x !@Æ ,, 160.50
15.20.07 ld6/ aS; ,, 267.50
15.21.00 aS; Knfli6ssf] 0.00
15.21.01 aS; Nkfli6ssf] $Æ x $Æ uf]6f 26.62
15.21.02 aS; Nkfli6ssf] $Æ x ^Æ ,, 38.72
15.21.03 aS; Nkfli6ssf] ^Æ x *Æ ,, 96.50
15.21.04 aS; Nkfli6ssf] *Æ x !)Æ ,, 144.50
15.21.05 aS; Nkfli6ssf] *Æ x !@Æ ,, 160.50
15.21.06 aS; Nkfli6ssf] !)Æ x !@Æ ,, 209.00
15.21.07 kfj/ ;s]6 aS; ,, 91.00
15.21.08 ld6/ aS; ,, 465.50
15.22.00 aS; ;gdfO{sfsf] 0.00
15.22.01 aS; ;gdfO{sfsf] $Æ x $Æ uf]6f 48.50
15.22.02 aS; ;gdfO{sfsf] $Æ x ^Æ ,, 64.50
15.22.03 aS; ;gdfO{sfsf] ^Æ x *Æ ,, 75.00
15.22.04 aS; ;gdfO{sfsf] *Æ x !)Æ ,, 144.50
15.22.05 aS; ;gdfO{sfsf] *Æ x !@Æ ,, 150.00
15.22.06 aS; ;gdfO{sfsf] !)Æ x !@Æ ,, 171.50
15.22.07 kfj/ ;s]6 aS; ,, 91.00
15.22.08 ld6/ aS; ,, 391.00
15.23.00 d]6n jS; 0.00
15.23.01 d]6n jS; -# x #_ ,, 75.00
15.23.02 d]6n jS; -# x %_ ,, 91.00
15.23.03 d]6n jS; -^ x $_ ,, 91.00
15.23.04 d]6n jS; -^ x *_ ,, 118.00
15.23.05 d]6n jS; -* x !)_ ,, 198.00
15.23.06 d]6n jS; -!) x !@_ ,, 241.00
15.23.07 kfj/ aS; ,, 107.00
15.23.08 ld6/ aS; ,, 465.50
15.24.00 ! km]h ld6/ %–#) uf]6f 1265.00
15.24.01 # km]h ld6/ %–@) ,, 5200.00
15.24.02 # km]h ld6/ !)–$) 5700.00
15.24.03 # km]h ld6/ !%–^) 5000.00
15.24.04 ;a ld6/ -Ol08og_ ,, 669.00
15.24.05 ;a ld6/ -rfO{lgh_ ,, 455.00
15.24.06 # km]h d]6n ld6/ aS; ,, 1500.00
15.25.00 lx6/ l;+un 58 -!))) jf6_ ,, 374.50
15.25.01 lx6/ 8jn 58 -!))) jf6_ ,, 481.50
15.25.02 jf6/ lx6/ -!))) jf6_ ,, 481.50
15.26.00 uLh/ 0.00
15.26.01 uLh/ -!% ln6/_ ;fwf/0f ,, 12305.00
15.26.02 uLh/ -@% ln6/_ ;fwf/0f ,, 14445.00
15.26.03 uLh/ -!% ln6/_ :k]lzon ,, 17655.00
15.26.04 uLh/ -@% ln6/_ :k]lzon ,, 21400.00
15.27.00 lkle;L lni6L ÷ Knfli6s aL6 0.00
15.27.01 lkle;L lni6L ÷ Knfli6s aL6 em\ofnsf] nflu 0.00
lkle;L lni6L ÷ Knfli6s aL6 em\ofnsf] nflu !
15.27.01.01 !) lkm6 43.00
( ld=ld=
lkle;L lni6L ÷ Knfli6s aL6 em\ofnsf] nflu @%
15.27.01.02 ,, 59.00
ld=ld=
lkle;L lni6L ÷ Knfli6s aL6 em\ofnsf] nflu #@
15.27.01.03 ,, 64.50
ld=ld=
15.27.02 lkle;L lni6L ÷ Knfli6s aL6 9f]sfsf] nflu 0.00
15.27.02.01 lkle;L lni6L ÷ Knfli6s aL6 9f]sfsf] nflu !( ld=ld= !) lkm6 75.00
lkle;L lni6L ÷ Knfli6s aL6 9f]sfsf] nflu @%
15.27.02.02 ,, 102.00
ld=ld=
lkle;L lni6L ÷ Knfli6s aL6 9f]sfsf] nflu #@
15.27.02.03 ,, 144.50
ld=ld=
15.28.00 8f]d nfO{6 uf]6f 369.50
15.28.01 ;fO{8 nfO{6 -/fd|f]_ ,, 963.00
15.28.02 ;fO{8 nfO{6 -;fwf/0f_ ,, 535.00
15.28.03 8f]d nfO{6 8]sf]/]l6e /fd|f] vfnsf] ,, 1230.50
15.28.04 uf8]{g aQL ,, 1123.50
15.28.05 cfp6 8f]/ 6\o'jnfO{6 uf]6f 1792.50
15.29.00 k+vf ;]6 0.00
15.29.01 l;lnË k+vf ;]6 -/]u'n]6/ ;lxt_ #^Æ ,, 3025.00
15.29.02 l;lnË k+vf ;]6 -/]u'n]6/ ;lxt_ $@Æ ,, 3025.00
15.29.03 l;lnË k+vf ;]6 -/]u'n]6/ ;lxt_ $*Æ ,, 3388.00
15.29.04 6]an k+vf @$Æ ,, 2805.00
15.29.05 6]an k+vf !@Æ ,, 2860.00
15.29.06 PSemi6 k+vf !@Æ ,, 2057.00
15.29.07 ;fO{8 ˆofg !)Æ sf] ,, 1870.00
15.29.08 k+vf /]u'n]6/ uf]6f 160.50
15.29.09 ˆn]lhjn s8{ @ lkg / # lkg ,, 214.00
15.30.00 l8d/ 0.00
15.30.01 l8d/ :jLr 6fOk $)) jf6 ,, 417.00
15.30.02 l8d/ :jLr *)) jf6 ,, 503.00
15.30.03 l8d/ :jLr !@)) jf6 ,, 578.00
15.31.00 cly{Ë;]6 0.00
15.31.01 cly{Ë sk/ Kn]6 -ldl8od_ ;]6 877.50
15.31.02 cly{Ë /8 ;]6 ;]6 2033.00
15.32.00 l8:s tf/ ld6/ 24.00
15.33.00 6]lnkmf]g ;s]6 uf]6f 41.00
l6eL tyf 6]lnkmf]g hf]8fO{ -rflxg]
15.34.00 ;]6 364.00
dfn;fdfg ;lxt_
15.35.00 kmfo/ PlS:6ª\UjL;/ uf]6f 6741.00
15.36.00 l8:6|Lao';g af]8{ 0.00
15.36.01 @% PlDko/ y|L km]h Pd=l;=l;=aL= uf]6f 856.00
15.36.02 #@ PlDko/ y|L km]h Pd=l;=l;=aL= ,, 1123.50
15.36.03 $) PlDko/ y|L km]h Pd\=l;=l;=aL= ,, 1268.00
15.36.04 %) PlDko/ y|L km]h Pd\=l;=l;=aL= ,, 1498.00
15.36.05 !)) PlDko/ y|L km]h Pd=l;=l;=aL= ,, 1530.50
15.37.00 !)) PlDko/ sk/ a;af/ ;]6 6366.50
15.38 !)) Pld6/ uf]6f 642.00
15.39 %)) ef]N6 ld6/ ,, 535.00
15.40 cf/=jfO{=aL= NofDk ÷ km\o"h O{lG8s]6/ ,, 749.00
15.41 lk=le=;L= jfol/8= kfO{k PNaf] tyf hS;g\ ;lxt 0.00
15.42 /]S6]+u'n/ -!) lkm6]_ uf]6f 128.50
15.43 ;s'{n/ -!) lkm6]_ uf]6f 128.50
15.44 Aluminium Conductor steel Reinforced 0.0359" k|lt ls=dL= 3959.00
15.45 Aluminium Conductor steel Reinforced 0.059" k|lt ls=dL= 6548.50
15.46 Aluminium Conductor steel Reinforced 0.159" k|lt ls=dL= 15515.00
15.47 Shackle Insulator with D - 1 m yfg 241.00
15.48 Stay Cable Set ;]6 1284.00
15.49 Stay Cable Wire s]=hL= 214.00
15.5 %/* x * g6 af]N6 s]=hL= 214.00
!!/)=$ s]=eL=,@% s]=eL=P= 6|fGkm/d/ # km]h\
15.51.00 uf]6f 211320.50
sf]
!!/)=$ s]=eL=,%) s]=eL=P= 6|fGkm/d/ # km]h\
15.51.01 uf]6f 299600.00
sf]
!!/)=$ s]=eL=,!)) s]=eL=P= 6|fGkm/d/ # km]h\
15.51.02 uf]6f 417300.00
sf]
8|k cfp6 km\o"h ;]6 -l8=cf]=_ !! s]=eL=sf] nflu #
15.51.03 uf]6f 18404.00
km]hsf]
15.52 Lightening Arrester 9 KV 3 pc = 1 set ;]6 14980.00
15.53 Fency Electric Accessories 0.00
15.53.01 150 Watt SV bulb uf]6f 1391.00
15.53.02 250Watt SV bulb Æ 1551.50
15.53.03 40 Watt 220 Volt Starter Æ 0.00
15.53.04 PVC Listy 0.5" Æ 48.50
15.53.05 PVC Listy 0.75" Æ 48.50
15.53.06 PVC Listy 1" Æ 59.00
15.53.07 PVC Listy 1.5" Æ 64.50
15.54 Dyna/CPL or Equivalent Switch & Socket 0.00
15.54.01 DP Switch 16-32 Amp uf]6f 160.50
15.54.02 Blanking Plate Single Æ 59.00
15.54.03 Telephone Socket Single Æ 86.00
15.55 Panel Board & Accessaries 0.00
Moulded Case Circuit Breaker (18 /50KA) Siemens made or
15.55.01 0.00
equivalent
15.55.01.01 18/63 Amp MCCB Siemens ;]6 3638.00
15.55.01.02 80/100 Amp MCCB Siemens Æ 4601.00
15.55.01.03 20/32 Amp MCCB Siemens (40KA) Æ 0.00
15.55.01.04 63/125 Amp MCCB Siemens Æ 7704.00
15.55.01.05 160Amp MCCB Siemens Æ 9416.00
15.55.01.06 200/250 Amp MCCB Siemens Æ 18725.00
15.55.01.07 400 Amp MCCB Siemens Æ 24075.00
15.55.01.08 60 Amps MCCB Mitsubishi Japan Æ 2568.00
15.56 General 0.00
15.56.01 Voltmeter ( 0- 500 ) ;]6 428.00
15.56.02 Amp Meter ( 0-500 ) Æ 428.00
15.56.03 Indicator Æ 166.00
15.56.04 Selector Switch Æ 342.50
15.56.05 C.T.Coil ( One ) ;]6 481.50
15.56.06 Energy Meter SP Æ 749.00
15.56.07 Energy Meter 3 Phase Æ 4146.50
15.57 Join Box Metal / PVC 0.00
15.57.01 4" x 4" Junction Box Metal uf]6f 89.54
15.57.02 4" x6" Junction Box Metal Æ 104.06
15.57.03 6" x 8" Junction Box Metal Æ 166.98
15.57.04 8" x 10" Junction Box Metal Æ 208.12
15.57.05 8" x 12" Junction Box Metal Æ 278.30
15.57.06 4" x4" Junction Box PVC Æ 20.57
15.57.07 4" x6" Junction Box PVC Æ 37.51
15.57.08 6" x 8" Junction Box PVC Æ 53.24
15.57.09 8" x 10" Junction Box PVC Æ 76.23
15.58 General Electrical Fittings. 0.00
15.58.01 Dome lightn 6" Decon or Equivalent uf]6f 802.50
15.58.02 Dome lightn 8" Decon or Equivalent Æ 1391.00
15.58.03 Distribution Board Geoc,Havels or equivalent Æ 0.00
15.58.04 4 way SPn DB Double cover Æ 1402.00
15.58.05 6 way SPn DB Double cover Æ 1889.00
15.58.06 8 way SPn DB Double cover Æ 1889.00
15.58.07 12 way SPn DB Double cover Æ 2514.50
15.58.08 16 way SPn DB Double cover Æ 3076.50
15.58.09 3 way Tpn DB Double cover Æ 4012.50
15.58.10 4 way Tpn DB Double cover Æ 4012.50
15.58.11 6 way Tpn DB Double cover Æ 5029.00
15.58.12 8 way Tpn DB Double cover Æ 6206.00
15.58.13 Bell Indicator Roma/ Appolo or Equivalent Æ 6206.00
15.58.14 4 way Indicator with Bell ;]6 1850.50
15.58.15 6 way Indicator with Bell Æ 2743.00
15.58.16 8 way Indicator with Bell Æ 3688.00
15.58.17 12 way Indicator with Bell Æ 5525.50
15.58.18 Dome light 6" Decorative ;]6 748.00
15.58.19 Dome light 6" Decorative Brace " 1063.00
15.58.20 Dome light 8" Decorative " 879.25
15.58.21 Dome light 8" Decorative Brace " 1325.50
15.58.22 40-60 Watt Down Light " 621.00
Wall Bracket/Spot Light/Mirror Light Bulk head Single
15.58.23 " 1230.50
Direct Ord. Bonus or equivalent
Wall Bracket/Spot Light/Mirror Light Bulk head Single
15.58.24 " 1123.50
Direct Ord. Decon or equivalent
Wall Bracket/Spot Light/Mirror Light Bulk head
15.58.25 " 610.00
Single Direct Ord. Prince or equivalent
15.58.26 Dinning Lamp Decorative Med ;]6 2300.50
15.58.27 Chandlers Lamp 3-5 Lamp Med " 5885.00
15.58.28 Chandlers Lamp 6-8 Lamp Med " 8453.00
15.58.29 IS: 3043 Copper Plate 80x80x3.15 " 3852.00
15.58.30 IS: 3043 Copper Plate 65x65x3.15 " 2247.00
15.58.31 G.No. 10 Plastic Coated Copper Wire " 2300.50
15.59 Power Cable Copper Conductor Un- Armored Nepal Cable 0.00
15.59.01 Prakash,Or NS/ISI Standard 0.00
15.59.01.01 4mm2 4 core Nepal ,Prakash Or NS Rm 171.50
15.59.01.02 6mm 4 core Nepal ,Prakash Or NS
2
Rm 267.50
15.59.01.03 10mm 4 core Nepal ,Prakash Or NS
2
Rm 385.50
15.59.01.04 16mm2 4 core Nepal ,Prakash Or NS Rm 749.00
15.59.01.05 25mm2 4 core Nepal ,Prakash Or NS Rm 990.00
15.59.01.06 35mm2 4 core Nepal ,Prakash Or NS Rm 1498.00
15.60 Transformer And Accessories 0.00
15.60.01 Out Door Type Cable Head ;]6 1926.00
15.60.02 Pin Insulator " 267.50
15.60.03 35mm2 Cable Socket " 37.50
15.60.04 3core AL/XL Cable 35 sq.mm 11kv " 1123.50
Power cable Aluminium conductor Un-Armored Nepal, Prakash
15.61 0.00
Cable Or NS
15.61.01 4mm2 4 core Nepal ,Prakash Or NS RM 102.00
15.61.02 6mm2 4 core Nepal ,Prakash Or NS RM 144.50
15.61.03 10mm2 4 core Nepal ,Prakash Or NS RM 160.50
15.61.04 16mm2 4 core Nepal ,Prakash Or NS RM 225.00
15.61.05 25mm 4 core Nepal ,Prakash Or NS
2
RM 289.00
15.61.06 35mm2 4 core Nepal ,Prakash Or NS RM 353.50
15.62 Roma Or North-West equivalent Switch and Socket 0.00
15.62.01 1 gang Switch with Plate Set No 211.75
15.62.02 2 gang Switch with Plate Set No 272.25
15.62.03 3 gang Switch with Plate Set No 302.50
15.62.04 4 gang Switch with Plate Set No 332.75
15.62.05 5 gang Switch with Plate Set No 544.50
15.62.06 6 gang Switch with Plate Set No 665.50
15.62.07 T.V Socket With Plate No 181.50
15.62.08 T.P. Socket With Plate No 181.50
15.62.09 Bull Push with Plate No 181.50
15.62.10 5 Amp socket with plate/switch No 320.65
15.62.11 15 Amp socket with plate ,, No 429.55
15.62.12 13 Amp socket with plate ,, No 429.55
15.63 Switch Gears (ISI) Mark 0.00
15.63.01 16 Amp 415 Volt DP Main Switch S No 320.65
15.63.02 32 Amp 415 Volt DP Main Switch S No 1028.50
15.63.03 63 Amp 415 Volt DP Main Switch S No 2081.20
15.63.04 100 Amp 415 Volt DP Main Switch No 4888.40
15.63.05 16 Amp 415 Volt TP Main Switch No 834.90
15.63.06 32 Amp 415 Volt TP Main Switch No 1373.35
15.63.07 63 Amp 415 Volt TP Main Switch No 2891.90
15.63.08 100 Amp 415 Volt TP Main Switch No 5535.75
15.63.09 200 Amp 415 Volt TP Main Switch No 7979.95
15.63.10 16 Amp 415 Volt TP Main Switch HRC No 1845.25
15.63.11 32 Amp 415 Volt TP Main Switch HRC No 2087.25
15.63.12 63 Amp 415 Volt TP Main Switch HRC No 4307.60
15.63.13 100 Amp 415 Volt TP Main Switch HRC No 7005.90
15.63.14 200 Amp 415 Volt TP Switch HRC No 9341.20
15.63.15 300 Amp 415 Volt TP Switch HRC No 11942.70
15.63.16 400 Amp 415 Volt TP Switch HRC No 2359.50
15.63.17 16 Amp 415 Volt Change over Switch 4 pole No 1845.25
15.63.18 32 Amp 415 Volt Change over Switch 4 pole No 2087.25
15.63.19 63 Amp 415 Volt Change over Switch 4 pole No 4307.60
15.63.20 100 Amp 415 Volt Change over Switch 4 pole No 7005.90
15.63.21 200 Amp 415 Volt Change over Switch 4 pole No 9341.20
15.63.22 300 Amp 415 Volt Change over Switch 4 pole No 11942.70
15.63.23 63 Amp Bus Bar Chamber No 2359.50
15.63.24 100 Amp Bus Bar Chamber No 4537.50
15.63.25 200 Amp Bus Bar Chamber No 6352.50
15.63.26 300 Amp Bus Bar Chamber No 7925.50
15.64 MCB and Distribution Board Geco. NS / ISI or Equivalent 0.00
15.64.01 6-32 Amp SP MCB No 166.38
15.64.02 6-32 Amp DP MCB No 805.26
15.64.03 6-32 Amp TP MCB No 1184.59
15.64.04 6-32 Amp TPN MCB No 1543.96
15.64.05 40-60 Amp SP MCB No 658.85
15.64.06 40-60 Amp DP MCB No 1304.38
15.64.07 40-60 Amp TP MCB No 1883.37
15.64.08 40-60 Amp TPN MCB No 2362.53
15.64.09 4 Way SPN DB Double Cover No 1197.90
15.64.10 6 Way SPN DB Double Cover No 1610.51
15.64.11 8 Way SPN DB Double Cover No 1610.51
15.64.12 12 Way SPN DB Double Cover No 2136.26
15.64.13 16 Way SPN DB Double Cover No 2628.73
15.64.14 3 Way TPN DB Double Cover No 3294.23
15.64.15 4 Way TPN DB Double Cover No 3294.23
15.64.16 6 Way TPN DB Double Cover No 4092.83
15.64.17 8 Way TPN DB Double Cover No 5104.39
15.64.18 2 Pole PVC MCB Box No 68.97
15.64.19 4 Pole PVC MCB Box No 139.15
15.65 Roma/Appolo or equivalent Bell Indicator 0.00
15.65.01 4 way Indicator With Bell Rm 1498.00
15.65.02 6 way Indicator With Bell Rm 2300.50
15.65.03 8 way Indicator With Bell Rm 2942.50
15.65.04 12 way Indicator With Bell Rm 4601.00
15.66 Cable / Wire Nepal Cable, Prakash Cable or NS/ISI standard or Equivalent 0.00
15.66.01 7/16 PVC Copper Wire Nepal, Prakash Rm 267.50
15.67 Power Cable Copper Conductor Armored 0.00
15.67.01 4mm2 4 core Nepal ,Prakash Or NS No 308.55
15.67.02 6mm2 4 core Nepal ,Prakash Or NS No 417.45
15.67.03 10mm2 4 core Nepal ,Prakash Or NS No 623.15
15.67.04 16mm2 4 core Nepal ,Prakash Or NS No 834.90
15.67.05 25mm2 4 core Nepal ,Prakash Or NS No 1355.20
15.67.06 35mm2 4 core Nepal ,Prakash Or NS No 1875.50
15.67.07 4mm2 2 core Nepal ,Prakash Or NS No 187.55
15.67.08 6mm2 2 core Nepal ,Prakash Or NS No 235.95
15.67.09 10mm2 2 core Nepal ,Prakash Or NS No 369.05
15.68.00 Cable Shoe 0.00
15.68.01 16 sq mm Cable Shoe No 20.50
15.68.02 25 sq mm Cable Shoe No 32.50
15.68.03 35 sq mm Cable Shoe No 37.50
15.68.04 50 Sq mm Cable Shoe No 43.00
15.69.00 Decorative Wall Brackets 0.00
15.69.01 Decorative Wall Bracke SL Fancy Type No 1230.50
15.69.02 Decorative Wall Bracke Sigle Wallite No 1230.50
15.69.03 Decorative Wall Bracke Single Vertile No 1230.50
15.70.00 Fluoroscent Tube Light Patti Philips, Wipro, Bajaj or equivalent 0.00
15.70.01 1 x 20 FTL Patti No 481.50
15.70.02 1 x 40 FTL Patti No 514.00
15.70.03 1 x 20 FTL Minolta TMS200/120 LPF No 1070.00
15.70.04 1 x 40 FTL Minolta TMS200/140 LPF No 1070.00
15.70.05 1 x 20 FTL Astramini TMS21/118 LPF No 1070.00
15.70.06 1 x 40 FTL Astramini TMS21/118 LPF No 1070.00
15.70.07 2 x 40 FTL F.T.C TCX 20/236 HPF No 2889.00
15.70.08 1 x 40 FTL Box Fitting TMC 501/136 HPF No 1177.00
15.70.09 2 x 40 FTL Box Fitting TMC 501/236 HPF No 1658.50
1 x 40 FTLIndustrial Channel With Stove
15.70.10 Set 2140.00
EnammellledTKC202/136 HPF
2 x 40 FTL Industrial Channel With Stove
15.70.11 Set 2621.50
Enammelled TKC203
1 x 40 FTL Opalite With Opal Acrylic Diffuser
15.70.12 Set 1819.00
TCS19/136
2 x 40 FTL Opalite With Opal Acrylic Diffuser
15.70.13 Set 2868.00
TCS19/236
4 x 18/20 FTL With Dished Opal Acrylic Cover
15.70.14 Set 5885.00
TBC71/420 or72/420 HPF
15.70.15 1 x 40 FTL Mirror Optic Slim Flat light Set 2568.00
15.70.16 2 x 40 FTL Mirror Optic Slim Flat light Set 4012.50
15.70.17 300/500 Halogen Light Set Set 1444.50
15.70.18 1000 Halogen Light Set Set 3049.50
15.70.19 150 Watt HPSV Lamp Set 1316.50
15.70.20 250 Watt HPSV Lamp Set 1444.50
15.71.00 Telephone Drop Wire / Pair Cable 0.00
15.71.01 Telephone Socket flush type CPL or equivalent 342.50
15.71.02 2/20 Tel wire Coil 1016.50
15.71.03 2/22 Tel wire Coil 685.00
15.71.04 2 Pair Tel (2 x 2 x 0.45) mm Rm 21.50
15.71.05 3 Pair Tel (3 x 2 x 0.45) mm Rm 32.50
15.71.06 5 Pair Tel (5 x 2 x 0.45) mm Rm 37.50
15.71.07 10 Pair Tel (10 x 2 x 0.45) mm Rm 64.50
15.71.08 15 Pair Tel (15 x 2 x 0.45) mm Rm 86.00
15.71.09 20 Pair Tel (15 x 2 x 0.45) mm Rm 107.00
15.72.00 ;s]6\;\ (Sockets) 0.00
16 A socket & 6 amp 6 pin shuttered, Double
15.72.01 No 353.50
Modules
25 A socket & 6 amp 6 pin shuttered, Double
15.72.02 No 385.50
Modules
15.72.03 Socket 13 A -3 pin flat Douuble Shuttered Modules No 278.50

15.72.04 Socket 6 A -3 Pin flat Douuble Shuttered Modules No 235.50


Socket 6 A -2 + 3 Pin Shuttered with Push Button
15.72.05 No 235.50
Switch
15.72.06 Socket 6 A -2 + 3 Pin Round and Flat Shuttered No 396.00
15.73.00 Internet ;DaGwL 0.00
15.73.01 Internet cable (CAT 6) Rm 0.00
15.73.02 Main Router 4 port (TP Link or Equivalent) uf]6f 0.00
15.73.03 8 Port Switch (D-Link or Equivalent) uf]6f 0.00
15.73.04 16 Port Switch (D-Link or Equivalent) uf]6f 0.00
15.73.05 24 Port Switch (D-Link or Equivalent) uf]6f 0.00
15.73.11 Internet Wall Socket (Colour or Equivalent) uf]6f 0.00
15.73.12 Spitter uf]6f 0.00
15.73.13 RJ 45 uf]6f 0.00
15.74.00 kfgL tfGg] kDk 0.00
15.74.01 kfgL tfGg] kDk !÷@ xif{ kfj/ lrlgof uf]6f 2728.50
15.74.02 ,, ,, !÷@ xif{ kfj/ ef/tLo ,, 7062.00
15.74.03 ,, ,, ! xif{ kfj/ rLgLof ,, 4922.00
15.74.04 ,, ,, ! xif{ kfj/ ef/tLo ,, 16585.00
15.75 :6f]e -7"nf] r'nf]_ uf]6f 1123.50
15.76 ldS:r/ d]l;g ;]6 -afof] Uof;sf] nflu_ uf]6f 1316.50
15.77 Uof; kfO{k uf]6f 835.00
15.78 Uof; eNj uf]6f 824.00
15.79 Uof; 6]k uf]6f 514.00
15.80 Uof; lx6/ -/fd|f] vfn_ uf]6f 9630.00
2 H P Electricmotor pump with base plate nuts, bolts
15.81 No 32104.50
etc.set (Crompton or equivalent )
3 H P Electricmotor pump with base plate nuts, bolts
15.82 No 58984.00
etc.set (Crompton or equivalent)
5 H P Electricmotor pump with base plate nuts, bolts
15.83 No 76960.00
etc.set crompton or equivalent
16 vfg]kfgLsf ;fdfgx? 0.00
16.01.00 lh=cfO{= kfO{k -d]l8od u|]8_ 0.00
16.01.01 !÷@Æ Aof; ld6/ 237.50
16.01.02 #÷$Æ Aof; ,, 301.50
16.01.03 !Æ Aof; ,, 461.00
16.01.04 !!÷$Æ Aof; ,, 600.50
16.01.05 !!÷@Æ Aof; ,, 692.00
16.01.06 @Æ Aof; ,, 952.00
16.01.07 @!÷@Æ Aof; 1215.50
16.01.08 #Æ Aof; 1513.50
16.01.09 $Æ Aof; ,, 2270.50
16.01.10 %Æ Aof; 2993.50
16.01.11 ^Æ Aof; 3556.50
16.01.12 *Æ Aof; ,, 5574.50
16.02 lh=cfO{= o'lgog -d]l8od u|]8_ (NS/ISI) 0.00
16.02.01 !÷@Æ Aof; uf]6f 133.00
16.02.02 #÷$Æ Aof; ,, 184.50
16.02.03 !Æ Aof; ,, 246.50
16.02.04 !!÷$Æ Aof; ,, 362.00
16.02.05 !!÷@Æ Aof; ,, 479.00
16.02.06 @Æ Aof; ,, 666.50
16.02.07 @!÷@Æ Aof; ,, 1245.00
16.02.08 #Æ Aof; ,, 1725.00
16.02.09 $Æ Aof; ,, 2366.50
16.02.10 %Æ Aof; ,, 6370.50
16.02.11 ^Æ Aof; ,, 7668.00
16.03 lh=cfO{= PNa]f -d]l8od u|]8_ (NS/ISI) 0.00
16.03.01 !÷@Æ Aof; uf]6f 49.50
16.03.02 #÷$Æ Aof; ,, 78.00
16.03.03 !Æ Aof; ,, 124.00
16.03.04 !!÷$Æ Aof; ,, 189.00
16.03.05 !!÷@Æ Aof; ,, 260.00
16.03.06 @Æ Aof; ,, 394.50
16.03.07 @!÷@Æ Aof; ,, 755.00
16.03.08 #Æ Aof; ,, 1002.50
16.03.09 $Æ Aof; ,, 1799.00
16.03.10 %Æ Aof; ,, 4719.00
16.03.11 ^Æ Aof; ,, 5780.50
16.04.00 lh=cfO{= ;s]6 -d]l8od u|]8_ (NS/ISI) 0.00
16.04.01 !÷@Æ Aof; uf]6f 44.00
16.04.02 #÷$Æ Aof; ,, 71.00
16.04.03 !Æ Aof; ,, 89.00
16.04.04 !!÷$Æ Aof; ,, 137.50
16.04.05 !!÷@Æ Aof; ,, 184.50
16.04.06 @Æ Aof; 288.00
16.04.07 @!÷@Æ Aof; 425.00
16.04.08 #Æ Aof; 616.00
16.04.09 $Æ Aof; 1091.00
16.04.10 %Æ Aof; 3244.00
16.04.11 ^Æ Aof; 4483.00
16.05.00 lh=cfO{= 6L -OSjfon_ (NS/ISI) 0.00
16.05.01 !÷@Æ Aof; uf]6f 78.00
16.05.02 #÷$Æ Aof; ,, 121.50
16.05.03 !Æ Aof; ,, 163.00
16.05.04 !!÷$Æ Aof; ,, 257.50
16.05.05 !!÷@Æ
Aof; ,, 315.00
16.05.06 @Æ Aof; ,, 492.50
16.05.07 @!÷@Æ Aof; ,, 861.00
16.05.08 #Æ Aof; ,, 1238.50
16.05.09 $Æ Aof; ,, 2216.00
16.05.10 %Æ Aof; ,, 6252.50
16.05.11 ^Æ Aof; ,, 7314.00
16.06.00 lh=cfO{=/]8\o'l;Ë PNaf] (NS/ISI) 0.00
16.06.01 !÷@Æ Aof; " 45.00
16.06.02 #÷$Æ Aof; uf]6f 84.50
16.06.03 !Æ Aof; ,, 131.50
16.06.04 !!÷$Æ Aof; ,, 204.50
16.06.05 !!÷@Æ Aof; ,, 275.50
16.06.06 @Æ Aof; ,, 427.00
16.06.07 @!÷@Æ Aof; ,, 808.00
16.06.08 #Æ Aof; ,, 1088.00
16.06.09 $Æ Aof; ,, 1943.00
16.07.00 lh=cfO{=y|L j] 6L 0.00
16.07.01 !÷@Æ Aof; uf]6f 78.00
16.07.02 #÷$Æ Aof; ,, 113.50
16.07.03 !Æ Aof; ,, 162.00
16.07.04 !!÷$Æ Aof; ,, 252.00
16.07.05 ! Aof;
!÷@Æ
,, 374.50
16.07.06 @Æ Aof; ,, 590.00
16.08.00 lh=cfO{=kmf]/ j] 6L 0.00
16.08.01 !÷@Æ Aof; uf]6f 60.00
16.08.02 #÷$Æ Aof; uf]6f 101.50
16.08.03 !Æ Aof; ,, 158.50
16.08.04 !!÷$Æ Aof; ,, 266.50
16.08.05 !!÷@Æ Aof; ,, 262.00
16.08.06 @Æ Aof; ,, 548.50
16.09.00 lh=cfO{=d]n÷ lkmd]n PNaf] 0.00
16.09.01 !÷@Æ Aof; uf]6f 60.00
16.09.02 #÷$Æ Aof; ,, 97.00
16.09.03 !Æ Aof; ,, 139.50
16.09.04 !!÷$Æ Aof; ,, 215.00
16.09.05 ! Aof;
!÷@Æ
,, 327.00
16.09.06 @Æ Aof; ,, 495.50
16.10.00 a|f; o'lgog 0.00
16.10.01 !÷@Æ Aof; uf]6f 367.20
16.10.02 #÷$Æ Aof; uf]6f 583.50
16.10.03 !Æ Aof; uf]6f 863.00
16.10.04 !!÷$Æ Aof; uf]6f 1178.00
16.10.05 !!÷@Æ Aof; uf]6f 1765.90
16.10.06 @Æ Aof; uf]6f 2002.00
16.10.07 @!÷@Æ Aof; uf]6f 6444.70
16.10.08 #Æ Aof; uf]6f 9483.70
16.10.09 $Æ Aof; uf]6f 14857.75
16.11.00 lh=cfO{ 6L -cg OSjfon_ 0.00
16.11.01 20 20 15 Pd Pd uf]6f 85.50
16.11.02 25 25 15 Pd Pd Æ 116.00
16.11.03 25 25 20 Pd Pd Æ 116.00
16.11.04 32 32 15 Pd Pd Æ 174.50
16.11.05 32 32 20 Pd Pd Æ 174.50
16.11.06 32 32 25 Pd Pd Æ 174.50
16.11.07 40 40 15 Pd Pd Æ 225.00
16.11.08 40 40 20 Pd Pd Æ 225.00
16.11.09 40 40 25 Pd Pd Æ 225.00
16.11.10 40 40 32 Pd Pd Æ 225.00
16.11.11 50 50 15 Pd Pd Æ 290.00
16.11.12 50 50 20 Pd Pd Æ 290.00
16.11.13 50 50 25 Pd Pd Æ 290.00
16.11.14 50 50 32 Pd Pd Æ 290.00
16.11.15 50 50 40 Pd Pd uf]6f 290.00
16.11.16 65 65 15 Pd Pd Æ 355.50
16.11.17 65 65 20 Pd Pd Æ 355.50
16.11.18 65 65 25 Pd Pd Æ 355.50
16.11.19 65 65 32 Pd Pd Æ 355.50
16.11.20 65 65 40 Pd Pd Æ 355.50
16.11.21 65 65 50 Pd Pd Æ 477.50
16.11.22 80 80 15 Pd Pd Æ 477.50
16.11.23 80 80 20 Pd Pd Æ 477.50
16.11.24 80 80 25 Pd Pd Æ 477.50
16.11.25 80 80 32 Pd Pd Æ 477.50
16.11.26 80 80 40 Pd Pd Æ 477.50
16.11.27 80 80 50 Pd Pd Æ 477.50
16.11.28 80 80 65 Pd Pd Æ 477.50
16.11.29 90 90 15 Pd Pd Æ 643.00
16.11.30 90 90 20 Pd Pd Æ 643.00
16.11.31 90 90 25 Pd Pd Æ 643.00
16.11.32 90 90 32 Pd Pd Æ 643.00
16.11.33 90 90 40 Pd Pd Æ 643.00
16.11.34 90 90 50 Pd Pd Æ 643.00
16.11.35 90 90 65 Pd Pd Æ 643.00
16.11.36 90 90 80 Pd Pd Æ 643.00
16.12.00 lh=Pd\= Unf]e eNj - NS lrGx k|fKt jf ;f] ;/xsf] _ 0.00
16.12.01 !÷@Æ Aof; uf]6f 938.50
16.12.02 #÷$Æ Aof; ,, 1508.00
16.12.03 !Æ Aof; ,, 2265.00
16.12.04 !!÷$Æ Aof; ,, 4393.00
16.12.05 ! Aof;
!÷@Æ
,, 5626.50
16.12.06 @Æ Aof; ,, 7960.00
16.12.07 @!÷@Æ Aof; ,, 16081.00
16.12.08 #Æ Aof; ,, 21871.50
16.12.09 $Æ Aof; ,, 38916.00
16.13.00 r]s eNj - NS lrGx k|fKt jf ;f] ;/xsf] _ Vertical 0.00
16.13.01 !÷@Æ Aof; uf]6f 457.50
16.13.02 #÷$Æ Aof; ,, 606.00
16.13.03 !Æ Aof; ,, 855.00
16.13.04 !!÷$Æ Aof; ,, 1304.50
16.13.05 !!÷@Æ Aof; ,, 1702.50
16.13.06 @Æ Aof; ,, 2637.00
16.13.07 @!÷@Æ Aof; ,, 6551.50
16.13.08 #Æ Aof; ,, 12168.00
16.13.09 $Æ Aof; ,, 16574.00
16.14.00 r]s eNj - NS lrGx k|fKt jf ;f] ;/xsf] _ Horizontal 0.00
16.14.01 !÷@Æ Aof; uf]6f 490.00
16.14.02 #÷$Æ Aof; ,, 753.00
16.14.03 !Æ Aof; ,, 1637.00
16.14.04 !!÷$Æ Aof; ,, 2756.00
16.14.05 ! !÷@Æ
Aof; ,, 4129.00
16.14.06 @Æ Aof; ,, 6188.50
16.14.07 @!÷@Æ Aof; ,, 10763.50
16.15.00 lh=Pd\= u]6 eNj - NS lrGx k|fKt jf ;f] ;/xsf] _ 0.00
16.15.01 !÷@Æ Aof; uf]6f 1080.95
16.15.02 #÷$Æ Aof; uf]6f 1553.20
16.15.03 !Æ Aof; ,, 1632.00
16.15.04 !!÷$Æ Aof; ,, 3510.20
16.15.05 !!÷@Æ Aof; ,, 4506.25
16.15.06 @Æ Aof; ,, 7421.65
16.15.07 @!÷@Æ Aof; ,, 14573.95
16.15.08 #Æ Aof; ,, 22194.40
16.15.09 $Æ Aof; ,, 40415.60
16.16.00 :n'O{;\ eNj 0.00
16.16.01 !Æ Aof; uf]6f 0.00
16.16.02 !!÷$Æ Aof; ,, 0.00
16.16.03 !!÷@Æ Aof; ,, 0.00
16.16.04 @Æ Aof; ,, 0.00
16.16.05 @!÷@Æ Aof; ,, 0.00
16.16.06 #Æ Aof; ,, 13893.50
16.16.07 $Æ Aof; ,, 18494.00
16.16.08 %Æ Aof; 0.00
16.16.09 ^Æ Aof; ,, 34118.50
16.16.10 *Æ Aof; ,, 61281.50
16.17.00 jg j] :6k ss\ -laa ss\_ 0.00
16.17.01 !÷@Æ Aof;sf] uf]6f 664.00
16.18.00 ;fj/ eNj 0.00
16.18.01 !÷@Æ Aof; uf]6f 981.00
16.18.02 #÷$Æ Aof; ,, 1683.00
16.18.03 !Æ Aof; ,, 2805.50
16.18.04 !!÷$Æ Aof; ,, 2992.00
16.18.05 !!÷@Æ Aof; ,, 3180.00
16.18.06 @Æ Aof; ,, 4677.50
16.19.00 6\ofÍ lgKkn 0.00
16.19.01 !÷@Æ Aof; uf]6f 92.50
16.19.02 #÷$Æ Aof; ,, 171.00
16.19.03 !Æ Aof; ,, 212.50
16.19.04 !!÷$Æ Aof; ,, 286.50
16.19.05 ! Aof;
!÷@Æ
,, 363.00
16.19.06 @Æ Aof; ,, 726.00
16.19.07 @!÷@Æ Aof; ,, 784.50
16.19.08 #Æ Aof; ,, 902.50
16.19.09 $Æ Aof; ,, 1055.00
16.20.00 lh=cfO{=lgKkn @Æ nfdf] ldl8od u|]8 0.00
16.20.01 !÷@Æ Aof; uf]6f 36.00
16.20.02 #÷$Æ Aof; ,, 45.00
16.20.03 !Æ Aof; ,, 70.00
16.20.04 !!÷$Æ Aof; ,, 91.00
16.20.05 !!÷@Æ Aof; ,, 104.50
16.20.06 @Æ Aof; ,, 145.00
16.20.07 @!÷@Æ Aof; uf]6f 185.50
16.20.08 #Æ Aof; ,, 231.50
16.20.09 $Æ Aof; ,, 348.50
16.21.00 lh=cfO{=lgKkn #Æ nfdf] ldl8od u|]8 0.00
16.21.01 !÷@Æ Aof; uf]6f 54.00
16.21.02 #÷$Æ Aof; ,, 69.00
16.21.03 !Æ Aof; ,, 106.00
16.21.04 !!÷$Æ Aof; ,, 137.50
16.21.05 !!÷@Æ Aof; ,, 157.50
16.21.06 @Æ Aof; ,, 218.00
16.21.07 @!÷@Æ Aof; uf]6f 179.00
16.21.08 #Æ Aof; ,, 348.50
16.21.09 $Æ Aof; ,, 522.50
16.22.00 lh=cfO{=lgKkn $Æ nfdf] ldl8od u|]8 0.00
16.22.01 !÷@Æ Aof; uf]6f 72.00
16.22.02 #÷$Æ Aof; uf]6f 91.00
16.22.03 !Æ Aof; ,, 140.50
16.22.04 !!÷$Æ Aof; ,, 183.50
16.22.05 !!÷@Æ Aof; ,, 210.50
16.22.06 @Æ Aof; ,, 291.00
16.22.07 @!÷@Æ Aof; ,, 372.00
16.22.08 #Æ Aof; ,, 464.50
16.22.09 $Æ Aof; ,, 697.00
16.23.00 lh=cfO{=lgKkn ^Æ nfdf] ldl8od u|]8 0.00
16.23.01 !÷@Æ Aof; uf]6f 108.00
16.23.02 #÷$Æ Aof; ,, 137.50
16.23.03 !Æ Aof; ,, 211.50
16.23.04 !!÷$Æ Aof; ,, 274.50
16.23.05 !!÷@Æ Aof; ,, 316.00
16.23.06 @Æ Aof; ,, 437.50
16.23.07 @!÷@Æ Aof; uf]6f 557.50
16.23.08 #Æ Aof; ,, 697.00
16.23.09 $Æ Aof; ,, 1045.00
16.23.10 ^Æ Aof; 0.00
16.24.00 lh=cfO{=lgKkn (Æ nfdf] ldl8od u|]8 0.00
16.24.01 !÷@Æ Aof; uf]6f 163.00
16.24.02 #÷$Æ Aof; ,, 207.00
16.24.03 !Æ Aof; ,, 317.00
16.24.04 !!÷$Æ Aof; ,, 424.00
16.24.05 ! Aof;
!÷@Æ
,, 474.50
16.24.06 @Æ Aof; ,, 655.00
16.24.07 @!÷@Æ Aof; uf]6f 837.50
16.24.08 #Æ Aof; ,, 1045.00
16.24.09 $Æ Aof; ,, 1567.50
16.25.00 lh=cfO{=lgKkn !@Æ nfdf] ldl8od u|]8 0.00
16.25.01 !÷@Æ Aof; uf]6f 217.00
16.25.02 #÷$Æ Aof; ,, 275.50
16.25.03 !Æ Aof; ,, 422.50
16.25.04 !!÷$Æ Aof; ,, 549.50
16.25.05 !!÷@Æ Aof; ,, 633.00
16.25.06 @Æ Aof; ,, 874.50
16.25.07 @!÷@Æ Aof; uf]6f 1115.00
16.25.08 #Æ Aof; ,, 1394.50
16.25.09 $Æ Aof; ,, 2091.00
16.26.00 lh=cfO{=lgKkn !*Æ nfdf] ldl8od u|]8 0.00
16.26.01 !÷@Æ Aof; uf]6f 326.00
16.26.02 #÷$Æ Aof; ,, 413.50
16.26.03 !Æ Aof; ,, 634.00
16.26.04 !!÷$Æ Aof; ,, 824.00
16.26.05 !!÷@Æ Aof; ,, 948.50
16.26.06 @Æ Aof; ,, 1311.50
16.26.07 @!÷@Æ Aof; uf]6f 1674.50
16.26.08 #Æ Aof; uf]6f 2091.00
16.26.09 $Æ Aof; ,, 3136.00
16.26.10 %Æ Aof; ,, 3185.50
16.26.11 ^Æ Aof; ,, 3303.50
16.27.00 lh=cfO{= r]s g6 (Check Nut) 0.00
16.27.01 !÷@Æ Aof; uf]6f 31.50
16.27.02 #÷$Æ Aof; ,, 51.00
16.27.03 !Æ Aof; ,, 66.50
16.27.04 !!÷$Æ Aof; ,, 78.00
16.27.05 !!÷@Æ Aof; ,, 139.50
16.27.06 @Æ Aof; ,, 180.00
16.27.07 @!÷@Æ Aof; uf]6f 226.00
16.27.08 #Æ Aof; ,, 297.00
16.27.09 $Æ Aof; ,, 436.00
16.28.00 lh=cfO{= qm; cf]e/ (Cross Over) 0.00
16.28.01 !÷@Æ Aof; uf]6f 116.00
16.28.02 #÷$Æ Aof; ,, 156.50
16.28.03 !Æ Aof; ,, 249.50
16.28.04 !!÷$Æ Aof; ,, 408.00
16.28.05 ! Aof;
!÷@Æ
,, 561.00
16.28.06 @Æ Aof; ,, 840.50
16.29.00 lh=cfO{= a]08 -@@=%) ,$%) ,())_ 0.00
16.29.01 #Æ Aof; uf]6f 1635.00
16.29.02 $Æ Aof; ,, 3269.50
16.29.03 %Æ Aof; ,, 7786.00
16.29.04 ^Æ Aof; ,, 16100.00
16.30.00 Pd\=cfO{=Sofk ( Melleable) 0.00
16.30.01 !÷@Æ Aof; uf]6f 38.50
16.30.02 #÷$Æ Aof; ,, 56.50
16.30.03 !Æ Aof; ,, 97.00
16.30.04 !!÷$Æ Aof; ,, 133.00
16.30.05 !!÷@Æ Aof; ,, 178.00
16.30.06 @Æ Aof; ,, 310.50
16.30.07 @!÷@Æ Aof; ,, 388.00
16.30.08 #Æ Aof; ,, 465.50
16.30.09 $Æ Aof; ,, 620.50
16.31.00 :6«]g/ GI 0.00
16.31.01 !÷@Æ Aof; uf]6f 227.00
16.31.02 #÷$Æ Aof; ,, 455.50
16.31.03 !Æ Aof; ,, 589.00
16.31.04 !!÷$Æ Aof; ,, 977.50
16.31.05 !
!÷@Æ
Aof; ,, 1139.50
16.31.06 @Æ Aof; ,, 1538.50
16.31.07 @!÷@Æ Aof; ,, 1785.50
16.31.08 #Æ Aof; ,, 2583.00
16.31.09 $Æ Aof; ,, 5318.00
16.32.00 GM km]/n ss\ 0.00
16.32.01 !÷@Æ Aof; uf]6f 1074.50
16.32.02 #÷$Æ Aof; ,, 2173.00
16.32.03 !Æ Aof; ,, 3887.50
16.33.00 l;=cfO{= Knu 0.00
16.33.01 !÷@Æ Aof; uf]6f 13.50
16.33.02 #÷$Æ Aof; ,, 21.50
16.33.03 !Æ Aof; ,, 34.00
16.33.04 !!÷$Æ Aof; ,, 58.50
16.33.05 !!÷@Æ Aof; ,, 71.00
16.33.06 @Æ Aof; ,, 107.00
16.33.07 @!÷@Æ Aof; ,, 151.00
16.33.08 #Æ Aof; ,, 214.00
16.33.09 $Æ Aof; ,, 364.50
16.34.00 l;=cfO{= Sofk 0.00
16.34.01 !÷@Æ Aof; uf]6f 24.00
16.34.02 #÷$Æ Aof; ,, 40.50
16.34.03 !Æ Aof; ,, 53.00
16.34.04 !!÷$Æ Aof; ,, 94.50
16.34.05 !!÷@Æ Aof; ,, 108.00
16.34.06 @Æ Aof; ,, 135.00
16.34.07 @!÷@Æ Aof; ,, 253.00
16.34.08 #Æ Aof; ,, 343.00
16.34.09 $Æ Aof; ,, 524.00
16.35.00 lk=eL=;L= :of8n (PVC Shaddle) 0.00
16.35.01 $) ld=ld= 8fo ,, 118.00
16.35.02 %) ld=ld= 8fo ,, 153.00
16.35.03 ^# ld=ld= 8fo ,, 203.50
16.35.04 &% ld=ld= 8fo ,, 228.50
16.35.05 () ld=ld= 8fo ,, 253.00
16.35.06 !!) ld=ld= 8fo ,, 311.50
16.35.07 !@% ld=ld= 8fo ,, 661.00
16.35.08 !$) ld=ld= 8fo ,, 661.00
16.36.00 l;=cfO{= :of8n (Cast Iron Shaddle) 0.00
16.36.01 #@ ld=ld= 8fo uf]6f 291.00
16.36.02 $) ld=ld= 8fo ,, 345.00
16.36.03 %) ld=ld= 8fo uf]6f 375.50
16.36.04 ^# ld=ld= 8fo ,, 402.50
16.36.05 &% ld=ld= 8fo ,, 529.50
16.36.06 () ld=ld= 8fo ,, 555.50
16.36.07 !!) ld=ld= 8fo ,, 677.50
16.36.08 !@% ld=ld= 8fo ,, 858.50
16.37.00
Pr=8L=kL=÷Pr=l8=lk=ˆn]Gh\ ;]6 -g6 af]N6 tyf jf;/ / 0.00
P8K6/ ;lxt_
16.37.01 () ld=ld= ;fO{hsf] ;]6 2451.50
16.37.02 !!) ld=ld= ;fO{hsf] ,, 2683.00
16.37.03 !@% ld=ld= ;fO{hsf] ,, 2724.50
16.37.04 !$) ld=ld= ;fO{hsf] ,, 4983.00
16.37.05 !^) ld=ld= ;fO{hsf] ,, 5761.50
16.37.06 !*) ld=ld= ;fO{hsf] ,, 6540.00
16.37.07 @)) ld=ld= ;fO{hsf] ,, 7623.00
16.37.08 @@% ld=ld= ;fO{hsf] ,, 8707.50
16.37.09 @%) ld=ld= ;fO{hsf] ,, 10559.00
16.37.10 @*) ld=ld= ;fO{hsf] ,, 13884.50
16.38.00
lh=cfO{=÷lh=cfO{=ˆn]Gh\ ;]6 -g6 af]N6 tyf jf;/ / 0.00
P8K6/ ;lxt_
16.38.01 !
!÷@Æ
Aof; uf]6f 1113.50
16.38.02 @Æ Aof; ,, 1458.50
16.38.03 @!÷@Æ Aof; ,, 1932.50
16.38.04 #Æ Aof; ,, 2316.50
16.38.05 $Æ Aof; ,, 3362.00
16.38.06 ^Æ Aof; ,, 0.00
16.39
lh=cfO{=÷Pr=l8=lk=ˆn]Gh\ ;]6 -g6 af]N6 tyf jf;/ / 0.00
P8K6/ ;lxt_
16.39.01 %)÷^# ld=ld= ;fO{hsf] ;]6 1492.50
16.39.02 ^%÷&% ld=ld= ;fO{hsf] ,, 1790.00
16.39.03 *)÷() ld=ld= ;fO{hsf] ,, 2271.00
16.39.04 !))÷!!) ld=ld= ;fO{hsf] ,, 2790.00
16.39.05 !!)÷!@% ld=ld= ;fO{hsf] ,, 2790.00
16.39.06 !@%÷!$) ld=ld= ;fO{hsf] ,, 3879.50
16.39.07 !%)÷!^) ld=ld= ;fO{hsf] ,, 4814.50
16.39.08 !*)÷@)) ld=ld= ;fO{hsf] ,, 6689.50
16.39.09 @))÷@@% ld=ld= ;fO{hsf] ,, 8564.50
16.39.10 @@%÷@%) ld=ld= ;fO{hsf] ,, 9991.50
16.39.11 @%)÷@*) ld=ld= ;fO{hsf] ,, 13664.50
16.40.00 lh=cfO{=/]8\o';/ 0.00
16.40.01 !!÷@Æ
x #÷$Æ uf]6f 57.50
16.40.02 !÷@Æ x !Æ ,, 79.00
16.40.03 #÷$Æ x !Æ ,, 121.50
16.40.04 !!÷@Æ x !Æ ,, 151.00
16.40.05 !!÷@Æ x @Æ ,, 253.00
16.41.00 Pr=l8=kL=:6]g/ 0.00
16.41.01 Pr=l8=kL=:6]g/ @% ld=ld= uf]6f 107.00
16.41.02 Pr=l8=kL=:6]g/ #@ ld=ld= uf]6f 128.50
16.41.03 Pr=l8=kL=:6]g/ $) ld=ld= uf]6f 149.50
16.41.04 Pr=l8=kL=:6]g/ %)ld=ld= uf]6f 171.00
16.41.05 Pr=l8=kL=:6]g/ ^# ld=ld= uf]6f 192.50
16.42.00 Pr=l8=kL=/]8';/ 0.00
16.42.01 Pr=l8=kL=/]8';/ @) x @% ld=ld= uf]6f 33.00
16.42.02 Pr=l8=kL=/]8';/ @% x #@ ld=ld= ,, 64.50
16.42.03 Pr=l8=kL=/]8';/ #@ x $) ld=ld= ,, 64.50
16.42.04 Pr=l8=kL=/]8';/ $) x %) ld=ld= ,, 64.50
16.42.05 Pr=l8=kL=/]8';/ %) x ^# ld=ld= uf]6f 138.50
16.43.00 wf/f 0.00
16.43.01 wf/f !÷@Æ lkQn uf]6f 708.00
16.43.02 wf/f !÷@Æ l:6n ,, 553.00
16.43.03 wf/f !÷@Æ h];g ,, 506.00
16.43.04 wf/f !÷@Æ Knfli6s ,, 74.50
16.44.00 laa ss\ 0.00
16.44.01 laa ss\ !÷@Æ ;fO{hsf] :of088{ :6Ln ,, 553.00
16.44.02 a|f; laa ss\ !÷@Æ ;fO{hsf] ,, 206.00
16.44.03 a|f; gf]hn ss\ !÷@Æ ;fO{hsf] ,, 255.50
16.44.04 ˆn]lShjn 6fO{ksf] wf/fsf] 6'6L ,, 4645.00
16.45.00 ˆnf]6 eNj !÷@Æ Aof; uf]6f 2558.50
16.45.01 #÷$Æ Aof; ,, 2904.50
16.45.02 !Æ Aof; ,, 4306.50
16.45.03 !!÷$Æ Aof; ,, 9167.00
16.45.04 ! Aof;
!÷@Æ
,, 12283.50
16.45.05 @Æ Aof; ,, 18975.00
16.46.00 hfd g6\ 0.00
16.46.01 !÷@Æ Aof; uf]6f 116.00
16.46.02 #÷$Æ Aof; ,, 290.00
16.46.03 !Æ Aof; ,, 434.00
16.47.00 Po/ eNj 0.00
16.47.01 !÷@Æ Aof; uf]6f 1910.00
16.47.02 #÷$Æ Aof; ,, 2359.50
16.47.03 !Æ Aof; ,, 3651.50
16.48.00 lk=lk=cf/=k~rsGof kfO{k jf ;f] ;/x 0.00
16.48.01 kfO{k lk=Pg= @ 0.00
16.48.01.01 @) ld=ld= aflx/L Aof;sf] @=* ld=ld= afSnf] ld6/ 107.00
16.48.01.02 @% ld=ld= aflx/L Aof;sf] #=% ld=ld= afSnf] ld6/ 165.50
16.48.01.03 #@ ld=ld= aflx/L Aof;sf] $=$ ld=ld= afSnf] ld6/ 270.00
16.48.01.04 $) ld=ld= aflx/L Aof;sf] %=% ld=ld= afSnf] ld6/ 417.00
16.48.01.05 %) ld=ld= aflx/L Aof;sf] ^=( ld=ld= afSnf] ld6/ 644.00
16.48.01.06 ^# ld=ld= aflx/L Aof;sf] *=^ ld=ld= afSnf] ld6/ 1020.50
16.48.01.07 &% ld=ld= aflx/L Aof;sf] ld6/ 0.00
16.48.01.08 () ld=ld= aflx/L Aof;sf] ld6/ 0.00
16.48.01.09 !!) ld=ld= aflx/L Aof;sf] ld6/ 0.00
16.48.02.00 kfO{k lk=Pg= @=% 0.00
16.48.02.01 @) ld=ld= aflx/L Aof;sf] #=$ ld=ld= afSnf] ld6/ 126.00
16.48.02.02 @% ld=ld= aflx/L Aof;sf] $=@ ld=ld= afSnf] ld6/ 193.50
16.48.02.03 #@ ld=ld= aflx/L Aof;sf] %=$ ld=ld= afSnf] ld6/ 309.00
16.48.02.04 $) ld=ld= aflx/L Aof;sf] ^=& ld=ld= afSnf] ld6/ 474.50
16.48.02.05 %) ld=ld= aflx/L Aof;sf] *=# ld=ld= afSnf] ld6/ 734.00
16.48.02.06 ^# ld=ld= aflx/L Aof;sf] !)=% ld=ld= afSnf] ld6/ 1143.00
16.49.00.00 kfO{k lkml6Ë;\ (Accessories) 0.00
16.49.01.00 O{Naf] 0.00
16.49.01.01 @) ld=ld= uf]6f 22.50
16.49.01.02 @% ld=ld= " 45.00
16.49.01.03 #@ ld=ld= " 67.50
16.49.01.04 $) ld=ld= " 135.00
16.49.01.05 %) ld=ld= " 225.00
16.49.01.06 ^# ld=ld= " 399.00
16.49.02.00 ;s]6 (Sockets) 0.00
16.49.02.01 @) ld=ld= uf]6f 22.50
16.49.02.02 @% ld=ld= " 28.50
16.49.02.03 #@ ld=ld= " 45.00
16.49.02.04 $) ld=ld= " 79.00
16.49.02.05 %) ld=ld= " 124.00
16.49.02.06 ^# ld=ld= " 219.50
16.49.03.00 O{Sjfon 6L (Equal Tee) 0.00
16.49.03.01 @) ld=ld= uf]6f 34.00
16.49.03.02 @% ld=ld= " 51.00
16.49.03.03 #@ ld=ld= " 84.50
16.49.03.04 $) ld=ld= " 163.00
16.49.03.05 %) ld=ld= " 264.50
16.49.03.06 ^# ld=ld= " 477.50
16.49.04.00 qm; 6L (Cross Tee) 0.00
16.49.04.01 @) ld=ld= uf]6f 51.00
16.49.04.02 @% ld=ld= " 73.50
16.49.04.03 #@ ld=ld= " 118.00
16.49.04.04 $) ld=ld= " 230.50
16.49.04.05 %) ld=ld= " 388.00
16.49.04.06 ^# ld=ld= " 511.50
16.49.05.00 $%) O{Naf] (45 Degree Elbow) 0.00
16.49.05.01 @) ld=ld= uf]6f 20.50
16.49.05.02 @% ld=ld= " 32.00
16.49.05.03 #@ ld=ld= " 49.50
16.49.05.04 $) ld=ld= " 92.50
16.49.05.05 %) ld=ld= " 156.50
16.49.05.06 ^# ld=ld= " 247.50
16.49.06.00 Kn]g o'lgog (Plain Union) 0.00
16.49.06.01 @) ld=ld= uf]6f 71.00
16.49.06.02 @% ld=ld= " 120.50
16.49.06.03 #@ ld=ld= " 191.00
16.49.06.04 $) ld=ld= " 325.00
16.49.06.05 %) ld=ld= " 768.50
16.49.06.06 ^# ld=ld= " 884.50
16.49.07.00 o' SNofDk (U - Clamps) 0.00
16.49.07.01 @) ld=ld= uf]6f 13.48
16.49.07.02 @% ld=ld= " 16.00
16.49.07.03 #@ ld=ld= " 28.50
16.49.07.04 $) ld=ld= " 35.00
16.49.07.05 %) ld=ld= " 53.00
16.49.07.06 ^# ld=ld= " 70.00
16.49.08.00 O{08 Sofk (End Caps) 0.00
16.49.08.01 @) ld=ld= uf]6f 20.50
16.49.08.02 @% ld=ld= " 30.50
16.49.08.03 #@ ld=ld= " 46.50
16.49.08.04 $) ld=ld= " 71.00
16.49.08.05 %) ld=ld= " 118.00
16.49.08.06 ^# ld=ld= " 219.50
16.49.09.00 :6k eNe (Stop Valve) 0.00
16.49.09.01 @) ld=ld= uf]6f 456.50
16.49.09.02 @% ld=ld= " 600.00
16.49.09.03 #@ ld=ld= " 607.00
16.49.09.04 $) ld=ld= " 963.00
16.49.09.05 %) ld=ld= " 1595.50
16.49.09.06 ^# ld=ld= " 2322.50
16.49.10.00 Knfli6s an eNe (Plastic Ball Valve) 0.00
16.49.10.01 @) ld=ld= uf]6f 179.00
16.49.10.02 @% ld=ld= " 242.00
16.49.10.03 #@ ld=ld= " 388.00
16.49.10.04 $) ld=ld= " 992.50
16.49.10.05 %) ld=ld= " 1268.50
16.49.10.06 ^# ld=ld= " 2227.00
16.49.11.00 x6jf6/ an eNe (Hot Water Ball Valve) 0.00
16.49.11.01 @) ld=ld= uf]6f 506.00
16.49.11.02 @% ld=ld= " 712.50
16.49.11.03 #@ ld=ld= " 1199.00
16.49.12.00 an eNa d]6n a9L (Ball Valve Metal Body) 0.00
16.49.12.01 @) ld=ld= uf]6f 782.00
16.49.12.02 @% ld=ld= " 1079.00
16.49.12.03 #@ ld=ld= " 1454.00
16.49.12.04 $) ld=ld= " 2969.50
16.49.12.05 %) ld=ld= " 3715.50
16.49.12.06 ^# ld=ld= " 4754.00
16.49.13.00 an eNa d]6n a9L lkmd]n (Ball Valve Metal Body Female) 0.00
16.49.13.01 @) ld=ld= uf]6f 782.00
16.49.13.02 @% ld=ld= " 1079.00
16.49.13.03 #@ ld=ld= " 1454.00
16.49.13.04 $) ld=ld= " 2969.50
16.49.13.05 %) ld=ld= " 3715.50
16.49.13.06 ^# ld=ld= " 4754.00
16.49.14.00 qm; cf]e/ (Cross Over) 0.00
16.49.14.01 @) ld=ld= uf]6f 135.00
16.49.14.02 @% ld=ld= " 192.50
16.49.14.03 #@ ld=ld= " 275.50
16.49.15.00 Knu (Plug) 0.00
16.49.15.01 @) ld=ld= uf]6f 13.50
16.49.15.02 @% ld=ld= " 19.50
16.49.15.03 #@ ld=ld= " 26.00
16.49.16.00 Knfli6s km\n]Gh (Plastic Flange) 0.00
16.49.16.01 $) ld=ld= uf]6f 246.50
16.49.16.02 %) ld=ld= " 411.50
16.49.16.03 ^# ld=ld= " 536.00
16.50.00 d]6n lkml68=\;\ (Adopter for G.I. Taps) 0.00
16.50.01 d]n ;s]6 (Male Socket) 0.00
16.50.01.01 @) ld=ld= x !/@" uf]6f 265.50
16.50.01.02 @) ld=ld= x #/$" " 312.50
16.50.01.03 @% ld=ld= x !/@" " 253.00
16.50.01.04 @% ld=ld= x #/$" " 318.00
16.50.01.05 #@ ld=ld= x !/@" " 309.00
16.50.01.06 #@ ld=ld= x #/$" " 367.50
16.50.01.07 #@ ld=ld= x !" " 573.00
16.50.01.08 $) ld=ld= x %/$" " 1047.50
16.50.01.09 %) ld=ld= x #/@" " 1581.00
16.50.01.10 ^# ld=ld= x @" " 2294.50
16.50.02.00 lkmd]n ;s]6 (Female Socket) 0.00
16.50.02.01 @) ld=ld= x !/@" uf]6f 197.00
16.50.02.02 @) ld=ld= x #/$" " 224.00
16.50.02.03 @% ld=ld= x !/@" " 199.00
16.50.02.04 @% ld=ld= x #/$" " 245.00
16.50.02.05 #@ ld=ld= x !/@" " 236.00
16.50.02.06 #@ ld=ld= x #/$" " 253.00
16.50.02.07 #@ ld=ld= x !" " 438.50
16.50.02.08 $) ld=ld= x %/$" " 922.50
16.50.02.09 %) ld=ld= x #/@" " 1195.50
16.50.02.10 ^# ld=ld= x @" " 1759.50
16.50.03.00 d]n O{Naf] (Male Elbow) 0.00
16.50.03.01 @) ld=ld= x !/@" uf]6f 254.00
16.50.03.02 @% ld=ld= x !/@" " 274.50
16.50.03.03 @% ld=ld= x #/$" " 331.50
16.50.03.04 #@ ld=ld= x !/@" " 549.50
16.50.03.05 #@ ld=ld= x #/$" " 391.00
16.50.03.06 #@ ld=ld= x !" " 757.50
16.50.03.07 $) ld=ld= x %/$" " 1070.00
16.50.04.00 lkmd]n O{Naf] (Female Elbow) 0.00
16.50.04.01 @) ld=ld= x !/@" uf]6f 201.50
16.50.04.02 @% ld=ld= x !/@" " 207.00
16.50.04.03 @% ld=ld= x #/$" " 261.00
16.50.04.04 #@ ld=ld= x !/@" " 384.50
16.50.04.05 #@ ld=ld= x #/$" " 318.00
16.50.04.06 #@ ld=ld= x !" " 537.50
16.50.04.07 $) ld=ld= x %/$" " 567.50
16.50.04.08 %) ld=ld= x #/@" " 1011.50
16.50.04.09 ^# ld=ld= x @" " 1466.50
16.50.05.00 d]n l;6]8 O{Naf] (Male Seated Elbow with Disk) 0.00
16.50.05.01 @) ld=ld= x !/@" uf]6f 266.50
16.50.05.02 @% ld=ld= x !/@" " 308.00
16.50.05.03 @% ld=ld= x #/$" " 343.00
16.50.06.00 lkmd]n l;6]8 O{Naf] (Female Seated Elbow with Disk) 0.00
16.50.06.01 @) ld=ld= x !/@" uf]6f 292.50
16.50.06.02 @% ld=ld= x !/@" " 238.50
16.50.06.03 @% ld=ld= x #/$" " 269.00
16.50.07.00 d]n 6L (Male Tee) 0.00
16.50.07.01 @) ld=ld= x !/@" x @) ld=ld= uf]6f 261.00
16.50.07.02 @) ld=ld= x #/$" x @) ld=ld= " 293.50
16.50.07.03 @% ld=ld= x !/@" x @% ld=ld= " 272.00
16.50.07.04 @% ld=ld= x #/$" x @% ld=ld= " 337.50
16.50.07.05 #@ ld=ld= x !/@" x #@ ld=ld= " 418.00
16.50.07.06 #@ ld=ld= x #/$" x #@ ld=ld= " 428.50
16.50.07.07 #@ ld=ld= x !" x #@ ld=ld= " 764.00
16.50.07.08 $) ld=ld= x %/$" x $) ld=ld= " 1237.00
16.50.07.09 %) ld=ld= x #/@" x %) ld=ld= " 1780.00
16.50.07.10 ^# ld=ld= x !" x ^# ld=ld= " 2308.00
16.50.07.11 ^# ld=ld= x @" x ^# ld=ld= " 2507.00
16.50.08.00 lkmd]n 6L (Female Tee) 0.00
16.50.08.01 @) ld=ld= x !/@" x @) ld=ld= uf]6f 204.50
16.50.08.02 @) ld=ld= x #/$" x @) ld=ld= " 226.00
16.50.08.03 @% ld=ld= x !/@" x @% ld=ld= " 233.00
16.50.08.04 @% ld=ld= x #/$" x @% ld=ld= " 304.50
16.50.08.05 #@ ld=ld= x !/@" x #@ ld=ld= " 346.50
16.50.08.06 #@ ld=ld= x #/$" x #@ ld=ld= " 382.00
16.50.08.07 #@ ld=ld= x !" x #@ ld=ld= " 608.00
16.50.08.08 $) ld=ld= x %/$" x $) ld=ld= " 1083.50
16.50.08.09 $) ld=ld= x !/@" x $) ld=ld= " 1102.50
16.50.08.10 %) ld=ld= x #/@" x %) ld=ld= " 1536.00
16.50.08.11 ^# ld=ld= x !" x ^# ld=ld= " 2102.50
16.50.08.12 ^# ld=ld= x @" x ^# ld=ld= " 2221.50
16.50.09.00 d]n o'lgog (Male Union) 0.00
16.50.09.01 @) ld=ld= x !/@" uf]6f 466.50
16.50.09.02 @% ld=ld= x #/$" " 673.00
16.50.09.03 #@ ld=ld= x !" " 964.00
16.50.09.04 $) ld=ld= x %/$" " 1865.50
16.50.09.05 %) ld=ld= x #/@" " 2559.50
16.50.09.06 ^# ld=ld= x @" " 4763.00
16.50.10.00 lkmd]n o'lgog (Female Union) 0.00
16.50.10.01 @) ld=ld= x !/@" uf]6f 454.00
16.50.10.02 @% ld=ld= x #/$" " 663.00
16.50.10.03 #@ ld=ld= x !" " 929.50
16.50.10.04 $) ld=ld= x %/$" " 1423.50
16.50.10.05 %) ld=ld= x #/@" " 2390.00
16.50.10.06 ^# ld=ld= x @" " 4524.50
16.50.11.00 /]8\o';/ ;s]6 (Reducer Socket) 0.00
16.50.11.01 @) ld=ld= x @% ld=ld= uf]6f 29.50
16.50.11.02 #@ ld=ld= x @) ld=ld= " 38.50
16.50.11.03 #@ ld=ld= x @% ld=ld= " 42.00
16.50.11.04 $) ld=ld= x @) ld=ld= " 60.00
16.50.11.05 $) ld=ld= x @% ld=ld= " 72.00
16.50.11.06 $) ld=ld= x #@ ld=ld= " 84.50
16.50.11.07 %) ld=ld= x @) ld=ld= " 110.50
16.50.11.08 %) ld=ld= x @% ld=ld= " 121.50
16.50.11.09 %) ld=ld= x #@ ld=ld= " 130.50
16.50.11.10 %) ld=ld= x $) ld=ld= " 146.50
16.50.11.11 ^# ld=ld= x @) ld=ld= " 201.50
16.50.11.12 ^# ld=ld= x @% ld=ld= " 219.50
16.50.11.13 ^# ld=ld= x #@ ld=ld= " 204.50
16.50.11.14 ^# ld=ld= x $) ld=ld= " 224.00
16.50.11.15 ^# ld=ld= x %) ld=ld= " 233.00
16.50.12.00 /]8\o';/ O{Naf] (Reducer Elbow) 0.00
16.50.12.01 @) ld=ld= x @% ld=ld= uf]6f 42.00
16.50.12.02 #@ ld=ld= x @) ld=ld= " 62.00
16.50.12.03 #@ ld=ld= x @% ld=ld= " 79.00
16.50.12.04 $) ld=ld= x @) ld=ld= " 143.00
16.50.12.05 $) ld=ld= x @% ld=ld= " 154.00
16.50.12.06 $) ld=ld= x #@ ld=ld= " 190.00
16.50.13.00 /]8\o';/ 6L (Reducer Tee) 0.00
16.50.13.01 @% ld=ld= x @) ld=ld= x @) ld=ld= uf]6f 48.50
16.50.13.02 @% ld=ld= x @) ld=ld= x @% ld=ld= " 52.00
16.50.13.03 #@ ld=ld= x @) ld=ld= x @) ld=ld= " 107.00
16.50.13.04 #@ ld=ld= x @) ld=ld= x #@ ld=ld= " 81.00
16.50.13.05 #@ ld=ld= x @% ld=ld= x @) ld=ld= " 113.50
16.50.13.06 #@ ld=ld= x @% ld=ld= x #@ ld=ld= " 85.50
16.50.13.07 $) ld=ld= x @) ld=ld= x $) ld=ld= " 127.00
16.50.13.08 $) ld=ld= x @% ld=ld= x $) ld=ld= " 130.50
16.50.13.09 $) ld=ld= x #@ ld=ld= x $) ld=ld= " 146.50
16.50.13.10 %) ld=ld= x @) ld=ld= x %) ld=ld= " 284.50
16.50.13.11 %) ld=ld= x @% ld=ld= x %) ld=ld= " 290.00
16.50.13.12 %) ld=ld= x #@ ld=ld= x %) ld=ld= " 295.50
16.50.13.13 %) ld=ld= x $) ld=ld= x %) ld=ld= " 233.00
16.50.13.14 ^# ld=ld= x @) ld=ld= x ^# ld=ld= " 369.00
16.50.13.15 ^# ld=ld= x @% ld=ld= x ^# ld=ld= " 369.00
16.50.13.16 ^# ld=ld= x #@ ld=ld= x ^# ld=ld= " 369.00
16.50.13.17 ^# ld=ld= x $) ld=ld= x ^# ld=ld= " 369.00
16.50.13.18 ^# ld=ld= x %) ld=ld= x ^# ld=ld= " 410.50
16.50.14.00 km]/n :of8n (Ferrule Shaddle) 0.00
16.50.14.01 !!÷@Æ Aof; uf]6f 360.00
16.50.14.02 @Æ Aof; Æ 404.50
16.50.14.03 @!÷@Æ Aof; Æ 360.00
16.50.14.04 #Æ Aof; Æ 404.50
16.50.14.05 $Æ Aof; Æ 506.00
16.51.00 6\o"jj]n x]8 0.00
16.51.01 6\o"jj]n x]8 -!* s]=hL= tf}n ePsf]_ uf]6f 0.00
16.51.02 6\o"jj]n x]8 -@@ s]=hL= tf}n ePsf]_ ,, 0.00
lk=le=;L= lkmN6/ -!!÷@Æ Aof; !=% dL=
16.52.00 uf]6f 530.50
nDafO{sf]_
16.53.00 lk=eL=;L= ;]08 6\ofk !!÷@Æ ,, 265.50
16.54.00 lk=eL=;L= slKnË !!÷@Æ ,, 94.50
16.55.00 lk=eL=;L= P8K6/ !!÷@Æ ,, 94.50
16.56.00 lk=eL=;L= kfO{k !!÷@Æ ,, 58.50
16.57.00 l;lnË jf6/ 6fO{6 d]6]l/on s]=hL= 383.50
16.58.00 ;Ne]G6 l;d]G6 6\o"a s]=hL= 826.00
16.59.00 jf6/ :6k /a/ l;n s]=hL= 200.00
17 cf}hf/ (Tools) 0.00
17.01 !)) ld=ld= 8fosf] lxl6Ë Kn]6 uf]6f 1261.00
17.02 !%) ld=ld= 8fosf] lxl6Ë Kn]6 Æ 1891.00
17.03 @)) ld=ld= 8fosf] lxl6Ë Kn]6 Æ 3146.00
17.04 #)) ld=ld= 8fosf] lxl6Ë Kn]6 Æ 4538.50
17.05 6]km\nf]g se/ ld6/ 4412.00
17.06 ydf]{qmf]d qmfO{g rs uf]6f 945.50
17.07 km\Nff] /]u'n]6/ Æ 945.50
17.08 /a/ Uof:s]6 ld6/ 1891.00
17.09 6]km\nf]g 6]k uf]6f 28.50
17.10 d];g :Sjfo/ -!@Æ nfdf]_ Æ 477.50
17.11 d];g l:6|Ë /f]n - ld:qLsf] wfuf]_ Æ 67.50
17.12 Sn XofDa/ -sf+6L lemSg]_ Æ 315.00
17.13 KnDaa nfO{g Æ 90.00
17.14 :n]h XofDa/ -!=% s]=hL=_ Æ 1067.50
17.15 9'Ëf 8|]; ug]{ x\ofDa/ Æ 477.50
17.16 kmnfddf k|of]u x'g] /]tL !*Æ Æ 449.50
17.17 /]tL ;fdfGo -km\of6_ Æ 229.00
17.18 g/d k|sf/sf] a|; !*Æ Æ 180.00
17.19 kmnfd] a|; $Æ Æ 225.00
17.20 kmnfd] s/fO{ !*Æ / @ s]=hL= Æ 258.50
17.21 kmnfd] s/fO{ !*Æ / @ s]=hL=aL6 kmls{Psf] Æ 326.00
17.22 s]/f]l;g hl/Sofg -% ln6/sf]_ Æ 84.50
17.23 s+lqm6 lrhn (Chisel) Æ 786.50
17.24 Double Ended Spanner !(÷!* Æ 219.50
17.25 Double Ended Spanner !(÷@) Æ 230.50
17.26 Double Ended Spanner @!÷@@ Æ 292.50
17.27 Measuring Tape # ld6/ Metal Æ 185.50
17.28 Measuring Tape % ld6/ Metal Æ 303.50
17.29 Measuring Tape #) ld6/ Fiber Æ 1685.50
17.30 Die set 1/2" x 1" Automatic Æ 11000.00
17.31 Die set 1/2" x 2" Automatic Æ 33000.00
17.32 Die set 11/4" x 2" Automatic Æ 23000.00
17.33 Die set 11/2" x 3" Automatic Æ 31000.00
17.34 Die set 4" Automatic Æ 28500.00
17.35 Die Teeth 3/4" Æ 1668.50
17.36 Die Teeth 1/2" Æ 1668.50
17.37 Die Teeth 1" Æ 1668.50
17.38 Die Teeth 11/2" Æ 3979.50
17.39 Die Teeth 2" Æ 5314.50
17.40 Die Teeth 3" Æ 6921.00
17.41 Die Teeth 4" 12976.50
17.42 Pipe Cutter 4" Æ 4511.00
17.43 Pipe Vice 2" Æ 2719.00
17.44 Plane Jack Æ 1384.50
17.45 Rough Wood file 10" Æ 1069.50
17.46 Screw driver 10" Æ 151.00
17.47 Spirit Level (Metal 12") Æ 766.50
17.48 Cable Pulling Machine 3 ton Æ 15757.50
17.49 Steel Chain Æ 2126.00
17.50 Wheel Jack Machine Adjustable Type 22690.50
17.51 Hack Saw Frame Æ 226.50
17.52 Hack Blade Æ 14.00
17.53 Bench Vice 2" uf]6f 2113.50
17.54 Bench Vice 3" Æ 3065.00
17.55 Bench Vice 4" Æ 3930.00
17.56 Chain Wrench 3" Æ 2472.00
17.57 Chain Wrench 4" Æ 3596.50
17.58 Chain Wrench 6" Æ 4511.00
17.59 Pipe Wrench 12" (Medium) Æ 2017.00
17.60 Pipe Wrench 14" Æ 4832.50
17.61 Pipe Wrench 18" Æ 6051.00
17.62 Pipe Wrench 36" (Heavy) Æ 17240.50
17.63 Pipe Wrench 48" Æ 29042.50
17.64 Adustable Wrench 6" uf]6f 309.00
17.65 Adustable Wrench 8" Æ 451.50
17.66 Adustable Wrench 10" Æ 966.50

17.67 Adustable Wrench 12" Æ 1180.00

17.68 Adustable Wrench 14" Æ 1404.50


17.69 Head pan Plastic Æ 506.00
17.70 u}+tL Æ 775.00
17.71 sf]bfnf]÷ km?jf Æ 635.00
17.72 emDkn -!!÷@Æ x % lkm6 nfdf] _ Æ 1755.00
17.73 XofDa/ % s]=hL= Æ 1038.00
17.74 XofDa/ @=% s]=hL= uf]6f 519.00
17.75 lJxn Aof/f] (Wheel Barrow) ## s]=hL= uf]6f 11345.50
17.76 Chisel Kingpin 1.5" -!=% s]=hL=_ jf ;f] ;/x uf]6f 426.50
17.77 cf/f -xft]_ uf]6f 0.00
17.78 6'n as; ;]6 uf]6f 0.00
17.79 Anf] n]Dk uf]6f 0.00
17.80 Knfo;{ uf]6f 0.00
17.81 KmNof6 kmfon uf]6f 0.00
18 cGo ;fdfgx? 0.00
18.01 cnsqf -lj6'ldg_ 0.00
18.01.01 Bitumen 80/100 grade (New M.S. Drum packed) s]=hL= 0.00
18.01.02 CRMB - DIGO 55(New M S Drum packed) s]=hL= 0.00
18.02.00 CATIONIC BITUMEN EMULSION HIMALSION WITHOUT BARREL 0.00
18.02.01 HIMALSION-R/1 (RS 60% Bitumen) s]=hL= 0.00
18.02.02 HIMALSION-R/2 (RS 65% Bitumen) s]=hL= 0.00
18.02.03 HIMALSION-R/2 (RS 70% Bitumen) s]=hL= 0.00
18.02.04 HIMALSION-M/1 (MS 60% Bitumen) ,, 0.00
18.02.05 HIMALSION-M/2 (MS 65% Bitumen) s]=hL= 0.00
18.02.06 HIMALSION-S (SS 60% Bitumen) ,, 0.00
18.02.07 HIMALSION-SS (Slurry seal 60% Bitumen) ,, 0.00
18.02.08 Anti strippng Agent (Anti strip Liquid) ,, 0.00
18.03.00 vfnL 8|\d 0.00
18.03.01 cnsqfsf] vfnL 8|d uf]6f 340.00
18.03.02 k]6|f]nsf] vfnL 8|d ,, 2000.00
18.04.00 OGwg 0.00
18.04.01 dl§t]n 0.00
18.04.02 l8hn 0.00
18.04.03 k]6|f]n 0.00
18.04.04 n'la|s]G6 0.00
18.05.00 8f]/L 0.00
18.05.01 -s_ g/Ljn s]=hL= 144.50
18.05.02 -v_ h'6 ,, 144.50
18.05.03 -u_ Knfli6s ,, 219.50
18.06.00 l;d]06 e]lG6n];g 0.00
18.06.01 l;d]06 e]lG6n];g -( x (_Æ uf]6f 29.00
18.06.02 -( x !@_Æ ,, 34.50
18.06.03 -( x !%_Æ ,, 34.50
18.06.04 -( x !*_Æ ,, 41.00
18.06.05 -! x !_ lkm= ,, 59.00
18.06.06 -! x ! !÷@_ lkm= ,, 64.50
18.06.07 -! x @_ lkm= ,, 80.50
18.06.08 -@ x @_ lkm= ,, 198.00
18.07.00 l;d]06 /]lnË 0.00
18.07.01 l;d]06 /]lnË laleGg ;fO{hsf] uf]6f 88.50
18.07.02 ;]tf] l;d]06 /]lnË(Marble) uf]6f 440.80
18.08.00 Stainless Steel sf] /]lnË kfO{k 0.00
e/f+usf] nflu 50 ldldsf] x]G*/]n kfO{k, ljrdf 20
ldld Jof;sf] :^]gn]; l:^n kfO{ksf] ltg nfO{g, 40
18.08.01 ldldsf] &F*F KF]i^ / 75 ldldsf] jf]n"i^/ lkm6 1335.00
kfO{ksf] /]lné jgfO{ h*fg ug] sfd
prfO{ 90 ;]=ld=(304 Quality)
j/)*fsf] nflu 50 ldldsf] x]G*/]n kfO{k, ljrdf 20
ldld Jof;sf] :^]gn]; l:^n kfO{ksf] ltg nfO{g, 40
18.08.02 lkm6 1355.00
ldldsf] &F*F KF]i^sf] /]lné jgfO{ h*fg ug] sfd
prfO{ 90 ;]=ld= (304 Quality)
18.09.00 kbf{sf] nflu kfO{k 0.00
18.09.01 kbf{sf] nflu kfO{k cfNd'lgod /=dL= 143.65
18.09.02 kbf{sf] nflu kfO{k :6Ln ,, 915.00
18.10.00 cf/=l;=l;=afp08\/L lkn/ 0.00
18.10.01 cf/=l;=l;=afp08/L lkn/ -$Æ x $Æ_ /=kmL= 203.90
18.10.02 cf/=l;=l;=afp08/L lkn/ -#Æ x #Æ_ ,, 154.50
18.10.03 a|fs]6 cf/=l;=l;= -$Æ x $Æ_ ,, 220.40
18.11.00 l;d]06 vfnL af]/f uf]6f 19.00
18.12.00 h'6 vfnL af]/f 7"nf] ,, 132.35
18.13.00 l;d]06 vfnL af]/f kf]lnlyg ,, 19.00
18.14.00 ;gdfO{sf j=dL= 417.50
18.15.00 kmf]/ dfO{sf ,, 760.00
18.16.00 sf7 6f+:g] u'+b s]=hL= 353.50
18.17.00 ;f]n';g (Admixture) 0.00
18.17.01 ;]kmlqm6 nufot ;a} k|sf/sf] Admixtures nL6/ 330.60
18.17.02 {l;n s]ldsn (Seal Chemicals) s]=hL= 352.75
18.17.03 qm\|ofs lkmn s]ldsn s]=hL= 160.00
18.17.04 kdf{ l/qm]6 s]ldsn s]=hL= 160.00
18.17.05 jfn k'6LË s]ldsn s]=hL= 105.00
18.17.06 6«+]'6 s]ldsn nL= 826.50
:yflgo :t/df d]l;gaf6 pTkflbt @=%) dL= nfdf] cf/=;L=
19 ;L= NP3 Xo"d kfOk ;s]6 (COLLAR) ;lxt 0.00
19.01.00 -s_ &% dL=dL= ;]n df]6fO ePsf] 0.00
19.01.01 #) ;]=ld Aof;sf] uf]6f 7000.00
19.01.02 $% ;]=ld Aof;sf] uf]6f 8500.00
19.02.00 -v_ *% dL=dL= ;]n df]6fO ePsf] 0.00
19.02.01 ^) ;]=ld Aof;sf] uf]6f 10500.00
19.02.02 &% ;]=ld Aof;sf] uf]6f 13500.00
19.03.00 -u_ !)) dL=dL= ;]n df]6fO ePsf] uf]6f 0.00
19.03.01 () ;]=ld Aof;sf] uf]6f 16500.00
19.04.00 -3_ !@) dL=dL= ;]n df]6fO ePsf] uf]6f 0.00
19.04.01 :yflgo :t/df d]l;gaf6 pTkflbt @=%) dL= nfdf]uf]6f
!@) ld=ld Aof;sf] cf/=;L= 28500.00
20 ;L= NP2 Xo"d kfOk 0.00
20.01.00 -s_ @% dL=dL= ;]n df]6fO ePsf] 0.00
20.01.01 !% ;]=ld Aof;sf] uf]6f 1700.00
20.01.02 @@=% ;]=ld Aof;sf] uf]6f 2500.00
20.02.00 -v_ #) dL=dL= ;]n df]6fO ePsf] 0.00
20.02.01 #) ;]=ld Aof;sf] uf]6f 3300.00
20.02.02 $) ;]=ld Aof;sf] uf]6f 3500.00
20.03.00 -u_ #% dL=dL= ;]n df]6fO ePsf] 0.00
20.03.01 $% ;]=ld Aof;sf] uf]6f 5250.00
20.04.00 -3_ $) dL=dL= ;]n df]6fO ePsf] 0.00
20.04.01 %% ;]=ld Aof;sf] uf]6f 4500.00
20.05.00 -ª_ $% dL=dL= ;]n df]6fO ePsf] 0.00
20.05.01 ^) ;]=ld Aof;sf] uf]6f 5500.00
20.06.00 -r_ %) dL=dL= ;]n df]6fO ePsf] 0.00
20.06.01 &% ;]=ld Aof;sf] uf]6f 7250.00
20.07.00 -5_ %% dL=dL= ;]n df]6fO ePsf] 0.00
20.07.01 () ;]=ld Aof;sf] uf]6f 9200.00
20.08.00 -h_ ^@ dL=dL= ;]n df]6fO ePsf] 0.00
20.08.01 !)% ;]=ld Aof;sf] uf]6f 12300.00
20.09.00 -em_ &) dL=dL= ;]n df]6fO ePsf] 0.00
20.09.01 !@) ;]=ld Aof;sf] uf]6f 15900.00
21 laB't kf]nx? 0.00
21.01 :yfgLo :t/df pTkflbt laB't kf]nx? -cf/=;L=;L=_ 0.00
21.01.01 * dL6/ nfdf] uf]6f 6006.45
21.01.02 ( dL6/ nfdf] uf]6f 7053.40
21.02.00 :yfgLo :t/df pTkflbt laB't kf]nx? -l;hlg∙ul/Psf sf7sf] kf]n_ 0.00
21.02.01 * dL6/ nfdf] uf]6f 4904.35
21.02.02 ( dL6/ nfdf] uf]6f 5510.50
21.03.00 kmnfdsf] 6\o"an/ laB't kf]nx? 0.00
21.03.01 * dL6/ nfdf] uf]6f 12840.00
21.03.02 ( dL6/ nfdf] uf]6f 19260.00
21.03.03 !! dL6/ nfdf] uf]6f 27820.00
22 jf6/ k|'lkmË ;fdfg 0.00
Dr Fixit Pidifin 2K coating for waterproofing over terrace,
22.01 slab, roof,toilets etc. au{ lkm6 60.70
Dr Fixit Pidifin 2K coating for waterproofing over Rcc
22.02 basement, watertank sharewall & floor etc. Æ 66.40
Dr Fixit Torchshield 3160 (3mm APP heavy duty bitumin
22.03 membrane ) laying for waterproofing over roofgarden, RBC Æ 105.00
roof etc.
Dr Fixit Proofcoat elastomaric coating for waterproofing
22.04 over external plaster surface Æ 44.25
Dr Fixit Dampgaurd coating for waterproofing over damp
22.05 surface Æ 60.70
Dr Fixit Dampgaurd coating on the POP surface for the
22.06 hygenic surface for hospital ceiling & wall Æ 38.60
Dr Fixit waterrepellin WR coating for waterproofing & fungi
22.07 resistence for brick/stone surface etc. Æ 33.40
Epoxy self levelling 2mm using Dr Fixit Pidipoxy ESL for
22.08 Hospital operation,ICU theatre floor Æ 231.75

Epoxy self levelling 2mm using Dr Fixit Pidipoxy ESL with


22.09 3mm epoxy mortar for Hospital operation,ICU theatre floor Æ 281.00

Epoxy coating using Dr Fixit Pidipoxy EC Hospital floor &


22.10 ceiling Æ 66.40

22.11 Dr Fixit Pidiproof LW ( integral waterproofing chemicals) ln6/ 286.80

22.12 Dr Fixit Powder waterproof( integral waterproofing powder) s]=hL= 138.00


22.13 Dr Fixit Pidcrete URP ( bonding & repair material) ln6/ 595.30
22.14 Dr Fixit Super Latex (SBR Latex for repair & waterproofing) Æ 738.50
22.15 Dr Fixit Repellin WR (waterrepellent chemicals) Æ 639.60
Dr Fixit Proofcoat Black ( Bitumin waterproofing chemicals
22.16 for AC roof ) Æ 699.80
Dr Fixit Proofcoat Elastomaric ( exterplaster plastered
22.17 waterproofing chemicals) s]=hL= 893.00
Dr Fixit Tar Epoxy ( corrosion resistant coating for concrete
22.18 & metal structure) ln6/ 372.50
Dr Fixit Dampguard ( waterproofing coating chemicals for
22.19 damp surface) s]=hL= 881.60
22.20 Dr Fixit Pidifin 2K ( waterproofing coating chemicals) s]=hL= 281.00
22.21 Dr Fixit Pidiseal PS41G (polysulphide for expansion joints) s]=hL= 1085.60

22.22 Dr Fixit Pidiseal PS42P (polysulphide for expansion joints) s]=hL= 1085.60
Pidiseal PG 43 (fuel & flame resistant sealent for
22.23 highways,exp[ressways,runways & pavements) s]=hL= 893.00
22.24 Dr Fixit Pidiprime A (Polysulphide primer) s]=hL= 1356.00
Dr Fixit Curing compound (curing compound for concrete &
22.25 plaster) s]=hL= 182.00
22.26 Dr Fixit Pidipoxy ESL (epoxy self levelling) s]=hL= 545.90
22.27 Dr Fixit Pidipoxy EP (epoxy primer) s]=hL= 970.20
22.28 Dr Fixit EC (epoxy coating) s]=hL= 848.70
22.29 Dr Fixit Piditop 333 (non metallic floor hardener) s]=hL= 55.00

Dr Fixit Pidifin Torchshield 3160 (3mm APP membrane for


22.30 waterproofing of wooden /RBC & terrace garden) au{ lkm6 77.25

22.31 Dr Fixit Pidifin Torchshield Primer ln6/ 259.00


Krystol T2 crystallasion coating for waterproofing over RCC
22.32 surface au{ lkm6 77.25
22.33 Kim (internal memberane) s]=hL= 562.30
22.34 Krystol T2 s]=hL= 573.20
22.35 Krystol T1 s]=hL= 628.30
22.36 Krystol Plug s]=hL= 551.00
22.37 Baricote s]=hL= 617.40
22.38 Recron 3s,6mm (fibre admixture for plaster) s]=hL= 584.50
22.39 ;'k/ Knli6;fOh/ ln= 556.70
6 mm thick Flex-O- Board (Water proof cement 0.00
22.40
board) 6mm thick for false ceiling j=ld=
Water proofing treatment by Injection and Pressure
Grouting System using perma Grout 500 with
22.41
mixing fresh gray cement slurry all complete. (slope j=ld= 0.00
roof, sunk slab, basement )

Providing and applying Dustban/Permise


22.42 chemicals for Anti Termite Treatment all 0.00
complete. j=ld=
23 af]6 la?jfsf] d"No 0.00
23.01 clDn;f] / g]lko/ em\ofË af6 km'6fPsf] -# ;]6\;\_ uf]6f 3.50
23.02 clDn;f] ÷g]lko/ sl6Ë Æ 3.00
23.03 af+; la?jf Æ 27.50
23.04 g]lko/ ;]6 -tLg cf+vfsf]_ Æ 2.00
23.05 l;;f}sf] Ps aif{ k"/fgf] lj?jf uf]6f 13.50
23.06 l6s, sbd, d;nf, a}+; Æ 16.50
23.07 nx/] lkkn, czf]s Æ 52.50
23.08 w"kL Æ 49.00
23.09 uf]ug Æ 14.50
23.10 lgdf/f] Æ 14.50
23.11 asfOgf] Æ 5.00
23.12 l/Ýf Æ 20.00
23.13 hfkflgh ;Nnf Æ 20.00
23.14 vf]6] ;Nnf Æ 20.00
23.15 l;dn Æ 20.00
23.16 plQ; Æ 5.00
23.17 ?b|fIf Æ 19.00
23.18 k}o'+ Æ 14.50
23.19 x/f]{ Æ 19.00
23.20 a/f} Æ 19.00
23.21 d;nf Æ 20.00
23.22 a]n Æ 20.00
23.23 b'lwnf] Æ 14.50
23.24 lsDa' Æ 3.00
23.25 cdnf Æ 20.00
23.26 /fha]If Æ 14.50
23.27 ;]tf] l;l/; Æ 8.00
23.28 l6ssf] lap s]=hL= 642.50
23.29 l;;f}sf] lap s]=hL= 428.50
23.30 as}gfsf] lap Æ 268.00
23.31 sbdsf] lap Æ 3103.50
23.32 af+;sf] ;s/ uf]6f 161.00
23.33 lsDa'sf] sndL xf+uf Æ 22.00
23.34 6f+sL]sf] a]gf{ Æ 8.00
23.35 sf]O{/fnf]]sf] a]gf{ Æ 14.50
23.36 s'6\ld/f, lgdf/f]sf] a]gf{ Æ 14.50
23.37 cfd|kfnL / dlnsfsf] ! aif]{ la?jf Æ 172.00
23.38 cGo hftsf cf+k / lnrLsf ! aif]{ la?jf Æ 86.50
23.39 ;"kf/Lsf ! aif]{ la?jf Æ 27.50
23.40 gl/jnsf ! aif]{ la?jf Æ 134.50
23.41 gLd tyf a9x/sf ! aif]{ la?jf Æ 33.00
23.42 s6x/sf ! aif]{ la?jf Æ 38.00
23.43 cfsL{8 la?jf uf]6f 118.50
23.44 s]/fsf] ;s/ -la?jf_ Æ 27.50
23.45 nf}7 ;Nnf uf]6f 27.50
23.46 ;'uGwjfn uf]6f 8.00
23.47 lr/fOtf] uf]6f 6.00
23.48 s6'; uf]6f 11.50
23.49 ;'uGw sf]sLnf uf]6f 33.00
23.50 w'kL uf]6f 14.50
23.51 slkm uf]6f 10.50
23.52 Olkn Kofln8f uf]6f 9.50
23.53 kft] a/ uf]6f 14.50
23.54 a8x/ uf]6f 21.00
23.55 n6x/ uf]6f 21.00
23.56 l;dn uf]6f 21.00
23.57 kf]nLAofu s]=hL= 370.00
23.58 uf]ugsf] lap s]=hL= 6217.50
23.59 lgdf/f]sf] lap s]=hL= 4441.00
23.60 6f+sLsf] lap s]=hL= 450.00
23.61 sf]O/fnfsf] lap s]=hL= 626.50
23.62 l/Ýfsf] lap s]=hL= 321.50
23.63 hfkflgh ;Nnfsf] lap s]=hL= 3799.00
23.64 vf]6] ;Nnfsf] lap s]=hL= 2568.50
23.65 l;dnsf] lap s]=hL= 3692.00
23.66 plQ;sf] lap s]=hL= 1231.00
23.67 cld|;f]sf] lap s]=hL= 3638.50
23.68 s6x/,a8x/,n6x/sf] lap s]=hL= 257.50
23.69 rfksf] lap s]=hL= 899.50
23.70 lrp/Lsf] lap s]=hL= 386.00
23.71 nK;Lsf] lap s]=hL= 562.50
23.72 lgdsf] lap s]=hL= 450.00
23.73 t]hkftsf] lap s]=hL= 899.50
23.74 kft]j/sf] lap s]=hL= 4922.50
23.75 lr/fOtf]sf] lap s]=hL= 13375.50
23.76 s'l/nf]sf] lap s]=hL= 6741.50
23.77 af]s] l6Dd'/sf] lap s]=hL= 899.50
23.78 /ftf] l;l/;sf] lap s]=hL= 899.50
23.79 ?b|fIfsf] lap s]=hL= 450.00
23.80 u'ndf]x/sf] lap s]=hL= 386.00
23.81 k}o'sf] lap s]=hL= 386.00
23.82 x/f]{,a/f]{sf] lap s]=hL= 675.00
23.83 a]nsf] lap s]=hL= 3103.50
23.84 b'lwnf]]sf] lap s]=hL= 6741.50
23.85 cdnfsf] lap s]=hL= 2782.50
23.86 dfnflu/Lsf] lap s]=hL= 1686.00
23.87 w'kLsf] lap s]=hL= 3874.00
23.88 slkmsf] lap s]=hL= 642.50
23.89 Olkn Kofln8fsf] lap s]=hL= 642.50
23.90 d;nfsf] lap s]=hL= 2568.50
23.91 af+;sf] lap s]=hL= 6206.50
23.92 l;l/;sf] lap s]=hL= 1124.00
23.93 u'ndf]x/sf] lap s]=hL= 1012.00
23.94 /fha[Ifsf] lap s]=hL= 1124.00
23.95 vo/sf] lap s]=hL= 899.50
23.96 ;k{uGw lap s]=hL= 1124.00
23.97 ;t'jf lap s]=hL= 11235.50
23.98 ljif lap s]=hL= 0.00
23.99 Ogb|fo0fL lap s]=hL= 0.00
23.100 cf]v]cfn' lap s]=hL= 14.50
23.101 ;]tf]ljvdf lap s]=hL= 0.00
23.102 sfnf] lavdf lap s]=hL= 0.00
23.103 /ftf] cf]v/ la?jf uf]6f 59.50
23.104 t]hkft la?jf uf]6f 27.50
23.105 ;k{uGw la?jf uf]6f 27.50
23.106 ;t'jf la?jf uf]6f 27.50
23.107 :yflgo sf7af6 agfOg] cfsL{8 aS; uf]6f 1124.00
23.108 :yflgo sf7af6 agfOg] xa]{l/od k|m]d uf]6f 1124.00
23.109 df}/Lsf] 3f/ - a|'8/ / ;'k/ km|]d ;lxt_ uf]6f 3060.20
23.110 df}/Lsf] uf]nf dfq uf]6f 5.00
23.111 df}/Lsf] 3f/ ;lxt df}/L uf]nf -b; k||m]d_ uf]6f 4944.00
23.112 cn}rL la?jf uf]6f 9.00
23.113 u8of}nf s]=hL= 1135.00

gf]6 M != pNn]lvt cf=j=@)&@÷)&# sf] dfn;fdfgsf] b//]6 @)&@ df ul/Psf] ताप्लेजुङग ahf/ ;e]
{If0f / पाँचथर lhNnfdf u/]sf] ahf/ b//]6nfO{ ;d]t cfwf/dfgL lgwf{/0f ul/Psf] 5 .
@= pko'Qm{ pNn]lvt dfn;fdfgx? Affx]s cGo aflx/L dfn ;fdfgx?sf] xsdf पाँचथर lhNnfsf]
b//]6df 9'jfgL ;dfa]z u/L b/laZn]if0f ug]{ .
#= pNn]lvt b//]6df Eof6 ;dfa]; ul/Psf] 5}g .
cf=a=)&$.)&%, ताप्लेजुङग
s}lkmot
s}lkmot

kSsL ;*s
;a} df};d
5.00
5.00
cf=a=074.
075
cf=a=074.
मल्ू यको १० प्रतिशत 075

मल्ू यको १० प्रतिशत

k]^«f]lnod kbfy{sf] d"No #^a( ePdf


k'gM a}&s a;L b//]^ lgwf{/)f ul/g]% .

s}lkmot

पाँचथर जिल्लाको दररे ट


पाँचथर जिल्लाको दररे ट
पाँचथर जिल्लाको दररे ट
पाँचथर जिल्लाको दररे ट
k|lt @% ls= dL=

k|lt @% ls= dL=

k|lt @% ls= dL=

ljz]if c;lhnf] ;dfg

OGwg k|lt 306f


पाँचथर जिल्लाको दररे ट
पाँचथर जिल्लाको दररे ट
पाँचथर जिल्लाको दररे ट
पाँचथर जिल्लाको दररे ट
पाँचथर जिल्लाको दररे ट
पाँचथर जिल्लाको दररे ट
पाँचथर जिल्लाको दररे ट
पाँचथर जिल्लाको दररे ट
पाँचथर जिल्लाको दररे ट
पाँचथर जिल्लाको दररे ट
पाँचथर जिल्लाको दररे ट
पाँचथर जिल्लाको दररे टबाट
पाँचथर जिल्लाको दररे टबाट
पाँचथर जिल्लाको दररे टबाट
पाँचथर जिल्लाको दररे टबाट
पाँचथर जिल्लाको दररे टबाट
पाँचथर जिल्लाको दररे टबाट
पाँचथर जिल्लाको दररे टबाट
पाँचथर जिल्लाको दररे टबाट
पाँचथर जिल्लाको दररे टबाट
पाँचथर जिल्लाको दररे टबाट
पाँचथर जिल्लाको दररे टबाट
पाँचथर जिल्लाको दररे टबाट
\^f nufpg] sfd
6A-250Volt
16A-250Volt
(2-40) A-250Volt
s}lkmot
9'jfgL tyf cGo
s/ ;dfa]; ug{'kg]
{.

9'jfgL tyf cGo


s/ ;dfa]; ug{'kg]
{.

(पाँचथरको जिल्ला
दररे टबाट) ढुवानी तथा
लोडिङ/ अनलोडिङ
वाहेक
0.79375mm th
0.635 mm th
0.47625 mm th
0.3968 mm th
0.3175 mm th
0.2579 mm th
(पाँचथरको जिल्ला
दररे टबाट
Rate of Panchthar
h8fg ;lxt
h8fg ;lxt
h8fg ;lxt

h8fg ;lxt
h8fg ;lxt
h8fg ;lxt
Door Spring Savrat
Brand or
equivalent

9'jfgL ;dfa];
ug{'kg]{ . (Rate
of Ilam)
Rate of Ilam
corrected in previous year
corrected in previous year
corrected in previous year
Add 3%
Transportation

Rate of Ilam

Add 3%
Transportation
Add 3%
Transportation

Add 3%
Transportation
Taparia or equivalent

Taparia or equivalent

Taparia or equivalent

g]kfn lj6'ldg
Jof/]n pBf]un
tf]s] cg";f/

g]kfn cfon
lgudn] tf]s]
cg";f/
g]kfn cfon
lgudn] tf]s]
cg";f/

Rate of Panchthar

Rate of Panchthar
Transportation
charge not
included in base
rate

Transportation
charge not
included in base
rate
@ df ul/Psf] ताप्लेजुङग ahf/ ;e]
ul/Psf] 5 .
?sf] xsdf पाँचथर lhNnfsf]
दर-बिश्लेषण-२०७१-०७२/बिद्धुत/ताप्लेजुङ Page 116

Electrical Material District Rate 2074/75 Taplejung


S.N Particular Unit Rate S.N Particular Unit Rate

1 Skilled Labour No 775.00 Roma Or North-West Switch and Socket


2 semi skilled No 645.00 1 1 gang Switch with Plate Set No 211.75
3 un skilled No 600.00 2 2gang Switch with Plate Set No 272.25
4 Superviser No
Lighting accessories 3 3gang Switch with Plate Set No 302.50
1 20 Watt FTL rod No 91.00 4 4 gang Switch with Plate Set No 332.75
2 40 Watt FTL rod No 91.00 5 5 gang Switch with Plate Set No 544.50
3 40 Watt FTL ballast(Chowk) No 300.00 6 6 gang Switch with Plate Set No 665.50
4 150 Watt SV bulb No 1391.00 7 T.V Socket With Plate No 181.50
5 250Watt SV bulb No 1551.50 8 T.P. Socket With Plate No 181.50
6 40 Watt 220 Volt Starter No 21.50 9 Bell Push with Plate No 181.50
7 Alluminium Listy No No Rate 10 5 Amp socket with plate No 320.65
8 PVC Listy 0.5" No 48.50 11 15 Amp socket with plate No 429.55
9 PVC Listy 0.75" No 48.50 12 13Amp socket with plate No 429.55
10 PVC Listy 1" No 59.00 Switch Gears(ISI) Mark
11 PVC Listy 1.5" No 64.50 1 16 Amp 415 Volt DP Main Switch S No 320.65
12 PVC Listy 2" No No Rate 2 32 Amp 415 Volt DP Main Switch S No 1028.50
13 Acralic Cover 2'x2' No No Rate 3 63 Amp 415 Volt DP Main Switch S No 2081.20
Dyna/CPL Switch $ Socket 4 100 Amp 415 Volt DP Main Switch No 4888.40
1 1 Way Switch No 32.50 5 16 Amp 415 Volt TP Main Switch No 834.90
2 1 Bell Push No No Rate 6 32 Amp 415 Volt TP Main Switch No 1373.35
3 2 Way Switch one way No 32.50 7 63 Amp 415 Volt TP Main Switch No 2891.90
4 3 Way Switch No No Rate 8 100 Amp 415 Volt TP Main Switch No 5535.75
5 4 Way Switch No No Rate 9 200 Amp 415 Volt TP Main Switch No 7979.95
6 6 Way Switch No No Rate 10 16 Amp 415 Volt TP Main Switch HRC No 1845.25
7 16 Amp Switch Indicator No 32.50 11 32 Amp 415 Volt TP Main Switch HRC No 2087.25
8 6 Amp Uni Socket Switch Combined WNo 48.50 12 63 Amp 415 Volt TP Main Switch HRC No 4307.60
9 Dimmer Single 400 Watt No 41.70 13 100 Amp 415 Volt TP Main Switch HRC No 7005.90
10 Dimmer Single 800 Watt No 503.00 14 200 Amp 415 Volt TP Switch HRC No 9341.20
11 16/6 Amp Combined S/Socket With ShuNo 353.50 15 300 Amp 415 Volt TP Switch HRC No 11942.70
12 DP Switch 16-32 Amp No 160.50 16 400 Amp 415 Volt TP Switch HRC No 2359.50
13 Blanking Plate Single No 59.00 17 16 Amp 415 Volt Change over Switch No 1845.25
14 Telephone Socket Single No 86.00 18 32 Amp 415 Volt Change over Switch No 2087.25
15 Angle Holder No 27.83 19 63 Amp 415 Volt Change over Switch No 4307.60
16 Ceiling Rose No 27.83 20 100 Amp 415 Volt Change over Switch No 7005.90
17 Bottom Holder No 27.00 21 200 Amp 415 Volt Change over Switch No 9341.20
18 Buzzer No 267.50 22 300 Amp 415 Volt Change over Switch No 11942.70
19 Musical Bell No 283.50 23 63 Amp Bus Bar Chamber No 2359.50
20 Dry Charcoal kg 25.75 24 100 Amp Bus Bar Chamber No 4537.50
25 200 Amp Bus Bar Chamber No 6352.50
26 300 Amp Bus Bar Chamber No 7925.50
Panel Board & Accessaries Roma/North West PVc Box
Pannel Board Doubled door type with locking arrangement with two
coat of red oxide metal primer & final coats enamel paints with TPNE
CU Busbar & Acc. (MORANG RATE 069/070)
1 4"x4" PVC box No 20.57
1
60/100Amp Panel Board with
Suitable color,Floor Mounted Double
cover,Push Type Switch, Size
9"x36"x48" Set 17250.00 2 4"x6" PVC box No 37.51

Prepared By:- Checked By:- Approved By:-


दर-बिश्लेषण-२०७१-०७२/बिद्धुत/ताप्लेजुङ Page 117

Electrical Material District Rate 2074/75 Taplejung


S.N Particular Unit Rate S.N Particular Unit Rate
60/100Amp Panel Board with
2
Suitable color,Floor Mounted Double
cover,Push Type Switch, Size
12"x36"x48" Set 17250.00 Fan: Almonard,Bajaj Or Equ.
3
60/100Amp Panel Board with
Suitable color,Floor Mounted Double
cover,Push Type Switch, Size
9"x48"x60" Set 17250.00 1 36" Ceiling Fan Set 3025.00
4
60/100Amp Panel Board with
Suitable color,Floor Mounted Double
cover,Push Type Switch, Size
12"x48"x60" Set 17250.00 2 42" Ceiling Fan Set 3025.00
5
150/200 Amp Panel Board with
Suitable color,Floor Mounted Double
cover,Push Type Switch, Size
9"x38"x52" Set 34500.00 3 48" Ceiling Fan Set 3388.00
6
150/200 Amp Panel Board with
Suitable color,Floor Mounted Double
cover,Push Type Switch, Size
9"x42"x56" Set 34500.00 4 56" Ceiling Fan Set No rate

250/300 Amp Panel Board with


Suitable color,Floor Mounted Double
cover,Push Type Switch, Size
7 12"x48"x60" Set 34500.00 5 10" Wall Fan Set 1870.00
400 Amp Panel Board with Suitable
color,Floor Mounted Double
cover,,Push Type Switch, Size Size
8 12"x52"x66" Set 63250.00 6 9" Exhaust Fan Set No rate
7 12" Exhaust Fan Set 2057.00
Moulded Case Circuit Breaker (18 /50KA) Siemens made

1 18/63 Amp MCCB Siemens Set 3638.00 MCB and Distribution Board Geco.ISI & Eqv.
2 80/100 Amp MCCB Siemens Set 4601.00 1 6-32 Amp SP MCB No 166.38
3 20/32 Amp MCCB Siemens (40KA) Set 2 6-32 Amp DP MCB No 805.26
4 63/125 Amp MCCB Siemens Set 7704.00 3 6-32 Amp TP MCB No 1184.59
5 160Amp MCCB Siemens Set 9416.00 4 6-32 Amp TPN MCB No 1543.96
6 200/250 Amp MCCB Siemens Set 18725.00 5 40-60 Amp SP MCB No 658.85
7 400 Amp MCCB Siemens Set 24075.00 6 40-60 Amp DP MCB No 1304.38
8 60 Amps MCCBMitsubishi Japan Set 2568.00 7 40-60 Amp TP MCB No 1883.37
General 8 40-60 Amp TPN MCB No 2362.53
11 Voltmeter ( 0- 500 ) Set 428.00 9 4 Way SPN DB Double Cover No 1197.90
12 Amp Meter ( 0-500 ) Set 428.00 10 6 Way SPN DB Double Cover No 1610.51
13 Indicator Set 166.00 11 8 Way SPN DB Double Cover No 1610.51
14 Selector Switch Set 342.50 12 12 Way SPN DB Double Cover No 2136.26
15 C.T.Coil ( One ) Set 481.50 13 16 Way SPN DB Double Cover No 2628.73
16 Energy Meter SP Set 749.00 14 3 Way TPN DB Double Cover No 3294.23
17 Energy Meter 3 Phase Set 4146.50 15 4 Way TPN DB Double Cover No 3294.23
Join Box Metal / Wooden / PVC 16 6 Way TPN DB Double Cover No 4092.83
17 8 Way TPN DB Double Cover No 5104.39
1 4" x 4" Junction Box Metal No 89.54 18 2 Pole PVC MCB Box No 68.97
2 4" x6" Junction Box Metal No 104.06 19 4 Pole PVC MCB Box No 139.15
3 6" x 8" Junction Box Metal No 166.98 Steel Tubelar/Wood Pole
4 8" x 10" Junction Box Metal No 208.12
5 8" x 12" Junction Box Metal No 278.30 1 9 Meter Steel Tubelar Pole Set 19260.00
6 4" x4" Junction Box Wooden No 37.50 2 8 Meter Steel Wooden Pole Set 4904.35
Prepared By:- Checked By:- Approved By:-
दर-बिश्लेषण-२०७१-०७२/बिद्धुत/ताप्लेजुङ Page 118

Electrical Material District Rate 2074/75 Taplejung


S.N Particular Unit Rate S.N Particular Unit Rate

7 4" x 6" Junction Box Wooden No 48.50 3 9 Meter Steel Wooden Pole Set 5510.50
8 6" x 8" Junction Box Wooden No 64.50 Roma/Appolo Bell Indicator
9 8" x 10" Junction Box Wooden No 96.50 1 4 way Indicator With Bell Rm 1498.00
10 4" x4" Junction Box PVC No 20.57 2 6 way Indicator With Bell Rm 2300.50
11 4" x6" Junction Box PVC No 37.51 3 8 way Indicator With Bell Rm 2942.50
12 6" x 8" Junction Box PVC No 53.24 4 12 way Indicator With Bell Rm 4601.00
13 8" x 10" Junction Box PVC No 76.23
Cable /Wire Nepal Cable, Prakash Cable or NS
1 1/18 PVC Copper Wire Nepal, PrakashRm 12.33 5 7/20 PVC Copper Wire Nepal, Prakash Rm 50.36
2 3/22 PVC Copper Wire Nepal, PrakashRm 12.59 6 7/18 PVC Copper Wire Nepal, Prakash Rm 64.83
3 3/20 PVC Copper Wire Nepal, PrakashRm 18.89 7 7/16 PVC Copper Wire Nepal, Prakash Rm 0.00
4 7/22 PVC Copper Wire Nepal, PrakashRm 31.48
General Fittings. Power Cable Copper Conductor Armored
1 Dome light 6" Decorative Set 748.00 Nepal Cable, Prakash Cable Or N.S
2 Dome light 6" Decorative Brace Set 1063.00
3 Dome light 8" Decorative Set 879.25 1 4mm2 4 core Nepal ,Prakash Or NS No 308.55
4 Dome light 8" Decorative Brace Set 1325.50 2 6mm 4 core Nepal ,Prakash Or NS
2
No 417.45
5 40-60 Watt Down Light Set 621.00 3 10mm2 4 core Nepal ,Prakash Or NS No 623.15
6 Wall Bracket/Spot Light/Mirror Light 4 16mm 4 core Nepal ,Prakash Or NS
2
No 834.90
Bulk head Single Direct Ord. Bonus Set 1230.50 5 25mm 4 core Nepal ,Prakash Or NS
2
No 1355.20
6 35mm2 4 core Nepal ,Prakash Or NS No 1875.50
7 Wall Bracket/Spot Light/Mirror Light 7 4mm 2 core Nepal ,Prakash Or NS
2
No 187.55
Bulk head Single Direct Ord. Decon Set 1123.50 8 6mm2 2 core Nepal ,Prakash Or NS No 235.95
9 10mm 2 core Nepal ,Prakash Or NS
2
No 369.05
8 Wall Bracket/Spot Light/Mirror Light Cable Shoe
Bulk head Single Direct Ord. Prince Set 610.00 1 16 sq mm Cable Shoe No 20.50
9 Dinning Lamp Decorative Med Set 2300.50 2 25 sq mm Cable Shoe No 32.50
10 Chandlers Lamp 3-5 Lamp Med Set 5885.00 3 35 sq mm Cable Shoe No 37.50
11 Chandlers Lamp 6-8 Lamp Med Set 8453.00 4 50 Sq mm Cable Shoe No 43.00
12 IS: 3043 Copper Plate 80x80x3.15 Set 3852.00 Decorative Wall Brackets
13 IS: 3043 Copper Plate 65x65x3.15 Set 2247.00 1 Decorative Wall Bracke SL Fancy Type No 1230.50
14 G.No. 10 Plastic Coated Cu. Wire Set 2300.50 2 Decorative Wall Bracke Sigle Wallite No 1230.50
15 100 Watt Bulb(ISI) NO 48.50 3 Decorative Wall Bracke Single Vertile No 1230.50
16 40 Watt Bulb(ISI) NO 41.00 Roma/North West PVCBox
17 Earthing Rod Set 2033.00 1 PVC box 4x4 No 20.57
2 PVC box 4x6 No 37.51
Air conditionar 3 PVC box 6x8 No 53.24
1 1.5 ton AC Japan Set No Rate 4 PVC box 6x10 No 76.23
2 2 ton AC Japan Set No Rate Telephone Drop Wire / Pair Cable
1 2/20 Tel wire Coil 1016.50
2 2/22 Tel wire Coil 685.00

Prepared By:- Checked By:- Approved By:-


दर-बिश्लेषण-२०७१-०७२/बिद्धुत/ताप्लेजुङ Page 119

Electrical Material District Rate 2074/75 Taplejung


S.N Particular Unit Rate S.N Particular Unit Rate

Power Cable Copper Conductor Un- Armored Nepal


Cable,Prakash,Or NS 3 2Pair Tel (2x2x0.45) mm Rm 21.50
1 4mm 4 core Nepal ,Prakash Or NS
2
Rm 171.50 4 3Pair Tel (3x2x0.45) mm Rm 32.50
2 6mm2 4 core Nepal ,Prakash Or NS Rm 267.50 5 5Pair Tel (5x2x0.45) mm Rm 37.50
3 10mm 4 core Nepal ,Prakash Or NS Rm
2
385.50 6 10Pair Tel (10x2x0.45) mm Rm 64.50
4 16mm2 4 core Nepal ,Prakash Or NS Rm 749.00 7 15Pair Tel (15x2x0.45) mm Rm 86.00
5 25mm 4 core Nepal ,Prakash Or NS Rm
2
990.00 8 20Pair Tel (15x2x0.45) mm Rm 107.00
6 35mm 4 core Nepal ,Prakash Or NS Rm
2
1498.00
Transformer And Accessories FTL Patti Philips,Wipro, Bajajetc.
1 1x20 FTL Patti No 481.50
1 25 KVA Transformer Set 211320.50 2 1x40 FTL Patti No 514.00
2 50 KVA Transformer Set 299600.00 3 1x20 FTL Minolta TMS200/120 LPF No 1070.00
3 100 KVA Transformer Set 417300.00 4 1x40 FTL Minolta TMS200/140 LPF No 1070.00
4 250 KVA Transformer Set No Rate 5 1x20 FTL Astramini TMS21/118 LPF No 1070.00
5 350 KVA Transformer Set No Rate 6 1x40 FTL Astramini TMS21/118 LPF No 1070.00
6 400 KVA Transformer Set No Rate 7 2x40 FTL F.T.C TCX 20/236 HPF No 2889.00
7 500 KVA Transformer Set No Rate 8 1x40 FTL Box Fitting TMC 501/136 HPF No 1177.00
8 Out Door Type Cable Head Set 1926.00 9 2x40 FTL Box Fitting TMC 501/236 HPF No 1658.50
9 11 KVA Drop out Fuse Set 18404.00 10 1x40 FTLIndustrial Channel With Stove Set 2140.00
10 Lighting Arrester Set 14980.00 EnammellledTKC202/136 HPF
11 Earthing rod Set Set 2033.00 11 2x40 FTL Industrial Channel With Stove Set 2621.50
12 Pin Insulator Set 267.50 Enammelled TKC202/236
13 35mm2 Cable Socket Set 37.50 12 1x40 FTL Opalite With Opal Acrylic Set 1819.00
14 Transfer Tower Set With Clamp Nut BoRoll No Rate Diffuser TCS19/136
15 H.T.Tape Set No Rate 13 2x40 FTL Opalite With Opal Acrylic Set 2868.00
16 3core AL/XL Cable 35 sq.mm Set 1123.50 Diffuser TCS19/236
17 Chain Rm 50.00 14 4x18/20 FTL With Dished Opal Acrylic Set 5885.00
Power cable aluminium conductor Un-Armored
Nepal, Prakash Cable Or NS Cover TBC71/420 or72/420 HPF
15 1x40 FTL Mirror Optic Slim Flat light Set 2568.00
1 4mm2 4 core Nepal ,Prakash Or NS RM 102.00 16 2x40 FTL Mirror Optic Slim Flat light Set 4012.50
2 6mm 4 core Nepal ,Prakash Or NS
2
RM 144.50 17 300/500 Halogen Light Set Set 1444.50
3 10mm2 4 core Nepal ,Prakash Or NS RM 160.50 18 1000 Halogen Light Set Set 3049.50
4 16mm 4 core Nepal ,Prakash Or NS RM
2
225.00 19 150 Watt HPSV Lamp Set 1316.50
5 25mm 4 core Nepal ,Prakash Or NS RM
2
289.00 20 250 Watt HPSV Lamp Set 1444.50
6 35mm2 4 core Nepal ,Prakash Or NS RM 353.50
Electric Pole
1 R.C.C. Pole 8 meter No 6006.45
2 R.C.C. Pole 9 meter No 7053.40
3 Wooden Pole 8 meter No 4904.35
4 Wooden Pole 9 meter No 5510.50
5 Steel Tubelar Pole 8 meter No 12840.00
6 Steel Tubelar Pole 9 meter No 19260.00
7 Steel Tubelar Pole 11 meter No 27820.00
Multistrand Flexible PVC insulated copper wire
MM1 1.0mm2 PVC insulated copper wire Rm 14.76
Rate from Kathmnadu

MM2 1.5mm2 PVC insulated copper wire Rm 20.17


MM3 2.5mm2 PVC insulated copper wire Rm 34.96
MM4 4.0mm2 PVC insulated copper wire Rm 53.11
MM5 6.0mm2 PVC insulated copper wire Rm 68.23
MM6 10.0mm2PVC insulated copper wire Rm 83.36

Prepared By:- Checked By:- Approved By:-


Only for DUDBC Ilam Use Page 120 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
1 Decorative Wall bracket Sl Fancy Type Phillips or equivalent with bulb 10 set
3001 sources Code Level Qty Unit Rate/unit cost Total Cost
labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.03 un skilled 0 nos 600.00 0.00 710.00
materials 15.69.01 a. Decorative wall Bracket 10 nos 1230.50 12305.00
15.13.03 b. Bulb 40 watt 10 nos 41.00 410.00
c screw, grips PVC tape etc. 10 LS 30.00 300.00
13015.00
Actual rate 13725.00
15% conctractor overhead 2058.75
Rate per set Rs. 1578.37 Total (Rs.) 15783.75

2 Decorative Wall bracket Single wallite Type Phillips or equivalent 10 set


3001.1 sources Code Level Qty Unit Rate/unit cost Total Cost
labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.03 un skilled 0 nos 600.00 0.00 710.00
a. Decorative bracket single wallite
materials 15.69.02 type 10 nos 1230.50 12305.00
15.13.03 b. Bulb 40 watt 10 nos 41.00 410.00
c screw, grips PVC tape etc. 10 LS 30.00 300.00
13015.00
Actual rate 13725.00
15% conctractor overhead 2058.75
Rate per set Rs. 1578.37 Total (Rs.) 15783.75

3 Decorative Wall bracket Single Vertile Phillips or equivalent 10 set


3002 sources Code Level Qty Unit Rate/unit cost Total Cost
labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.03 un skilled 0 nos 600.00 0.00 710.00
a. Decorative bracket single vertical
materials 15.69.03 type 10 nos 1230.50 12305.00
15.13.03 b. Bulb 40 watt 10 nos 41.00 410.00
c screw, grips PVC tape etc. 10 LS 30.00 300.00
13015.00
Actual rate 13725.00
15% conctractor overhead 2058.75
Rate per set Rs. 1578.37 Total (Rs.) 15783.75

4 Decorative Wall bracket /spot light/Mirror Light bonus or equivalent 10 set


3002.1 sources Code Level Qty Unit Rate/unit cost Total Cost
labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.03 un skilled 0 nos 600.00 0.00 710.00
Only for DUDBC Ilam Use Page 121 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
a. Wall Bracket/Spot Light/Mirror Light
Bulk head Single Direct Ord. Bonus or
materials 15.58.23 equivalent 10 nos 1230.50 12305.00
15.13.03 b. Bulb 40 watt 10 nos 41.00 410.00
c screw, grips PVC tape etc. 10 LS 30.00 300.00
13015.00
Actual rate 13725.00
15% conctractor overhead 2058.75
Rate per set Rs. 1578.38 Total (Rs.) 15783.75

5 Decorative Wall bracket /spot light/Mirror Light Decon or equivalent 10 set


3003 sources Code Level Qty Unit Rate/unit cost Total Cost
labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.03 un skilled 0 nos 600.00 0.00 710.00
a.Wall Bracket/Spot Light/Mirror Light
Bulk head Single Direct Ord. Decon
materials 15.58.24 or equivalent 10 nos 1123.50 11235.00
15.13.03 b. Bulb 40 watt 10 nos 41.00 410.00
c screw, grips PVC tape etc. 10 LS 30.00 300.00
11945.00
Actual rate 12655.00
15% conctractor overhead 1898.25
Rate per set Rs. 1455.32 Total (Rs.) 14553.25

6 Decorative Wall bracket /spot light/Mirror Light Prince or equivalent 10 set


3003.1 sources Level Qty Unit Rate/unit cost Total Cost
labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.03 un skilled 0 nos 600.00 0.00 710.00
a. Wall Bracket/Spot Light/Mirror Light
Bulk head Single Direct Ord. Prince
materials 15.58.25 or equivalent 10 nos 610.00 6100.00
15.13.03 b. Bulb 40 watt 10 nos 41.00 410.00
c screw, grips PVC tape etc. 10 LS 30.00 300.00
6810.00
Actual rate 7520.00
15% conctractor overhead 1128.00
Rate per set Rs. 864.80 Total (Rs.) 8648.00

7 1x20 Watt F.T.L Patti fitting only Phillips Wipro or equivalent


3004 sources Code Level Qty Unit Rate/unit cost Total Cost
labour 1.08 skilled 0.5 nos 760.00 380.00
1.09 Semi skilled 0.5 nos 600.00 300.00
1.03 un skilled 0 nos 615.00 0.00 680.00
materials 15.70.01 a.1 x 20 FTL Patti 10 nos 481.50 4815.00
15.17.02 b. Choke (electronics) 10 nos 300.00 3000.00
c. Rod, screw, grips etc. 10 LS 30.00 300.00
8115.00
Only for DUDBC Ilam Use Page 122 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
Actual rate 8795.00
15% conctractor overhead 1319.25
Rate per set Rs. 1011.42 Total (Rs.) 10114.25

8 1x40 Watt F.T.L Patti fitting only Phillips/Wipro or equivalent


3005 sources Code Level Qty Unit Rate/unit cost Total Cost
labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.03 un skilled 0 nos 600.00 0.00 710.00
materials 15.70.02 a. 1x40 Watt F.T.L Patti 10 nos 514.00 5140.00
15.17.02 b. Choke (electronics) 10 nos 300.00 3000.00
c. Rod, screw, grips etc. 10 LS 30.00 300.00
8440.00
Actual rate 9150.00
15% conctractor overhead 1372.50
Rate per set Rs. 1052.25 Total (Rs.) 10522.50

9 1x20 Watt F.T.L Set Mirolta TMS 200/120 LPF Phillips or equivalent
3006 sources Code Level Qty Unit Rate/unit cost Total Cost
labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.03 un skilled 0 nos 600.00 0.00 710.00
a.1 x 20 FTL Minolta TMS200/120 LPF
materials 15.70.03 Set 10 nos 1070.00 10700.00
b. screw, grips etc. 10 LS 30.00 300.00
11000.00
Actual rate 11710.00
15% conctractor overhead 1756.50
Rate per set Rs. 1346.65 Total (Rs.) 13466.50

10 1x40 Watt F.T.L Mirolta FMC 200/140 Phillips or equivalent


sources Code Level Qty Unit Rate/unit cost Total Cost
3007 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.03 un skilled 0 nos 600.00 0.00 710.00
a. FTL Set (1x40 Watt F.T.L Mirolta
materials 15.70.04 FMC 200/140) 10 nos 1070.00 10700.00
b.Tube rod 0 nos 0.00
c. screw, grips etc. 10 LS 30.00 300.00
11000.00
Actual rate 11710.00
15% conctractor overhead 1756.50
Rate per set Rs. 1346.65 Total (Rs.) 13466.50

11 1x40 Watt F.T.L Mirolta FMC 200/140 Phillips or equivalent


3007.1 sources Code Level Qty Unit Rate/unit cost Total Cost
labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.03 un skilled 0 nos 600.00 0.00 710.00
a. FTL Set (1x40 Watt F.T.L Mirolta
materials 15.70.04 FMC 200/140) 10 nos 1070.00 10700.00
Only for DUDBC Ilam Use Page 123 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
b.Tube rod 10 nos 0.00
c. screw, grips etc. 10 LS 30.00 300.00
11000.00
Actual rate 11710.00
15% conctractor overhead 1756.50
Rate per set Rs. 1346.65 Total (Rs.) 13466.50

12 1x20 Watt F.T.L Astramini TMS 21/118 LPF Phillips or equivalent


3008 sources Code Level Qty Unit Rate/unit cost Total Cost
labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.03 un skilled 0 nos 600.00 0.00 710.00
a. FTL Set (1x20 Watt F.T.L Astramini
materials 15.70.05 TMS 21/118 LPF) 10 nos 1070.00 10700.00
b.Tube rod 10 nos 0.00
c. screw, grips etc. 10 LS 30.00 300.00
11000.00
Actual rate 11710.00
15% conctractor overhead 1756.50
Rate per set Rs. 1346.65 Total (Rs.) 13466.50
13 1x40 Watt F.T.L Astramini TMS 21/136 HPF Phillips or equivalent
3009 sources Code Level Qty Unit Rate/unit cost Total Cost
labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.03 un skilled 0 nos 600.00 0.00 710.00
materials 15.70.06 a. FTL Set 10 nos 1070.00 10700.00
b.Tube rod 10 nos 0.00
c. screw, grips etc. 10 LS 30.00 300.00
11000.00
Actual rate 11710.00
15% conctractor overhead 1756.50
Rate per set Rs. 1346.65 Total (Rs.) 13466.50
14 2x40 Watt F.T.C TCX 20/236 HPF Decolite Phillips /Wipro or equivalent
3010 sources Code Level Qty Unit Rate/unit cost Total Cost
labour 1.08 skilled 0.5 nos 760.00 380.00
1.09 Semi skilled 0.5 nos 600.00 300.00
1.03 un skilled 0 nos 450.00 0.00 680.00
a. FTL Set (2x40 Watt F.T.C TCX
materials 15.70.07 20/236 HPF) 10 nos 2889.00 28890.00
b.Tube rod 20 nos 0.00
c. screw, grips etc. 10 LS 30.00 300.00
29190.00
Actual rate 29870.00
15% conctractor overhead 4480.50
Rate per set Rs. 3435.05 Total (Rs.) 34350.50

15 1x40 Watt F.T.L Box Fitting TMC 501/136 HPF Phillips/Wipro or equivalent
3011 sources Code Level Qty Unit Rate/unit cost Total Cost
labour 1.08 skilled 0.5 nos 775.00 387.50
Only for DUDBC Ilam Use Page 124 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
1.09 Semi skilled 0.5 nos 645.00 322.50
1.03 un skilled 0 nos 600.00 0.00 710.00
a. FTL Set (1x40 Watt F.T.L Box
materials 15.70.08 Fitting TMC 501/136) 10 nos 1177.00 11770.00
b.Tube rod 10 nos 0.00
c.Chain 10 Rm 0.00 0.00
d Iron Hooks 20 nos 0.00 0.00
e. screw, grips etc. 10 LS 30.00 300.00
12070.00
Actual rate 12780.00
15% conctractor overhead 1917.00
Rate per set Rs. 1469.70 Total (Rs.) 14697.00

16 2x40 Watt F.T.L Box Fitting TMC 501/236 HPF Phillips/Wipro or equivalent
sources Code Level Qty Unit Rate/unit cost Total Cost
3012 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.03 un skilled 0 nos 600.00 0.00 710.00
a. FTL Set (2x40 Watt F.T.L Box
materials 15.70.09 Fitting TMC 501/236) 10 nos 1658.50 16585.00
b.Tube rod 20 nos 0.00
c.Chain 10 Rm 0.00 0.00
d Iron Hooks 20 nos 0.00 0.00
e. screw, grips etc. 10 LS 30.00 300.00
16885.00
Actual rate 17595.00
15% conctractor overhead 2639.25
Rate per set Rs. 2023.42 Total (Rs.) 20234.25

17 1x40 Watt FTL IndustrialChannel Stove Enamelled Reflector Philips/Wipro or eqv


sources Code Level Qty Unit Rate/unit cost Total Cost
3013 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 1 nos 645.00 645.00
1.03 un skilled 1 nos 600.00 600.00 2020.00
a. FTL Set (1x40 Watt FTL
IndustrialChannel Stove Enamelled
materials 15.70.10 Reflector) 10 nos 2140.00 21400.00
b.Tube rod 10 nos 0.00
c.Chain 10 Rm 0.00 0.00
d Iron Hooks 20 nos 0.00 0.00
e. screw, grips etc. 10 LS 30.00 300.00
21700.00
Actual rate 23720.00
15% conctractor overhead 3558.00
Rate per set Rs. 2727.80 Total (Rs.) 27278.00

19 2x40 Watt FTL IndustrialChannel Stove Enamelled Reflector Philips/Wipro or eqv


sources Code Level Qty Unit Rate/unit cost Total Cost
Only for DUDBC Ilam Use Page 125 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
3015 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 1 nos 645.00 645.00
1.03 un skilled 1 nos 600.00 600.00 2020.00
a. FTL Set (2x40 Watt FTL
IndustrialChannel Stove Enamelled
materials 15.70.11 Reflector ) 10 nos 2621.50 26215.00
b.Tube rod 20 nos 0.00
c. Chain 10 nos 0.00 0.00
d. screw, grips , etc. 10 LS 30.00 300.00
e.Iron hook 20 nos 0.00 0.00
26515.00
Actual rate 28535.00
15% conctractor overhead 4280.25
Rate per set Rs. 3281.53 Total (Rs.) 32815.25

20 1x40 Watt F.T.L Opalite with Acrylic Difuser TCS 19/136 Philips or equivalent
sources Code Level Qty Unit Rate/unit cost Total Cost
3016 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 1 nos 645.00 645.00
1.03 un skilled 1 nos 600.00 600.00 2020.00
a. FTL Set (1x40 Watt F.T.L Opalite

materials 15.70.12 with Acrylic Difuser TCS 19/136) 10 nos 1819.00 18190.00
b.Tube rod 10 nos 0.00
c. Chain 10 nos 0.00 0.00
d. screw, grips , etc. 10 LS 30.00 300.00
e.Iron hook 20 nos 0.00 0.00
18490.00
Actual rate 20510.00
15% conctractor overhead 3076.50
Rate per set Rs. 2358.65 Total (Rs.) 23586.50

21 2x40 Watt F.T.L Opalite with Acrylic Difuser TCS 19/236 Philips or equivalent
sources Code Level Qty Unit Rate/unit cost Total Cost
3017 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 1 nos 645.00 645.00
1.03 un skilled 1 nos 600.00 600.00 2020.00
a. FTL Set (2x40 Watt F.T.L Opalite

materials 15.70.13 with Acrylic Difuser TCS 19/236) 10 nos 2868.00 28680.00
b.Tube rod 20 nos 0.00
c. Chain 10 nos 0.00 0.00
d. screw, grips , etc. 10 LS 30.00 300.00
e.Iron hook 20 nos 0.00 0.00
28980.00
Actual rate 31000.00
15% conctractor overhead 4650.00
Rate per set Rs. 3565.00 Total (Rs.) 35650.00

22 4x18/20 Watt F.T.L Dished Opal Acrylic Cover TBC 71/420 HPF, 72/420 Philips or equivalent
sources Code Level Qty Unit Rate/unit cost Total Cost
Only for DUDBC Ilam Use Page 126 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
3018 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 1 nos 645.00 645.00
1.03 un skilled 1 nos 600.00 600.00 2020.00
a. FTL Set (4x18/20 Watt F.T.L
Dished Opal Acrylic Cover TBC
materials 15.70.14 71/420 HPF) 10 nos 5885.00 58850.00
b.Tube rod 40 nos 0.00
c. screw, grips etc. 20 LS 30.00 600.00
59450.00
Actual rate 61470.00
15% conctractor overhead 9220.50
Rate per set Rs. 7069.05 Total (Rs.) 70690.50

23 1x40 Watt F.T.L Mirror Optic HPFPhilips / Wipro or equivalent


sources Code Level Qty Unit Rate/unit cost Total Cost
3019 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 1 nos 645.00 645.00
1.03 un skilled 1 nos 600.00 600.00 2020.00
a. FTL Set (1x40 Watt F.T.L Mirror
materials 15.70.15 Optic HPF) 10 nos 2568.00 25680.00
b.Tube rod 10 nos 0.00
c. Chain 10 nos 0.00 0.00
d. screw, grips , etc. 10 LS 30.00 300.00
e.Iron hook 10 nos 0.00 0.00
25980.00
Actual rate 28000.00
15% conctractor overhead 4200.00
Rate per set Rs. 3220.00 Total (Rs.) 32200.00

24 2x40 Watt F.T.L Mirror Optic HPFPhilips / Wipro or equivalent


sources Code Level Qty Unit Rate/unit cost Total Cost
3020 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 1 nos 645.00 645.00
1.03 un skilled 1 nos 600.00 600.00 2020.00
a. FTL Set (2x40 Watt F.T.L Mirror
materials 15.70.16 Optic) 10 nos 4012.50 40125.00
b.Tube rod 20 nos 0.00
c. Chain 10 nos 0.00 0.00
d. screw, grips , etc. 10 LS 30.00 300.00
e.Iron hook 20 nos 0.00 0.00
40425.00
Actual rate 42445.00
Rate per set Rs. 4881.18 15% conctractor overhead 6366.75
Total (Rs.) 48811.75
25 300/500 Watt Halogen Philips / Wipro or equivalent
sources Code Level Qty Unit Rate/unit cost Total Cost
3021 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 1 nos 645.00 645.00
1.03 un skilled 0 nos 600.00 0.00 1420.00
materials 15.70.17 a. Helogen light set (300/500 Watt) 10 nos 1444.50 14445.00
c. screw, grips etc. 10 LS 30.00 300.00
Only for DUDBC Ilam Use Page 127 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
14745.00
Actual rate 16165.00
15% conctractor overhead 2424.75
Rate per set Rs. 1858.98 Total (Rs.) 18589.75

26 1000 Watt Halogen Philips / Wipro or equivalent


sources Code Level Qty Unit Rate/unit cost Total Cost
labour 1.08 skilled 1 nos 775.00 775.00
3022 1.09 Semi skilled 1 nos 645.00 645.00
1.03 un skilled 0 nos 600.00 0.00 1420.00
materials 15.70.18 a. Helogen light (1000 watt) 10 nos 3049.50 30495.00
c. screw, grips etc. 10 LS 30.00 300.00
30795.00
Actual rate 32215.00
15% conctractor overhead 4832.25
Rate per set Rs. 3704.73 Total (Rs.) 37047.25

27 150 Watt HPSV HPF Philips / Wipro or equivalent


sources Code Level Qty Unit Rate/unit cost Total Cost
3023 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 1 nos 645.00 645.00
1.03 un skilled 0 nos 600.00 0.00 1420.00
materials 15.70.19 a. Light (150 Watt HPSV) 10 nos 1316.50 13165.00
b. 4' 6" Black pIpe 10 LS 250.00 2500.00
c. Clamps ,nut bolts etc. 10 LS 50.00 500.00
16165.00
Actual rate 17585.00
15% conctractor overhead 2637.75
Rate per set Rs. 2022.28 Total (Rs.) 20222.75

28 250 Watt HPSV HPF Philips / Wipro or equivalent


sources Code Level Qty Unit Rate/unit cost Total Cost
3024 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 1 nos 645.00 645.00
1.03 un skilled 0 nos 600.00 0.00 1420.00
materials 15.70.20 a. Light (250 Watt HPSV) 10 nos 1444.50 14445.00
b. 4' 6" Black pIpe 10 LS 250.00 2500.00
c. Clamps ,nut bolts etc. 10 LS 50.00 500.00
17445.00
Actual rate 18865.00
15% conctractor overhead 2829.75
Rate per set Rs. 2169.48 Total (Rs.) 21694.75

Lighting Accessories Philips or equivalent

29 40 Watt FTL Rod Philips or equivalent


sources Code Level Qty Unit Rate/unit cost Total Cost
3025 labour 1.08 skilled 0 nos 775.00 0.00
1.09 Semi skilled 0 nos 645.00 0.00
Only for DUDBC Ilam Use Page 128 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
1.03 un skilled 0 nos 600.00 0.00 0.00
materials 15.17.05 a. Rod (4 ft., 11mm dia.) 10 nos 91.00 910.00
910.00
Actual rate 910.00
15% conctractor overhead 136.50
Rate per set Rs. 104.65 Total (Rs.) 1046.50

30 40 Watt 220 Volt Starter Philips or equivalent


sources Code Level Qty Unit Rate/unit cost Total Cost
3026 labour 1.08 skilled 0 nos 775.00 0.00
1.09 Semi skilled 0 nos 645.00 0.00
1.03 un skilled 0 nos 600.00 0.00 0.00
materials 15.17.03 a.Starter 10 nos 21.50 215.00
215.00
Actual rate 215.00
15% conctractor overhead 32.25
Rate per set Rs. 24.73 Total (Rs.) 247.25

31 20 Watt FTL Rod Philips or equivalent


sources Code Level Qty Unit Rate/unit cost Total Cost
3027 labour 1.08 skilled 0 nos 775.00 0.00
1.09 Semi skilled 0 nos 645.00 0.00
1.03 un skilled 0 nos 600.00 0.00 0.00
materials 15.17.06 a. Rod (4 ft, 20mm dia.) 10 nos 96.50 965.00
965.00
Actual rate 965.00
15% conctractor overhead 144.75
Rate per set Rs. 110.98 Total (Rs.) 1109.75

32 40 Watt 220 Volt FTL Ballast Philips or equivalent


sources Code Level Qty Unit Rate/unit cost Total Cost
3028 labour 1.08 skilled 0 nos 775.00 0.00
1.09 Semi skilled 0 nos 645.00 0.00
1.03 un skilled 0 nos 600.00 0.00 0.00
materials 15.17.02 Chowk (Electronics) 10 nos 300.00 3000.00
3000.00
Actual rate 3000.00
15% conctractor overhead 450.00
Rate per set Rs. 345.00 Total (Rs.) 3450.00

33 150 Watt SV Bulb Philips or equivalent


sources Code Level Qty Unit Rate/unit cost Total Cost
3029 labour 1.08 skilled 0 nos 775.00 0.00
Only for DUDBC Ilam Use Page 129 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
1.09 Semi skilled 0 nos 645.00 0.00
1.03 un skilled 0 nos 600.00 0.00 0.00
materials 15.53.01 a. SV Bulb (150 watt) 10 nos 1391.00 13910.00
13910.00
Actual rate 13910.00
15% conctractor overhead 2086.50
Rate per set Rs. 1599.65 Total (Rs.) 15996.50

34 250 Watt SV Bulb Philips or equivalent


sources Code Level Qty Unit Rate/unit cost Total Cost
3030 labour 1.08 skilled 0 nos 775.00 0.00
1.09 Semi skilled 0 nos 645.00 0.00
1.03 un skilled 0 nos 600.00 0.00 0.00
materials 15.53.02 a. SV Bulb (250 watt) 10 nos 1551.50 15515.00
15515.00
Actual rate 15515.00
15% conctractor overhead 2327.25
Rate per set Rs. 1784.23 Total (Rs.) 17842.25

38 1.5" PVC Listy


sources Code Level Qty Unit Rate/unit cost Total Cost
3034 labour 1.08 skilled 0 nos 775.00 0.00
1.09 Semi skilled 0 nos 645.00 0.00
1.03 un skilled 0 nos 600.00 0.00 0.00
materials 15.53.07 a. Listy (1.5") 10 Rm 64.50 645.00
645.00
Actual rate 645.00
Rate per set Rs. 74.18 15% conctractor overhead 96.75
Total (Rs.) 741.75

39 1" PVC Listy


sources Code Level Qty Unit Rate/unit cost Total Cost
3035 labour 1.08 skilled 0 nos 775.00 0.00
1.09 Semi skilled 0 nos 645.00 0.00
1.03 un skilled 0 nos 600.00 0.00 0.00
materials 15.53.06 a. Listy (1") 10 Rm 59.00 590.00
590.00
Actual rate 590.00
Rate per set Rs. 67.85 15% conctractor overhead 88.50
Total (Rs.) 678.50
39 0.75" PVC Listy
sources Code Level Qty Unit Rate/unit cost Total Cost
3035 labour 1.08 skilled 0 nos 775.00 0.00
1.09 Semi skilled 0 nos 645.00 0.00
1.03 un skilled 0 nos 600.00 0.00 0.00
materials 15.53.05 a. Listy (0.75") 10 Rm 48.50 485.00
485.00
Only for DUDBC Ilam Use Page 130 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
Actual rate 485.00
Rate per set Rs. 55.78 15% conctractor overhead 72.75
Total (Rs.) 557.75

40 0.5" PVC Listy


sources Code Level Qty Unit Rate/unit cost Total Cost
3036 labour 1.08 skilled 0 nos 775.00 0.00
1.09 Semi skilled 0 nos 645.00 0.00
1.03 un skilled 0 nos 600.00 0.00 0.00
materials 15.53.04 a. Listy (0.5") 10 Rm 48.50 485.00
485.00
Actual rate 485.00
Rate per set Rs. 55.78 15% conctractor overhead 72.75
Total (Rs.) 557.75

Dyna / CPL or equivalent Switch & Socket


41 1 Gang 1 one way Switch F
sources Code Level Qty Unit Rate/unit cost Total Cost
3037 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 2 nos 645.00 1290.00
1.03 un skilled 0 nos 600.00 0.00 2065.00
materials 15.62.01 a. Switch 10 nos 211.75 2117.50
15.57.01 b.Metal Box (4"x4") 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 30.00 300.00
3312.90
Actual rate 5377.90
Rate per set Rs. 618.45 15% conctractor overhead 806.69
Total (Rs.) 6184.59

42 1 Gang 1 one way Switch S


sources Code Level Qty Unit Rate/unit cost Total Cost
3038 labour 1.08 skilled 0.5 nos 835.00 417.50
1.09 Semi skilled 1 nos 660.00 660.00
1.03 un skilled 0 nos 615.00 0.00 1077.50
materials 15.62.01 a. Switch 10 nos 193.00 1930.00
15.57.01 b.Metal Box (4"x4") 10 nos 59.00 590.00
c. CM, Screws, Grips etc. 10 LS 30.00 300.00
2820.00
Actual rate 3897.50
Rate per set Rs. 426.41 13% Vat 366.60
Total (Rs.) 4264.10

43 2 Gang 2 one way Switch F


sources Code Level Qty Unit Rate/unit cost Total Cost
3039 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 2 nos 645.00 1290.00
1.03 un skilled 0 nos 600.00 0.00 2065.00
materials 15.62.02 a. Switch 10 nos 272.25 2722.50
Only for DUDBC Ilam Use Page 131 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
15.57.01 b.Metal Box (4"x4") 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 30.00 300.00
3917.90
Actual rate 5982.90
Rate per set Rs. 688.03 15% conctractor overhead 897.44
Total (Rs.) 6880.34
44 2Gang 2 one way Switch S
sources Code Level Qty Unit Rate/unit cost Total Cost
3040 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.03 un skilled 0 nos 600.00 0.00 1032.50
materials 15.62.02 a. Switch 10 nos 272.25 2722.50
15.57.01 15.57.01 b.PVC/Metal Box (4"x4") 10 nos 20.57 205.70
c. CM, Screws, Grips etc. 10 LS 30.00 300.00
3228.20
Actual rate 4260.70
Rate per set Rs. 468.03 13% Vat 419.67
Total (Rs.) 4680.37

45 3 Gang 3 one way Switch F


sources Code Level Qty Unit Rate/unit cost Total Cost
3041 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 2 nos 645.00 1290.00
1.03 un skilled 0 nos 600.00 0.00 2065.00
materials 15.62.03 a. Switch 10 nos 302.50 3025.00
15.57.01 b.Metal Box (4"x4") 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 30.00 300.00
4220.40
Actual rate 6285.40
Rate per set Rs. 722.82 15% conctractor overhead 942.81
Total (Rs.) 7228.21

46 3 Gang 3 one way Switch S


sources Code Level Qty Unit Rate/unit cost Total Cost
3042 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.03 un skilled 0 nos 600.00 0.00 1032.50
materials 15.62.03 a. Switch 10 nos 302.50 3025.00
15.57.01 b.Metal Box (4"x4") 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 30.00 300.00
4220.40
Actual rate 5252.90
Rate per set Rs. 604.08 15% conctractor overhead 787.94
Total (Rs.) 6040.84

47 4 Gang 4 one way Switch F


sources Code Level Qty Unit Rate/unit cost Total Cost
3043 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 2 nos 645.00 1290.00
Only for DUDBC Ilam Use Page 132 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
1.03 un skilled 0 nos 600.00 0.00 2065.00
materials 15.62.04 a. Switch 10 nos 332.75 3327.50
15.57.01 b.Metal Box (4"x4") 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 30.00 300.00
4522.90
Actual rate 6587.90
Rate per set Rs. 717.58 13% Vat 587.98
Total (Rs.) 7175.88

48 4 Gang 4 one way Switch S


sources Code Level Qty Unit Rate/unit cost Total Cost
3044 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.03 un skilled 0 nos 600.00 0.00 1032.50
materials 15.62.04 a. Switch 10 nos 332.75 3327.50
15.57.01 b.PVC/Metal Box (4"x4") 10 nos 20.57 205.70
c. CM, Screws, Grips etc. 10 LS 30.00 300.00
3833.20
Actual rate 4865.70
Rate per set Rs. 536.40 13% Vat 498.32
Total (Rs.) 5364.02

49 6 Gang 6 one way Switch F


sources Code Level Qty Unit Rate/unit cost Total Cost
3045 labour 1.08 skilled 2 nos 775.00 1550.00
1.09 Semi skilled 4 nos 645.00 2580.00
1.03 un skilled 0 nos 600.00 0.00 4130.00
materials 15.62.06 a. Switch 10 nos 665.50 6655.00
15.57.01 b..Metal Box (4"x4") 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 30.00 300.00
7850.40
Actual rate 11980.40
Rate per set Rs. 1377.75 15% conctractor overhead 1797.06
Total (Rs.) 13777.46
50 6 Gang 6 one way Switch S
sources Code Level Qty Unit Rate/unit cost Total Cost
3046 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 2 nos 645.00 1290.00
1.03 un skilled 0 nos 600.00 0.00 2065.00
materials 15.62.06 a. Switch 10 nos 665.50 6655.00
15.57.01 b..PVC/Metal Box (4"x6") 10 nos 37.51 375.10
c. CM, Screws, Grips etc. 10 LS 30.00 300.00
7330.10
Actual rate 9395.10
Rate per set Rs. 1034.80 13% Vat 952.91
Total (Rs.) 10348.01

51 1 Gang 1 one Bell Push F


sources Code Level Qty Unit Rate/unit cost Total Cost
Only for DUDBC Ilam Use Page 133 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
3047 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 2 nos 645.00 1290.00
1.03 un skilled 0 nos 600.00 0.00 2065.00
materials 15.62.09 a. Switch 10 nos 181.50 1815.00
15.57.01 b..Metal Box (4"x4") 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 30.00 300.00
3010.40
Actual rate 5075.40
Rate per set Rs. 583.67 15% conctractor overhead 761.31
Total (Rs.) 5836.71
52 1 Gang 1 one Bell Push S
sources Code Level Qty Unit Rate/unit cost Total Cost
3048 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.03 un skilled 0 nos 600.00 0.00 1032.50
materials 15.62.09 a. Switch 10 nos 181.50 1815.00
15.57.01 b..Metal Box (4"x4") 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 30.00 300.00
3010.40
Actual rate 4042.90
Rate per set Rs. 464.93 15% conctractor overhead 606.44
Total (Rs.) 4649.34

53 16 Amp Switch Indicator F


sources Code Level Qty Unit Rate/unit cost Total Cost
3049 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 2 nos 645.00 1290.00
1.03 un skilled 0 nos 600.00 0.00 2065.00
materials 15.04.03 a. Indicator 10 nos 32.50 325.00
15.57.01 b..Metal Box (4"x4") 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 30.00 300.00
1520.40
Actual rate 3585.40
Rate per set Rs. 412.32 15% conctractor overhead 537.81
Total (Rs.) 4123.21
54 16 Amp Switch Indicator S
sources Code Level Qty Unit Rate/unit cost Total Cost
3050 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.03 un skilled 0 nos 600.00 0.00 1032.50
materials 15.04.03 a. Indicator Switch 10 nos 32.50 325.00
15.57.01 b..Metal Box (4"x4") 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 30.00 300.00
1520.40
Actual rate 2552.90
Rate per set Rs. 293.58 15% conctractor overhead 382.94
Total (Rs.) 2935.84
55 5 Amp Uni Socket Switch Combined With Shutter F
sources Code Level Qty Unit Rate/unit cost Total Cost
Only for DUDBC Ilam Use Page 134 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
3051 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 2 nos 645.00 1290.00
1.03 un skilled 0 nos 600.00 0.00 2065.00
materials 15.03.03 a. Switch (socket 5A, 5 pin) 10 nos 48.50 485.00
15.57.01 b..Metal Box (4"x4") 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 30.00 300.00
1680.40
Actual rate 3745.40
Rate per set Rs. 430.72 15% conctractor overhead 561.81
Total (Rs.) 4307.21

56 5 Amp Uni Socket Switch Combined With Shutter S


sources Code Level Qty Unit Rate/unit cost Total Cost
3052 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.03 un skilled 0 nos 600.00 0.00 1032.50
materials 15.03.03 a. Switch (socket 5A, 5 pin) 10 nos 48.50 485.00
15.57.01 b..Metal Box (4"x4") 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 30.00 300.00
1680.40
Actual rate 2712.90
Rate per set Rs. 311.98 15% conctractor overhead 406.94
Total (Rs.) 3119.84

57 Dimmer Single 400 Watt F


sources Code Level Qty Unit Rate/unit cost Total Cost
3053 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.03 un skilled 0 nos 600.00 0.00 1032.50
materials 15.30.01 a. Switch (Dimmer 400 W) 10 nos 417.00 4170.00
15.57.01 b..Metal Box (4"x4") 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 30.00 300.00
5365.40
Actual rate 6397.90
Rate per set Rs. 735.75 15% conctractor overhead 959.69
Total (Rs.) 7357.59
58 Dimmer Single 400 Watt S
sources Code Level Qty Unit Rate/unit cost Total Cost
3054 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.03 un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 10 nos 417.00 4170.00
b.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 30.00 300.00
5365.40
Actual rate 6397.90
Rate per set Rs. 735.75 15% conctractor overhead 959.69
Total (Rs.) 7357.59
59 Dimmer Single 800 Watt F
Only for DUDBC Ilam Use Page 135 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
sources Code Level Qty Unit Rate/unit cost Total Cost
3055 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.03 un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 10 nos 503.00 5030.00
b.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 30.00 300.00
6225.40
Actual rate 7257.90
Rate per set Rs. 834.65 15% conctractor overhead 1088.69
Total (Rs.) 8346.59

60 Dimmer Single 800 Watt S


sources Code Level Qty Unit Rate/unit cost Total Cost
3056 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.03 un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 10 nos 503.00 5030.00
b.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 30.00 300.00
6225.40
Actual rate 7257.90
Rate per set Rs. 834.65 15% conctractor overhead 1088.69
Total (Rs.) 8346.59

61 16/6 Amp Combined S/Socket With Safety Shutter F


sources Code Level Qty Unit Rate/unit cost Total Cost
3057 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 2 nos 645.00 1290.00
1.03 un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 353.50 3535.00
b.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 30.00 300.00
4730.40
Actual rate 6795.40
Rate per set Rs. 781.47 15% conctractor overhead 1019.31
Total (Rs.) 7814.71

62 16/6 Amp Combined S/Socket With Safety ShutterS


sources Code Level Qty Unit Rate/unit cost Total Cost
3058 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.03 un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 10 nos 353.50 3535.00
b.Box 10 nos 20.57 205.70
c. CM, Screws, Grips etc. 10 LS 30.00 300.00
4040.70
Actual rate 5073.20
Rate per set Rs. 583.41 15% conctractor overhead 760.98
Only for DUDBC Ilam Use Page 136 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
Total (Rs.) 5834.18

63 DP Switch 16-32 Amp F


sources Code Level Qty Unit Rate/unit cost Total Cost
3059 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 2 nos 645.00 1290.00
1.03 un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 160.50 1605.00
b.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 30.00 300.00
2800.40
Actual rate 4865.40
Rate per set Rs. 559.52 15% conctractor overhead 729.81
Total (Rs.) 5595.21
64 DP Switch 16-32 Amp S
sources Code Level Qty Unit Rate/unit cost Total Cost
3060 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.03 un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 10 nos 160.50 1605.00
b.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. LS 30.00 300.00
2800.40
Actual rate 3832.90
Rate per set Rs. 440.78 15% conctractor overhead 574.94
Total (Rs.) 4407.84

65 Telephone Socket Single F


sources Code Level Qty Unit Rate/unit cost Total Cost
3061 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 2 nos 645.00 1290.00
1.03 un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 86.00 860.00
b.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. LS 30.00 300.00
2055.40
Actual rate 4120.40
Rate per set Rs. 473.85 15% conctractor overhead 618.06
Total (Rs.) 4738.46
66 Telephone Socket Single S
sources Code Level Qty Unit Rate/unit cost Total Cost
3062 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.03 un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 10 nos 86.00 860.00
b.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. LS 30.00 300.00
2055.40
Only for DUDBC Ilam Use Page 137 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
Actual rate 3087.90
Rate per set Rs. 355.11 15% conctractor overhead 463.19
Total (Rs.) 3551.09

67 Buzzer
sources Code Level Qty Unit Rate/unit cost Total Cost
3063 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.03 un skilled 0 nos 600.00 0.00 710.00
materials a. Buzzer 10 nos 267.50 2675.00
b. Screws, Grips etc. LS 30.00 300.00
Transportation 3% 89.25 3064.25
Actual rate 3774.25
Rate per set Rs. 434.03 15% conctractor overhead 566.14
Total (Rs.) 4340.39

68 Musical Bell
sources Code Level Qty Unit Rate/unit cost Total Cost
3064 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.25 nos 645.00 161.25
1.03 un skilled 0 nos 600.00 0.00 548.75
materials a. M.Bell 10 nos 283.50 2835.00
b. CM, Screws, Grips etc. LS 30.00 300.00
3135.00
Actual rate 3683.75
Rate per set Rs. 423.63 15% conctractor overhead 552.56
Total (Rs.) 4236.31

69 Blanking Plate Single


sources Code Level Qty Unit Rate/unit cost Total Cost
3065 labour 1.08 skilled 0.25 nos 775.00 193.75
1.09 Semi skilled 0.25 nos 645.00 161.25
1.03 un skilled 0 nos 600.00 0.00 355.00
materials a. Plate 10 nos 59.00 590.00
b.Box 10 nos 0.00 0.00
c. CM, Screws, Grips etc. LS 30.00 300.00
890.00
Actual rate 1245.00
Rate per set Rs. 143.17 15% conctractor overhead 186.75
Total (Rs.) 1431.75

70 Angle/ Batten Holder


sources Code Level Qty Unit Rate/unit cost Total Cost
3066 labour 1.08 skilled 0.25 nos 775.00 193.75
1.09 Semi skilled 0.25 nos 645.00 161.25
1.03 un skilled 0 nos 600.00 0.00 355.00
materials a. Holder 10 nos 27.83 278.30
b. CM, Screws, Grips etc. LS 30.00 300.00
Only for DUDBC Ilam Use Page 138 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
578.30
Actual rate 933.30
Rate per set Rs. 100.84 13 % Vat 75.18
Total (Rs.) 1008.48

70 LED Bulb 15 watt


sources Code Level Qty Unit Rate/unit cost Total Cost
3066 labour 1.08 skilled 0.25 nos 775.00 193.75
1.09 Semi skilled 0.25 nos 645.00 161.25
1.03 un skilled 0 nos 600.00 0.00 355.00
materials a. Holder 10 nos 27.83 278.30
b. LED Bulb 10 nos 266.20 2662.00
c. CM, Screws, Grips etc. LS 30.00 300.00
3240.30
Actual rate 3595.30
Rate per set Rs. 401.65 13 % Vat 421.24
Total (Rs.) 4016.54

71 Ceiling Rose
sources Code Level Qty Unit Rate/unit cost Total Cost
3067 labour 1.08 skilled 0.25 nos 775.00 193.75
1.09 Semi skilled 0.25 nos 645.00 161.25
1.03 un skilled 0 nos 600.00 0.00 355.00
materials a. Ceiling rose 10 nos 27.83 278.30
b. CM, Screws, Grips etc. LS 30.00 300.00
578.30
Actual rate 933.30
Rate per set Rs. 100.84 13 % Vat 75.18
Total (Rs.) 1008.48

North-West/ Roma or equivalent Switch & Socket

72 1 Gang 1 one way Switch F


sources Code Level Qty Unit Rate/unit cost Total Cost
3068 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 2 nos 645.00 1290.00
1.03 un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 211.75 2117.50
b.PVC /M Box 10 nos 20.57 205.70
c. CM, Screws, Grips etc. 10 LS 25.00 250.00
2573.20
Actual rate 4638.20
Rate per set Rs. 533.39 15% conctractor overhead 695.73
Total (Rs.) 5333.93
73 2 Gang 2 one way Switch F
sources Code Level Qty Unit Rate/unit cost Total Cost
3069 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 2 nos 645.00 1290.00
1.03 un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 272.25 2722.50
Only for DUDBC Ilam Use Page 139 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
b.PVC /M Box 10 nos 20.57 205.70
c. CM, Screws, Grips etc. 10 LS 25.00 250.00
3178.20
Actual rate 5243.20
Rate per set Rs. 602.96 15% conctractor overhead 786.48
Total (Rs.) 6029.68
74 3 Gang 3 one way Switch F
sources Code Level Qty Unit Rate/unit cost Total Cost
3070 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 2 nos 645.00 1290.00
1.03 un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 302.50 3025.00
b.PVC /M Box 10 nos 27.00 270.00
c. CM, Screws, Grips etc. 10 LS 25.00 250.00
3545.00
Actual rate 5610.00
Rate per set Rs. 645.15 15% conctractor overhead 841.50
Total (Rs.) 6451.50

75 4Gang 4 one way Switch F


sources Code Level Qty Unit Rate/unit cost Total Cost
3071 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 2 nos 645.00 1290.00
1.03 un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 332.75 3327.50
b.PVC /M Box 10 nos 37.50 375.00
c. CM, Screws, Grips etc. 10 LS 25.00 250.00
3952.50
Actual rate 6017.50
Rate per set Rs. 692.01 15% conctractor overhead 902.63
Total (Rs.) 6920.13
76 5 Gang 5 one way Switch F
sources Code Level Qty Unit Rate/unit cost Total Cost
3072 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 2 nos 645.00 1290.00
1.03 un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 544.50 5445.00
b.PVC /M Box 10 nos 37.50 375.00
c. CM, Screws, Grips etc. 10 LS 25.00 250.00
6070.00
Actual rate 8135.00
Rate per set Rs. 935.52 15% conctractor overhead 1220.25
Total (Rs.) 9355.25

77 6Gang 6 one way Switch F


sources Code Level Qty Unit Rate/unit cost Total Cost
3073 labour 1.08 skilled 2 nos 775.00 1550.00
1.09 Semi skilled 4 nos 645.00 2580.00
1.03 un skilled 0 nos 600.00 0.00 4130.00
Only for DUDBC Ilam Use Page 140 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
materials a. Switch 10 nos 665.50 6655.00
b.PVC /M Box 10 nos 37.50 375.00
c. CM, Screws, Grips etc. 10 LS 25.00 250.00
7280.00
Actual rate 11410.00
Rate per set Rs. 1312.15 15% conctractor overhead 1711.50
Total (Rs.) 13121.50

78 5 Amp Power Socket


sources Code Level Qty Unit Rate/unit cost Total Cost
3074 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 2 nos 645.00 1290.00
1.03 un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 320.65 3206.50
b.PVC /M Box 10 nos 37.50 375.00
c. CM, Screws, Grips etc. 10 LS 25.00 250.00
Rate per set Rs. 3831.50
Actual rate 5896.50
678.09 15% conctractor overhead 884.48
Total (Rs.) 6780.98

79 13-15 Amp Power Socket


sources Code Level Qty Unit Rate/unit cost Total Cost
3075 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 2 nos 645.00 1290.00
1.03 un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 429.55 4295.50
b.PVC /M Box 10 nos 37.51 375.10
c. CM, Screws, Grips etc. 10 LS 25.00 250.00
4920.60
Actual rate 6985.60
Rate per set Rs. 762.52 13% Vat 639.68
Total (Rs.) 7625.28

80 T.V Socket
sources Code Level Qty Unit Rate/unit cost Total Cost
3076 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 2 nos 645.00 1290.00
1.03 un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 181.50 1815.00
b.PVC /M Box 10 nos 37.51 375.10
c. CM, Screws, Grips etc. 10 LS 25.00 250.00
2440.10
Actual rate 4505.10
Rate per set Rs. 518.08 15% conctractor overhead 675.77
Total (Rs.) 5180.87

81 T.Phone Socket
sources Code Level Qty Unit Rate/unit cost Total Cost
3077 labour 1.08 skilled 1 nos 775.00 775.00
Only for DUDBC Ilam Use Page 141 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
1.09 Semi skilled 2 nos 645.00 1290.00
1.03 un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 181.50 1815.00
b.PVC /M Box 10 nos 37.51 375.10
c. CM, Screws, Grips etc. 10 LS 25.00 250.00
2440.10
Actual rate 4505.10
Rate per set Rs. 518.08 15% conctractor overhead 675.77
Total (Rs.) 5180.87
82 Bell Push
sources Code Level Qty Unit Rate/unit cost Total Cost
3078 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 2 nos 645.00 1290.00
1.03 un skilled 0 nos 600.00 0.00 2065.00
materials a. Bell Switch 10 nos 181.50 1815.00
b.PVC /M Box 10 nos 37.51 375.10
c. CM, Screws, Grips etc. 10 LS 25.00 250.00
2440.10
Actual rate 4505.10
Rate per set Rs. 518.08 15% conctractor overhead 675.77
Total (Rs.) 5180.87

Switch Gears( ISI ) Mark Geco or equivalent

83 16 Amp 415 Volt DP Main Switch S


sources Code Level Qty Unit Rate/unit cost Total Cost
3079 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.03 un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 1 nos 320.65 320.65
b. CM, Screws, Grips etc. 1 LS 25.00 25.00
345.65
Actual rate 1378.15
Rate per set Rs. 1584.87 15% conctractor overhead 206.72
Total (Rs.) 1584.87

84 32 Amp 415 Volt DP Main Switch S


sources Code Level Qty Unit Rate/unit cost Total Cost
3080 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 1 nos 1028.50 1028.50
b. CM, Screws, Grips etc. LS 25.00
1053.50
Actual rate 2086.00
Rate per set Rs. 2398.90 15% conctractor overhead 312.90
Total (Rs.) 2398.90

85 63 Amp 415 Volt DP Main Switch S


sources Code Level Qty Unit Rate/unit cost Total Cost
Only for DUDBC Ilam Use Page 142 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
3081 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 1 nos 2081.20 2081.20
b. CM, Screws, Grips etc. LS 25.00
2106.20
Actual rate 3138.70
Rate per set Rs. 3609.50 15% conctractor overhead 470.80
Total (Rs.) 3609.50

86 100 Amp 415 Volt DP Main Switch


sources Code Level Qty Unit Rate/unit cost Total Cost
3082 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 1 nos 4888.40 4888.40
b. CM, Screws, Grips etc. LS 25.00
4913.40
Actual rate 5945.90
Rate per set Rs. 6837.78 15% conctractor overhead 891.88
Total (Rs.) 6837.78

87 16 Amp 415 Volt TP Main Switch


sources Code Level Qty Unit Rate/unit cost Total Cost
3083 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 1 nos 834.90 834.90
b. CM, Screws, Grips etc. LS 25.00
859.90
Actual rate 1892.40
Rate per set Rs. 2176.26 15% conctractor overhead 283.86
Total (Rs.) 2176.26

88 32 Amp 415 Volt TP Main Switch


sources Code Level Qty Unit Rate/unit cost Total Cost
3084 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 1 nos 1373.35 1373.35
b. CM, Screws, Grips etc. LS 25.00
1398.35
Actual rate 2430.85
Rate per set Rs. 2795.47 15% conctractor overhead 364.62
Total (Rs.) 2795.47
Only for DUDBC Ilam Use Page 143 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
89 63 Amp 415 Volt TP Main Switch
sources Code Level Qty Unit Rate/unit cost Total Cost
3085 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 1 nos 2891.90 2891.90
b. CM, Screws, Grips etc. LS 25.00
2916.90
Actual rate 3949.40
Rate per set Rs. 4541.81 15% conctractor overhead 592.41
Total (Rs.) 4541.81

90 100 Amp 415 Volt TP Main Switch


sources Code Level Qty Unit Rate/unit cost Total Cost
3086 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 1 nos 5535.75 5535.75
b. CM, Screws, Grips etc. LS 25.00
5560.75
Actual rate 6593.25
Rate per set Rs. 7582.23 15% conctractor overhead 988.98
Total (Rs.) 7582.23

91 200 Amp 415 Volt TP Main Switch


sources Code Level Qty Unit Rate/unit cost Total Cost
3087 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1420.00
materials a. Switch 1 nos 7979.95 7979.95
b. CM, Screws, Grips etc. LS 25.00
8004.95
Actual rate 9424.95
Rate per set Rs. 10838.69 15% conctractor overhead 1413.74
Total (Rs.) 10838.69

92 16 Amp 415 Volt TP Main Switch HRC


sources Code Level Qty Unit Rate/unit cost Total Cost
3088 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 1 nos 1845.25 1845.25
b. CM, Screws, Grips etc. LS 25.00
Transportation 3% 56.11 1926.36
Actual rate 2958.86
Rate per set Rs. 3402.69 15% conctractor overhead 443.83
Total (Rs.) 3402.69
Only for DUDBC Ilam Use Page 144 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.

93 32 Amp 415 Volt TP Main Switch HRC


sources Code Level Qty Unit Rate/unit cost Total Cost
3089 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 1 nos 2087.25 2087.25
b. CM, Screws, Grips etc. LS 25.00
Transportation 3% 63.37 2175.62
Actual rate 3208.12
Rate per set Rs. 3689.34 15% conctractor overhead 481.22
Total (Rs.) 3689.34

94 63 Amp 415 Volt TP Main Switch HRC


sources Code Level Qty Unit Rate/unit cost Total Cost
3090 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 1 nos 4307.60 4307.60
b. CM, Screws, Grips etc. LS 25.00
4332.60
Actual rate 5365.10
Rate per set Rs. 6169.86 15% conctractor overhead 804.76
Total (Rs.) 6169.86

95 100 Amp 415 Volt TP Main Switch HRC


sources Code Level Qty Unit Rate/unit cost Total Cost
3091 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 1 nos 7005.90 7005.90
c. CM, Screws, Grips etc. LS 25.00
Rate per set Rs. 7030.90
Actual rate 8063.40
9272.91 15% conctractor overhead 1209.51
Total (Rs.) 9272.91

96 200 Amp 415 Volt TP Switch HRC


sources Code Level Qty Unit Rate/unit cost Total Cost
3092 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1420.00
materials a. Switch 1 nos 9341.20 9341.20
b. CM, Screws, Grips etc. LS 25.00
9366.20
Actual rate 10786.20
Rate per set Rs. 12404.13 15% conctractor overhead 1617.93
Total (Rs.) 12404.13
Only for DUDBC Ilam Use Page 145 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.

97 300 Amp 415 Volt TP Switch HRC


sources Code Level Qty Unit Rate/unit cost Total Cost
3093 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1420.00
materials a. Switch 1 nos 11942.70 11942.70
b. CM, Screws, Grips etc. LS 25.00
11967.70
Actual rate 13387.70
Rate per set Rs. 15395.86 15% conctractor overhead 2008.16
Total (Rs.) 15395.86

98 400 Amp 415 Volt TP Switch HRC


sources Code Level Qty Unit Rate/unit cost Total Cost
3094 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1420.00
materials a. Switch 1 nos 2359.50 2359.50
b. CM, Screws, Grips etc. LS 25.00
2384.50
Actual rate 3804.50
Rate per set Rs. 4375.17 15% conctractor overhead 570.67
Total (Rs.) 4375.17

99 16 Amp 415 Volt Change over Switch


sources Code Level Qty Unit Rate/unit cost Total Cost
3095 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 1 nos 1845.25 1845.25
b. CM, Screws, Grips etc. LS 25.00
1870.25
Actual rate 2902.75
Rate per set Rs. 3338.16 15% conctractor overhead 435.41
Total (Rs.) 3338.16

100 32 Amp 415 Volt Change over Switch


sources Code Level Qty Unit Rate/unit cost Total Cost
3096 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 1 nos 2087.25 2087.25
b. CM, Screws, Grips etc. LS 25.00
2112.25
Actual rate 3144.75
Only for DUDBC Ilam Use Page 146 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
Rate per set Rs. 3616.46 15% conctractor overhead 471.71
Total (Rs.) 3616.46

101 63 Amp 415 Volt Change over Switch


sources Code Level Qty Unit Rate/unit cost Total Cost
3097 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 1 nos 4307.60 4307.60
b. CM, Screws, Grips etc. LS 25.00
4332.60
Actual rate 5365.10
Rate per set Rs. 6169.86 15% conctractor overhead 804.76
Total (Rs.) 6169.86

102 100 Amp 415 Volt Change over Switch


sources Code Level Qty Unit Rate/unit cost Total Cost
3098 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1420.00
materials a. Switch 1 nos 7005.90 7005.90
b. CM, Screws, Grips etc. LS 25.00
7030.90
Actual rate 8450.90
Rate per set Rs. 9718.53 15% conctractor overhead 1267.63
Total (Rs.) 9718.53

103 200 Amp 415 Volt Change over Switch


sources Code Level Qty Unit Rate/unit cost Total Cost
3099 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1420.00
materials a. Switch 1 nos 9341.20 9341.20
b. CM, Screws, Grips etc. LS 25.00
9366.20
Actual rate 10786.20
Rate per set Rs. 12404.13 15% conctractor overhead 1617.93
Total (Rs.) 12404.13

104 300Amp 415 Volt Change over Switch


sources Code Level Qty Unit Rate/unit cost Total Cost
3100 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1420.00
materials a. Switch 1 nos 11942.70 11942.70
b. CM, Screws, Grips etc. LS 25.00
Only for DUDBC Ilam Use Page 147 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
11967.70
Actual rate 13387.70
Rate per set Rs. 15395.85 15% conctractor overhead 2008.15
Total (Rs.) 15395.85

105 63 Amp Bus Bar Chamber


sources Code Level Qty Unit Rate/unit cost Total Cost
3101 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 2 nos 645.00 1290.00
1.10 un skilled 0 nos 600.00 0.00 2065.00
materials a. Bus Bar 1 nos 2359.50 2359.50
b. CM, Screws, Grips etc. LS 30.00
2389.50
Actual rate 4454.50
Rate per set Rs. 5122.68 15% conctractor overhead 668.18
Total (Rs.) 5122.68

106 100 Amp Bus Bar Chamber


sources Code Level Qty Unit Rate/unit cost Total Cost
3102 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 2 nos 645.00 1290.00
1.10 un skilled 0 nos 600.00 0.00 2065.00
materials a. Bus Bar 1 nos 4440.50 4440.50
c. CM, Screws, Grips etc. LS 30.00
4470.50
Actual rate 6535.50
Rate per set Rs. 7515.83 15% conctractor overhead 980.33
Total (Rs.) 7515.83
107 200 Amp Bus Bar Chamber
sources Code Level Qty Unit Rate/unit cost Total Cost
3103 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 2 nos 645.00 1290.00
1.10 un skilled 0 nos 600.00 0.00 2065.00
materials a. Bus Bar 1 nos 6352.50 6352.50
c. CM, Screws, Grips etc. LS 30.00
6382.50
Actual rate 8447.50
Rate per set Rs. 9714.63 15% conctractor overhead 1267.13
Total (Rs.) 9714.63

108 300 Amp Bus Bar Chamber


sources Code Level Qty Unit Rate/unit cost Total Cost
3104 labour 1.08 skilled 1.5 nos 775.00 1162.50
1.09 Semi skilled 3 nos 645.00 1935.00
1.10 un skilled 0 nos 600.00 0.00 3097.50
materials a. Bus Bar 1 nos 7925.50 7925.50
b. CM, Screws, Grips etc. LS 30.00
7955.50
Only for DUDBC Ilam Use Page 148 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
Actual rate 11053.00
Rate per set Rs. 12710.95 15% conctractor overhead 1657.95
Total (Rs.) 12710.95
Panel Board & Accessaries

109 60/100Amp Panel Board with Suitable color,Floor Mounted Double cover,
Push Type Switch, Size 9"x36"x48"
sources Code Level Qty Unit Rate/unit cost Total Cost
3105 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 2 nos 645.00 1290.00
1.10 un skilled 0 nos 600.00 0.00 2065.00
materials a. Panel Board 1 nos 17250.00 17250.00
b. CM, Screws, Bus Bar etc. LS 40.00
Transportation 3% 518.70 17808.70
Actual rate 19873.70
Rate per set Rs. 22854.75 15% conctractor overhead 2981.05
Total (Rs.) 22854.75

110 60/100Amp Panel Board with Suitable color,Floor Mounted Double cover,
Push Type Switch, Size 12"x36"x48"
sources Code Level Qty Unit Rate/unit cost Total Cost
3106 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 2 nos 645.00 1290.00
1.10 un skilled 0 nos 600.00 0.00 2065.00
materials a. Panel Board 1 nos 17250.00 17250.00
b. CM, Screws, Bus Bar etc. LS 40.00
Transportation 3% 518.70 17808.70
Actual rate 19873.70
Rate per set Rs. 22854.75 15% conctractor overhead 2981.05
Total (Rs.) 22854.75

111 60/100Amp Panel Board with Suitable color,Floor Mounted Double cover,
Push Type Switch, Size 9"x48"x60"
sources Code Level Qty Unit Rate/unit cost Total Cost
3107 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 2 nos 645.00 1290.00
1.10 un skilled 0 nos 600.00 0.00 2065.00
materials a. Panel Board 1 nos 17250.00 17250.00
b. CM, Screws, Bus Bar etc. LS 40.00
Transportation 3% 518.70 17808.70
Actual rate 19873.70
Rate per set Rs. 22854.75 15% conctractor overhead 2981.05
Total (Rs.) 22854.75

112 60/100 Amp Panel Board with Suitable color,Floor Mounted Double cover,
Push Type Switch, Size 12"x48"x60"
sources Code Level Qty Unit Rate/unit cost Total Cost
Only for DUDBC Ilam Use Page 149 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
3108 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 2 nos 645.00 1290.00
1.10 un skilled 0 nos 600.00 0.00 2065.00
materials a. Panel Board 1 nos 17250.00 17250.00
b. CM, Screws, Bus Bar etc. LS 40.00
Transportation 3% 518.70 17808.70
Actual rate 19873.70
Rate per set Rs. 22854.75 15% conctractor overhead 2981.05
Total (Rs.) 22854.75

113 150/200 Amp Panel Board with Suitable color,Floor Mounted Double cover,
Push Type Switch, Size 9"x38"x52"
sources Code Level Qty Unit Rate/unit cost Total Cost
3109 labour 1.08 skilled 1.5 nos 775.00 1162.50
1.09 Semi skilled 3 nos 645.00 1935.00
1.10 un skilled 0 nos 600.00 0.00 3097.50
materials a. Panel Board 1 nos 34500.00 34500.00
b. CM, Screws, Bus Bar etc. LS 40.00
Transportation 3% 1036.20 35576.20
Actual rate 38673.70
Rate per set Rs. 44474.76 15% conctractor overhead 5801.06
Total (Rs.) 44474.76

114 150/200 Amp Panel Board with Suitable color,Floor Mounted Double cover,
Push Type Switch, Size 9"x42"x56"
sources Code Level Qty Unit Rate/unit cost Total Cost
3110 labour 1.08 skilled 1.5 nos 775.00 1162.50
1.09 Semi skilled 3 nos 645.00 1935.00
1.10 un skilled 0 nos 600.00 0.00 3097.50
materials a. Panel Board 1 nos 34500.00 34500.00
b. CM, Screws, Bus Bar etc. LS 40.00
Transportation 3% 1036.20 35576.20
Actual rate 38673.70
Rate per set Rs. 44474.76 15% conctractor overhead 5801.06
Total (Rs.) 44474.76

115 250/300 Amp Panel Board with Suitable color,Floor Mounted Double cover,
Push Type Switch, Size 12"x48"x60"
sources Code Level Qty Unit Rate/unit cost Total Cost
3111 labour 1.08 skilled 1.5 nos 775.00 1162.50
1.09 Semi skilled 3 nos 645.00 1935.00
1.10 un skilled 0 nos 600.00 0.00 3097.50
materials a. Panel Board 1 nos 34500.00 34500.00
b. CM, Screws, Bus Bar etc. LS 40.00
Transportation 3% 1036.20 35576.20
Actual rate 38673.70
Only for DUDBC Ilam Use Page 150 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
Rate per set Rs. 44474.76 15% conctractor overhead 5801.06
Total (Rs.) 44474.76

116 400 Amp Panel Board with Suitable color,Floor Mounted Double cover,
Push Type Switch, Size 12"x52"x66"
sources Code Level Qty Unit Rate/unit cost Total Cost
3112 labour 1.08 skilled 1.5 nos 775.00 1162.50
1.09 Semi skilled 3 nos 645.00 1935.00
1.10 un skilled 0 nos 600.00 0.00 3097.50
materials a. Panel Board 1 nos 63250.00 63250.00
b. CM, Screws, Bus Bar etc. LS 40.00
Transportation 3% 1898.70 65188.70
Actual rate 68286.20
Rate per set Rs. 78529.13 15% conctractor overhead 10242.93
Total (Rs.) 78529.13

117 60 Amp MCCB Siemens or equivalent


sources Code Level Qty Unit Rate/unit cost Total Cost
3113 labour 1.08 skilled 0 nos 775.00 0.00
1.09 Semi skilled 0 nos 645.00 0.00
1.10 un skilled 0 nos 600.00 0.00 0.00
materials a. MCCB 1 nos 3638.00 3638.00
b. CM, Screws, Grips etc. LS 30.00
3668.00
Actual rate 3668.00
Rate per set Rs. 4218.20 15% conctractor overhead 550.20
Total (Rs.) 4218.20
118 100 Amp MCCB Siemens or equivalent
sources Code Level Qty Unit Rate/unit cost Total Cost
3114 labour 1.08 skilled 0 nos 775.00 0.00
1.09 Semi skilled 0 nos 645.00 0.00
1.10 un skilled 0 nos 600.00 0.00 0.00
materials a.MCCB 1 nos 4601.00 4601.00
b. CM, Screws, Grips etc. LS 30.00
4631.00
Actual rate 4631.00
Rate per set Rs. 5325.65 15% conctractor overhead 694.65
Total (Rs.) 5325.65

120 200 Amp MCCB Siemens or equivalent


sources Code Level Qty Unit Rate/unit cost Total Cost
3116 labour 1.08 skilled 0 nos 775.00 0.00
1.09 Semi skilled 0 nos 645.00 0.00
1.10 un skilled 0 nos 600.00 0.00 0.00
materials a. MCCB 1 nos 7704.00 7704.00
b. CM, Screws, Grips etc. LS 30.00
7734.00
Actual rate 7734.00
Only for DUDBC Ilam Use Page 151 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
Rate per set Rs. 8894.10 15% conctractor overhead 1160.10
Total (Rs.) 8894.10

121 250Amp MCCB Siemens or equivalent


sources Code Level Qty Unit Rate/unit cost Total Cost
3117 labour 1.08 skilled 0 nos 775.00 0.00
1.09 Semi skilled 0 nos 645.00 0.00
1.10 un skilled 0 nos 600.00 0.00 0.00
materials a. MCCB 1 nos 9416.00 9416.00
c. CM, Screws, Grips etc. LS 30.00
9446.00
Actual rate 9446.00
Rate per set Rs. 10862.90 15% conctractor overhead 1416.90
Total (Rs.) 10862.90

122 300Amp MCCB Siemens or equivalent


sources Code Level Qty Unit Rate/unit cost Total Cost
3118 labour 1.08 skilled 0 nos 775.00 0.00
1.09 Semi skilled 0 nos 645.00 0.00
1.10 un skilled 0 nos 600.00 0.00 0.00
materials a.MCCB 1 nos 18725.00 18725.00
b. CM, Screws, Grips etc. LS 30.00
18755.00
Actual rate 18755.00
Rate per set Rs. 21568.25 15% conctractor overhead 2813.25
Total (Rs.) 21568.25

123 Voltmeter (0-500)


sources Code Level Qty Unit Rate/unit cost Total Cost
3119 labour 1.08 skilled 0 nos 775.00 0.00
1.09 Semi skilled 0 nos 645.00 0.00
1.10 un skilled 0 nos 600.00 0.00 0.00
materials a. Voltmeter 1 nos 428.00 428.00
c. CM, Screws, Grips etc. LS 30.00
458.00
Actual rate 458.00
Rate per set Rs. 526.70 15% conctractor overhead 68.70
Total (Rs.) 526.70

124 Amp. Meter (0-500)


sources Code Level Qty Unit Rate/unit cost Total Cost
3120 labour 1.08 skilled 0 nos 775.00 0.00
1.09 Semi skilled 0 nos 645.00 0.00
1.10 un skilled 0 nos 600.00 0.00 0.00
materials a. Amp.Meter 1 nos 428.00 428.00
b. CM, Screws, Grips etc. LS 30.00
458.00
Actual rate 458.00
Only for DUDBC Ilam Use Page 152 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
Rate per set Rs. 526.70 15% conctractor overhead 68.70
Total (Rs.) 526.70

125 Indicator
sources Code Level Qty Unit Rate/unit cost Total Cost
3121 labour 1.08 skilled 0 nos 775.00 0.00
1.09 Semi skilled 0 nos 645.00 0.00
1.10 un skilled 0 nos 600.00 0.00 0.00
materials a. Indicator 1 nos 166.00 166.00
b. CM, Screws, Grips etc. LS 30.00
196.00
Actual rate 196.00
Rate per set Rs. 225.40 15% conctractor overhead 29.40
Total (Rs.) 225.40

126 Slector Switch


sources Code Level Qty Unit Rate/unit cost Total Cost
3122 labour 1.08 skilled 0 nos 775.00 0.00
1.09 Semi skilled 0 nos 645.00 0.00
1.10 un skilled 0 nos 600.00 0.00 0.00
materials a. Selector Switch 1 nos 342.50 342.50
b. CM, Screws, Grips etc. LS 30.00
372.50
Actual rate 372.50
Rate per set Rs. 428.38 15% conctractor overhead 55.88
Total (Rs.) 428.38

127 C.T.Coil
sources Code Level Qty Unit Rate/unit cost Total Cost
3123 labour 1.08 skilled 0 nos 775.00 0.00
1.09 Semi skilled 0 nos 645.00 0.00
1.10 un skilled 0 nos 600.00 0.00 0.00
materials a. CT Coil 1 nos 481.50 481.50
b. CM, Screws, Grips etc. LS 30.00
511.50
Actual rate 511.50
Rate per set Rs. 588.23 15% conctractor overhead 76.73
Total (Rs.) 588.23

128 Energy meter


sources Code Level Qty Unit Rate/unit cost Total Cost
3124 labour 1.08 skilled 0 nos 775.00 0.00
1.09 Semi skilled 0 nos 645.00 0.00
1.10 un skilled 0 nos 600.00 0.00 0.00
materials a. Meter 1 nos 749.00 749.00
b. CM, Screws, Grips etc. LS 30.00
779.00
Only for DUDBC Ilam Use Page 153 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
Actual rate 779.00
Rate per set Rs. 895.85 15% conctractor overhead 116.85
Total (Rs.) 895.85

Join Box Metal/Wooden/PVC

129 Join Box Metal 4"x4"


sources Code Level Qty Unit Rate/unit cost Total Cost
3125 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1032.50
materials a. M.Box 10 nos 89.54 895.40
b. CM, Screws, Grips etc. 10 LS 25.00 250.00
1145.40
Actual rate 2177.90
Rate per set Rs. 250.45 15% conctractor overhead 326.68
Total (Rs.) 2504.58

130 Join Box Metal 4"x6"


sources Code Level Qty Unit Rate/unit cost Total Cost
3126 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1032.50
materials a. M.Box 10 nos 104.06 1040.60
b. CM, Screws, Grips etc. 10 LS 25.00 250.00
1290.60
Actual rate 2323.10
Rate per set Rs. 267.15 15% conctractor overhead 348.47
Total (Rs.) 2671.57

131 Join Box Metal 6"x8"


sources Code Level Qty Unit Rate/unit cost Total Cost
3127 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1032.50
materials a. M.Box 10 nos 166.98 1669.80
b. CM, Screws, Grips etc. 10 LS 25.00 250.00
1919.80
Actual rate 2952.30
Rate per set Rs. 339.51 15% conctractor overhead 442.84
Total (Rs.) 3395.14

132 Join Box Metal 8"x10"


sources Code Level Qty Unit Rate/unit cost Total Cost
3128 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1032.50
materials a. M.Box 10 nos 208.12 2081.20
Only for DUDBC Ilam Use Page 154 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
b. CM, Screws, Grips etc. 10 LS 25.00 250.00
2331.20
Actual rate 3363.70
Rate per set Rs. 386.83 15% conctractor overhead 504.56
Total (Rs.) 3868.26

133 Join Box Metal 8"x12"


sources Code Level Qty Unit Rate/unit cost Total Cost
3129 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1032.50
materials a. M.Box 10 nos 278.30 2783.00
b. CM, Screws, Grips etc. 10 LS 25.00 250.00
3033.00
Actual rate 4065.50
Rate per set Rs. 467.53 15% conctractor overhead 609.83
Total (Rs.) 4675.33

134 Join Box Wooden 4"x4"


sources Code Level Qty Unit Rate/unit cost Total Cost
3130 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.10 un skilled 0 nos 600.00 0.00 710.00
materials a. M.Box 10 nos 37.50 375.00
b. CM, Screws, Grips etc. 10 LS 25.00 250.00
625.00
Actual rate 1335.00
Rate per set Rs. 153.53 15% conctractor overhead 200.25
Total (Rs.) 1535.25

135 Join Box Wooden 4"x6"


sources Code Level Qty Unit Rate/unit cost Total Cost
3131 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.10 un skilled 0 nos 600.00 0.00 710.00
materials a. M.Box 10 nos 48.50 485.00
b. CM, Screws, Grips etc. 10 LS 25.00 250.00
735.00
Actual rate 1445.00
Rate per set Rs. 166.18 15% conctractor overhead 216.75
Total (Rs.) 1661.75

136 Join Box Wooden 6"x8"


sources Code Level Qty Unit Rate/unit cost Total Cost
3132 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.10 un skilled 0 nos 600.00 0.00 710.00
Only for DUDBC Ilam Use Page 155 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
materials a. M.Box 10 nos 64.50 645.00
b. CM, Screws, Grips etc. 10 LS 25.00 250.00
895.00
Actual rate 1605.00
Rate per set Rs. 184.58 15% conctractor overhead 240.75
Total (Rs.) 1845.75

137 Join Box Wooden 8"x10"


sources Code Level Qty Unit Rate/unit cost Total Cost
3133 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.10 un skilled 0 nos 600.00 0.00 710.00
materials a. M.Box 10 nos 96.50 965.00
b. CM, Screws, Grips etc. 10 LS 25.00 250.00
1215.00
Actual rate 1925.00
Rate per set Rs. 221.38 15% conctractor overhead 288.75
Total (Rs.) 2213.75

138 Join Box PVC 4"x4"


sources Code Level Qty Unit Rate/unit cost Total Cost
3134 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.10 un skilled 0 nos 600.00 0.00 710.00
materials a. M.Box 10 nos 20.57 205.70
b. CM, Screws, Grips etc. 10 LS 25.00 250.00
455.70
Actual rate 1165.70
Rate per set Rs. 134.06 15% conctractor overhead 174.86
Total (Rs.) 1340.56

139 Join Box PVC 4"x6"


sources Code Level Qty Unit Rate/unit cost Total Cost
3135 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.10 un skilled 0 nos 600.00 0.00 710.00
materials a. M.Box 10 nos 37.51 375.10
b. CM, Screws, Grips etc. 10 LS 25.00 250.00
625.10
Actual rate 1335.10
Rate per set Rs. 153.53 15% conctractor overhead 200.27
Total (Rs.) 1535.37

140 Join Box PVC 6"x8"


sources Code Level Qty Unit Rate/unit cost Total Cost
3136 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.10 un skilled 0 nos 600.00 0.00 710.00
materials a. M.Box 10 nos 53.24 532.40
Only for DUDBC Ilam Use Page 156 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
b. CM, Screws, Grips etc. 10 LS 25.00 250.00
782.40
Actual rate 1492.40
Rate per set Rs. 171.63 15% conctractor overhead 223.86
Total (Rs.) 1716.26

141 Join Box PVC 8"x10"


sources Code Level Qty Unit Rate/unit cost Total Cost
3137 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.10 un skilled 0 nos 600.00 0.00 710.00
materials a. M.Box 10 nos 76.23 762.30
b. CM, Screws, Grips etc. 10 LS 25.00 250.00
1012.30
Actual rate 1722.30
Rate per set Rs. 198.06 15% conctractor overhead 258.35
Total (Rs.) 1980.65

MCB Geco ISI or equivalent

142 6-32 Amp SP MCB


sources Code Level Qty Unit Rate/unit cost Total Cost
3138 labour 1.08 skilled 0 nos 775.00 0.00
1.09 Semi skilled 0 nos 645.00 0.00
1.10 un skilled 0 nos 600.00 0.00 0.00
materials a. M.C.B 10 nos 166.38 1663.75
b. CM, Screws, Grips etc. LS 0.00
1663.75
Actual rate 1663.75
Rate per set Rs. 188.00 13% vat 216.29
Total (Rs.) 1880.04

143 6-32 Amp DP MCB


sources Code Level Qty Unit Rate/unit cost Total Cost
3139 labour 1.08 skilled 0 nos 775.00 0.00
1.09 Semi skilled 0 nos 645.00 0.00
1.10 un skilled 0 nos 600.00 0.00 0.00
materials a. M.C.B 10 nos 805.26 8052.55
b. CM, Screws, Grips etc. LS 0.00
8052.55
Actual rate 8052.55
Rate per set Rs. 926.04 15% conctractor overhead 1207.88
Total (Rs.) 9260.43

144 6-32 Amp TP MCB


sources Code Level Qty Unit Rate/unit cost Total Cost
3140 labour 1.08 skilled 0 nos 775.00 0.00
Only for DUDBC Ilam Use Page 157 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
1.09 Semi skilled 0 nos 645.00 0.00
1.10 un skilled 0 nos 600.00 0.00 0.00
materials a. M.C.B 10 nos 1184.59 11845.90
b. CM, Screws, Grips etc. LS 0.00
11845.90
Actual rate 11845.90
Rate per set Rs. 1362.28 15% conctractor overhead 1776.89
Total (Rs.) 13622.79

145 6-32 Amp TPN MCB


sources Code Level Qty Unit Rate/unit cost Total Cost
3141 labour 1.08 skilled 0 nos 775.00 0.00
1.09 Semi skilled 0 nos 645.00 0.00
1.10 un skilled 0 nos 600.00 0.00 0.00
materials a. M.C.B 10 nos 1391.00 13910.00
b. CM, Screws, Grips etc. LS 0.00
13910.00
Actual rate 13910.00
Rate per set Rs. 1599.65 15% conctractor overhead 2086.50
Total (Rs.) 15996.50

146 40-60 Amp SP MCB


sources Code Level Qty Unit Rate/unit cost Total Cost
3142 labour 1.08 skilled 0 nos 775.00 0.00
1.09 Semi skilled 0 nos 645.00 0.00
1.10 un skilled 0 nos 600.00 0.00 0.00
materials a. M.C.B 10 nos 658.85 6588.45
b. CM, Screws, Grips etc. LS 0.00
6588.45
6588.45
Rate per set Rs. 757.67 15% conctractor overhead 988.27
Total (Rs.) 7576.72

147 40-60 AmpDP MCB


sources Code Level Qty Unit Rate/unit cost Total Cost
3143 labour 1.08 skilled 0 nos 775.00 0.00
1.09 Semi skilled 0 nos 645.00 0.00
1.10 un skilled 0 nos 600.00 0.00 0.00
materials a. M.C.B 10 nos 1304.38 13043.80
b. CM, Screws, Grips etc. LS 0.00
13043.80
Actual rate 13043.80
Rate per set Rs. 1500.04 15% conctractor overhead 1956.57
Total (Rs.) 15000.37

148 40-60 Amp TP MCB


sources Code Level Qty Unit Rate/unit cost Total Cost
Only for DUDBC Ilam Use Page 158 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
3144 labour 1.08 skilled 0 nos 775.00 0.00
1.09 Semi skilled 0 nos 645.00 0.00
1.10 un skilled 0 nos 600.00 0.00 0.00
materials a. M.C.B 10 nos 1883.37 18833.65
b. CM, Screws, Grips etc. LS 0.00
18833.65
Actual rate 18833.65
Rate per set Rs. 2165.87 15% conctractor overhead 2825.05
Total (Rs.) 21658.70

149 40-60 Amp TPN MCB


sources Code Level Qty Unit Rate/unit cost Total Cost
3145 labour 1.08 skilled 0 nos 775.00 0.00
1.09 Semi skilled 0 nos 645.00 0.00
1.10 un skilled 0 nos 600.00 0.00 0.00
materials a. M.C.B 10 nos 2362.53 23625.25
b. CM, Screws, Grips etc. LS 0.00
23625.25
Actual rate 23625.25
Rate per set Rs. 2716.90 15% conctractor overhead 3543.79
Total (Rs.) 27169.04

Distribution Board DB.Geco ISIor equivalent of Nepal.

150 4 Way SPN DB Double Cover


sources Code Level Qty Unit Rate/unit cost Total Cost
3146 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.75 nos 645.00 483.75
1.10 un skilled 0 nos 600.00 0.00 871.25
materials a. Cover 1 nos 1197.90 1197.90
b. CM, Screws, Grips etc. LS 25.00
1222.90
Actual rate 2094.15
Rate per set Rs. 2253.13 13% Vat 158.98
Total (Rs.) 2253.13

151 6 Way SPN DB Double Cover


sources Code Level Qty Unit Rate/unit cost Total Cost
3147 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.75 nos 645.00 483.75
1.10 un skilled 0 nos 600.00 0.00 871.25
materials a. Cover 1 nos 1610.51 1610.51
b. CM, Screws, Grips etc. LS 25.00
1635.51
Actual rate 2506.76
Rate per set Rs. 2882.77 15% conctractor overhead 376.01
Total (Rs.) 2882.77

152 8Way SPN DB Double Cover


Only for DUDBC Ilam Use Page 159 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
sources Code Level Qty Unit Rate/unit cost Total Cost
3148 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1032.50
materials a. Cover 1 nos 1610.51 1610.51
b. CM, Screws, Grips etc. LS 25.00
1635.51
Actual rate 2668.01
Rate per set Rs. 3068.21 15% conctractor overhead 400.20
Total (Rs.) 3068.21

153 12 Way SPN DB Double Cover


sources Code Level Qty Unit Rate/unit cost Total Cost
3149 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1032.50
materials a. Cover 1 nos 2136.26 2136.26
b. CM, Screws, Grips etc. LS 25.00
2161.26
Actual rate 3193.76
Rate per set Rs. 3672.82 15% conctractor overhead 479.06
Total (Rs.) 3672.82

154 16 Way SPN DB Double Cover


sources Code Level Qty Unit Rate/unit cost Total Cost
3150 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1032.50
materials a. Cover 1 nos 2628.73 2628.73
b. CM, Screws, Grips etc. LS 25.00
2653.73
Actual rate 3686.23
Rate per set Rs. 4239.16 15% conctractor overhead 552.93
Total (Rs.) 4239.16

155 3 Way TPN DB Double Cover


sources Code Level Qty Unit Rate/unit cost Total Cost
3151 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.75 nos 645.00 483.75
1.10 un skilled 0 nos 600.00 0.00 871.25
materials a. Cover 1 nos 3294.23 3294.23
b. CM, Screws, Grips etc. LS 25.00
3319.23
Actual rate 4190.48
Rate per set Rs. 4819.05 15% conctractor overhead 628.57
Total (Rs.) 4819.05
Only for DUDBC Ilam Use Page 160 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
156 4 WayTPN DB Double Cover
sources Code Level Qty Unit Rate/unit cost Total Cost
3152 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.75 nos 645.00 483.75
1.10 un skilled 0 nos 600.00 0.00 871.25
materials a. Cover 1 nos 3294.23 3294.23
b. CM, Screws, Grips etc. LS 25.00
3319.23
Actual rate 4190.48
Rate per set Rs. 4819.05 15% conctractor overhead 628.57
Total (Rs.) 4819.05

157 6 WayTPN DB Double Cover


sources Code Level Qty Unit Rate/unit cost Total Cost
3153 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.75 nos 645.00 483.75
1.10 un skilled 0 nos 600.00 0.00 871.25
materials a. Cover 1 nos 4092.83 4092.83
b. CM, Screws, Grips etc. LS 25.00
4117.83
Actual rate 4989.08
Rate per set Rs. 5737.44 15% conctractor overhead 748.36
Total (Rs.) 5737.44
158 8 Way TPN DB Double Cover
sources Code Level Qty Unit Rate/unit cost Total Cost
3154 labour 1.08 skilled 0.75 nos 775.00 581.25
1.09 Semi skilled 0.75 nos 645.00 483.75
1.10 un skilled 0 nos 600.00 0.00 1065.00
materials a. Cover 1 nos 5104.39 5104.39
b. CM, Screws, Grips etc. LS 25.00
5129.39
Actual rate 6194.39
Rate per set Rs. 7123.54 15% conctractor overhead 929.16
Total (Rs.) 7123.54

159 2 Pole MCB Box


sources Code Level Qty Unit Rate/unit cost Total Cost
3155 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.10 un skilled 0 nos 600.00 0.00 710.00
materials a. M.Box 1 nos 68.97 68.97
b. CM, Screws, Grips etc. LS 25.00
93.97
Actual rate 803.97
Rate per set Rs. 924.57 15% conctractor overhead 120.60
Total (Rs.) 924.57

160 4 Pole MCB Box


Only for DUDBC Ilam Use Page 161 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
sources Code Level Qty Unit Rate/unit cost Total Cost
3156 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.10 un skilled 0 nos 600.00 0.00 710.00
materials a. M.Box 1 nos 139.15 139.15
b. CM, Screws, Grips etc. LS 25.00
164.15
Actual rate 874.15
Rate per set Rs. 1005.27 15% conctractor overhead 131.12
Total (Rs.) 1005.27

Fan: Almonard/Bajaj or equivalent.

161 36" Ceiling Fan


sources Code Level Qty Unit Rate/unit cost Total Cost
3157 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.10 un skilled 0 nos 600.00 0.00 710.00
materials a. Fan 1 nos 3025.00 3025.00
b. Iron clamps LS 0.00
c. Ceiling rose 1 nos 27.83 26.00
d. CM, Screws, Grips etc. LS 0.00
3051.00
Actual rate 3761.00
Rate per set Rs. 4157.63 13% vat 396.63
Total (Rs.) 4157.63
162 42" Ceiling Fan
sources Code Level Qty Unit Rate/unit cost Total Cost
3158 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.10 un skilled 0 nos 600.00 0.00 710.00
materials a. Fan 1 nos 3025.00 3025.00
b. Iron clamps LS 0.00
c. Ceiling rose 1 nos 30.80 30.80
d. CM, Screws, Grips etc. LS 0.00
3055.80
Actual rate 3765.80
Rate per set Rs. 4330.67 15% conctractor overhead 564.87
Total (Rs.) 4330.67

163 48" Ceiling Fan


sources Code Level Qty Unit Rate/unit cost Total Cost
3159 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.10 un skilled 0 nos 600.00 0.00 710.00
materials a. Fan 1 nos 3388.00 3388.00
b. Iron clamps LS 0.00
c. Ceiling rose 1 nos 26.00 26.00
d. CM, Screws, Grips etc. LS 0.00
3414.00
Only for DUDBC Ilam Use Page 162 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
Actual rate 4124.00
Rate per set Rs. 4742.60 15% conctractor overhead 618.60
Total (Rs.) 4742.60
165 10" Wall Fan
sources Code Level Qty Unit Rate/unit cost Total Cost
3161 labour 1.08 skilled 0.25 nos 775.00 193.75
1.09 Semi skilled 0.25 nos 645.00 161.25
1.10 un skilled 0 nos 600.00 0.00 355.00
materials a. Fan 1 nos 1870.00 1870.00
b. CM, Screws, Grips etc. LS 18.00
1888.00
Actual rate 2243.00
Rate per set Rs. 2579.45 15% conctractor overhead 336.45
Total (Rs.) 2579.45
167 12" Exhaust Fan
sources Code Level Qty Unit Rate/unit cost Total Cost
3163 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1420.00
materials a. Fan 1 nos 2057.00 2057.00
b. Wooden Frame 1
c. Nut bolts 4 LS 18.00
d. CM, Cement Paints etc. LS
2075.00
Actual rate 3495.00
Rate per set Rs. 4019.25 15% conctractor overhead 524.25
Total (Rs.) 4019.25
General Fittings

170 Dome Light 6" Milky Type Heavy Carrier(decorative)


sources Code Level Qty Unit Rate/unit cost Total Cost
3166 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.10 un skilled 0 nos 600.00 0.00 710.00
materials a. D Light 10 nos 748.00 7480.00
b. CM, Screws, Grips etc. 10 LS 25.00 250.00
7730.00
Actual rate 8440.00
Rate per set Rs. 970.60 15% conctractor overhead 1266.00
Total (Rs.) 9706.00

171 Dome Light 6" Brace Base


sources Code Level Qty Unit Rate/unit cost Total Cost
3167 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1420.00
materials a. D Light 10 nos 1063.00 10630.00
b. CM, Screws, Grips etc. 10 LS 25.00 250.00
10880.00
Actual rate 12300.00
Only for DUDBC Ilam Use Page 163 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
Rate per set Rs. 1414.50 15% conctractor overhead 1845.00
Total (Rs.) 14145.00

172 Dome Light 8" Milky Type Heavy Carrier


sources Code Level Qty Unit Rate/unit cost Total Cost
3168 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.10 un skilled 0 nos 600.00 0.00 710.00
materials a. D Light 10 nos 879.25 8792.50
b. CM, Screws, Grips etc. 10 LS 25.00 250.00
9042.50
Actual rate 9752.50
Rate per set Rs. 1121.54 15% conctractor overhead 1462.88
Total (Rs.) 11215.38

173 Dome Light 8" Brace Base


sources Code Level Qty Unit Rate/unit cost Total Cost
3169 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1420.00
materials a. D Light 10 nos 1325.50 13255.00
b. CM, Screws, Grips etc. 10 LS 25.00 250.00
13505.00
Actual rate 14925.00
Rate per set Rs. 1716.38 15% conctractor overhead 2238.75
Total (Rs.) 17163.75

174 40/60 Watt Down Light


sources Code Level Qty Unit Rate/unit cost Total Cost
3170 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1420.00
materials a. D Light 10 nos 621.00 6210.00
b. CM, Screws, Grips etc. 10 LS 25.00 250.00
6460.00
Actual rate 7880.00
Rate per set Rs. 906.20 15% conctractor overhead 1182.00
Total (Rs.) 9062.00

175 Wall / Spot /Bulk Head Light Single Direct


sources Code Level Qty Unit Rate/unit cost Total Cost
3171 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.10 un skilled 0 nos 600.00 0.00 710.00
materials a. Wall/S.light/Bulk Light 10 nos 1230.50 12305.00
b. CM, Screws, Grips etc. 10 LS 25.00 250.00
12555.00
Only for DUDBC Ilam Use Page 164 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
Actual rate 13265.00
Rate per set Rs. 1525.48 15% conctractor overhead 1989.75
Total (Rs.) 15254.75

176 Wall / Spot /Bulk Head Light Single Direct


sources Code Level Qty Unit Rate/unit cost Total Cost
3172 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.10 un skilled 0 nos 600.00 0.00 710.00
materials a. Wall/S.light/Bulk Light 10 nos 1123.50 11235.00
b. CM, Screws, Grips etc. 10 LS 25.00 250.00
11485.00
Actual rate 12195.00
Rate per set Rs. 1402.43 15% conctractor overhead 1829.25
Total (Rs.) 14024.25

177 Wall / Spot /Bulk Head Light Single Direct


sources Code Level Qty Unit Rate/unit cost Total Cost
3173 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.10 un skilled 0 nos 600.00 0.00 710.00
materials a. Wall/S.light/Bulk Light 10 nos 610.00 6100.00
b. CM, Screws, Grips etc. 10 LS 25.00 250.00
6350.00
Actual rate 7060.00
Rate per set Rs. 811.90 15% conctractor overhead 1059.00
Total (Rs.) 8119.00

178 Dinning Lamp Decorative Medium


sources Code Level Qty Unit Rate/unit cost Total Cost
3174 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1420.00
materials a. D.Light 10 nos 2300.50 23005.00
b. CM, Screws, Grips etc. 10 LS 25.00 250.00
23255.00
Actual rate 24675.00
Rate per set Rs. 2837.63 15% conctractor overhead 3701.25
Total (Rs.) 28376.25

179 Chandlers Lamp 3-5 Lamp Medium


sources Code Level Qty Unit Rate/unit cost Total Cost
3175 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1420.00
materials a. Chandlers Lamp 10 nos 5885.00 58850.00
Only for DUDBC Ilam Use Page 165 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
b. CM, Screws, Grips,Iron clamp etc. 10 LS 25.00 250.00
59100.00
Actual rate 60520.00
Rate per set Rs. 6959.80 15% conctractor overhead 9078.00
Total (Rs.) 69598.00

180 Chandlers Lamp 6-8 Lamp Medium


sources Code Level Qty Unit Rate/unit cost Total Cost
3176 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 1 nos 645.00 645.00
1.10 un skilled 0 nos 600.00 0.00 1420.00
materials a. Chandlers Lamp 10 nos 8453.00 84530.00
b. CM, Screws, Grips etc. 10 LS 25.00 250.00
84780.00
Actual rate 86200.00
Rate per set Rs. 9913.00 15% conctractor overhead 12930.00
Total (Rs.) 99130.00

181 IS 3043 Copper Plate 80x80x3.15


sources Code Level Qty Unit Rate/unit cost Total Cost
3177 labour 1.08 skilled 0.2 nos 775.00 155.00
1.09 Semi skilled 1.5 nos 645.00 967.50
1.10 un skilled 2 nos 600.00 1200.00 2322.50
materials a.Copper Plate 10 nos 3852.00 38520.00
b. Coal, Salt,sand,soil etc. 10 LS 500.00 5000.00
43520.00
Actual rate 45842.50
Rate per set Rs. 5271.89 15% conctractor overhead 6876.38
Total (Rs.) 52718.88

182 IS 3043 Copper Plate65x65x3.15


sources Code Level Qty Unit Rate/unit cost Total Cost
3178 labour 1.08 skilled 0.2 nos 775.00 155.00
1.09 Semi skilled 1.5 nos 645.00 967.50
1.10 un skilled 2 nos 600.00 1200.00 2322.50
materials a.Copper Plate 10 nos 2247.00 22470.00
b. Coal, Salt,sand,soil etc. 10 LS 500.00 5000.00
27470.00
Actual rate 29792.50
Rate per set Rs. 3426.14 15% conctractor overhead 4468.88
Total (Rs.) 34261.38

184 0-100 Watt Bulb (ISI)


sources Code Level Qty Unit Rate/unit cost Total Cost
3180 labour 1.08 skilled 0 nos 775.00 0.00
1.09 Semi skilled 0 nos 645.00 0.00
1.10 un skilled 0.25 nos 600.00 150.00 150.00
Only for DUDBC Ilam Use Page 166 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
materials a.Bulb 10 nos 48.50 485.00
b. CM, Screws, Grips etc. LS 0.00
485.00
Actual rate 635.00
Rate per set Rs. 73.03 15% conctractor overhead 95.25
Total (Rs.) 730.25

185 Festival Light


sources Code Level Qty Unit Rate/unit cost Total Cost
3181 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.10 un skilled 0 nos 600.00 0.00 710.00
materials a.Bulb 10 nos 48.50 485.00
b. C plate, Screws, Grips etc. 10 LS 15.00 150.00
c.Holder 10 nos 27.00 270.00
905.00
Actual rate 1615.00
Rate per set Rs. 185.73 15% conctractor overhead 242.25
Total (Rs.) 1857.25

Roma /Appolo or equivalent. Bell Indicator

186 4 way Indicator With Bell


sources Code Level Qty Unit Rate/unit cost Total Cost
3182 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.10 un skilled 0 nos 600.00 0.00 710.00
materials a.Indicater Bell 10 nos 1498.00 14980.00
b. Screws, Grips etc. 10 LS 5.00 50.00
15030.00
Actual rate 15740.00
Rate per set Rs. 1810.10 15% conctractor overhead 2361.00
Total (Rs.) 18101.00

187 6 way Indicator With Bell


sources Code Level Qty Unit Rate/unit cost Total Cost
3183 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.10 un skilled 0 nos 600.00 0.00 710.00
materials a.Indicater Bell 10 nos 2300.50 23005.00
b. Screws, Grips etc. 10 LS 5.00 50.00
23055.00
Actual rate 23765.00
Rate per set Rs. 2732.98 15% conctractor overhead 3564.75
Total (Rs.) 27329.75

188 8way Indicator With Bell


sources Code Level Qty Unit Rate/unit cost Total Cost
3184 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
Only for DUDBC Ilam Use Page 167 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
1.10 un skilled 0 nos 600.00 0.00 710.00
materials a.Indicater Bell 10 nos 2942.50 29425.00
b. Screws, Grips etc. 10 LS 5.00 50.00
29475.00
Actual rate 30185.00
Rate per set Rs. 3471.28 15% conctractor overhead 4527.75
Total (Rs.) 34712.75

189 12 way Indicator With Bell


sources Code Level Qty Unit Rate/unit cost Total Cost
3185 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.10 un skilled 0 nos 600.00 0.00 710.00
materials a.Indicater Bell 10 nos 4601.00 46010.00
b.Screws, Grips etc. 10 LS 5.00 50.00
46060.00
Actual rate 46770.00
Rate per set Rs. 5378.55 15% conctractor overhead 7015.50
Total (Rs.) 53785.50

Steel Tubelar / Wood Pole


191 8 meter Wooden Pole
sources Code Level Qty Unit Rate/unit cost Total Cost
3187 labour 1.08 skilled 0.2 nos 775.00 155.00
1.09 Semi skilled 1.5 nos 645.00 967.50
1.10 un skilled 2 nos 600.00 1200.00 2322.50
materials a.Pole 1 nos 4904.35 4904.35
b. Earth Work CM etc. LS 0.00
Transportation 3% 147.13 5051.48
Actual rate 7373.98
Rate per set Rs. 8480.08 15% conctractor overhead 1106.10
Total (Rs.) 8480.08

192 9 meter Wooden Pole


sources Code Level Qty Unit Rate/unit cost Total Cost
3188 labour 1.08 skilled 0.2 nos 775.00 155.00
1.09 Semi skilled 1.5 nos 645.00 967.50
1.10 un skilled 2 nos 600.00 1200.00 2322.50
materials a.Pole 1 nos 5510.50 5510.50
b. Earth Work CM etc. LS 0.00
Transportation 3% 165.32 5675.82
Actual rate 7998.32
Rate per set Rs. 9198.06 15% conctractor overhead 1199.75
Total (Rs.) 9198.06
191 8 meter R.C.C. Pole
sources Code Level Qty Unit Rate/unit cost Total Cost
3187 labour 1.08 skilled 0.2 nos 775.00 155.00
1.09 Semi skilled 1.5 nos 645.00 967.50
Only for DUDBC Ilam Use Page 168 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
1.10 un skilled 2 nos 600.00 1200.00 2322.50
materials a.Pole 1 nos 6006.45 6006.45
b. Earth Work CM etc. LS 0.00
Transportation 3% 180.19 6186.64
Actual rate 8509.14
Rate per set Rs. 9785.52 15% conctractor overhead 1276.37
Total (Rs.) 9785.52

192 9 meter R.C.C. Pole


sources Code Level Qty Unit Rate/unit cost Total Cost
3188 labour 1.08 skilled 0.2 nos 775.00 155.00
1.09 Semi skilled 1.5 nos 645.00 967.50
1.10 un skilled 2 nos 600.00 1200.00 2322.50
materials a.Pole 1 nos 7053.40 7053.40
b. Earth Work CM etc. LS 0.00
Transportation 3% 211.60 7265.00
Actual rate 9587.50
Rate per set Rs. 11025.63 15% conctractor overhead 1438.13
Total (Rs.) 11025.63
Cable Wire Prakash / Janta or Equivalent

Concelled Wiring

193 1/18 PVC copper Wire Nepal, Prakash etc or equivalent.


sources Code Level Qty Unit Rate/unit cost Total Cost
3189 labour 1.08 skilled 0.75 nos 775.00 581.25
1.09 Semi skilled 1.3 nos 645.00 838.50
1.10 un skilled 1.2 nos 600.00 720.00 2139.75
materials a.Cu wire 100 Rm 12.33 1233.33
b.HDP, hooks 100 LS 30.00 3000.00
4233.33
Actual rate 6373.08
Rate per set Rs. 73.29 15% conctractor overhead 955.96
Total (Rs.) 7329.05

194 3/22 PVC copper Wire Nepal, Prakash etc.or equivalent.


sources Code Level Qty Unit Rate/unit cost Total Cost
3190 labour 1.08 skilled 0.75 nos 775.00 581.25
1.09 Semi skilled 1.3 nos 645.00 838.50
1.10 un skilled 1.2 nos 600.00 720.00 2139.75
materials a.Cu wire 100 Rm 12.59 1258.89
b.HDP, hooks 100 LS 30.00 3000.00
4258.89
Actual rate 6398.64
Rate per set Rs. 73.58 15% conctractor overhead 959.80
Total (Rs.) 7358.43

195 3/20 PVC copper Wire Nepal, Prakash etc.or equivalent.


Only for DUDBC Ilam Use Page 169 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
sources Code Level Qty Unit Rate/unit cost Total Cost
3191 labour 1.08 skilled 0.75 nos 775.00 581.25
1.09 Semi skilled 1.3 nos 645.00 838.50
1.10 un skilled 1.2 nos 600.00 720.00 2139.75
materials a.Cu wire 100 Rm 18.89 1888.89
b.HDP, hooks 100 LS 30.00 3000.00
4888.89
Actual rate 7028.64
Rate per set Rs. 80.83 15% conctractor overhead 1054.30
Total (Rs.) 8082.93

196 7/22 PVC copper Wire Nepal, Prakash etc.or equivalent.


sources Code Level Qty Unit Rate/unit cost Total Cost
3192 labour 1.08 skilled 0.75 nos 775.00 581.25
1.09 Semi skilled 1.3 nos 645.00 838.50
1.10 un skilled 1.2 nos 600.00 720.00 2139.75
materials a.Cu wire 100 Rm 31.48 3147.78
b.HDP, hooks 100 LS 30.00 3000.00
6147.78
Actual rate 8287.53
Rate per set Rs. 95.31 15% conctractor overhead 1243.13
Total (Rs.) 9530.66

197 7/20 PVC copper Wire Nepal, Prakash etc.or equivalent.


sources Code Level Qty Unit Rate/unit cost Total Cost
3193 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 1.5 nos 645.00 967.50
1.10 un skilled 2 nos 600.00 1200.00 2942.50
materials a.Cu wire 100 Rm 50.36 5035.56
b.HDP, hooks 100 LS 30.00 3000.00
8035.56
Actual rate 10978.06
Rate per set Rs. 126.25 15% conctractor overhead 1646.71
Total (Rs.) 12624.76

198 7/18 PVC copper Wire Nepal, Prakash etc.or equivalent.


sources Code Level Qty Unit Rate/unit cost Total Cost
3194 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 1.5 nos 645.00 967.50
1.10 un skilled 2 nos 600.00 1200.00 2942.50
materials a.Cu wire 100 Rm 64.83 6483.33
b.HDP, hooks 100 LS 30.00 3000.00
9483.33
Actual rate 12425.83
Rate per set Rs. 142.90 15% conctractor overhead 1863.88
Total (Rs.) 14289.71
Only for DUDBC Ilam Use Page 170 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
PVC Copper /Alm Wiring In PVC Listy/PVC conduct Pipe
Surface Wiring

200 1/18 PVC copper Wire Nepal, Prakash etc.or equivalent.


sources Code Level Qty Unit Rate/unit cost Total Cost
3196 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.75 nos 645.00 483.75
1.10 un skilled 1.5 nos 600.00 900.00 1771.25
materials a.Cu wire 100 Rm 12.33 1233.33
b.PVC Listy/Conduit Pipe 100 LS 30.00 3000.00
4233.33
Actual rate 6004.58
Rate per set Rs. 69.05 15% conctractor overhead 900.69
Total (Rs.) 6905.27

201 3/22 PVC copper Wire Nepal, Prakash etc.or equivalent.


sources Code Level Qty Unit Rate/unit cost Total Cost
3197 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.75 nos 645.00 483.75
1.10 un skilled 1.5 nos 600.00 900.00 1771.25
materials a.Cu wire 100 Rm 12.59 1258.89
b.PVC Listy/Conduit Pipe 100 LS 30.00 3000.00
4258.89
Actual rate 6030.14
Rate per set Rs. 69.35 15% conctractor overhead 904.52
Total (Rs.) 6934.66

202 3/20 PVC copper Wire Nepal, Prakash etc.or equivalent.


sources Code Level Qty Unit Rate/unit cost Total Cost
3198 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.75 nos 645.00 483.75
1.10 un skilled 1.5 nos 600.00 900.00 1771.25
materials a.Cu wire 100 Rm 18.89 1888.89
b.PVC Listy/Conduit Pipe 100 LS 30.00 3000.00
4888.89
Actual rate 6660.14
Rate per set Rs. 76.59 15% conctractor overhead 999.02
Total (Rs.) 7659.16
203 7/22 PVC copper Wire Nepal, Prakash etc.or equivalent.
sources Code Level Qty Unit Rate/unit cost Total Cost
3199 labour 1.08 skilled 0.75 nos 775.00 581.25
1.09 Semi skilled 1.3 nos 645.00 838.50
1.10 un skilled 1.5 nos 600.00 900.00 2319.75
materials a.Cu wire 100 Rm 31.48 3147.78
b.PVC Listy/Conduit Pipe 100 LS 30.00 3000.00
6147.78
Actual rate 8467.53
Rate per set Rs. 97.38 15% conctractor overhead 1270.13
Total (Rs.) 9737.66
Only for DUDBC Ilam Use Page 171 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
204 7/20 PVC copper Wire Nepal, Prakash etc.or equivalent.
sources Code Level Qty Unit Rate/unit cost Total Cost
3200 labour 1.08 skilled 0.75 nos 775.00 581.25
1.09 Semi skilled 1.3 nos 645.00 838.50
1.10 un skilled 1.5 nos 600.00 900.00 2319.75
materials a.Cu wire 100 Rm 50.36 5035.56
b.PVC Listy/Conduit Pipe 100 Ls 30.00 3000.00
8035.56
Actual rate 10355.31
Rate per set Rs. 119.09 15% conctractor overhead 1553.30
Total (Rs.) 11908.60
Multistrand Flexible wire( 1 coil=90.00Meter)
Surface Wiring
201 1.50 mm2 PVC insulated copper wire
sources Code Level Qty Unit Rate/unit cost Total Cost
3201 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.75 nos 645.00 483.75
1.10 un skilled 1.5 nos 600.00 900.00 1771.25
materials MM2 a.Cu wire 100 Rm 22.79 2278.83
b.PVC Listy/Conduit Pipe 100 LS 11.50 1150.00
3428.83
Actual rate 5200.08
Rate per Rm Rs. 52.00
Total (Rs.) 5200.08

Surface Wiring
201 2.50 mm2 PVC insulated copper wire
sources Code Level Qty Unit Rate/unit cost Total Cost
3201 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.75 nos 645.00 483.75
1.10 un skilled 1.5 nos 600.00 900.00 1771.25
materials MM3 a.Cu wire 100 Rm 39.50 3949.98
b.PVC Listy/Conduit Pipe 100 LS 11.50 1150.00
5099.98
Actual rate 6871.23
Rate per Rm Rs. 68.71
Total (Rs.) 6871.23
Surface Wiring
201 1 mm2 PVC insulated copper wire
sources Code Level Qty Unit Rate/unit cost Total Cost
3201 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.75 nos 645.00 483.75
1.10 un skilled 1.5 nos 600.00 900.00 1771.25
materials MM1 a.Cu wire 100 Rm 16.68 1667.88
b.PVC Listy/Conduit Pipe 100 LS 11.50 1150.00
2817.88
Actual rate 4589.13
Rate per Rm Rs. 45.89
Total (Rs.) 4589.13
Only for DUDBC Ilam Use Page 172 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
202 2.50 mm2 PVC insulated copper wire
sources Code Level Qty Unit Rate/unit cost Total Cost
3202 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.75 nos 645.00 483.75
1.10 un skilled 1.5 nos 600.00 900.00 1771.25
materials MM3 a.Cu wire 100 Rm 34.96 3495.56
b.PVC Listy/Conduit Pipe 100 LS 11.50 1150.00
4645.56
Actual rate 6416.81
Rate per Rm Rs. 73.79 15% conctractor overhead 962.52
Total (Rs.) 7379.33

203 4.0 mm2 PVC insulated copper wire


sources Code Level Qty Unit Rate/unit cost Total Cost
3203 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.75 nos 645.00 483.75
1.10 un skilled 1.5 nos 600.00 900.00 1771.25
materials MM4 a.Cu wire 100 Rm 53.11 5310.56
b.PVC Listy/Conduit Pipe 100 LS 15.00 1500.00
6810.56
Actual rate 8581.81
Rate per Rm Rs. 98.69 15% conctractor overhead 1287.27
Total (Rs.) 9869.08

204 6.0 mm2 PVC insulated copper wire


sources Code Level Qty Unit Rate/unit cost Total Cost
3204 labour 1.08 skilled 0.75 nos 775.00 581.25
1.09 Semi skilled 1.3 nos 645.00 838.50
1.10 un skilled 1.5 nos 600.00 900.00 2319.75
materials MM5 a.Cu wire 100 Rm 68.23 6823.06
b.PVC Listy/Conduit Pipe 100 Ls 15.00 1500.00
8323.06
Actual rate 10642.81
Rate perRm Rs. 122.39 15% conctractor overhead 1596.42
Total (Rs.) 12239.23

205 10.0 mm2 PVC insulated copper wire


sources Code Level Qty Unit Rate/unit cost Total Cost
3205 labour 1.08 skilled 0.75 nos 775.00 581.25
1.09 Semi skilled 1.3 nos 645.00 838.50
1.10 un skilled 1.5 nos 600.00 900.00 2319.75
materials MM6 a.Cu wire 100 Rm 83.36 8335.56
b.PVC Listy/Conduit Pipe 100 Ls 18.00 1800.00
10135.56
Actual rate 12455.31
Rate per Rm Rs. 143.23 15% conctractor overhead 1868.30
Total (Rs.) 14323.60
Only for DUDBC Ilam Use Page 173 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
205A 7/18 PVC copper Wire Nepal, Prakash etc.or equivalent.
sources Code Level Qty Unit Rate/unit cost Total Cost
3201A labour 1.08 skilled 0.75 nos 775.00 581.25
1.09 Semi skilled 1.3 nos 645.00 838.50
1.10 un skilled 1.5 nos 600.00 900.00 2319.75
materials a.Cu wire 100 Rm 64.83 6483.33
b.PVC Listy/Conduit Pipe 100 Ls 30.00 3000.00
9483.33
Actual rate 11803.08
Rate per set Rs. 135.74 15% conctractor overhead 1770.46
Total (Rs.) 13573.55

Point Wiring in PVC Listy


207B 2x3/22 PVC copper Wire Nepal, Prakash etcor equivalent. Light Pt. Med.(15m wire)
sources Code Level Qty Unit Rate/unit cost Total Cost
3203B
Point Wiring inPVCPipe/Listy 1 Pts 904.52 904.52 904.52
Actual rate 904.52
Rate per set Rs. 1040.20 15% conctractor overhead 135.68
Total (Rs.) 1040.20

208C 2x3/22 PVC copper Wire Nepal, Prakash etc or equivalent. Light Pt. Long (18m wire)
sources Code Level Qty Unit Rate/unit cost Total Cost
3204C
Point Wiring inPVCPipe/Listy 1 Pts 1085.43 1085.43 1085.43
Actual rate 1085.43
Rate per set Rs. 1248.24 15% conctractor overhead 162.81
Total (Rs.) 1248.24

209D 2x3/20 PVC copper Wire Nepal, Prakash etc.or equivalent. Light Pt. (15m wire)
sources Code Level Qty Unit Rate/unit cost Total Cost
3205D Point Wiring inPVCPipe/Listy 1 Pts 999.02 999.02 999.02
Actual rate 999.02
Rate per set Rs. 1148.87 15% conctractor overhead 149.85
Total (Rs.) 1148.87
210 2x3/20 PVC copper Wire Nepal, Prakash etc.or equivalent. Light Pt. 18 mLong
sources Code Level Qty Unit Rate/unit cost Total Cost
3206 Point Wiring 1 Pts 1198.83 1198.83 1198.83
Actual rate 1198.83
Rate per set Rs. 1378.65 15% conctractor overhead 179.82
Total (Rs.) 1378.65

211 2x1.5 mm2 PVC copper Wire Nepal, Prakash etc.or equivalent. Power Pt.
sources Code Level Qty Unit Rate/unit cost Total Cost
3207 Point Wiring inPVCPipe/Listy 1 Pts 780.00 780.00 780.00
Actual rate 780.00
Rate per set Rs. 780.00
Total (Rs.) 780.00

212 2x2.5 mm2 + 1x1.5 mm2 PVC copper Wire Nepal, Prakash etc.or equivalent. Power Pt. Long
Only for DUDBC Ilam Use Page 174 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
3208 sources Code Level Qty Unit Rate/unit cost Total Cost
Point Wiring inPVCPipe/Listy 1 Pts 1409.15 1409.15 1409.15
Actual rate 1409.15
Rate per set Rs. 1409.15
Total (Rs.) 1409.15
Power cable copper conductor Armored Nepal, Prakash Cable Or NS
213 4mm2 4 core Nepal, Prakash Or NS
sources Code Level Qty Unit Rate/unit cost Total Cost
3209 labour 1.08 skilled 0.75 nos 775.00 581.25
1.09 Semi skilled 1.3 nos 645.00 838.50
1.10 un skilled 1.2 nos 600.00 720.00 2139.75
materials a.Cu wire 100 Rm 308.55 30855.00
b.Shaddle,Grips,Screws 100 LS 25.00 2500.00

33355.00
Actual rate 35494.75
Rate per set Rs. 408.19 15% conctractor overhead 5324.21
Total (Rs.) 40818.96

214 6 mm2 4 core Nepal, Prakash Or NS


3210 sources Code Level Qty Unit Rate/unit cost Total Cost
labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 1.5 nos 645.00 967.50
1.10 un skilled 2 nos 600.00 1200.00 2942.50
materials a.Cu wire 100 Rm 417.45 41745.00
b.Shaddle,Grips,Screws 100 LS 25.00 2500.00
44245.00
Actual rate 47187.50
Rate per set Rs. 542.66 15% conctractor overhead 7078.13
Total (Rs.) 54265.63
215 10 mm2 4 core Nepal, Prakash Or NS
sources Code Level Qty Unit Rate/unit cost Total Cost
3211 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 1.5 nos 645.00 967.50
1.10 un skilled 2 nos 600.00 1200.00 2942.50
materials a. Cu wire 100 Rm 623.15 62315.00
b.Shaddle,Grips,Screws 100 LS 25.00 2200.00

64515.00
Actual rate 67457.50
Rate per set Rs. 775.76 15% conctractor overhead 10118.63
Total (Rs.) 77576.13
216 16 mm 4 core Nepal, Prakash Or NS
2

sources Level Qty Unit Rate/unit cost Total Cost


3212 labour skilled 1 nos 775.00 775.00
Semi skilled 1.5 nos 645.00 967.50
un skilled 2 nos 600.00 1200.00 2942.50
materials a.Cu wire 100 Rm 834.90 83490.00
b.Shaddle,Grips,Screws 100 LS 25.00 3300.00
Only for DUDBC Ilam Use Page 175 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.

86790.00
Actual rate 89732.50
Rate per set Rs. 1031.92 15% conctractor overhead 13459.88
Total (Rs.) 103192.38

217 25 mm2 4 core Nepal, Prakash Or NS


sources Level Qty Unit Rate/unit cost Total Cost
3213 labour skilled 1 nos 775.00 775.00
Semi skilled 1.5 nos 645.00 967.50
un skilled 2 nos 600.00 1200.00 2942.50
materials a.Cu wire 100 Rm 1355.20 135520.00
b.Shaddle,Grips,Screws 100 LS 25.00 3300.00

138820.00
Actual rate 141762.50
Rate per set Rs. 1630.27 15% conctractor overhead 21264.38
Total (Rs.) 163026.88
218 35 mm2 4 core Nepal, Prakash Or NS
sources Level Qty Unit Rate/unit cost Total Cost
3214 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 3 nos 600.00 1800.00 3865.00
materials a.Cu wire 100 Rm 1875.50 187550.00
b.Shaddle,Grips,Screws 100 LS 25.00 3300.00

190850.00
Actual rate 194715.00
Rate per set Rs. 2239.22 15% conctractor overhead 29207.25
Total (Rs.) 223922.25

219 4 mm22 core Nepal, Prakash Or NS


sources Level Qty Unit Rate/unit cost Total Cost
3215 labour skilled 0.75 nos 775.00 581.25
Semi skilled 1.30 nos 645.00 838.50
un skilled 1.20 nos 600.00 720.00 2139.75
materials a.Cu wire 100 Rm 187.55 18755.00
b.Shaddle,Grips,Screws 100 LS 25.00 2200.00

20955.00
Actual rate 23094.75
Rate per set Rs. 265.59 15% conctractor overhead 3464.21
Total (Rs.) 26558.96

220 6 mm2 2 core Nepal, Prakash Or NS


sources Level Qty Unit Rate/unit cost Total Cost
3216 labour skilled 1.0 nos 775.00 775.00
Semi skilled 1.5 nos 645.00 967.50
un skilled 2.0 nos 600.00 1200.00 2942.50
Only for DUDBC Ilam Use Page 176 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
materials a.Cu wire 100 Rm 235.95 23595.00
b.PVCPipe/Listy 100 LS 25.00 2500.00

26095.00
Actual rate 29037.50
Rate per set Rs. 333.93 15% conctractor overhead 4355.63
Total (Rs.) 33393.13
Cable Shoe
221 16 mm2 Cable Shoe
sources Level Qty Unit Rate/unit cost Total Cost
3217 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a.Cable Shoe 1 Rm 20.50 20.50
b.Saddle,Grips, Screws 1 LS 0.00 0.00

20.50
Actual rate 20.50
Rate per set Rs. 23.58 15% conctractor overhead 3.08
Total (Rs.) 23.58
222 25 mm2 Cable Shoe
sources Level Qty Unit Rate/unit cost Total Cost
3218 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a.Cable Shoe 1 Rm 32.50 32.50
b.Saddle,Grips, Screws 1 LS 0.00 0.00

32.50
Actual rate 32.50
Rate per set Rs. 37.38 15% conctractor overhead 4.88
Total (Rs.) 37.38
223 35 mm Cable Shoe
2

sources Level Qty Unit Rate/unit cost Total Cost


3219 labour skilled 0 nos 775.00 0.00
Semi skilled 0.00 nos 645.00 0.00
un skilled 0.00 nos 600.00 0.00 0.00
materials a.Cable Shoe 1 Rm 37.50 37.50
b.Saddle,Grips, Screws 1 LS 0.00 0.00

37.50
Actual rate 37.50
Rate per set Rs. 43.13 15% conctractor overhead 5.63
Total (Rs.) 43.13
224 50 mm2 Cable Shoe
sources Level Qty Unit Rate/unit cost Total Cost
3220 labour skilled 0.0 nos 775.00 0.00
Semi skilled 0.0 nos 645.00 0.00
un skilled 0.0 nos 600.00 0.00 0.00
Only for DUDBC Ilam Use Page 177 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
materials a.Cable Shoe 1 Rm 43.00 43.00
b.Saddle,Grips, Screws 1 LS 0.00 0.00

43.00
Actual rate 43.00
Rate per set Rs. 49.45 15% conctractor overhead 6.45
Total (Rs.) 49.45
Power cable Aluminium conductor Un-Armored Nepal, Prakash Cable Or NS
225 4mm2 4 core Nepal, Prakash Or NS
sources Level Qty Unit Rate/unit cost Total Cost
3221 labour skilled 0.75 nos 775.00 581.25
Semi skilled 1.3 nos 645.00 838.50
un skilled 1.2 nos 600.00 720.00 2139.75
materials a.Cu wire 100 Rm 102.00 10200.00
b.Saddle,Grips, Screws 100 LS 25.00 2500.00

12700.00
Actual rate 14839.75
Rate per set Rs. 170.66 15% conctractor overhead 2225.96
Total (Rs.) 17065.71
226 6 mm2 4 core Nepal, Prakash Or NS
sources Level Qty Unit Rate/unit cost Total Cost
3222 labour skilled 1 nos 775.00 775.00
Semi skilled 1.5 nos 645.00 967.50
un skilled 2 nos 600.00 1200.00 2942.50
materials a.Cu wire 100 Rm 144.50 14450.00
b.PVCPipe/Listy Ls 2500.00

16950.00
Actual rate 19892.50
Rate per set Rs. 228.76 15% conctractor overhead 2983.88
Total (Rs.) 22876.38

227 10 mm2 4 core Nepal, Prakash Or NS


sources Level Qty Unit Rate/unit cost Total Cost
3223 labour skilled 1 nos 775.00 775.00
Semi skilled 1.5 nos 645.00 967.50
un skilled 2 nos 600.00 1200.00 2942.50
materials a.Cu wire 100 Rm 160.50 16050.00
b.Saddle,Grips, Screws 100 LS 25.00 2500.00

18550.00
Actual rate 21492.50
Rate per set Rs. 247.16 15% conctractor overhead 3223.88
Total (Rs.) 24716.38
228 16 mm2 4 core Nepal, Prakash Or NS
sources Level Qty Unit Rate/unit cost Total Cost
3224 labour skilled 1 nos 775.00 775.00
Semi skilled 1.5 nos 645.00 967.50
Only for DUDBC Ilam Use Page 178 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
un skilled 2 nos 600.00 1200.00 2942.50
materials a.Cu wire 100 Rm 225.00 22500.00
b.Saddle,Grips, Screws 100 LS 25.00 2500.00

25000.00
Actual rate 27942.50
Rate per set Rs. 321.34 15% conctractor overhead 4191.38
Total (Rs.) 32133.88

229 25 mm2 4 core Nepal, Prakash Or NS


sources Level Qty Unit Rate/unit cost Total Cost
3225 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 3 nos 600.00 1800.00 3865.00
materials a.Cu wire 100 Rm 289.00 28900.00
b.Saddle,Grips, Screws 100 LS 25.00 2500.00

31400.00
Actual rate 35265.00
Rate per set Rs. 405.55 15% conctractor overhead 5289.75
Total (Rs.) 40554.75

230 35 mm2 4 core Nepal, Prakash Or NS


sources Level Qty Unit Rate/unit cost Total Cost
3226 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 3 nos 600.00 1800.00 3865.00
materials a.Cu wire 100 Rm 353.50 35350.00
b.Saddle,Grips, Screws 100 LS 25.00 2500.00

37850.00
Actual rate 41715.00
Rate per set Rs. 479.72 15% conctractor overhead 6257.25
Total (Rs.) 47972.25

Transformer and Accessories

231 25 KVA Transformer


sources Level Qty Unit Rate/unit cost Total Cost
3227 labour skilled 10 nos 775.00 7750.00
Semi skilled 2 nos 645.00 1290.00
un skilled 10 nos 600.00 6000.00
15040.00

materials a.Transformer 1 Set 211320.50 211320.50


Transportation 3% 6339.62
217660.12
Actual rate 232700.12
Rate per set Rs. 267605.13 15% conctractor overhead 34905.02
Total (Rs.) 267605.13
Only for DUDBC Ilam Use Page 179 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.

232 50 KVA Transformer


sources Level Qty Unit Rate/unit cost Total Cost
3228 labour skilled 10 nos 775.00 7750.00
Semi skilled 2 nos 645.00 1290.00
un skilled 10 nos 600.00 6000.00 15040.00
materials a.Transformer 1 Set 299600.00 299600.00
Transportation 3% 8988.00
308588.00
Actual rate 323628.00
Rate per set Rs. 372172.20 15% conctractor overhead 48544.20
Total (Rs.) 372172.20

233 100 KVA Transformer


sources Level Qty Unit Rate/unit cost Total Cost
3229 labour skilled 10 nos 775.00 7750.00
Semi skilled 2 nos 645.00 1290.00
un skilled 10 nos 600.00 6000.00 15040.00
materials a.Transformer 1 Set 417300.00 417300.00
Transportation 3% 12519.00
429819.00
Actual rate 444859.00
Rate per set Rs. 511587.85 15% conctractor overhead 66728.85
Total (Rs.) 511587.85

238 Out Door Type Cable Head


sources Level Qty Unit Rate/unit cost Total Cost
3234 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a.Cable Head 1 Set 1926.00 1926.00

1926.00
Actual rate 1926.00
Rate per set Rs. 2214.90 15% conctractor overhead 288.90
Total (Rs.) 2214.90
239 11 KVA Drop Out Fuse
sources Level Qty Unit Rate/unit cost Total Cost
3235 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a.Fuse 1 Rm 18404.00 18404.00

18404.00
Actual rate 18404.00
Rate per set Rs. 21164.60 15% conctractor overhead 2760.60
Total (Rs.) 21164.60
240 Lightning Arrester
sources Level Qty Unit Rate/unit cost Total Cost
3236 labour skilled 0 nos 775.00 0.00
Only for DUDBC Ilam Use Page 180 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a.Arester 1 Set 14980.00 14980.00

14980.00
Actual rate 14980.00
Rate per set Rs. 17227.00 15% conctractor overhead 2247.00
Total (Rs.) 17227.00
241 Earthing plateSet
sources Level Qty Unit Rate/unit cost Total Cost
3237 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a.Cu wire,Plate andAcc 1 Set 2033.00 2033.00

2033.00
Actual rate 2033.00
Rate per set Rs. 2337.95 15% conctractor overhead 304.95
Total (Rs.) 2337.95
242 Pin Insulator
sources Level Qty Unit Rate/unit cost Total Cost
3238 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a.Insulator 1 Set 267.50 267.50

267.50
Actual rate 267.50
Rate per set Rs. 307.63 15% conctractor overhead 40.13
Total (Rs.) 307.63

245 3 Core AL/XL Cable 35 Sq mm


sources Level Qty Unit Rate/unit cost Total Cost
3241 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a.Cable 1 Rm 1123.50 1123.50

1123.50
Actual rate 1123.50
Rate per set Rs. 1292.03 15% conctractor overhead 168.53
Total (Rs.) 1292.03

2 x2.5 mm. +1 x 1 mm. PVC cu. Wire for fan pointand power socket 1/2" hdp polythine pipe
3151
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.0075 nos 775.00 5.81
Semi skilled 0.013 nos 645.00 8.39
un skilled 0.012 nos 600.00 7.20 21.40
materials a.Cu wire 2.5 mm. 10 Rm 34.96 349.56
b.Cu wire 1 mm. 5 Rm 14.76 73.80
b.HDP 16 mm dia, hooks & Laying 5 Rm 40.00 200.00
623.36
Only for DUDBC Ilam Use Page 181 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
Actual rate 644.75
Rate per set Rs. 725.79 13% Vat 81.04
Total (Rs.) 725.79

3151 2x1.5 mm. PVC cu. Wire for light point 1/2" hdp polythine pipe

sources Level Qty Unit Rate/unit cost Total Cost


labour skilled 0.0075 nos 775.00 5.81
Semi skilled 0.013 nos 645.00 8.39
un skilled 0.012 nos 600.00 7.20 21.40
materials a.Cu wire 1.5 .mm. 10 Rm 14.76 147.60
b.HDP 16 mm dia, hooks & Laying 5 Rm 40.00 200.00
347.60
Actual rate 369.00
Rate per set Rs. 414.19 13% Vat 45.19
Total (Rs.) 414.19

3151 2 x3/20+1 x 1/18 PVC cu. Wire for 5 amp power point 1/2" hdp polythine pipe

sources Level Qty Unit Rate/unit cost Total Cost


labour skilled 0.0075 nos 775.00 5.81
Semi skilled 0.013 nos 645.00 8.39
un skilled 0.012 nos 600.00 7.20 21.40
materials a.Cu wire 3/20 10 Rm 34.96 349.56
b.Cu wire 1/18 5 Rm 14.76 73.80
b.HDP 16 mm dia, hooks & Laying 5 Rm 40.00 200.00
623.36
Actual rate 644.75
Rate per set Rs. 741.47 15% conctractor overhead 96.71
Total (Rs.) 741.47

3151 2 x 7/22 +1*1/18pvc cu. Wire for 15 amp.power point in 3/4" HDP polythine pipe

sources Level Qty Unit Rate/unit cost Total Cost


labour skilled 0.0075 nos 775.00 5.81
Semi skilled 0.013 nos 645.00 8.39
un skilled 0.012 nos 600.00 7.20 21.40
materials a.Cu wire7/22 10 Rm 31.48 314.78
c.Cu wire 1/18 5 Rm 14.76 73.80
d.HDP 20 mm dia, hooks & Laying 5 Rm 60.00 300.00
614.78
Actual rate 636.18
Rate per set Rs. 731.60 15% conctractor overhead 95.43
Total (Rs.) 731.60

3151 2x 7/18 + 1 x 3/22 pvc coper wire in 1" HDPE Polythine pipe from Meter to Main Switch
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.0075 nos 775.00 5.81
Semi skilled 0.013 nos 645.00 8.39
Only for DUDBC Ilam Use Page 182 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
un skilled 0.012 nos 600.00 7.20 21.40
materials a.Cu wire7/18 10 Rm 64.83 648.33
b.Cu wire 3/22 5 Rm 12.59 62.94
d.HDP 20 mm dia, hooks & Laying 5 Rm 60.00 300.00
1011.28
Actual rate 1032.68
Rate per set Rs. 1187.58 15% conctractor overhead 154.90
Total (Rs.) 1187.58

3151 2x 7/18 + 1 x 3/22 pvc coper wire in 1" HDPE Polythine pipe from Main Switch to Bush bar chamber
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.0075 nos 775.00 5.81
Semi skilled 0.013 nos 645.00 8.39
un skilled 0.012 nos 600.00 7.20 21.40
materials a.Cu wire7/18 10 Rm 64.83 648.33
b.Cu wire 3/22 5 Rm 12.59 62.94
d.HDP 20 mm dia, hooks & Laying 5 Rm 60.00 300.00
1011.28
Actual rate 1032.68
Rate per set Rs. 1187.58 15% conctractor overhead 154.90
Total (Rs.) 1187.58

3151 2x 7/18 + 1 x 3/22 pvc coper wire in 1" HDPE Polythine pipe from Bush bar chamber to DB
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.0075 nos 775.00 5.81
Semi skilled 0.013 nos 645.00 8.39
un skilled 0.012 nos 600.00 7.20 21.40
materials a.Cu wire7/18 20 Rm 64.83 1296.67
b.Cu wire 3/22 10 Rm 12.59 125.89
d.HDP 20 mm dia, hooks & Laying 5 Rm 60.00 300.00
1722.56
Actual rate 1743.95
Rate per set Rs. 2005.55 15% conctractor overhead 261.59
Total (Rs.) 2005.55

3151 2x 7/22 + 1 x 3/22vc coper wire in 1" HDPE Polythine pipe from D.B. to SPN D.B.
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.0075 nos 775.00 5.81
Semi skilled 0.013 nos 645.00 8.39
un skilled 0.012 nos 600.00 7.20 21.40
materials a.Cu wire7/22 20 Rm 31.48 629.56
b.Cu wire 3/22 10 Rm 12.59 125.89
d.HDP 20 mm dia, hooks & Laying 5 Rm 60.00 300.00
Only for DUDBC Ilam Use Page 183 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


S. No.
1055.44
Actual rate 1076.84
Rate per set Rs. 1238.37 15% conctractor overhead 161.53
Total (Rs.) 1238.37

183 Earthing Set


Supplying required materials and inter connection of earthing system including excavation of Earth
3183 pit about 1.5 meter and back filling . The main materials are as follows:-

sources Level Qty Unit Rate/unit cost Total Cost


labour skilled 1 nos 775.00 775.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 775.00
a. 600 x600 x3.15 mm Copper earth
materials plate no-1 1 set 2247.00 2247.00
b. 12 SWG copper earth conductor 6
meter 6 Rm 267.50 1605.00
32 mm H.D.P. pipe with funel fitting 2 Rm 128.82 257.65
c. Dry Charcoal 11 kg 25.75 283.25
d. Common Salt 9 kg 11.00 99.00
e. Dry soil L.s. 25.00
f. Excavation 2.16 cum 252.35 545.07
g.Filling 2.16 cum 238.24 514.61
5576.57
6351.57
Actual rate 7126.57
Rate per set Rs. 8195.56 15% conctractor overhead 1068.99
Total (Rs.) 8195.56

The End
Only for DUDBC Ilam Use Page 184 of 343
Table of Content
Electrical Analysis 2074/075 Taplejung

Description Rate
Rate with
S.No P.G. Rs. without Per
overhead
overhead
1 Decorative Wall bracket Sl Fancy Type Phillips or equivalent with bulb 1 Rs. 1372.50 1578.37 Set
2 Decorative Wall bracket Single wallite Type Phillips or equivalent 1 Rs. 1372.50 1578.37 Set
3 Decorative Wall bracket Single Vertile Phillips or equivalent 1 Rs. 1372.50 1578.37 Set
4 Decorative Wall bracket /spot light/Mirror Light bonus or equivalent 2 Rs. 1372.50 1578.37 Set
5 Decorative Wall bracket /spot light/Mirror Light Decon or equivalent 2 Rs. 1265.50 1455.32 Set
6 Decorative Wall bracket /spot light/Mirror Light Prince or equivalent 2 Rs. 752.00 864.80 Set
7 1x20 Watt F.T.L Patti fitting Phillips or equivalent 3 Rs. 879.50 1011.42 Set
8 1x40 Watt F.T.L Patti fitting Phillips or equivalent 3 Rs. 915.00 1052.25 Set
9 1x20 Watt F.T.L Mirolta TMS 200/120 LPF Phillips or equivalent 3 Rs. 1171.00 1346.65 Set
10 1x40 Watt F.T.L Mirolta FMC 200/140 Phillips(wthout rod or equivalent 3 Rs. 1171.00 1346.65 Set
11 1x40 Watt F.T.L Mirolta FMC 200/140 Phillips or equivalent 4 Rs. 1171.00 1346.65 Set
12 1x20 Watt F.T.L Astramini TMS 21/118 LPF Phillips or equivalent 4 Rs. 1171.00 1346.65 Set
13 1x40 Watt F.T.L Astramini TMS 21/136 HPF Phillips or equivalent 4 Rs. 1171.00 1346.65 Set
14 2x40 Watt F.T.C TCX 20/236 HPF Decolite Phillips or equivalent 4 Rs. 2987.00 3435.05 Set
15 1x40 Watt F.T.L Box Fitting TMC 501/136 HPF Phillips or equivalent 5 Rs. 1278.00 1469.70 Set
16 2x40 Watt F.T.L Box Fitting TMC 501/236 HPF Phillips or equivalent 5 Rs. 1759.50 2023.42 Set
17 1x40 Watt F.T.L Industrial Channel Stove Enamelled Reflector HPF TKC 5 Rs. 2372.00 2727.80 Set
202/136
2x40 Watt F.T.L Industrial Channel Stove Enamelled Reflector HPF TKC
18 6 Rs. 2853.50 3281.52 Set
202/236
1x40 Watt F.T.L Opalite with Acrylic Difuser TCS 19/136 Philips or
19 6 Rs. 2051.00 2358.65 Set
equivalent
2x40 Watt F.T.L Opalite with Acrylic Difuser TCS 19/236 Philips or
20 6 Rs. 3100.00 3565.00 Set
equivalent
4x18/20 Watt F.T.L Dished Opal Acrylic Cover TBC 71/420 HPF, 72/420
21 7 Rs. 6147.00 7069.05 Set
Philips
1x40 Watt F.T.L Mirror Optic HPFPhilips or equivalent
22 7 Rs. 2800.00 3220.00 Set
23 2x40 Watt F.T.L Mirror Optic HPFPhilips or equivalent 7 Rs. 4244.50 4881.17 Set
24 300/500 Watt Halogen Philips or equivalent 8 Rs. 1616.50 1858.97 Set
25 1000 Watt Halogen Philips or equivalent 8 Rs. 3221.50 3704.72 Set
26 150 Watt HPSV HPF Philips or equivalent 8 Rs. 1758.50 2022.27 Set
27 250 Watt HPSV HPF Philips or equivalent 8 Rs. 1886.50 2169.47 Set
Lighting Accessories Philips or equivalent
28 40 Watt FTL Rod Philips or equivalent 9 Rs. 91.00 104.65 Set
29 40 Watt 220 Volt Starter Philips or equivalent 9 Rs. 21.50 24.72 Set
30 20 Watt FTL Rod Philips or equivalent 9 Rs. 96.50 110.97 Set
31 40 Watt 220 Volt FTL Ballast Philips or equivalent 9 Rs. 300.00 345.00 Set
32 150 Watt SV Bulb Philips or equivalent 10 Rs. 1391.00 1599.65 Set
33 250 Watt SV Bulb Philips or equivalent 10 Rs. 1551.50 1784.22 Set
34 1.5" PVC Listy 10 Rs. 64.50 74.17 Rm
35 1" PVC Listy 10 Rs. 59.00 67.85 Rm
36 0.75" PVC Listy 11 Rs. 48.50 55.77 Rm
37 0.5" PVC Listy 11 Rs. 48.50 55.77 Rm
Dyna / CPL Switch & Socket
38 1 Gang 1 one way Switch F 11 Rs. 537.79 618.45 Set
39 1 Gang 1 one way Switch S 11 Rs. 389.75 448.21 Set
40 2 Gang 2 one way Switch F 12 Rs. 598.29 688.03 Set
41 2Gang 2 one way Switch S 12 Rs. 426.07 489.98 Set
42 3 Gang 3 one way Switch F 12 Rs. 628.54 722.82 Set
43 3 Gang 3 one way Switch S 12 Rs. 525.29 604.08 Set
Only for DUDBC Ilam Use Page 185 of 343
Table of Content
Electrical Analysis 2074/075 Taplejung

Description Rate
Rate with
S.No P.G. Rs. without Per
overhead
overhead
44 4 Gang 4 one way Switch F 13 Rs. 658.79 757.60 Set
45 4 Gang 4 one way Switch S 13 Rs. 486.57 559.55 Set
46 6 Gang 6 one way Switch F 13 Rs. 1198.04 1377.74 Set
47 6 Gang 6 one way Switch S 13 Rs. 939.51 1080.43 Set
48 1 Gang 1 one Bell Push F 14 Rs. 507.54 583.67 Set
49 1 Gang 1 one Bell Push S 14 Rs. 404.29 464.93 Set
50 16 Amp Switch Indicator F 14 Rs. 358.54 412.32 Set
51 16 Amp Switch Indicator S 14 Rs. 255.29 293.58 Set
52 6 Amp Uni Socket Switch Combined With Shutter F 15 Rs. 374.54 430.72 Set
53 6 Amp Uni Socket Switch Combined With Shutter S 15 Rs. 271.29 311.98 Set
54 Dimmer Single 400 Watt F 15 Rs. 639.79 735.75 Set
55 Dimmer Single 400 Watt S 15 Rs. 639.79 735.75 Set
56 Dimmer Single 800 Watt F 16 Rs. 725.79 834.65 Set
57 Dimmer Single 800 Watt S 16 Rs. 725.79 834.65 Set
58 16/6 Amp Combined S/Socket With Safety Shutter F 16 Rs. 679.54 781.47 Set
59 16/6 Amp Combined S/Socket With Safety ShutterS 16 Rs. 507.32 583.41 Set
60 DP Switch 16-32 Amp F 17 Rs. 486.54 559.52 Set
61 DP Switch 16-32 Amp S 17 Rs. 383.29 440.78 Set
62 Telephone Socket Single F 17 Rs. 412.04 473.84 Set
63 Telephone Socket Single S 17 Rs. 308.79 355.10 Set
64 Buzzer 18 Rs. 377.43 434.03 Set
65 Musical Bell 18 Rs. 368.38 423.63 Set
66 Blanking Plate Single 18 Rs. 124.50 143.17 Set
67 Angle/ Batten Holder 18 Rs. 93.33 107.32 Set
68 Ceiling Rose 19 Rs. 93.33 107.32 Set
Roma / North-West Switch & Socket Or Equivalent
69 1 Gang 1 one way Switch F 19 Rs. 463.82 533.39 Set
70 2 Gang 2 one way Switch F 19 Rs. 524.32 602.96 Set
71 3 Gang 3 one way Switch F 19 Rs. 561.00 645.15 Set
72 4Gang 4 one way Switch F 20 Rs. 601.75 692.01 Set
73 5 Gang 5 one way Switch F 20 Rs. 813.50 935.52 Set
74 6Gang 6 one way Switch F 20 Rs. 1141.00 1312.15 Set
75 5 Amp Pqwer Socket 20 Rs. 589.65 678.09 Set
76 13-15 Amp Power Socket 21 Rs. 698.56 803.34 Set
77 T.V Socket 21 Rs. 450.51 518.08 Set
78 T.Phone Socket 21 Rs. 450.51 518.08 Set
79 Bell Push 21 Rs. 450.51 518.08 Set
Switch Gears( ISI ) Mark Geco or equivalent
80 16 Amp 415 Volt DP Main Switch S 22 Rs. 1378.15 1584.87 Set
81 32 Amp 415 Volt DP Main Switch S 22 Rs. 2086.00 2398.90 Set
82 63 Amp 415 Volt DP Main Switch S 22 Rs. 3138.70 3609.50 Set
83 100 Amp 415 Volt DP Main Switch 22 Rs. 5945.90 6837.78 Set
84 16 Amp 415 Volt TP Main Switch 23 Rs. 1892.40 2176.26 Set
85 32 Amp 415 Volt TP Main Switch 23 Rs. 2430.85 2795.47 Set
86 63 Amp 415 Volt TP Main Switch 23 Rs. 3949.40 4541.81 Set
Only for DUDBC Ilam Use Page 186 of 343
Table of Content
Electrical Analysis 2074/075 Taplejung

Description Rate
Rate with
S.No P.G. Rs. without Per
overhead
overhead
87 100 Amp 415 Volt TP Main Switch 23 Rs. 6593.25 7582.23 Set
88 200 Amp 415 Volt TP Main Switch 24 Rs. 9424.95 10838.69 Set
89 16 Amp 415 Volt TP Main Switch HRC 24 Rs. 2958.86 3402.68 Set
90 32 Amp 415 Volt TP Main Switch HRC 24 Rs. 3208.12 3689.33 Set
91 63 Amp 415 Volt TP Main Switch HRC 24 Rs. 5365.10 6169.86 Set
92 100 Amp 415 Volt TP Main Switch HRC 24 Rs. 8063.40 9272.91 Set
93 200 Amp 415 Volt TP Switch HRC 24 Rs. 10786.20 12404.13 Set
94 300 Amp 415 Volt TP Switch HRC 25 Rs. 13387.70 15395.85 Set
95 400 Amp 415 Volt TP Switch HRC 25 Rs. 3804.50 4375.17 Set
96 16 Amp 415 Volt Change over Switch 25 Rs. 2902.75 3338.16 Set
97 32 Amp 415 Volt Change over Switch 25 Rs. 3144.75 3616.46 Set
98 63 Amp 415 Volt Change over Switch 26 Rs. 5365.10 6169.86 Set
99 100 Amp 415 Volt Change over Switch 26 Rs. 8450.90 9718.53 Set
100 200 Amp 415 Volt Change over Switch 26 Rs. 10786.20 12404.13 Set
101 300Amp 415 Volt Change over Switch 26 Rs. 13387.70 15395.85 Set
102 63 Amp Bus Bar Chamber 27 Rs. 4454.50 5122.67 Set
103 100 Amp Bus Bar Chamber 27 Rs. 6535.50 7515.82 Set
104 200 Amp Bus Bar Chamber 27 Rs. 8447.50 9714.62 Set
105 300 Amp Bus Bar Chamber 27 Rs. 11053.00 12710.95 Set
Panel Board & Accessaries
60/100 Panel Board with Suitable color,Floor Mounted Double
106 cover,pushTypeSwitch, Size 9"x36"x48" 28 Rs. 19873.70 22854.75 Set
60/100 Panel Board with Suitable color,Floor Mounted Double
107 cover,pushTypeSwitch, Size 12"x36"x48" 28 Rs. 19873.70 22854.75 Set
60/100 Panel Board with Suitable color,Floor Mounted Double cover,push Type
108 Switch Size 9"x48"x60" 28 Rs. 19873.70 22854.75 Set
60/100 Panel Board with Suitable color,Floor Mounted Double cover,Push Type
109 Switch Size 12"x48"x60" 29 Rs. 19873.70 22854.75 Set
150/200 Panel Board with Suitable color,Floor Mounted Double cover,Push Type
110 Switch Size 9"x38"x52" 29 Rs. 38673.70 44474.75 Set
150/200 Panel Board with Suitable color,Floor Mounted Double cover,Push Type
111 Switch Size 9"x42"x56" 29 Rs. 38673.70 44474.75 Set
250/300 Panel Board with Suitable color,Floor Mounted Double cover,Push Type
112 Switch Size 12"x48"x60" 30 Rs. 38673.70 44474.75 Set
400 Panel Board with Suitable color,Floor Mounted Double cover,Push Type
113 Switch Size 12"x52"x66" 30 Rs. 68286.20 78529.13 Set
114 60 Amp MCCB Mitsubi Japan or equivalent 30 Rs. 3668.00 4218.20 Set
115 100 Amp MCCB Mitsubi Japan or equivalent 30 Rs. 4631.00 5325.65 Set
116 200 Amp MCCB Mitsubi Japan or equivalent 31 Rs. 7734.00 8894.10 Set
117 250 Amp MCCB Mitsubi Japan or equivalent 31 Rs. 9446.00 10862.90 Set
118 300 Amp MCCB Mitsubi Japan or equivalent 31 Rs. 18755.00 21568.25 Set
119 Voltmeter (0-500) 31 Rs. 458.00 526.70 Set
120 Amp. Meter (0-500) 32 Rs. 458.00 526.70 Set
121 Indicator 32 Rs. 196.00 225.40 Set
122 Slector Switch 32 Rs. 372.50 428.37 Set
123 C.T.Coil 32 Rs. 511.50 588.22 Set
124 Energy meter 33 Rs. 779.00 895.85 Set
Join Box Metal/Wooden/PVC
125 Join Box Metal 4"x4" 33 Rs. 217.79 250.45 Set
Only for DUDBC Ilam Use Page 187 of 343
Table of Content
Electrical Analysis 2074/075 Taplejung

Description Rate
Rate with
S.No P.G. Rs. without Per
overhead
overhead
126 Join Box Metal 4"x6" 33 Rs. 232.31 267.15 Set
127 Join Box Metal 6"x8" 33 Rs. 295.23 339.51 Set
128 Join Box Metal 8"x10" 34 Rs. 336.37 386.82 Set
129 Join Box Metal 8"x12" 34 Rs. 406.55 467.53 Set
130 Join Box Wooden 4"x4" 34 Rs. 133.50 153.52 Set
131 Join Box Wooden 4"x6" 34 Rs. 144.50 166.17 Set
132 Join Box Wooden 6"x8" 35 Rs. 160.50 184.57 Set
133 Join Box Wooden 8"x10" 35 Rs. 192.50 221.37 Set
134 Join Box PVC 4"x4" 35 Rs. 116.57 134.05 Set
135 Join Box PVC 4"x6" 35 Rs. 133.51 153.53 Set
136 Join Box PVC 6"x8" 36 Rs. 149.24 171.62 Set
137 Join Box PVC 8"x10" 36 Rs. 172.23 198.06 Set
MCB and Distribution Board ISI Mark Protec & equi.
138 6-32 Amp SP MCB 36 Rs. 166.38 191.33 Set
139 6-32 Amp DP MCB 36 Rs. 805.26 926.04 Set
140 6-32 Amp TP MCB 37 Rs. 1184.59 1362.27 Set
141 6-32 Amp TPN MCB 37 Rs. 1391.00 1599.65 Set
142 40-60 Amp SP MCB 37 Rs. 658.85 757.67 Set
143 40-60 AmpDP MCB 37 Rs. 1304.38 1500.03 Set
144 40-60 Amp TP MCB 38 Rs. 1883.37 2165.86 Set
145 40-60 Amp TPN MCB 38 Rs. 2362.53 2716.90 Set
Distribution Board DV.Geco Protec or Equi.
146 4 Way SPN DB Double Cover 38 Rs. 2094.15 2408.27 Set
147 6 Way SPN DB Double Cover 38 Rs. 2506.76 2882.77 Set
148 8Way SPN DB Double Cover 39 Rs. 2668.01 3068.21 Set
149 12 Way SPN DB Double Cover 39 Rs. 3193.76 3672.81 Set
150 16 Way SPN DB Double Cover 39 Rs. 3686.23 4239.15 Set
151 3 Way TPN DB Double Cover 39 Rs. 4190.48 4819.04 Set
152 4 WayTPN DB Double Cover 40 Rs. 4190.48 4819.04 Set
153 6 WayTPN DB Double Cover 40 Rs. 4989.08 5737.43 Set
154 8 Way TPN DB Double Cover 40 Rs. 6194.39 7123.54 Set
155 2 Pole MCB Box 40 Rs. 803.97 924.56 Set
156 4 Pole MCB Box 41 Rs. 874.15 1005.27 Set
Fan: Anchor,C/G, Almonard/Khaitan/Usha/Vision Or equivalent.
157 36" Ceiling Fan Almonard/Bajaj or equivalent. 41 Rs. 3761.00 4325.15 Set
158 42" Ceiling Fan Almonard/Bajaj or equivalent. 41 Rs. 3765.80 4330.67 Set
159 48" Ceiling Fan Almonard/Bajaj or equivalent. 42 Rs. 4124.00 4742.60 Set
160 10" Wall Fan Almonard/Bajaj or equivalent. 42 Rs. 2243.00 2579.45 Set
161 12" Exhaust Fan Almonard/Bajaj or equivalent. 42 Rs. 3495.00 4019.25 Set
162 AC 1.5 Ton Rs. Set
163 AC 2.0 Ton Rs. Set
General Fittings
164 Dome Light 6" Milky Type Heavy Carrier(decorative) 42 Rs. 844.00 970.60 Set
165 Dome Light 6" Brace Base 43 Rs. 1230.00 1414.50 Set
166 Dome Light 8" Milky Type Heavy Carrier 43 Rs. 975.25 1121.53 Set
167 Dome Light 8" Brace Base 43 Rs. 1492.50 1716.37 Set
168 40/60 Watt Down Light 43 Rs. 788.00 906.20 Set
Only for DUDBC Ilam Use Page 188 of 343
Table of Content
Electrical Analysis 2074/075 Taplejung

Description Rate
Rate with
S.No P.G. Rs. without Per
overhead
overhead
169 Wall / Spot /Bulk Head Light Single Direct Ord. Bonus 44 Rs. 1326.50 1525.47 Set
170 Wall / Spot /Bulk Head Light Single Direct Ord. Decon 44 Rs. 1219.50 1402.42 Set
171 Wall / Spot /Bulk Head Light Single Direct Ord. Prince 44 Rs. 706.00 811.90 Set
172 Dinning Lamp Decorative Medium 44 Rs. 2467.50 2837.62 Set
173 Chandlers Lamp 3-5 Lamp Medium 45 Rs. 6052.00 6959.80 Set
174 Chandlers Lamp 6-8 Lamp Medium 45 Rs. 8620.00 9913.00 Set
175 IS 3043 Copper Plate 80x80x3.15 45 Rs. 4584.25 5271.88 Set
176 IS 3043 Copper Plate65x65x3.15 45 Rs. 2979.25 3426.13 Set
177 G.NO 10 Plastic Coated Cu. Wire 46 Rs. 2329.93 2679.41 Set
178 0-100 Watt Bulb (ISI) 46 Rs. 63.50 73.02 Set
179 Festival Light 46 Rs. 161.50 185.72 Set
Roma /Appolo Bell Indicator
180 4 way Indicator With Bell 46 Rs. 1574.00 1810.10 Set
181 6 way Indicator With Bell 46 Rs. 2376.50 2732.97 Set
182 8way Indicator With Bell 47 Rs. 3018.50 3471.27 Set
183 12 way Indicator With Bell 47 Rs. 4677.00 5378.55 Set
Steel Tubelar / Wood Pole/R.C.C. pole
184 8 meter Wooden Pole 47 Rs. 7373.98 8480.07 nos
185 9 meter Wooden Pole 47 Rs. 7998.32 9198.06 nos
186 8 meter R.C.C. Pole 48 Rs. 8509.14 9785.51 nos
187 9 meter R.C.C. Pole 48 Rs. 9587.50 11025.62 nos
Cable Wire Prakash / Janata or Equivalent
Concelled Wiring
188 1/18 PVC Coper Wire Nepal, Prakash etc. or equivalent 48 Rs. 63.73 73.29 Set
189 3/22 PVC Coper Wire Nepal, Prakash etc. or equivalent 48 Rs. 63.99 73.58 Set
190 3/20 PVC Coper Wire Nepal, Prakash etc. or equivalent 49 Rs. 70.29 80.82 Set
191 7/22 PVC Coper Wire Nepal, Prakash etc. or equivalent 49 Rs. 82.88 95.30 Set
192 7/20 PVC Coper Wire Nepal, Prakash etc. or equivalent 49 Rs. 109.78 126.24 Set
193 7/18 PVC Coper Wire Nepal, Prakash etc. or equivalent 49 Rs. 124.26 142.89 Set
PVC Copper /AL Wiring In PVC Listy/PVC conduit Pipe
Surface Wiring
194 1/18 PVC Coper Wire Nepal, Prakash etc. or equivalent 50 Rs. 60.05 69.05 Set
195 3/22 PVC Coper Wire Nepal, Prakash etc. or equivalent 50 Rs. 60.30 69.34 Set
196 3/20 PVC Coper Wire Nepal, Prakash etc. or equivalent 50 Rs. 66.60 76.59 Set
197 7/22 PVC Coper Wire Nepal, Prakash etc. or equivalent 50 Rs. 84.68 97.37 Set
198 7/20 PVC Coper Wire Nepal, Prakash etc. or equivalent 51 Rs. 103.55 119.08 Set
199 7/18 PVC Coper Wire Nepal, Prakash etc. or equivalent 51 Rs. 118.03 135.73 Set
Point Wiring in PVC Listy
200 2x3/22 PVC Coper Wire Nepal, Prakash etc or equivalent Light Pt. Med.(15m 51 Rs. 904.52 1040.19 Set
wire)
201 2x3/22 PVC Coper Wire Nepal, Prakash etc or equivalent Light Pt. Long(18m 51 Rs. 1085.43 1248.23 Set
wire)
202 2x3/20 PVC Coper Wire Nepal, Prakash etc.or equivalent Light Pt. 51 Rs. 999.02 1148.87 Set
203 2x3/20 PVC Coper Wire Nepal, Prakash etc.or equivalent Light Pt. Long 52 Rs. 1198.83 1378.64 Set
204 2x7/22 +1x3/22 PVC Coper Wire Nepal, Prakash etc.or equivalent Power Pt. 52 Rs. 780.00 897.00 Set
205 2x7/22
Power cable+ copper
1x3/22 PVC Coper Wire Nepal, Prakash etc.or equivalent Power Pt. Long
conductor Armored Nepal, Prakash Cable 52 Rs. 1409.15 1620.52 Set
Or NS
206 4mm2 4 core Nepal, Prakash Or NS 52 Rs. 354.95 408.18 Set
207 6 mm2 4 core Nepal, Prakash Or NS 52 Rs. 471.88 542.65 Set
Only for DUDBC Ilam Use Page 189 of 343
Table of Content
Electrical Analysis 2074/075 Taplejung

Description Rate
Rate with
S.No P.G. Rs. without Per
overhead
overhead
208 10 mm2 4 core Nepal, Prakash Or NS 53 Rs. 674.58 775.76 Set
209 16 mm2 4 core Nepal, Prakash Or NS 53 Rs. 897.33 1031.92 Set
210 25 mm2 4 core Nepal, Prakash Or NS 53 Rs. 1417.63 1630.26 Set
211 35 mm2 4 core Nepal, Prakash Or NS 53 Rs. 1947.15 2239.22 Set
212 4 mm22 core Nepal, Prakash Or NS 54 Rs. 230.95 265.58 Set
213 6 mm2 2 core Nepal, Prakash Or NS 54 Rs. 290.38 333.93 Set
214 16 mm2 Cable Shoe 54 Rs. 20.50 23.57 Set
215 25 mm2 Cable Shoe 54 Rs. 32.50 37.37 Set
216 35 mm2 Cable Shoe 55 Rs. 37.50 43.12 Set
217 50 mm Cable Shoe
2
Power cable Aluminium conductor Un-Armored Nepal, Prakash 55 Rs. 43.00 49.45 Set
Cable Or NS
218 4mm2 4 core Nepal, Prakash Or NS 55 Rs. 148.40 170.65 Set
219 6 mm2 4 core Nepal, Prakash Or NS 55 Rs. 198.93 228.76 Set
220 10 mm2 4 core Nepal, Prakash Or NS 56 Rs. 214.93 247.16 Set
221 16 mm2 4 core Nepal, Prakash Or NS 56 Rs. 279.43 321.33 Set
222 25 mm2 4 core Nepal, Prakash Or NS 56 Rs. 352.65 405.54 Set
223 35 mm2 4 core Nepal, Prakash Or NS 56 Rs. 417.15 479.72 Set
Transformer and Accessories
224 25 KVA Transformer 57 Rs. 232700.12 267605.13 Set
225 50 KVA Transformer 57 Rs. 323628.00 372172.20 nos
226 100 KVA Transformer 57 Rs. 444859.00 511587.85 nos
227 Out Door Type Cable Head 58 Rs. 1926.00 2214.90 Set
228 11 KVA Drop Out Fuse 58 Rs. 18404.00 21164.60 Set
229 Lightning Arrester 58 Rs. 14980.00 17227.00 Set
230 Earthing plate Set 58 Rs. 2033.00 2337.95 Set
231 Pin Insulator 58 Rs. 267.50 307.62 Set
232 3 Core AL/XL Cable 35 Sq mm 59 Rs. 1123.50 1292.02 Set
Point Wiring and Earthing
233 2 x3/20+1 x 1/18 PVC cu. Wire for fan point 1/2" hdp polythine pipe 59 Rs. 644.75 741.46 set
234 2x3/20 PVC cu. Wire for light point 1/2" hdp polythine pipe 59 Rs. 369.00 424.34 set
235 2 x3/20+1 x 1/18 PVC cu. Wire for 5 amp power point 1/2" hdp polythine pipe 59 Rs. 644.75 741.46 set
2 x 7/22 +1*1/18pvc cu. Wire for 15 amp.power point in 3/4" HDP polythine pipe 60
236 Rs. 636.18 731.60 set
2x 7/18 + 1 x 3/22 pvc coper wire in 1" HDPE Polythine pipe from Meter to Main 60
Switch
237 Rs. 1032.68 1187.57 set
2x 7/18 + 1 x 3/22 pvc coper wire in 1" HDPE Polythine pipe from Main Switch to 60
Bush bar chamber
238 Rs. 1032.68 1187.57 set
2x 7/18 + 1 x 3/22 pvc coper wire in 1" HDPE Polythine pipe from Bush bar 61
239 chamber to DB Rs. 1743.95 2005.54 set
2x 7/22 + 1 x 3/22vc coper wire in 1" HDPE Polythine pipe from D.B.ber to SPN 61
240 D.B. Rs. 1076.84 1238.36 set
Earthing Set Supplying required materials and inter connection of earthing system 61
241 including excavation of Earth pit about 1.5 meter and back filling . The main Rs. 7126.57 8195.56 set
materials are as follows:-
g]kfn ;/sf/
;x/L ljsf; dGqfno
;x/L ljsf; tyf ejg lgdf{0f ljefu
l8lehg sfof{no, Onfd

b/ ljZn]if0f, ताप्लेजङु ् ग

ljB't

cf=j= @)&$÷)&%

tof/ ug]{ M– सब–Ol~hlgo/ उदय नारायण rf}w/L


r]s hfFr ug]{ M– Ol~hlgo/
k|dfl0ft ug]{ M–नि. डिभिजन प्रमुख ई. ललित प्रसाद नेपाल

ldlt M– @)&@ ;fn मसं ीर @* गते बिहीबार


g]kfn ;/sf/
;x/L ljsf; dGqfno
;x/L ljsf; tyf ejg lgdf{0f ljefu
l8lehg sfof{no, Onfd

b/ ljZn]if0f, ताप्लेजुङ्ग

ljB't

cf=j= @)&@÷)&#
g]kfn ;/sf/
;x/L ljsf; dGqfno
;x/L ljsf; tyf ejg lgdf{0f ljefu
l8lehg sfof{no, Onfd

b/ ljZn]if0f, ताप्लेजङु ् ग

;]g]6/L

cf=j= @)&@÷)&#
Page 193 ELECTRICAL_ANALYSIS 2069 Ilam

Code 1 Decorative Wall bracket Single Sl Fancy Type 10 set


3001 sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. Decorative light 10 nos 1230.50 12305.00
b. Bulb 10 nos 0.00 0.00
c screw, grips PVC tape etc. 10 LS 32.00 320.00
Transportation 3% 378.75 13003.75
Actual rate 13713.75
15% conctractor overhead 2057.06
Rate per set Rs. 1577.08 Total (Rs.) 15770.81

2 Decorative Wall bracket Single Sl Fancy Type 10 set


3001.1 sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. Decorative light 10 nos 1230.50 12305.00
b. Bulb 10 nos 23.00 230.00
c screw, grips PVC tape etc. 10 LS 32.00 320.00
Transportation 3% 385.65 13240.65
Actual rate 13950.65
15% conctractor overhead 2092.60
Rate per set Rs. 1604.32 Total (Rs.) 16043.25

3 Decorative Wall bracket Single Wallite FMC18/109 Phillips or equivalent 10 set


3002 sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. Decorative light 10 nos 1230.50 12305.00
b. Bulb 10 nos 0.00 0.00
c screw, grips PVC tape etc. 10 LS 32.00 320.00
Transportation 3% 378.75 13003.75
Actual rate 13713.75
15% conctractor overhead 2057.06
Rate per set Rs. 1577.08 Total (Rs.) 15770.81

Prepare By:- Ckecked By:- Approved By:-


Page 194 ELECTRICAL_ANALYSIS 2069 Ilam

4 Decorative Wall bracket Single Wallite FMC18/109 Phillips or equivalent 10 set


3002.1 sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. Decorative light 10 nos 1230.50 12305.00
b. Bulb 10 nos 23.00 230.00
c screw, grips PVC tape etc. 10 LS 32.00 320.00
Transportation 3% 385.65 13240.65
Actual rate 13950.65
15% conctractor overhead 2092.60
Rate per set Rs. 1604.32 Total (Rs.) 16043.25

5 Decorative Wall bracket Single vertile FMC 19/109 Phillips or equivalent 10 set
3003 sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. Decorative light 10 nos 1230.50 12305.00
b. Bulb 10 nos 0.00 0.00
c screw, grips PVC tape etc. 10 LS 32.00 320.00
Transportation 3% 378.75 13003.75
Actual rate 13713.75
15% conctractor overhead 2057.06
Rate per set Rs. 1577.08 Total (Rs.) 15770.81

6 Decorative Wall bracket Single vertile FMC 19/109 Phillips or equivalent 10 set
3003.1 sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. Decorative light 10 nos 1230.50 12305.00
b. Bulb 10 nos 23.00 230.00
c screw, grips PVC tape etc. 10 LS 32.00 320.00
Transportation 3% 385.65 13240.65
Actual rate 13950.65
15% conctractor overhead 2092.60

Prepare By:- Ckecked By:- Approved By:-


Page 195 ELECTRICAL_ANALYSIS 2069 Ilam

Rate per set Rs. 1604.32 Total (Rs.) 16043.25

Prepare By:- Ckecked By:- Approved By:-


Page 196 ELECTRICAL_ANALYSIS 2069 Ilam

7 1x20 Watt F.T.L Patti fitting Phillips Wipro or equivalent


3004 sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. Patti with chowk 10 nos 481.50 4815.00
b. Rod, screw, grips etc. 10 LS 105.00 1050.00
Transportation 3% 175.95 6040.95
Actual rate 6750.95
15% conctractor overhead 1012.64
Rate per set Rs. 776.36 Total (Rs.) 7763.59

8 1x40 Watt F.T.L Patti fitting Phillips/Wipro or equivalent


3005 sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. Patti with chowk 10 nos 514.00 5140.00
b. Rod, screw, grips etc. 10 LS 105.00 1050.00
Transportation 3% 185.70 6375.70
Actual rate 7085.70
15% conctractor overhead 1062.86
Rate per set Rs. 814.86 Total (Rs.) 8148.56

9 1x20 Watt F.T.L Mirolta TMS 200/120 LPF Phillips or equivalent


3006 sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. FTL Set 10 nos 1070.00 10700.00
b.Tube rod 10 nos 91.00 910.00
c. screw, grips etc. 10 LS 9.00 90.00
Transportation 3% 351.00 12051.00
Actual rate 12761.00
15% conctractor overhead 1914.15

Prepare By:- Ckecked By:- Approved By:-


Page 197 ELECTRICAL_ANALYSIS 2069 Ilam

Rate per set Rs. 1467.52 Total (Rs.) 14675.15

Prepare By:- Ckecked By:- Approved By:-


Page 198 ELECTRICAL_ANALYSIS 2069 Ilam

10 1x40 Watt F.T.L Mirolta FMC 200/140 Phillips or equivalent


sources Level Qty Unit Rate/unit cost Total Cost
3007 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. FTL Set 10 nos 1070.00 10700.00
b.Tube rod 0 nos 91.00 0.00
c. screw, grips etc. 10 LS 9.00 90.00
Transportation 3% 323.70 11113.70
Actual rate 11823.70
15% conctractor overhead 1773.56
Rate per set Rs. 1359.73 Total (Rs.) 13597.26

11 1x40 Watt F.T.L Mirolta FMC 200/140 Phillips or equivalent


3007.1 sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. FTL Set 10 nos 1070.00 10700.00
b.Tube rod 10 nos 91.00 910.00
c. screw, grips etc. 10 LS 9.00 90.00
Transportation 3% 351.00 12051.00
Actual rate 12761.00
15% conctractor overhead 1914.15
Rate per set Rs. 1467.52 Total (Rs.) 14675.15

12 1x20 Watt F.T.L Astramini TMS 21/118 LPF Phillips or equivalent


3008 sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. FTL Set 10 nos 1070.00 10700.00
b.Tube rod 10 nos 91.00 910.00
c. screw, grips etc. 10 LS 9.00 90.00
Transportation 3% 351.00 12051.00
Actual rate 12761.00
15% conctractor overhead 1914.15
Rate per set Rs. 1467.52 Total (Rs.) 14675.15

Prepare By:- Ckecked By:- Approved By:-


Page 199 ELECTRICAL_ANALYSIS 2069 Ilam

13 1x40 Watt F.T.L Astramini TMS 21/136 HPF Phillips or equivalent


3009 sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. FTL Set 10 nos 1070.00 10700.00
b.Tube rod 10 nos 91.00 910.00
c. screw, grips etc. 10 LS 9.00 90.00
Transportation 3% 351.00 12051.00
Actual rate 12761.00
15% conctractor overhead 1914.15
Rate per set Rs. 1467.52 Total (Rs.) 14675.15

14 2x40 Watt F.T.C TCX 20/236 HPF Decolite Phillips /Wipro or equivalent
3010 sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. FTL Set 10 nos 2889.00 28890.00
b.Tube rod 20 nos 91.00 1820.00
c. screw, grips etc. 10 LS 9.00 90.00
Transportation 3% 924.00 31724.00
Actual rate 32434.00
15% conctractor overhead 4865.10
Rate per set Rs. 3729.91 Total (Rs.) 37299.10

15 1x40 Watt F.T.L Box Fitting TMC 501/136 HPF Phillips/Wipro or equivalent
3011 sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. FTL Set 10 nos 1177.00 11770.00
b.Tube rod 10 nos 91.00 910.00
c.Chain 10 Rm 50.00 500.00
d Iron Hooks 20 nos 15.00 300.00
e. screw, grips etc. 10 LS 9.00 90.00
Transportation 3% 407.10 13977.10
Actual rate 14687.10
15% conctractor overhead 2203.07

Prepare By:- Ckecked By:- Approved By:-


Page 200 ELECTRICAL_ANALYSIS 2069 Ilam

Rate per set Rs. 1689.02 Total (Rs.) 16890.17

Prepare By:- Ckecked By:- Approved By:-


Page 201 ELECTRICAL_ANALYSIS 2069 Ilam

16 2x40 Watt F.T.L Box Fitting TMC 501/236 HPF Phillips/Wipro or equivalent
sources Level Qty Unit Rate/unit cost Total Cost
3012 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. FTL Set 10 nos 1658.50 16585.00
b.Tube rod 20 nos 91.00 1820.00
c.Chain 10 Rm 50.00 500.00
d Iron Hooks 20 nos 15.00 300.00
e. screw, grips etc. 10 LS 9.00 90.00
Transportation 3% 578.85 19873.85
Actual rate 20583.85
15% conctractor overhead 3087.58
Rate per set Rs. 2367.14 Total (Rs.) 23671.43

17 1x40 Watt FTL IndustrialChannel Stove Enamelled Reflector Philips/Wipro or eqv


sources Level Qty Unit Rate/unit cost Total Cost
3013 labour skilled 1 nos 775.00 775.00
Semi skilled 1 nos 645.00 645.00
un skilled 1 nos 600.00 600.00 2020.00
materials a. FTL Set 10 nos 2140.00 21400.00
b.Tube rod 10 nos 91.00 910.00
c.Chain 10 Rm 50.00 500.00
d Iron Hooks 20 nos 15.00 300.00
e. screw, grips etc. 10 LS 9.00 90.00
Transportation 3% 696.00 23896.00
Actual rate 25916.00
15% conctractor overhead 3887.40
Rate per set Rs. 2980.34 Total (Rs.) 29803.40

19 2x40 Watt FTL IndustrialChannel Stove Enamelled Reflector Philips/Wipro or eqv


sources Level Qty Unit Rate/unit cost Total Cost
3015 labour skilled 1 nos 775.00 775.00
Semi skilled 1 nos 645.00 645.00
un skilled 1 nos 600.00 600.00 2020.00
materials a. FTL Set 10 nos 2621.50 26215.00
b.Tube rod 20 nos 91.00 1820.00
c. Chain 10 nos 50.00 500.00
d. screw, grips , etc. 10 LS 9.00 90.00
e.Iron hook 20 nos 15.00 300.00
Transportation 3% 867.75 29792.75
Actual rate 31812.75
15% conctractor overhead 4771.91

Prepare By:- Ckecked By:- Approved By:-


Page 202 ELECTRICAL_ANALYSIS 2069 Ilam

Rate per set Rs. 3658.47 Total (Rs.) 36584.66

Prepare By:- Ckecked By:- Approved By:-


Page 203 ELECTRICAL_ANALYSIS 2069 Ilam

20 1x40 Watt F.T.L Opalite with Acrylic Difuser TCS 19/136 Philips or equivalent
sources Level Qty Unit Rate/unit cost Total Cost
3016 labour skilled 1 nos 775.00 775.00
Semi skilled 1 nos 645.00 645.00
un skilled 1 nos 600.00 600.00 2020.00
materials a. FTL Set 10 nos 1819.00 18190.00
b.Tube rod 10 nos 91.00 910.00
c. Chain 10 nos 50.00 500.00
d. screw, grips , etc. 10 LS 9.00 90.00
e.Iron hook 20 nos 15.00 300.00
Transportation 3% 599.70 20589.70
Actual rate 22609.70
15% conctractor overhead 3391.46
Rate per set Rs. 2600.12 Total (Rs.) 26001.16

21 2x40 Watt F.T.L Opalite with Acrylic Difuser TCS 19/236 Philips or equivalent
sources Level Qty Unit Rate/unit cost Total Cost
3017 labour skilled 1 nos 775.00 775.00
Semi skilled 1 nos 645.00 645.00
un skilled 1 nos 600.00 600.00 2020.00
materials a. FTL Set 10 nos 2868.00 28680.00
b.Tube rod 20 nos 91.00 1820.00
c. Chain 10 nos 50.00 500.00
d. screw, grips , etc. 10 LS 9.00 90.00
e.Iron hook 20 nos 15.00 300.00
Transportation 3% 941.70 32331.70
Actual rate 34351.70
15% conctractor overhead 5152.76
Rate per set Rs. 3950.45 Total (Rs.) 39504.46

22 4x18/20 Watt F.T.L Dished Opal Acrylic Cover TBC 71/420 HPF, 72/420 Philips
sources Level Qty Unit Rate/unit cost Total Cost
3018 labour skilled 1 nos 775.00 775.00
Semi skilled 1 nos 645.00 645.00
un skilled 1 nos 600.00 600.00 2020.00
materials a. FTL Set 10 nos 5885.00 58850.00
b.Tube rod 40 nos 91.00 3640.00
c. screw, grips etc. 20 LS 9.00 180.00
Transportation 3% 1880.10 64550.10
Actual rate 66570.10
15% conctractor overhead 9985.52

Prepare By:- Ckecked By:- Approved By:-


Page 204 ELECTRICAL_ANALYSIS 2069 Ilam

Rate per set Rs. 7655.56 Total (Rs.) 76555.62

Prepare By:- Ckecked By:- Approved By:-


Page 205 ELECTRICAL_ANALYSIS 2069 Ilam

23 1x40 Watt F.T.L Mirror Optic HPFPhilips / Wipro or equivalent


sources Level Qty Unit Rate/unit cost Total Cost
3019 labour skilled 1 nos 775.00 775.00
Semi skilled 1 nos 645.00 645.00
un skilled 1 nos 600.00 600.00 2020.00
materials a. FTL Set 10 nos 2568.00 25680.00
b.Tube rod 10 nos 91.00 910.00
c. Chain 10 nos 50.00 500.00
d. screw, grips , etc. 10 LS 9.00 90.00
e.Iron hook 10 nos 15.00 150.00
Transportation 3% 819.90 28149.90
Actual rate 30169.90
15% conctractor overhead 4525.49
Rate per set Rs. 3469.54 Total (Rs.) 34695.39

24 2x40 Watt F.T.L Mirror Optic HPFPhilips / Wipro or equivalent


sources Level Qty Unit Rate/unit cost Total Cost
3020 labour skilled 1 nos 775.00 775.00
Semi skilled 1 nos 645.00 645.00
un skilled 1 nos 600.00 600.00 2020.00
materials a. FTL Set 10 nos 4012.50 40125.00
b.Tube rod 20 nos 91.00 1820.00
c. Chain 10 nos 50.00 500.00
d. screw, grips , etc. 10 LS 9.00 90.00
e.Iron hook 20 nos 15.00 300.00
Transportation 3% 1285.05 44120.05
Actual rate 46140.05
Rate per set Rs. 5306.11 15% conctractor overhead 6921.01
Total (Rs.) 53061.06

Prepare By:- Ckecked By:- Approved By:-


Page 206 ELECTRICAL_ANALYSIS 2069 Ilam

25 300/500 Watt Halogen Philips / Wipro or equivalent


sources Level Qty Unit Rate/unit cost Total Cost
3021 labour skilled 1 nos 775.00 775.00
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1420.00
materials a. H light 10 nos 1444.50 14445.00
c. screw, grips etc. 10 LS 9.00 90.00
Transportation 3% 436.05 14971.05
Actual rate 16391.05
15% conctractor overhead 2458.66
Rate per set Rs. 1884.97 Total (Rs.) 18849.71

26 1000 Watt Halogen Philips / Wipro or equivalent


sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 1 nos 775.00 775.00
3022 Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1420.00
materials a. H light 10 nos 3049.50 30495.00
c. screw, grips etc. 10 LS 9.00 90.00
Transportation 3% 917.55 31502.55
Actual rate 32922.55
15% conctractor overhead 4938.38
Rate per set Rs. 3786.09 Total (Rs.) 37860.93

27 150 Watt HPSV HPF Philips / Wipro or equivalent


sources Level Qty Unit Rate/unit cost Total Cost
3023 labour skilled 1 nos 775.00 775.00
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1420.00
materials a. light 10 nos 1316.50 13165.00
b. 4' 6" Black pIpe 10 LS 240.00 2400.00
c. Clamps ,nut bolts etc. 10 LS 200.00 2000.00
Transportation 3% 526.95 18091.95
Actual rate 19511.95
15% conctractor overhead 2926.79

Prepare By:- Ckecked By:- Approved By:-


Page 207 ELECTRICAL_ANALYSIS 2069 Ilam

Rate per set Rs. 2243.87 Total (Rs.) 22438.74

Prepare By:- Ckecked By:- Approved By:-


Page 208 ELECTRICAL_ANALYSIS 2069 Ilam

28 250 Watt HPSV HPF Philips / Wipro or equivalent


sources Level Qty Unit Rate/unit cost Total Cost
3024 labour skilled 1 nos 775.00 775.00
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1420.00
materials a. light 10 nos 1444.50 14445.00
b. 4' 6" Black pIpe 10 LS 240.00 2400.00
c. Clamps ,nut bolts etc. 10 LS 200.00 2000.00
Transportation 3% 649.80 19494.80
Actual rate 20914.80
15% conctractor overhead 3137.22
Rate per set Rs. 2405.20 Total (Rs.) 24052.02

Lighting Accessories Philips or equivalent

29 40 Watt FTL Rod Philips or equivalent


sources Level Qty Unit Rate/unit cost Total Cost
3025 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a. Rod 10 nos 91.00 910.00
Transportation 3% 27.30 937.30
Actual rate 937.30
15% conctractor overhead 140.60
Rate per set Rs. 107.79 Total (Rs.) 1077.90

30 40 Watt 220 Volt Starter Philips or equivalent


sources Level Qty Unit Rate/unit cost Total Cost
3026 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a.Starter 10 nos 21.50 215.00
Transportation 3% 6.45 221.45
Actual rate 221.45
15% conctractor overhead 33.22

Prepare By:- Ckecked By:- Approved By:-


Page 209 ELECTRICAL_ANALYSIS 2069 Ilam

Rate per set Rs. 25.47 Total (Rs.) 254.67

Prepare By:- Ckecked By:- Approved By:-


Page 210 ELECTRICAL_ANALYSIS 2069 Ilam

31 20 Watt FTL Rod Philips or equivalent


sources Level Qty Unit Rate/unit cost Total Cost
3027 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a. Rod 10 nos 91.00 910.00
Transportation 3% 27.30 937.30
Actual rate 937.30
15% conctractor overhead 140.60
Rate per set Rs. 107.79 Total (Rs.) 1077.90

32 40 Watt 220 Volt FTL Ballast Philips or equivalent


sources Level Qty Unit Rate/unit cost Total Cost
3028 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials Chowk 10 nos 300.00 3000.00
Transportation 3% 90.00 3090.00
Actual rate 3090.00
15% conctractor overhead 463.50
Rate per set Rs. 355.35 Total (Rs.) 3553.50

33 150 Watt SV Bulb Philips or equivalent


sources Level Qty Unit Rate/unit cost Total Cost
3029 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a. SV Bulb 10 nos 1391.00 13910.00
Transportation 3% 417.30 14327.30
Actual rate 14327.30

Prepare By:- Ckecked By:- Approved By:-


Page 211 ELECTRICAL_ANALYSIS 2069 Ilam

15% conctractor overhead 2149.10


Rate per set Rs. 1647.64 Total (Rs.) 16476.40

Prepare By:- Ckecked By:- Approved By:-


Page 212 ELECTRICAL_ANALYSIS 2069 Ilam

34 250 Watt SV Bulb Philips or equivalent


sources Level Qty Unit Rate/unit cost Total Cost
3030 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a. SV Bulb 10 nos 1551.50 15515.00
Transportation 3% 465.45 15980.45
Actual rate 15980.45
15% conctractor overhead 2397.07
Rate per set Rs. 1837.75 Total (Rs.) 18377.52

35 2'x2' Acrylic Cover


sources Level Qty Unit Rate/unit cost Total Cost
3031 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a. A Cover 10 nos No Rate #VALUE!
Transportation 3% #VALUE! #VALUE!
Actual rate #VALUE!
Rate per set Rs. #VALUE! 15% conctractor overhead #VALUE!
Total (Rs.) #VALUE!

36 Allmunium Listy
sources Level Qty Unit Rate/unit cost Total Cost
3032 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a. Listy 10 nos No Rate #VALUE!
Transportation 3% #VALUE! #VALUE!
Actual rate #VALUE!

Prepare By:- Ckecked By:- Approved By:-


Page 213 ELECTRICAL_ANALYSIS 2069 Ilam

Rate per set Rs. #VALUE! 15% conctractor overhead #VALUE!


Total (Rs.) #VALUE!

Prepare By:- Ckecked By:- Approved By:-


Page 214 ELECTRICAL_ANALYSIS 2069 Ilam

37 2" PVC Listy


sources Level Qty Unit Rate/unit cost Total Cost
3033 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a. Listy 10 Rm No Rate #VALUE!
Transportation 3% #VALUE! #VALUE!
Actual rate #VALUE!
Rate per set Rs. #VALUE! 15% conctractor overhead #VALUE!
Total (Rs.) #VALUE!

38 1.5" PVC Listy


sources Level Qty Unit Rate/unit cost Total Cost
3034 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a. Listy 10 Rm 64.50 645.00
Transportation 3% 19.35 664.35
Actual rate 664.35
Rate per set Rs. 76.40 15% conctractor overhead 99.65
Total (Rs.) 764.00

39 1" PVC Listy


sources Level Qty Unit Rate/unit cost Total Cost
3035 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a. Listy 10 Rm 59.00 590.00
Transportation 3% 17.70 607.70
Actual rate 607.70
Rate per set Rs. 69.89 15% conctractor overhead 91.16

Prepare By:- Ckecked By:- Approved By:-


Page 215 ELECTRICAL_ANALYSIS 2069 Ilam

Total (Rs.) 698.86

Prepare By:- Ckecked By:- Approved By:-


Page 216 ELECTRICAL_ANALYSIS 2069 Ilam

39 0.75" PVC Listy


sources Level Qty Unit Rate/unit cost Total Cost
3035 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a. Listy 10 Rm 48.50 485.00
Transportation 3% 14.55 499.55
Actual rate 499.55
Rate per set Rs. 57.45 15% conctractor overhead 74.93
Total (Rs.) 574.48

40 0.5" PVC Listy


sources Level Qty Unit Rate/unit cost Total Cost
3036 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a. Listy 10 Rm 48.50 485.00
Transportation 3% 14.55 499.55
Actual rate 499.55
Rate per set Rs. 57.45 15% conctractor overhead 74.93
Total (Rs.) 574.48

Dyna / CPL Switch & Socket

41 1 Gang 1 one way Switch F


sources Level Qty Unit Rate/unit cost Total Cost
3037 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 32.50 325.00
b.M.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 11.00 110.00
Transportation 3% 39.91 1370.31
Actual rate 3435.31

Prepare By:- Ckecked By:- Approved By:-


Page 217 ELECTRICAL_ANALYSIS 2069 Ilam

Rate per set Rs. 395.06 15% conctractor overhead 515.30


Total (Rs.) 3950.61

Prepare By:- Ckecked By:- Approved By:-


Page 218 ELECTRICAL_ANALYSIS 2069 Ilam

42 1 Gang 1 one way Switch S


sources Level Qty Unit Rate/unit cost Total Cost
3038 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 10 nos 32.50 325.00
b.M.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 9.00 90.00
Transportation 3% 39.31 1349.71
Actual rate 2382.21
Rate per set Rs. 273.95 15% conctractor overhead 357.33
Total (Rs.) 2739.54

43 2 Gang 2 one way Switch F


sources Level Qty Unit Rate/unit cost Total Cost
3039 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 32.50 325.00
b.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 11.00 110.00
Transportation 3% 39.91 1370.31
Actual rate 3435.31
Rate per set Rs. 395.06 15% conctractor overhead 515.30
Total (Rs.) 3950.61

44 2Gang 2 one way Switch S


sources Level Qty Unit Rate/unit cost Total Cost
3040 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 10 nos 119.00 1190.00
b.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 9.00 90.00
Transportation 3% 65.26 2240.66
Actual rate 3273.16
Rate per set Rs. 376.41 15% conctractor overhead 490.97

Prepare By:- Ckecked By:- Approved By:-


Page 219 ELECTRICAL_ANALYSIS 2069 Ilam

Total (Rs.) 3764.14

Prepare By:- Ckecked By:- Approved By:-


Page 220 ELECTRICAL_ANALYSIS 2069 Ilam

45 3 Gang 3 one way Switch F


sources Level Qty Unit Rate/unit cost Total Cost
3041 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 159.00 1590.00
b.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 11.00 110.00
Transportation 3% 77.86 2673.26
Actual rate 4738.26
Rate per set Rs. 544.90 15% conctractor overhead 710.74
Total (Rs.) 5449.00

46 3 Gang 3 one way Switch S


sources Level Qty Unit Rate/unit cost Total Cost
3042 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 10 nos 159.00 1590.00
b.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 9.00 90.00
Transportation 3% 77.26 2652.66
Actual rate 3685.16
Rate per set Rs. 423.79 15% conctractor overhead 552.77
Total (Rs.) 4237.94

47 4 Gang 4 one way Switch F


sources Level Qty Unit Rate/unit cost Total Cost
3043 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 189.00 1890.00
b.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 9.00 90.00
Transportation 3% 11.00 86.26 2961.66
Actual rate 5026.66
Rate per set Rs. 578.07 15% conctractor overhead 754.00

Prepare By:- Ckecked By:- Approved By:-


Page 221 ELECTRICAL_ANALYSIS 2069 Ilam

Total (Rs.) 5780.66

Prepare By:- Ckecked By:- Approved By:-


Page 222 ELECTRICAL_ANALYSIS 2069 Ilam

48 4 Gang 4 one way Switch S


sources Level Qty Unit Rate/unit cost Total Cost
3044 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 10 nos 189.00 1890.00
b.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 9.00 90.00
Transportation 3% 86.26 2961.66
Actual rate 3994.16
Rate per set Rs. 459.33 15% conctractor overhead 599.12
Total (Rs.) 4593.29

49 6 Gang 6 one way Switch F


sources Level Qty Unit Rate/unit cost Total Cost
3045 labour skilled 2 nos 775.00 1550.00
Semi skilled 4 nos 645.00 2580.00
un skilled 0 nos 600.00 0.00 4130.00
materials a. Switch 10 nos 299.00 2990.00
b.Box 10 nos 38.00 380.00
c. CM, Screws, Grips etc. 10 LS 11.00 110.00
Transportation 3% 104.40 3584.40
Actual rate 7714.40
Rate per set Rs. 887.16 15% conctractor overhead 1157.16
Total (Rs.) 8871.56

50 6 Gang 6 one way Switch S


sources Level Qty Unit Rate/unit cost Total Cost
3046 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 299.00 2990.00
b.Box 10 nos 38.00 380.00
c. CM, Screws, Grips etc. 10 LS 9.00 90.00
Transportation 3% 103.80 3563.80
Actual rate 5628.80
Rate per set Rs. 647.31 15% conctractor overhead 844.32

Prepare By:- Ckecked By:- Approved By:-


Page 223 ELECTRICAL_ANALYSIS 2069 Ilam

Total (Rs.) 6473.12

Prepare By:- Ckecked By:- Approved By:-


Page 224 ELECTRICAL_ANALYSIS 2069 Ilam

51 1 Gang 1 one Bell Push F


sources Level Qty Unit Rate/unit cost Total Cost
3047 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 84.00 840.00
b.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 11.00 110.00
Transportation 3% 55.36 1900.76
Actual rate 3965.76
Rate per set Rs. 456.06 15% conctractor overhead 594.86
Total (Rs.) 4560.63

52 1 Gang 1 one Bell Push S


sources Level Qty Unit Rate/unit cost Total Cost
3048 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 10 nos 84.00 840.00
b.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 9.00 90.00
Transportation 3% 54.76 1880.16
Actual rate 2912.66
Rate per set Rs. 334.96 15% conctractor overhead 436.90
Total (Rs.) 3349.56

53 16 Amp Switch Indicator F


sources Level Qty Unit Rate/unit cost Total Cost
3049 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 0 nos 600.00 0.00 2065.00
materials a. Indicator 10 nos 32.50 325.00
b.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 11.00 110.00
Transportation 3% 39.91 1370.31
Actual rate 3435.31
Rate per set Rs. 395.06 15% conctractor overhead 515.30

Prepare By:- Ckecked By:- Approved By:-


Page 225 ELECTRICAL_ANALYSIS 2069 Ilam

Total (Rs.) 3950.61

Prepare By:- Ckecked By:- Approved By:-


Page 226 ELECTRICAL_ANALYSIS 2069 Ilam

54 16 Amp Switch Indicator S


sources Level Qty Unit Rate/unit cost Total Cost
3050 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 10 nos 32.50 325.00
b.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 9.00 90.00
Transportation 3% 39.31 1349.71
Actual rate 2382.21
Rate per set Rs. 273.95 15% conctractor overhead 357.33
Total (Rs.) 2739.54

55 6 Amp Uni Socket Switch Combined With Shutter F


sources Level Qty Unit Rate/unit cost Total Cost
3051 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 32.50 325.00
b.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 11.00 110.00
Transportation 3% 39.91 1370.31
Actual rate 3435.31
Rate per set Rs. 395.06 15% conctractor overhead 515.30
Total (Rs.) 3950.61

56 6 Amp Uni Socket Switch Combined With Shutter S


sources Level Qty Unit Rate/unit cost Total Cost
3052 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 10 nos 48.50 485.00
b.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 9.00 90.00
Transportation 3% 44.11 1514.51
Actual rate 2547.01
Rate per set Rs. 292.91 15% conctractor overhead 382.05

Prepare By:- Ckecked By:- Approved By:-


Page 227 ELECTRICAL_ANALYSIS 2069 Ilam

Total (Rs.) 2929.06

Prepare By:- Ckecked By:- Approved By:-


Page 228 ELECTRICAL_ANALYSIS 2069 Ilam

57 Dimmer Single 400 Watt F


sources Level Qty Unit Rate/unit cost Total Cost
3053 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 10 nos 41.70 417.00
b.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 11.00 110.00
Transportation 3% 42.67 1465.07
Actual rate 2497.57
Rate per set Rs. 287.22 15% conctractor overhead 374.64
Total (Rs.) 2872.21

58 Dimmer Single 400 Watt S


sources Level Qty Unit Rate/unit cost Total Cost
3054 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 10 nos 41.70 417.00
b.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 9.00 90.00
Transportation 3% 42.07 1444.47
Actual rate 2476.97
Rate per set Rs. 284.85 15% conctractor overhead 371.55
Total (Rs.) 2848.52

59 Dimmer Single 800 Watt F


sources Level Qty Unit Rate/unit cost Total Cost
3055 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 10 nos 503.00 5030.00
b.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 11.00 110.00
Transportation 3% 181.06 6216.46
Actual rate 7248.96

Prepare By:- Ckecked By:- Approved By:-


Page 229 ELECTRICAL_ANALYSIS 2069 Ilam

Rate per set Rs. 833.63 15% conctractor overhead 1087.34


Total (Rs.) 8336.31

Prepare By:- Ckecked By:- Approved By:-


Page 230 ELECTRICAL_ANALYSIS 2069 Ilam

60 Dimmer Single 800 Watt S


sources Level Qty Unit Rate/unit cost Total Cost
3056 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 10 nos 503.00 5030.00
b.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 9.00 90.00
Transportation 3% 180.46 6195.86
Actual rate 7228.36
Rate per set Rs. 831.26 15% conctractor overhead 1084.25
Total (Rs.) 8312.62

61 16/6 Amp Combined S/Socket With Safety Shutter F


sources Level Qty Unit Rate/unit cost Total Cost
3057 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 353.50 3535.00
b.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 9.00 90.00
Transportation 3% 135.61 4656.01
Actual rate 6721.01
Rate per set Rs. 772.92 15% conctractor overhead 1008.15
Total (Rs.) 7729.16

62 16/6 Amp Combined S/Socket With Safety ShutterS


sources Level Qty Unit Rate/unit cost Total Cost
3058 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 10 nos 353.50 3535.00
b.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 9.00 90.00
Transportation 3% 135.61 4656.01
Actual rate 5688.51

Prepare By:- Ckecked By:- Approved By:-


Page 231 ELECTRICAL_ANALYSIS 2069 Ilam

Rate per set Rs. 654.18 15% conctractor overhead 853.28


Total (Rs.) 6541.79

Prepare By:- Ckecked By:- Approved By:-


Page 232 ELECTRICAL_ANALYSIS 2069 Ilam

63 DP Switch 16-32 Amp F


sources Level Qty Unit Rate/unit cost Total Cost
3059 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 160.50 1605.00
b.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. 10 LS 9.00 90.00
Transportation 3% 77.71 2668.11
Actual rate 4733.11
Rate per set Rs. 544.31 15% conctractor overhead 709.97
Total (Rs.) 5443.08

64 DP Switch 16-32 Amp S


sources Level Qty Unit Rate/unit cost Total Cost
3060 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 10 nos 160.50 1605.00
b.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. LS 110.00
Transportation 3% 78.31 2688.71
Actual rate 3721.21
Rate per set Rs. 427.94 15% conctractor overhead 558.18
Total (Rs.) 4279.39

65 Telephone Socket Single F


sources Level Qty Unit Rate/unit cost Total Cost
3061 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 86.00 860.00
b.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. LS 110.00
Transportation 3% 55.96 1921.36
Actual rate 3986.36
Rate per set Rs. 458.43 15% conctractor overhead 597.95

Prepare By:- Ckecked By:- Approved By:-


Page 233 ELECTRICAL_ANALYSIS 2069 Ilam

Total (Rs.) 4584.32

Prepare By:- Ckecked By:- Approved By:-


Page 234 ELECTRICAL_ANALYSIS 2069 Ilam

66 Telephone Socket Single S


sources Level Qty Unit Rate/unit cost Total Cost
3062 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 10 nos 86.00 860.00
b.Box 10 nos 89.54 895.40
c. CM, Screws, Grips etc. LS 90.00
Transportation 3% 55.36 1900.76
Actual rate 2933.26
Rate per set Rs. 337.33 15% conctractor overhead 439.99
Total (Rs.) 3373.25

67 Buzzer
sources Level Qty Unit Rate/unit cost Total Cost
3063 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. Buzzer 10 nos Err:509 Err:509
b. Screws, Grips etc. LS 45.00
Transportation 3% Err:509 Err:509
Actual rate Err:509
Rate per set Rs. Err:509 15% conctractor overhead Err:509
Total (Rs.) Err:509

68 Musical Bell
sources Level Qty Unit Rate/unit cost Total Cost
3064 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.25 nos 645.00 161.25
un skilled 0 nos 600.00 0.00 548.75
materials a. M.Bell 10 nos Err:509 Err:509
b. CM, Screws, Grips etc. LS 90.00
Transportation 3% Err:509 Err:509
Actual rate Err:509
Rate per set Rs. Err:509 15% conctractor overhead Err:509
Total (Rs.) Err:509

Prepare By:- Ckecked By:- Approved By:-


Page 235 ELECTRICAL_ANALYSIS 2069 Ilam

69 Blanking Plate Single


sources Level Qty Unit Rate/unit cost Total Cost
3065 labour skilled 0.25 nos 775.00 193.75
Semi skilled 0.25 nos 645.00 161.25
un skilled 0 nos 600.00 0.00 355.00
materials a. Plate 10 nos 59.00 590.00
b.Box 10 nos 0.00 0.00
c. CM, Screws, Grips etc. LS 90.00
Transportation 3% 20.40 700.40
Actual rate 1055.40
Rate per set Rs. 121.37 15% conctractor overhead 158.31
Total (Rs.) 1213.71

70 Angle/ Batten Holder


sources Level Qty Unit Rate/unit cost Total Cost
3066 labour skilled 0.25 nos 775.00 193.75
Semi skilled 0.25 nos 645.00 161.25
un skilled 0 nos 600.00 0.00 355.00
materials a. Holder 10 nos 27.83 278.30
b. CM, Screws, Grips etc. LS 90.00
Transportation 3% 11.05 379.35
Actual rate 734.35
Rate per set Rs. 84.45 15% conctractor overhead 110.15
Total (Rs.) 844.50

71 Ceiling Rose
sources Level Qty Unit Rate/unit cost Total Cost
3067 labour skilled 0.25 nos 775.00 193.75
Semi skilled 0.25 nos 645.00 161.25
un skilled 0 nos 600.00 0.00 355.00
materials a. Ceiling rose 10 nos 27.83 278.30
b. CM, Screws, Grips etc. LS 90.00
Transportation 3% 11.05 379.35
Actual rate 734.35
Rate per set Rs. 84.45 15% conctractor overhead 110.15
Total (Rs.) 844.50

Prepare By:- Ckecked By:- Approved By:-


Page 236 ELECTRICAL_ANALYSIS 2069 Ilam

North-West/ Roma Switch & Socket Or Equivalent

72 1 Gang 1 one way Switch F


sources Level Qty Unit Rate/unit cost Total Cost
3068 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 211.75 2117.50
b.PVC /M Box 10 nos 20.57 205.70
c. CM, Screws, Grips etc. 10 LS 9.00 90.00
Transportation 3% 8.87 2422.07
Actual rate 4487.07
Rate per set Rs. 516.01 15% conctractor overhead 673.06
Total (Rs.) 5160.13

73 2 Gang 2 one way Switch F


sources Level Qty Unit Rate/unit cost Total Cost
3069 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 272.25 2722.50
b.PVC /M Box 10 nos 20.57 205.70
c. CM, Screws, Grips etc. 10 LS 9.00 90.00
Transportation 3% 90.55 3108.75
Actual rate 5173.75
Rate per set Rs. 594.98 15% conctractor overhead 776.06
Total (Rs.) 5949.81

74 3 Gang 3 one way Switch F


sources Level Qty Unit Rate/unit cost Total Cost
3070 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 302.50 3025.00
b.PVC /M Box 10 nos 37.51 375.10
c. CM, Screws, Grips etc. 10 LS 9.00 90.00
Transportation 3% 104.70 3594.80
Actual rate 5659.80
Rate per set Rs. 650.88 15% conctractor overhead 848.97

Prepare By:- Ckecked By:- Approved By:-


Page 237 ELECTRICAL_ANALYSIS 2069 Ilam

Total (Rs.) 6508.77

Prepare By:- Ckecked By:- Approved By:-


Page 238 ELECTRICAL_ANALYSIS 2069 Ilam

75 4Gang 4 one way Switch F


sources Level Qty Unit Rate/unit cost Total Cost
3071 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 332.75 3327.50
b.PVC /M Box 10 nos 37.51 375.10
c. CM, Screws, Grips etc. 10 LS 9.00 90.00
Transportation 3% 113.78 3906.38
Actual rate 5971.38
Rate per set Rs. 686.71 15% conctractor overhead 895.71
Total (Rs.) 6867.08

76 5 Gang 5 one way Switch F


sources Level Qty Unit Rate/unit cost Total Cost
3072 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 544.50 5445.00
b.PVC /M Box 10 nos 37.51 375.10
c. CM, Screws, Grips etc. 10 LS 9.00 90.00
Transportation 3% 177.30 6087.40
Actual rate 8152.40
Rate per set Rs. 937.53 15% conctractor overhead 1222.86
Total (Rs.) 9375.26

77 6Gang 6 one way Switch F


sources Level Qty Unit Rate/unit cost Total Cost
3073 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 665.50 6655.00
b.PVC /M Box 10 nos 37.51 375.10
c. CM, Screws, Grips etc. 10 LS 9.00 90.00
Transportation 3% 213.60 7333.70
Actual rate 9398.70
Rate per set Rs. 1080.85 15% conctractor overhead 1409.81

Prepare By:- Ckecked By:- Approved By:-


Page 239 ELECTRICAL_ANALYSIS 2069 Ilam

Total (Rs.) 10808.51

Prepare By:- Ckecked By:- Approved By:-


Page 240 ELECTRICAL_ANALYSIS 2069 Ilam

78 5 Amp Power Socket


sources Level Qty Unit Rate/unit cost Total Cost
3074 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 320.65 3206.50
b.PVC /M Box 10 nos 37.51 375.10
c. CM, Screws, Grips etc. 10 LS 9.00 90.00
Rate per set Rs. Transportation 3% 110.15 3781.75
Actual rate 5846.75
672.38 15% conctractor overhead 877.01
Total (Rs.) 6723.76

79 13-15 Amp Power Socket


sources Level Qty Unit Rate/unit cost Total Cost
3075 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 429.55 4295.50
b.PVC /M Box 10 nos 37.51 375.10
c. CM, Screws, Grips etc. 10 LS 9.00 90.00
Transportation 3% 142.82 4903.42
Actual rate 6968.42
Rate per set Rs. 801.37 15% conctractor overhead 1045.26
Total (Rs.) 8013.68

80 T.V Socket
sources Level Qty Unit Rate/unit cost Total Cost
3076 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 181.50 1815.00
b.PVC /M Box 10 nos 37.51 375.10
c. CM, Screws, Grips etc. 10 LS 9.00 90.00
Transportation 3% 68.40 2348.50
Actual rate 4413.50
Rate per set Rs. 507.55 15% conctractor overhead 662.03

Prepare By:- Ckecked By:- Approved By:-


Page 241 ELECTRICAL_ANALYSIS 2069 Ilam

Total (Rs.) 5075.53

Prepare By:- Ckecked By:- Approved By:-


Page 242 ELECTRICAL_ANALYSIS 2069 Ilam

81 T.Phone Socket
sources Level Qty Unit Rate/unit cost Total Cost
3077 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 181.50 1815.00
b.PVC /M Box 10 nos 37.51 375.10
c. CM, Screws, Grips etc. 10 LS 9.00 90.00
Transportation 3% 68.40 2348.50
Actual rate 4413.50
Rate per set Rs. 507.55 15% conctractor overhead 662.03
Total (Rs.) 5075.53

82 Bell Push
sources Level Qty Unit Rate/unit cost Total Cost
3078 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 0 nos 600.00 0.00 2065.00
materials a. Bell Switch 10 nos 181.50 1815.00
b.PVC /M Box 10 nos 37.51 375.10
c. CM, Screws, Grips etc. 10 LS 9.00 90.00
Transportation 3% 68.40 2348.50
Actual rate 4413.50
Rate per set Rs. 507.55 15% conctractor overhead 662.03
Total (Rs.) 5075.53

Switch Gears( ISI ) Mark Geco or equivalent

83 16 Amp 415 Volt DP Main Switch S


sources Level Qty Unit Rate/unit cost Total Cost
3079 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 1 nos 320.65 320.65
b. CM, Screws, Grips etc. 1 LS 27.00 27.00
Transportation 3% 10.43 358.08
Actual rate 1390.58
Rate per set Rs. 1599.17 15% conctractor overhead 208.59
Total (Rs.) 1599.17

Prepare By:- Ckecked By:- Approved By:-


Page 243 ELECTRICAL_ANALYSIS 2069 Ilam

84 32 Amp 415 Volt DP Main Switch S


sources Level Qty Unit Rate/unit cost Total Cost
3080 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 1 nos 1028.50 1028.50
b. CM, Screws, Grips etc. LS 27.00
Transportation 3% 31.67 1087.17
Actual rate 2119.67
Rate per set Rs. 2437.61 15% conctractor overhead 317.95
Total (Rs.) 2437.61

85 63 Amp 415 Volt DP Main Switch S


sources Level Qty Unit Rate/unit cost Total Cost
3081 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 1 nos 2081.20 2081.20
b. CM, Screws, Grips etc. LS 27.00
Transportation 3% 63.25 2171.45
Actual rate 3203.95
Rate per set Rs. 3684.54 15% conctractor overhead 480.59
Total (Rs.) 3684.54

86 100 Amp 415 Volt DP Main Switch


sources Level Qty Unit Rate/unit cost Total Cost
3082 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 1 nos 4888.40 4888.40
b. CM, Screws, Grips etc. LS 27.00
Transportation 3% 147.46 5062.86
Actual rate 6095.36

Prepare By:- Ckecked By:- Approved By:-


Page 244 ELECTRICAL_ANALYSIS 2069 Ilam

Rate per set Rs. 7009.67 15% conctractor overhead 914.30


Total (Rs.) 7009.67

Prepare By:- Ckecked By:- Approved By:-


Page 245 ELECTRICAL_ANALYSIS 2069 Ilam

87 16 Amp 415 Volt TP Main Switch


sources Level Qty Unit Rate/unit cost Total Cost
3083 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 1 nos 834.90 834.90
b. CM, Screws, Grips etc. LS 27.00
Transportation 3% 25.86 887.76
Actual rate 1920.26
Rate per set Rs. 2208.30 15% conctractor overhead 288.04
Total (Rs.) 2208.30

88 32 Amp 415 Volt TP Main Switch


sources Level Qty Unit Rate/unit cost Total Cost
3084 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 1 nos 1373.35 1373.35
b. CM, Screws, Grips etc. LS 27.00
Transportation 3% 42.01 1442.36
Actual rate 2474.86
Rate per set Rs. 2846.09 15% conctractor overhead 371.23
Total (Rs.) 2846.09

89 63 Amp 415 Volt TP Main Switch


sources Level Qty Unit Rate/unit cost Total Cost
3085 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 1 nos 2891.90 2891.90
b. CM, Screws, Grips etc. LS 27.00
Transportation 3% 87.57 3006.47
Actual rate 4038.97
Rate per set Rs. 4644.81 15% conctractor overhead 605.85
Total (Rs.) 4644.81

Prepare By:- Ckecked By:- Approved By:-


Page 246 ELECTRICAL_ANALYSIS 2069 Ilam

90 100 Amp 415 Volt TP Main Switch


sources Level Qty Unit Rate/unit cost Total Cost
3086 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 1 nos 5535.75 5535.75
b. CM, Screws, Grips etc. LS 27.00
Transportation 3% 166.88 5729.63
Actual rate 6762.13
Rate per set Rs. 7776.45 15% conctractor overhead 1014.32
Total (Rs.) 7776.45

91 200 Amp 415 Volt TP Main Switch


sources Level Qty Unit Rate/unit cost Total Cost
3087 labour skilled 1 nos 775.00 775.00
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1420.00
materials a. Switch 1 nos 7979.95 7979.95
b. CM, Screws, Grips etc. LS 27.00
Transportation 3% 240.21 8247.16
Actual rate 9667.16
Rate per set Rs. 11117.23 15% conctractor overhead 1450.07
Total (Rs.) 11117.23

92 16 Amp 415 Volt TP Main Switch HRC


sources Level Qty Unit Rate/unit cost Total Cost
3088 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 1 nos 1845.25 1845.25
b. CM, Screws, Grips etc. LS 27.00
Transportation 3% 56.17 1928.42
Actual rate 2960.92
Rate per set Rs. 3405.06 15% conctractor overhead 444.14
Total (Rs.) 3405.06

Prepare By:- Ckecked By:- Approved By:-


Page 247 ELECTRICAL_ANALYSIS 2069 Ilam

93 32 Amp 415 Volt TP Main Switch HRC


sources Level Qty Unit Rate/unit cost Total Cost
3089 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 1 nos 2087.25 2087.25
b. CM, Screws, Grips etc. LS 27.00
Transportation 3% 63.43 2177.68
Actual rate 3210.18
Rate per set Rs. 3691.70 15% conctractor overhead 481.53
Total (Rs.) 3691.70

94 63 Amp 415 Volt TP Main Switch HRC


sources Level Qty Unit Rate/unit cost Total Cost
3090 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 1 nos 4307.60 4307.60
b. CM, Screws, Grips etc. LS 27.00
Transportation 3% 130.04 4464.64
Actual rate 5497.14
Rate per set Rs. 6321.71 15% conctractor overhead 824.57
Total (Rs.) 6321.71

95 100 Amp 415 Volt TP Main Switch HRC


sources Level Qty Unit Rate/unit cost Total Cost
3091 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 1 nos 7005.90 7005.90
c. CM, Screws, Grips etc. LS 27.00
Rate per set Rs. Transportation 3% 210.99 7243.89
Actual rate 8276.39
9517.85 15% conctractor overhead 1241.46
Total (Rs.) 9517.85

Prepare By:- Ckecked By:- Approved By:-


Page 248 ELECTRICAL_ANALYSIS 2069 Ilam

96 200 Amp 415 Volt TP Switch HRC


sources Level Qty Unit Rate/unit cost Total Cost
3092 labour skilled 1 nos 775.00 775.00
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1420.00
materials a. Switch 1 nos 9341.20 9341.20
b. CM, Screws, Grips etc. LS 46.00
Transportation 3% 281.62 9668.82
Actual rate 11088.82
Rate per set Rs. 12752.14 15% conctractor overhead 1663.32
Total (Rs.) 12752.14

97 300 Amp 415 Volt TP Switch HRC


sources Level Qty Unit Rate/unit cost Total Cost
3093 labour skilled 1 nos 775.00 775.00
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1420.00
materials a. Switch 1 nos 11942.70 11942.70
b. CM, Screws, Grips etc. LS 46.00
Transportation 3% 359.66 12348.36
Actual rate 13768.36
Rate per set Rs. 15833.62 15% conctractor overhead 2065.25
Total (Rs.) 15833.62

98 400 Amp 415 Volt TP Switch HRC


sources Level Qty Unit Rate/unit cost Total Cost
3094 labour skilled 1 nos 775.00 775.00
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1420.00
materials a. Switch 1 nos 2359.50 2359.50
b. CM, Screws, Grips etc. LS 46.00
Transportation 3% 72.17 2477.67
Actual rate 3897.67
Rate per set Rs. 4482.31 15% conctractor overhead 584.65
Total (Rs.) 4482.31

Prepare By:- Ckecked By:- Approved By:-


Page 249 ELECTRICAL_ANALYSIS 2069 Ilam

99 16 Amp 415 Volt Change over Switch


sources Level Qty Unit Rate/unit cost Total Cost
3095 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 1 nos 1845.25 1845.25
b. CM, Screws, Grips etc. LS 25.00
Transportation 3% 56.11 1926.36
Actual rate 2958.86
Rate per set Rs. 3402.69 15% conctractor overhead 443.83
Total (Rs.) 3402.69

100 32 Amp 415 Volt Change over Switch


sources Level Qty Unit Rate/unit cost Total Cost
3096 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 1 nos 2087.25 2087.25
b. CM, Screws, Grips etc. LS 25.00
Transportation 3% 63.37 2175.62
Actual rate 3208.12
Rate per set Rs. 3689.34 15% conctractor overhead 481.22
Total (Rs.) 3689.34

101 63 Amp 415 Volt Change over Switch


sources Level Qty Unit Rate/unit cost Total Cost
3097 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Switch 1 nos 4307.60 4307.60
b. CM, Screws, Grips etc. LS 25.00
Transportation 3% 129.98 4462.58
Actual rate 5495.08
Rate per set Rs. 6319.34 15% conctractor overhead 824.26

Prepare By:- Ckecked By:- Approved By:-


Page 250 ELECTRICAL_ANALYSIS 2069 Ilam

Total (Rs.) 6319.34

Prepare By:- Ckecked By:- Approved By:-


Page 251 ELECTRICAL_ANALYSIS 2069 Ilam

102 100 Amp 415 Volt Change over Switch


sources Level Qty Unit Rate/unit cost Total Cost
3098 labour skilled 1 nos 775.00 775.00
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1420.00
materials a. Switch 1 nos 7005.90 7005.90
b. CM, Screws, Grips etc. LS 25.00
Transportation 3% 210.93 7241.83
Actual rate 8661.83
Rate per set Rs. 9961.10 15% conctractor overhead 1299.27
Total (Rs.) 9961.10

103 200 Amp 415 Volt Change over Switch


sources Level Qty Unit Rate/unit cost Total Cost
3099 labour skilled 1 nos 775.00 775.00
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1420.00
materials a. Switch 1 nos 9341.20 9341.20
b. CM, Screws, Grips etc. LS 30.00
Transportation 3% 281.14 9652.34
Actual rate 11072.34
Rate per set Rs. 12733.19 15% conctractor overhead 1660.85
Total (Rs.) 12733.19

104 300Amp 415 Volt Change over Switch


sources Level Qty Unit Rate/unit cost Total Cost
3100 labour skilled 1 nos 775.00 775.00
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1420.00
materials a. Switch 1 nos 11942.70 11942.70
b. CM, Screws, Grips etc. LS 30.00
Transportation 3% 359.18 12331.88
Actual rate 13751.88
Rate per set Rs. 15814.66 15% conctractor overhead 2062.78
Total (Rs.) 15814.66

Prepare By:- Ckecked By:- Approved By:-


Page 252 ELECTRICAL_ANALYSIS 2069 Ilam

105 63 Amp Bus Bar Chamber


sources Level Qty Unit Rate/unit cost Total Cost
3101 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 0 nos 600.00 0.00 2065.00
materials a. Bus Bar 1 nos 2359.50 2359.50
b. CM, Screws, Grips etc. LS 11.00
Transportation 3% 71.12 2441.62
Actual rate 4506.62
Rate per set Rs. 5182.61 15% conctractor overhead 675.99
Total (Rs.) 5182.61

106 100 Amp Bus Bar Chamber


sources Level Qty Unit Rate/unit cost Total Cost
3102 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 0 nos 600.00 0.00 2065.00
materials a. Bus Bar 1 nos 4187.29 4187.29
c. CM, Screws, Grips etc. LS 11.00
Transportation 3% 125.95 4324.24
Actual rate 6389.24
Rate per set Rs. 7347.62 15% conctractor overhead 958.39
Total (Rs.) 7347.62

107 200 Amp Bus Bar Chamber


sources Level Qty Unit Rate/unit cost Total Cost
3103 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 0 nos 600.00 0.00 2065.00
materials a. Bus Bar 1 nos 6352.50 6352.50
c. CM, Screws, Grips etc. LS 15.00
Transportation 3% 191.03 6558.53
Actual rate 8623.53
Rate per set Rs. 9917.05 15% conctractor overhead 1293.53
Total (Rs.) 9917.05

Prepare By:- Ckecked By:- Approved By:-


Page 253 ELECTRICAL_ANALYSIS 2069 Ilam

108 300 Amp Bus Bar Chamber


sources Level Qty Unit Rate/unit cost Total Cost
3104 labour skilled 1.5 nos 775.00 1162.50
Semi skilled 3 nos 645.00 1935.00
un skilled 0 nos 600.00 0.00 3097.50
materials a. Bus Bar 1 nos 7925.50 7925.50
b. CM, Screws, Grips etc. LS 15.00
Transportation 3% 238.22 8178.72
Actual rate 11276.22
Rate per set Rs. 12967.65 15% conctractor overhead 1691.43
Total (Rs.) 12967.65

Panel Board & Accessaries

109 60/100Amp Panel Board with Suitable color,Floor Mounted Double cover,
Push Type Switch, Size 9"x36"x48"
sources Level Qty Unit Rate/unit cost Total Cost
3105 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 0 nos 600.00 0.00 2065.00
materials a. Panel Board 1 nos Err:509 Err:509
b. CM, Screws, Bus Bar etc. LS 46.00
Transportation 3% Err:509 Err:509
Actual rate Err:509
Rate per set Rs. Err:509 15% conctractor overhead Err:509
Total (Rs.) Err:509

110 60/100Amp Panel Board with Suitable color,Floor Mounted Double cover,
Push Type Switch, Size 12"x36"x48"
sources Level Qty Unit Rate/unit cost Total Cost
3106 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 0 nos 600.00 0.00 2065.00
materials a. Panel Board 1 nos Err:509 Err:509
b. CM, Screws, Bus Bar etc. LS 46.00
Transportation 3% Err:509 Err:509
Actual rate Err:509

Prepare By:- Ckecked By:- Approved By:-


Page 254 ELECTRICAL_ANALYSIS 2069 Ilam

Rate per set Rs. Err:509 15% conctractor overhead Err:509


Total (Rs.) Err:509

Prepare By:- Ckecked By:- Approved By:-


Page 255 ELECTRICAL_ANALYSIS 2069 Ilam

111 60/100Amp Panel Board with Suitable color,Floor Mounted Double cover,
Push Type Switch, Size 9"x48"x60"
sources Level Qty Unit Rate/unit cost Total Cost
3107 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 0 nos 600.00 0.00 2065.00
materials a. Panel Board 1 nos Err:509 Err:509
b. CM, Screws, Bus Bar etc. LS 46.00
Transportation 3% Err:509 Err:509
Actual rate Err:509
Rate per set Rs. Err:509 15% conctractor overhead Err:509
Total (Rs.) Err:509

112 60/100 Amp Panel Board with Suitable color,Floor Mounted Double cover,
Push Type Switch, Size 12"x48"x60"
sources Level Qty Unit Rate/unit cost Total Cost
3108 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 0 nos 600.00 0.00 2065.00
materials a. Panel Board 1 nos Err:509 Err:509
b. CM, Screws, Bus Bar etc. LS 46.00
Transportation 3% Err:509 Err:509
Actual rate Err:509
Rate per set Rs. Err:509 15% conctractor overhead Err:509
Total (Rs.) Err:509

113 150/200 Amp Panel Board with Suitable color,Floor Mounted Double cover,
Push Type Switch, Size 9"x38"x52"
sources Level Qty Unit Rate/unit cost Total Cost
3109 labour skilled 1.5 nos 775.00 1162.50
Semi skilled 3 nos 645.00 1935.00
un skilled 0 nos 600.00 0.00 3097.50
materials a. Panel Board 1 nos Err:509 Err:509
b. CM, Screws, Bus Bar etc. LS 46.00
Transportation 3% Err:509 Err:509
Actual rate Err:509

Prepare By:- Ckecked By:- Approved By:-


Page 256 ELECTRICAL_ANALYSIS 2069 Ilam

Rate per set Rs. Err:509 15% conctractor overhead Err:509


Total (Rs.) Err:509

Prepare By:- Ckecked By:- Approved By:-


Page 257 ELECTRICAL_ANALYSIS 2069 Ilam

114 150/200 Amp Panel Board with Suitable color,Floor Mounted Double cover,
Push Type Switch, Size 9"x42"x56"
sources Level Qty Unit Rate/unit cost Total Cost
3110 labour skilled 1.5 nos 775.00 1162.50
Semi skilled 3 nos 645.00 1935.00
un skilled 0 nos 600.00 0.00 3097.50
materials a. Panel Board 1 nos Err:509 Err:509
b. CM, Screws, Bus Bar etc. LS 46.00
Transportation 3% Err:509 Err:509
Actual rate Err:509
Rate per set Rs. Err:509 15% conctractor overhead Err:509
Total (Rs.) Err:509

115 250/300 Amp Panel Board with Suitable color,Floor Mounted Double cover,
Push Type Switch, Size 12"x48"x60"
sources Level Qty Unit Rate/unit cost Total Cost
3111 labour skilled 1.5 nos 775.00 1162.50
Semi skilled 3 nos 645.00 1935.00
un skilled 0 nos 600.00 0.00 3097.50
materials a. Panel Board 1 nos Err:509 Err:509
b. CM, Screws, Bus Bar etc. LS 46.00
Transportation 3% Err:509 Err:509
Actual rate Err:509
Rate per set Rs. Err:509 15% conctractor overhead Err:509
Total (Rs.) Err:509

116 400 Amp Panel Board with Suitable color,Floor Mounted Double cover,
Push Type Switch, Size 12"x52"x66"
sources Level Qty Unit Rate/unit cost Total Cost
3112 labour skilled 1.5 nos 775.00 1162.50
Semi skilled 3 nos 645.00 1935.00
un skilled 0 nos 600.00 0.00 3097.50
materials a. Panel Board 1 nos 0.00 0.00
b. CM, Screws, Bus Bar etc. LS 46.00
Transportation 3% 1.38 47.38
Actual rate 3144.88
Rate per set Rs. 3616.61 15% conctractor overhead 471.73

Prepare By:- Ckecked By:- Approved By:-


Page 258 ELECTRICAL_ANALYSIS 2069 Ilam

Total (Rs.) 3616.61

Prepare By:- Ckecked By:- Approved By:-


Page 259 ELECTRICAL_ANALYSIS 2069 Ilam

117 60 Amp MCCB Siemens made


sources Level Qty Unit Rate/unit cost Total Cost
3113 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a. MCCB 1 nos 3638.00 3638.00
b. CM, Screws, Grips etc. LS 0.00
Transportation 3% 109.14 3747.14
Actual rate 3747.14
Rate per set Rs. 4309.21 15% conctractor overhead 562.07
Total (Rs.) 4309.21

118 100 Amp MCCB Siemens made


sources Level Qty Unit Rate/unit cost Total Cost
3114 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a.MCCB 1 nos 4601.00 4601.00
b. CM, Screws, Grips etc. LS 0.00
Transportation 3% 138.03 4739.03
Actual rate 4739.03
Rate per set Rs. 5449.88 15% conctractor overhead 710.85
Total (Rs.) 5449.88

119 150 Amp MCCB Siemens made


sources Level Qty Unit Rate/unit cost Total Cost
3115 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a. MCCB 1 nos 0.00 0.00
c. CM, Screws, Grips etc. LS
Transportation 3% 0.00 0.00
Actual rate 0.00
Rate per set Rs. 0.00 15% conctractor overhead 0.00
Total (Rs.) 0.00

Prepare By:- Ckecked By:- Approved By:-


Page 260 ELECTRICAL_ANALYSIS 2069 Ilam

120 200 Amp MCCB Siemens made


sources Level Qty Unit Rate/unit cost Total Cost
3116 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a. MCCB 1 nos 7704.00 7704.00
b. CM, Screws, Grips etc. LS
Transportation 3% 231.12 7935.12
Actual rate 7935.12
Rate per set Rs. 9125.39 15% conctractor overhead 1190.27
Total (Rs.) 9125.39

121 250Amp MCCB Siemens made


sources Level Qty Unit Rate/unit cost Total Cost
3117 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a. MCCB 1 nos 9416.00 9416.00
c. CM, Screws, Grips etc. LS
Transportation 3% 282.48 9698.48
Actual rate 9698.48
Rate per set Rs. 11153.25 15% conctractor overhead 1454.77
Total (Rs.) 11153.25

122 300Amp MCCB Siemens made


sources Level Qty Unit Rate/unit cost Total Cost
3118 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a.MCCB 1 nos 18725.00 18725.00
b. CM, Screws, Grips etc. LS
Transportation 3% 561.75 19286.75
Actual rate 19286.75
Rate per set Rs. 22179.76 15% conctractor overhead 2893.01

Prepare By:- Ckecked By:- Approved By:-


Page 261 ELECTRICAL_ANALYSIS 2069 Ilam

Total (Rs.) 22179.76

Prepare By:- Ckecked By:- Approved By:-


Page 262 ELECTRICAL_ANALYSIS 2069 Ilam

123 Voltmeter (0-500)


sources Level Qty Unit Rate/unit cost Total Cost
3119 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a. Voltmeter 1 nos 428.00 428.00
c. CM, Screws, Grips etc. LS 0.00
Transportation 3% 12.84 440.84
Actual rate 440.84
Rate per set Rs. 506.97 15% conctractor overhead 66.13
Total (Rs.) 506.97

124 Amp. Meter (0-500)


sources Level Qty Unit Rate/unit cost Total Cost
3120 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a. Amp.Meter 1 nos 428.00 428.00
b. CM, Screws, Grips etc. LS 0.00
Transportation 3% 12.84 440.84
Actual rate 440.84
Rate per set Rs. 506.97 15% conctractor overhead 66.13
Total (Rs.) 506.97

125 Indicator
sources Level Qty Unit Rate/unit cost Total Cost
3121 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a. Indicator 1 nos 166.00 166.00
b. CM, Screws, Grips etc. LS 0.00
Transportation 3% 4.98 170.98
Actual rate 170.98
Rate per set Rs. 196.63 15% conctractor overhead 25.65
Total (Rs.) 196.63

Prepare By:- Ckecked By:- Approved By:-


Page 263 ELECTRICAL_ANALYSIS 2069 Ilam

126 Slector Switch


sources Level Qty Unit Rate/unit cost Total Cost
3122 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a. Selector Switch 1 nos 342.50 342.50
b. CM, Screws, Grips etc. LS 0.00
Transportation 3% 10.28 352.78
Actual rate 352.78
Rate per set Rs. 405.69 15% conctractor overhead 52.92
Total (Rs.) 405.69

127 C.T.Coil
sources Level Qty Unit Rate/unit cost Total Cost
3123 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a. CT Coil 1 nos 481.50 481.50
b. CM, Screws, Grips etc. LS 0.00
Transportation 3% 14.45 495.95
Actual rate 495.95
Rate per set Rs. 570.34 15% conctractor overhead 74.39
Total (Rs.) 570.34

128 Energy meter


sources Level Qty Unit Rate/unit cost Total Cost
3124 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a. Meter 1 nos 749.00 749.00
b. CM, Screws, Grips etc. LS 0.00
Transportation 3% 22.47 771.47
Actual rate 771.47
Rate per set Rs. 887.19 15% conctractor overhead 115.72
Total (Rs.) 887.19

Prepare By:- Ckecked By:- Approved By:-


Page 264 ELECTRICAL_ANALYSIS 2069 Ilam

Join Box Metal/Wooden/PVC

129 Join Box Metal 4"x4"


sources Level Qty Unit Rate/unit cost Total Cost
3125 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. M.Box 10 nos 89.54 895.40
b. CM, Screws, Grips etc. 10 LS 51.00 510.00
Transportation 3% 42.16 1447.56
Actual rate 2480.06
Rate per set Rs. 285.21 15% conctractor overhead 372.01
Total (Rs.) 2852.07

130 Join Box Metal 4"x6"


sources Level Qty Unit Rate/unit cost Total Cost
3126 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. M.Box 10 nos 104.06 1040.60
b. CM, Screws, Grips etc. 10 LS 51.00 510.00
Transportation 3% 46.52 1597.12
Actual rate 2629.62
Rate per set Rs. 302.41 15% conctractor overhead 394.44
Total (Rs.) 3024.06

131 Join Box Metal 6"x8"


sources Level Qty Unit Rate/unit cost Total Cost
3127 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. M.Box 10 nos 166.98 1669.80
b. CM, Screws, Grips etc. 10 LS 51.00 510.00
Transportation 3% 65.39 2245.19
Actual rate 3277.69
Rate per set Rs. 376.93 15% conctractor overhead 491.65
Total (Rs.) 3769.35

Prepare By:- Ckecked By:- Approved By:-


Page 265 ELECTRICAL_ANALYSIS 2069 Ilam

132 Join Box Metal 8"x10"


sources Level Qty Unit Rate/unit cost Total Cost
3128 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. M.Box 10 nos 208.12 2081.20
b. CM, Screws, Grips etc. 10 LS 51.00 510.00
Transportation 3% 77.74 2668.94
Actual rate 3701.44
Rate per set Rs. 425.67 15% conctractor overhead 555.22
Total (Rs.) 4256.65

133 Join Box Metal 8"x12"


sources Level Qty Unit Rate/unit cost Total Cost
3129 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. M.Box 10 nos 278.30 2783.00
b. CM, Screws, Grips etc. 10 LS 51.00 510.00
Transportation 3% 98.79 3391.79
Actual rate 4424.29
Rate per set Rs. 508.79 15% conctractor overhead 663.64
Total (Rs.) 5087.93

134 Join Box Wooden 4"x4"


sources Level Qty Unit Rate/unit cost Total Cost
3130 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. M.Box 10 nos 37.50 375.00
b. CM, Screws, Grips etc. 10 LS 51.00 510.00
Transportation 3% 26.55 911.55
Actual rate 1621.55
Rate per set Rs. 186.48 15% conctractor overhead 243.23
Total (Rs.) 1864.78

Prepare By:- Ckecked By:- Approved By:-


Page 266 ELECTRICAL_ANALYSIS 2069 Ilam

135 Join Box Wooden 4"x6"


sources Level Qty Unit Rate/unit cost Total Cost
3131 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. M.Box 10 nos 48.50 485.00
b. CM, Screws, Grips etc. 10 LS 51.00 510.00
Transportation 3% 29.85 1024.85
Actual rate 1734.85
Rate per set Rs. 199.51 15% conctractor overhead 260.23
Total (Rs.) 1995.08

136 Join Box Wooden 6"x8"


sources Level Qty Unit Rate/unit cost Total Cost
3132 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. M.Box 10 nos 64.50 645.00
b. CM, Screws, Grips etc. 10 LS 51.00 510.00
Transportation 3% 34.65 1189.65
Actual rate 1899.65
Rate per set Rs. 218.46 15% conctractor overhead 284.95
Total (Rs.) 2184.60

137 Join Box Wooden 8"x10"


sources Level Qty Unit Rate/unit cost Total Cost
3133 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. M.Box 10 nos 96.50 965.00
b. CM, Screws, Grips etc. 10 LS 51.00 510.00
Transportation 3% 44.25 1519.25
Actual rate 2229.25
Rate per set Rs. 256.36 15% conctractor overhead 334.39
Total (Rs.) 2563.64

Prepare By:- Ckecked By:- Approved By:-


Page 267 ELECTRICAL_ANALYSIS 2069 Ilam

138 Join Box PVC 4"x4"


sources Level Qty Unit Rate/unit cost Total Cost
3134 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. M.Box 10 nos 20.57 205.70
b. CM, Screws, Grips etc. 10 LS 51.00 510.00
Transportation 3% 21.47 737.17
Actual rate 1447.17
Rate per set Rs. 166.42 15% conctractor overhead 217.08
Total (Rs.) 1664.25

139 Join Box PVC 4"x6"


sources Level Qty Unit Rate/unit cost Total Cost
3135 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. M.Box 10 nos 37.51 375.10
b. CM, Screws, Grips etc. 10 LS 51.00 510.00
Transportation 3% 26.55 911.65
Actual rate 1621.65
Rate per set Rs. 186.49 15% conctractor overhead 243.25
Total (Rs.) 1864.90

140 Join Box PVC 6"x8"


sources Level Qty Unit Rate/unit cost Total Cost
3136 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. M.Box 10 nos 53.24 532.40
b. CM, Screws, Grips etc. 10 LS 51.00 510.00
Transportation 3% 31.27 1073.67
Actual rate 1783.67
Rate per set Rs. 205.12 15% conctractor overhead 267.55
Total (Rs.) 2051.22

Prepare By:- Ckecked By:- Approved By:-


Page 268 ELECTRICAL_ANALYSIS 2069 Ilam

141 Join Box PVC 8"x10"


sources Level Qty Unit Rate/unit cost Total Cost
3137 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. M.Box 10 nos 76.23 762.30
b. CM, Screws, Grips etc. 10 LS 51.00 510.00
Transportation 3% 38.17 1310.47
Actual rate 2020.47
Rate per set Rs. 232.35 15% conctractor overhead 303.07
Total (Rs.) 2323.54

MCB Geco ISI or equi.

142 6-32 Amp SP MCB


sources Level Qty Unit Rate/unit cost Total Cost
3138 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a. M.C.B 10 nos 166.38 1663.75
b. CM, Screws, Grips etc. LS 0.00
Transportation 3% 49.91 1713.66
Actual rate 1713.66
Rate per set Rs. 197.07 15% conctractor overhead 257.05
Total (Rs.) 1970.71

143 6-32 Amp DP MCB


sources Level Qty Unit Rate/unit cost Total Cost
3139 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a. M.C.B 10 nos 805.26 8052.55
b. CM, Screws, Grips etc. LS 0.00
Transportation 3% 241.58 8294.13
Actual rate 8294.13

Prepare By:- Ckecked By:- Approved By:-


Page 269 ELECTRICAL_ANALYSIS 2069 Ilam

Rate per set Rs. 953.82 15% conctractor overhead 1244.12


Total (Rs.) 9538.25

Prepare By:- Ckecked By:- Approved By:-


Page 270 ELECTRICAL_ANALYSIS 2069 Ilam

144 6-32 Amp TP MCB


sources Level Qty Unit Rate/unit cost Total Cost
3140 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a. M.C.B 10 nos 1184.59 11845.90
b. CM, Screws, Grips etc. LS 0.00
Transportation 3% 355.38 12201.28
Actual rate 12201.28
Rate per set Rs. 1403.15 15% conctractor overhead 1830.19
Total (Rs.) 14031.47

145 6-32 Amp TPN MCB


sources Level Qty Unit Rate/unit cost Total Cost
3141 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a. M.C.B 10 nos 1027.00 10270.00
b. CM, Screws, Grips etc. LS 0.00
Transportation 3% 308.10 10578.10
Actual rate 10578.10
Rate per set Rs. 1216.48 15% conctractor overhead 1586.72
Total (Rs.) 12164.82

146 40-60 Amp SP MCB


sources Level Qty Unit Rate/unit cost Total Cost
3142 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a. M.C.B 10 nos 658.85 6588.45
b. CM, Screws, Grips etc. LS 0.00
Transportation 3% 197.65 6786.10
Actual rate 6786.10
Rate per set Rs. 780.40 15% conctractor overhead 1017.92
Total (Rs.) 7804.02

Prepare By:- Ckecked By:- Approved By:-


Page 271 ELECTRICAL_ANALYSIS 2069 Ilam

147 40-60 AmpDP MCB


sources Level Qty Unit Rate/unit cost Total Cost
3143 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a. M.C.B 10 nos 1304.38 13043.80
b. CM, Screws, Grips etc. LS 0.00
Transportation 3% 391.31 13435.11
Actual rate 13435.11
Rate per set Rs. 1545.04 15% conctractor overhead 2015.27
Total (Rs.) 15450.38

148 40-60 Amp TP MCB


sources Level Qty Unit Rate/unit cost Total Cost
3144 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a. M.C.B 10 nos 1883.37 18833.65
b. CM, Screws, Grips etc. LS 0.00
Transportation 3% 565.01 19398.66
Actual rate 19398.66
Rate per set Rs. 2230.85 15% conctractor overhead 2909.80
Total (Rs.) 22308.46

149 40-60 Amp TPN MCB


sources Level Qty Unit Rate/unit cost Total Cost
3145 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a. M.C.B 10 nos 2362.53 23625.25
b. CM, Screws, Grips etc. LS 0.00
Transportation 3% 708.76 24334.01
Actual rate 24334.01
Rate per set Rs. 2798.41 15% conctractor overhead 3650.10
Total (Rs.) 27984.11

Prepare By:- Ckecked By:- Approved By:-


Page 272 ELECTRICAL_ANALYSIS 2069 Ilam

Distribution Board DB.Geco ISI or Equi.of Nepal.

150 4 Way SPN DB Double Cover


sources Level Qty Unit Rate/unit cost Total Cost
3146 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.75 nos 645.00 483.75
un skilled 0 nos 600.00 0.00 871.25
materials a. Cover 1 nos 1197.90 1197.90
b. CM, Screws, Grips etc. LS 45.00
Transportation 3% 37.29 1280.19
Actual rate 2151.44
Rate per set Rs. 2474.15 15% conctractor overhead 322.72
Total (Rs.) 2474.15

151 6 Way SPN DB Double Cover


sources Level Qty Unit Rate/unit cost Total Cost
3147 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.75 nos 645.00 483.75
un skilled 0 nos 600.00 0.00 871.25
materials a. Cover 1 nos 1610.51 1610.51
b. CM, Screws, Grips etc. LS 45.00
Transportation 3% 49.67 1705.18
Actual rate 2576.43
Rate per set Rs. 2962.89 15% conctractor overhead 386.46
Total (Rs.) 2962.89

152 8Way SPN DB Double Cover


sources Level Qty Unit Rate/unit cost Total Cost
3148 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Cover 1 nos 1610.51 1610.51
b. CM, Screws, Grips etc. LS 45.00
Transportation 3% 49.67 1705.18
Actual rate 2737.68
Rate per set Rs. 3148.33 15% conctractor overhead 410.65
Total (Rs.) 3148.33

Prepare By:- Ckecked By:- Approved By:-


Page 273 ELECTRICAL_ANALYSIS 2069 Ilam

153 12 Way SPN DB Double Cover


sources Level Qty Unit Rate/unit cost Total Cost
3149 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Cover 1 nos 2136.26 2136.26
b. CM, Screws, Grips etc. LS 45.00
Transportation 3% 65.44 2246.69
Actual rate 3279.19
Rate per set Rs. 3771.07 15% conctractor overhead 491.88
Total (Rs.) 3771.07

154 16 Way SPN DB Double Cover


sources Level Qty Unit Rate/unit cost Total Cost
3150 labour skilled 0.5 nos 775.00 387.50
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1032.50
materials a. Cover 1 nos 2628.73 2628.73
b. CM, Screws, Grips etc. LS 45.00
Transportation 3% 80.21 2753.94
Actual rate 3786.44
Rate per set Rs. 4354.40 15% conctractor overhead 567.97
Total (Rs.) 4354.40

155 3 Way TPN DB Double Cover


sources Level Qty Unit Rate/unit cost Total Cost
3151 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.75 nos 645.00 483.75
un skilled 0 nos 600.00 0.00 871.25
materials a. Cover 1 nos 3294.23 3294.23
b. CM, Screws, Grips etc. LS 45.00
Transportation 3% 100.18 3439.40
Actual rate 4310.65
Rate per set Rs. 4957.25 15% conctractor overhead 646.60

Prepare By:- Ckecked By:- Approved By:-


Page 274 ELECTRICAL_ANALYSIS 2069 Ilam

Total (Rs.) 4957.25

Prepare By:- Ckecked By:- Approved By:-


Page 275 ELECTRICAL_ANALYSIS 2069 Ilam

156 4 WayTPN DB Double Cover


sources Level Qty Unit Rate/unit cost Total Cost
3152 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.75 nos 645.00 483.75
un skilled 0 nos 600.00 0.00 871.25
materials a. Cover 1 nos 3294.23 3294.23
b. CM, Screws, Grips etc. LS 45.00
Transportation 3% 100.18 3439.40
Actual rate 4310.65
Rate per set Rs. 4957.25 15% conctractor overhead 646.60
Total (Rs.) 4957.25

157 6 WayTPN DB Double Cover


sources Level Qty Unit Rate/unit cost Total Cost
3153 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.75 nos 645.00 483.75
un skilled 0 nos 600.00 0.00 871.25
materials a. Cover 1 nos 4092.83 4092.83
b. CM, Screws, Grips etc. LS 45.00
Transportation 3% 82.76 4220.58
Actual rate 5091.83
Rate per set Rs. 5855.61 15% conctractor overhead 763.77
Total (Rs.) 5855.61

158 8 Way TPN DB Double Cover


sources Level Qty Unit Rate/unit cost Total Cost
3154 labour skilled 0.75 nos 775.00 581.25
Semi skilled 0.75 nos 645.00 483.75
un skilled 0 nos 600.00 0.00 1065.00
materials a. Cover 1 nos 5104.39 5104.39
b. CM, Screws, Grips etc. LS 45.00
Transportation 3% 154.48 5303.87
Actual rate 6368.87
Rate per set Rs. 7324.20 15% conctractor overhead 955.33
Total (Rs.) 7324.20

Prepare By:- Ckecked By:- Approved By:-


Page 276 ELECTRICAL_ANALYSIS 2069 Ilam

159 2 Pole MCB Box


sources Level Qty Unit Rate/unit cost Total Cost
3155 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. M.Box 1 nos 68.97 68.97
b. CM, Screws, Grips etc. LS 35.00
Transportation 3% 3.12 107.09
Actual rate 817.09
Rate per set Rs. 939.65 15% conctractor overhead 122.56
Total (Rs.) 939.65

160 4 Pole MCB Box


sources Level Qty Unit Rate/unit cost Total Cost
3156 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. M.Box 1 nos 139.15 139.15
b. CM, Screws, Grips etc. LS 50.00
Transportation 3% 5.67 194.82
Actual rate 904.82
Rate per set Rs. 1040.55 15% conctractor overhead 135.72
Total (Rs.) 1040.55

Fan: Almonard/Bajaj or equivalent.

161 36" Ceiling Fan


sources Level Qty Unit Rate/unit cost Total Cost
3157 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. Fan 1 nos 3025.00 3025.00
b. Iron clamps LS 60.00
c. Ceiling rose 1 nos 27.83 26.00
d. CM, Screws, Grips etc. LS 25.00
Transportation 3% 94.08 3230.08
Actual rate 3940.08
Rate per set Rs. 4531.09 15% conctractor overhead 591.01

Prepare By:- Ckecked By:- Approved By:-


Page 277 ELECTRICAL_ANALYSIS 2069 Ilam

Total (Rs.) 4531.09

Prepare By:- Ckecked By:- Approved By:-


Page 278 ELECTRICAL_ANALYSIS 2069 Ilam

162 42" Ceiling Fan


sources Level Qty Unit Rate/unit cost Total Cost
3158 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. Fan 1 nos 2450.00 2450.00
b. Iron clamps LS 60.00
c. Ceiling rose 1 nos 26.00 26.00
d. CM, Screws, Grips etc. LS 25.00
Transportation 3% 51.22 2612.22
Actual rate 3322.22
Rate per set Rs. 3820.55 15% conctractor overhead 498.33
Total (Rs.) 3820.55

163 48" Ceiling Fan


sources Level Qty Unit Rate/unit cost Total Cost
3159 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. Fan 1 nos 2550.00 2550.00
b. Iron clamps LS 60.00
c. Ceiling rose 1 nos 26.00 26.00
d. CM, Screws, Grips etc. LS 25.00
Transportation 3% 79.83 2740.83
Actual rate 3450.83
Rate per set Rs. 3968.45 15% conctractor overhead 517.62
Total (Rs.) 3968.45

164 56" Ceiling Fan


sources Level Qty Unit Rate/unit cost Total Cost
3160 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. Fan 1 nos 2700.00 2700.00
b. Iron clamps LS 60.00
c. Ceiling rose 1 nos 26.00 26.00
d. CM, Screws, Grips etc. LS 25.00
Transportation 3% 84.33 2895.33
Actual rate 3605.33

Prepare By:- Ckecked By:- Approved By:-


Page 279 ELECTRICAL_ANALYSIS 2069 Ilam

Rate per set Rs. 4146.13 15% conctractor overhead 540.80


Total (Rs.) 4146.13

Prepare By:- Ckecked By:- Approved By:-


Page 280 ELECTRICAL_ANALYSIS 2069 Ilam

165 16" Wall Fan


sources Level Qty Unit Rate/unit cost Total Cost
3161 labour skilled 0.25 nos 775.00 193.75
Semi skilled 0.25 nos 645.00 161.25
un skilled 0 nos 600.00 0.00 355.00
materials a. Fan 1 nos 1870.00 1870.00
b. CM, Screws, Grips etc. LS 18.00
Transportation 3% 61.48 1949.48
Actual rate 2304.48
Rate per set Rs. 2650.15 15% conctractor overhead 345.67
Total (Rs.) 2650.15

166 9" Exhaust Fan


sources Level Qty Unit Rate/unit cost Total Cost
3162 labour skilled 1 nos 775.00 775.00
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1420.00
materials a. Fan 1 nos No rate #VALUE!
b. Wooden Frame 1 LS 100.00 100.00
c. Nut bolts 4 LS 50.00
d. CM, Cement Paints etc. LS 38.00
Transportation 3% #VALUE! #VALUE!
Actual rate #VALUE!
Rate per set Rs. #VALUE! 15% conctractor overhead #VALUE!
Total (Rs.) #VALUE!

167 12" Exhaust Fan


sources Level Qty Unit Rate/unit cost Total Cost
3163 labour skilled 1 nos 775.00 775.00
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1420.00
materials a. Fan 1 nos 2057.00 2057.00
b. Wooden Frame 1 LS 100.00 100.00
c. Nut bolts 4 LS 50.00
d. CM, Cement Paints etc. LS 38.00
Transportation 3% 67.35 2312.35
Actual rate 3732.35
Rate per set Rs. 4292.20 15% conctractor overhead 559.85

Prepare By:- Ckecked By:- Approved By:-


Page 281 ELECTRICAL_ANALYSIS 2069 Ilam

Total (Rs.) 4292.20

Prepare By:- Ckecked By:- Approved By:-


Page 282 ELECTRICAL_ANALYSIS 2069 Ilam

168 AC 1.5 Ton


sources Level Qty Unit Rate/unit cost Total Cost
3164 labour skilled 1 nos 775.00 775.00
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1420.00
materials a. Fan 1 nos No Rate #VALUE!
b. Angle Frame 1 LS 500.00 500.00
c. Nut bolts 4 LS 50.00
d. CM, Cement Paints etc. LS 45.00
Transportation 3% #VALUE! #VALUE!
Actual rate #VALUE!
Rate per set Rs. #VALUE! 15% conctractor overhead #VALUE!
Total (Rs.) #VALUE!

169 AC 2.0 Ton


sources Level Qty Unit Rate/unit cost Total Cost
3165 labour skilled 1 nos 775.00 775.00
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1420.00
materials a. Fan 1 nos No Rate #VALUE!
b.Angle/ Wooden Frame 1 LS 500.00 500.00
c. Nut bolts 4 LS 50.00
d. CM, Cement Paints etc. LS 45.00
Transportation 3% #VALUE! #VALUE!
Actual rate #VALUE!
Rate per set Rs. #VALUE! 15% conctractor overhead #VALUE!
Total (Rs.) #VALUE!

General Fittings

170 Dome Light 6" Milky Type Heavy Carrier(decorative)


sources Level Qty Unit Rate/unit cost Total Cost
3166 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. D Light 10 nos 748.00 7480.00
b. CM, Screws, Grips etc. 10 LS 32.00 320.00
Transportation 3% 234.00 8120.00
Actual rate 8830.00

Prepare By:- Ckecked By:- Approved By:-


Page 283 ELECTRICAL_ANALYSIS 2069 Ilam

Rate per set Rs. 1015.45 15% conctractor overhead 1324.50


Total (Rs.) 10154.50

Prepare By:- Ckecked By:- Approved By:-


Page 284 ELECTRICAL_ANALYSIS 2069 Ilam

171 Dome Light 6" Brace Base


sources Level Qty Unit Rate/unit cost Total Cost
3167 labour skilled 1 nos 775.00 775.00
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1420.00
materials a. D Light 10 nos 1063.00 10630.00
b. CM, Screws, Grips etc. 10 LS 32.00 320.00
Transportation 3% 328.50 11270.00
Actual rate 12690.00
Rate per set Rs. 1459.35 15% conctractor overhead 1903.50
Total (Rs.) 14593.50

172 Dome Light 8" Milky Type Heavy Carrier


sources Level Qty Unit Rate/unit cost Total Cost
3168 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. D Light 10 nos 879.25 8792.50
b. CM, Screws, Grips etc. 10 LS 32.00 320.00
Transportation 3% 273.38 9432.50
Actual rate 10142.50
Rate per set Rs. 1166.39 15% conctractor overhead 1521.38
Total (Rs.) 11663.88

173 Dome Light 8" Brace Base


sources Level Qty Unit Rate/unit cost Total Cost
3169 labour skilled 1 nos 775.00 775.00
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1420.00
materials a. D Light 10 nos 1325.50 13255.00
b. CM, Screws, Grips etc. 10 LS 32.00 320.00
Transportation 3% 407.25 13895.00
Actual rate 15315.00
Rate per set Rs. 1761.23 15% conctractor overhead 2297.25

Prepare By:- Ckecked By:- Approved By:-


Page 285 ELECTRICAL_ANALYSIS 2069 Ilam

Total (Rs.) 17612.25

Prepare By:- Ckecked By:- Approved By:-


Page 286 ELECTRICAL_ANALYSIS 2069 Ilam

174 40/60 Watt Down Light


sources Level Qty Unit Rate/unit cost Total Cost
3170 labour skilled 1 nos 775.00 775.00
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1420.00
materials a. D Light 10 nos 621.00 6210.00
b. CM, Screws, Grips etc. 10 LS 32.00 320.00
Transportation 3% 195.90 6850.00
Actual rate 8270.00
Rate per set Rs. 951.05 15% conctractor overhead 1240.50
Total (Rs.) 9510.50

175 Wall / Spot /Bulk Head Light Single Direct


sources Level Qty Unit Rate/unit cost Total Cost
3171 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. Wall/S.light/Bulk Light 10 nos 1230.50 12305.00
b. CM, Screws, Grips etc. 10 LS 32.00 320.00
Transportation 3% 378.75 12945.00
Actual rate 13655.00
Rate per set Rs. 1570.33 15% conctractor overhead 2048.25
Total (Rs.) 15703.25

176 Wall / Spot /Bulk Head Light Single Direct


sources Level Qty Unit Rate/unit cost Total Cost
3172 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. Wall/S.light/Bulk Light 10 nos 1123.50 11235.00
b. CM, Screws, Grips etc. 10 LS 32.00 320.00
Transportation 3% 346.65 11875.00
Actual rate 12585.00
Rate per set Rs. 1447.28 15% conctractor overhead 1887.75
Total (Rs.) 14472.75

Prepare By:- Ckecked By:- Approved By:-


Page 287 ELECTRICAL_ANALYSIS 2069 Ilam

177 Wall / Spot /Bulk Head Light Single Direct


sources Level Qty Unit Rate/unit cost Total Cost
3173 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a. Wall/S.light/Bulk Light 10 nos 610.00 6100.00
b. CM, Screws, Grips etc. 10 LS 32.00 320.00
Transportation 3% 192.60 6740.00
Actual rate 7450.00
Rate per set Rs. 856.75 15% conctractor overhead 1117.50
Total (Rs.) 8567.50

178 Dinning Lamp Decorative Medium


sources Level Qty Unit Rate/unit cost Total Cost
3174 labour skilled 1 nos 775.00 775.00
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1420.00
materials a. D.Light 10 nos 2300.50 23005.00
b. CM, Screws, Grips etc. 10 LS 105.00 1050.00
Transportation 3% 721.65 25105.00
Actual rate 26525.00
Rate per set Rs. 3050.38 15% conctractor overhead 3978.75
Total (Rs.) 30503.75

179 Chandlers Lamp 3-5 Lamp Medium


sources Level Qty Unit Rate/unit cost Total Cost
3175 labour skilled 1 nos 775.00 775.00
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1420.00
materials a. Chandlers Lamp 10 nos 5885.00 58850.00
b. CM, Screws, Grips,Iron 10 LS 105.00 1050.00
clamp etc.
Transportation 3% 1797.00 60950.00
Actual rate 62370.00
Rate per set Rs. 7172.55 15% conctractor overhead 9355.50
Total (Rs.) 71725.50

Prepare By:- Ckecked By:- Approved By:-


Page 288 ELECTRICAL_ANALYSIS 2069 Ilam

180 Chandlers Lamp 6-8 Lamp Medium


sources Level Qty Unit Rate/unit cost Total Cost
3176 labour skilled 1 nos 775.00 775.00
Semi skilled 1 nos 645.00 645.00
un skilled 0 nos 600.00 0.00 1420.00
materials a. Chandlers Lamp 10 nos 8453.00 84530.00
b. CM, Screws, Grips etc. 10 LS 105.00 1050.00
Transportation 3% 2567.40 86630.00
Actual rate 88050.00
Rate per set Rs. 10125.75 15% conctractor overhead 13207.50
Total (Rs.) 101257.50

181 IS 3043 Copper Plate 80x80x3.15


sources Level Qty Unit Rate/unit cost Total Cost
3177 labour skilled 0.2 nos 775.00 155.00
Semi skilled 1.5 nos 645.00 967.50
un skilled 2 nos 600.00 1200.00 2322.50
materials a.Copper Plate 10 nos 3852.00 38520.00
b. Coal, Salt,sand,soil etc. 10 LS 800.00 8000.00
Transportation 3% 1395.60 54520.00
Actual rate 56842.50
Rate per set Rs. 6536.89 15% conctractor overhead 8526.38
Total (Rs.) 65368.88

182 IS 3043 Copper Plate65x65x3.15


sources Level Qty Unit Rate/unit cost Total Cost
3178 labour skilled 0.2 nos 775.00 155.00
Semi skilled 1.5 nos 645.00 967.50
un skilled 2 nos 600.00 1200.00 2322.50
materials a.Copper Plate 10 nos 2247.00 22470.00
b. Coal, Salt,sand,soil etc. 10 LS 800.00 8000.00
Transportation 3% 914.10 38470.00
Actual rate 40792.50
Rate per set Rs. 4691.14 15% conctractor overhead 6118.88
Total (Rs.) 46911.38

Prepare By:- Ckecked By:- Approved By:-


Page 289 ELECTRICAL_ANALYSIS 2069 Ilam

183 G.NO 10 Plastic Coated Cu. Wire


sources Level Qty Unit Rate/unit cost Total Cost
3179 labour skilled 1 nos 775.00 775.00
Semi skilled 1.5 nos 645.00 967.50
un skilled 2 nos 600.00 1200.00 2942.50
materials a.Copper Wire 100 Rm 2300.50 230050.00
b. CM, Screws, Grips etc. LS 0.00
Transportation 3% 6901.50 230050.00
Actual rate 232992.50
Rate per set Rs. 2679.41 15% conctractor overhead 34948.88
Total (Rs.) 267941.38

184 0-100 Watt Bulb (ISI)


sources Level Qty Unit Rate/unit cost Total Cost
3180 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0.25 nos 600.00 150.00 150.00
materials a.Bulb 10 nos 48.50 485.00
b. CM, Screws, Grips etc. LS 0.00
Transportation 3% 14.55 485.00
Actual rate 635.00
Rate per set Rs. 73.03 15% conctractor overhead 95.25
Total (Rs.) 730.25

185 Festival Light


sources Level Qty Unit Rate/unit cost Total Cost
3181 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a.Bulb 10 nos 48.50 485.00
b. C plate, Screws, Grips etc. 10 LS 27.00 270.00
c.Holder 10 nos 27.00 270.00
Transportation 3% 30.75 1055.75
Actual rate 1765.75
Rate per set Rs. 203.06 15% conctractor overhead 264.86
Total (Rs.) 2030.61

Prepare By:- Ckecked By:- Approved By:-


Page 290 ELECTRICAL_ANALYSIS 2069 Ilam

Roma /Appolo Bell Indicator

186 4 way Indicator With Bell


sources Level Qty Unit Rate/unit cost Total Cost
3182 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a.Indicater Bell 10 nos 1498.00 14980.00
b. Screws, Grips etc. 10 LS 5.00 50.00
Transportation 3% 450.90 15480.90
Actual rate 16190.90
Rate per set Rs. 1861.95 15% conctractor overhead 2428.64
Total (Rs.) 18619.54

187 6 way Indicator With Bell


sources Level Qty Unit Rate/unit cost Total Cost
3183 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a.Indicater Bell 10 nos 2300.50 23005.00
b. Screws, Grips etc. 10 LS 5.00 50.00
Transportation 3% 691.65 23746.65
Actual rate 24456.65
Rate per set Rs. 2812.51 15% conctractor overhead 3668.50
Total (Rs.) 28125.15

188 8way Indicator With Bell


sources Level Qty Unit Rate/unit cost Total Cost
3184 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a.Indicater Bell 10 nos 2942.50 29425.00
b. Screws, Grips etc. 10 LS 5.00 50.00
Transportation 3% 884.25 30359.25
Actual rate 31069.25
Rate per set Rs. 3572.96 15% conctractor overhead 4660.39
Total (Rs.) 35729.64

Prepare By:- Ckecked By:- Approved By:-


Page 291 ELECTRICAL_ANALYSIS 2069 Ilam

189 12 way Indicator With Bell


sources Level Qty Unit Rate/unit cost Total Cost
3185 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.5 nos 645.00 322.50
un skilled 0 nos 600.00 0.00 710.00
materials a.Indicater Bell 10 nos 4601.00 46010.00
b.Screws, Grips etc. 10 LS 5.00 50.00
Transportation 3% 1381.80 47441.80
Actual rate 48151.80
Rate per set Rs. 5537.46 15% conctractor overhead 7222.77
Total (Rs.) 55374.57

Steel Tubelar / Wood Pole

190 9 meter Steel Tubular Pole


sources Level Qty Unit Rate/unit cost Total Cost
3186 labour skilled 0.2 nos 775.00 155.00
Semi skilled 1.5 nos 645.00 967.50
un skilled 2 nos 600.00 1200.00 2322.50
materials a.Pole 1 nos 19260.00 19260.00
b. Earth Work CM etc. LS 0.00
Transportation 3% 577.80 19837.80
Actual rate 22160.30
Rate per set Rs. 25484.35 15% conctractor overhead 3324.05
Total (Rs.) 25484.35

191 7 meter Wooden Pole


sources Level Qty Unit Rate/unit cost Total Cost
3187 labour skilled 0.2 nos 775.00 155.00
Semi skilled 1.5 nos 645.00 967.50
un skilled 2 nos 600.00 1200.00 2322.50
materials a.Pole 1 nos 4904.35 4904.35
b. Earth Work CM etc. LS 0.00
Transportation 3% 147.13 5051.48
Actual rate 7373.98
Rate per set Rs. 8480.08 15% conctractor overhead 1106.10

Prepare By:- Ckecked By:- Approved By:-


Page 292 ELECTRICAL_ANALYSIS 2069 Ilam

Total (Rs.) 8480.08

Prepare By:- Ckecked By:- Approved By:-


Page 293 ELECTRICAL_ANALYSIS 2069 Ilam

192 9 meter Wooden Pole


sources Level Qty Unit Rate/unit cost Total Cost
3188 labour skilled 0.2 nos 775.00 155.00
Semi skilled 1.5 nos 645.00 967.50
un skilled 2 nos 600.00 1200.00 2322.50
materials a.Pole 1 nos 5510.50 5510.50
b. Earth Work CM etc. LS 0.00
Transportation 3% 165.32 5675.82
Actual rate 7998.32
Rate per set Rs. 9198.06 15% conctractor overhead 1199.75
Total (Rs.) 9198.06

Cable Wire Prakash / Janta or Equivalent

Concelled Wiring

193 1/18 PVC copper Wire Nepal, Prakash etc.


sources Level Qty Unit Rate/unit cost Total Cost
3189 labour skilled 0.75 nos 775.00 581.25
Semi skilled 1.3 nos 645.00 838.50
un skilled 1.2 nos 600.00 720.00 2139.75
materials a.Cu wire 100 Rm 12.33 1233.33
b.HDP, hooks 100 LS 7.11 711.00
Transportation 3% 58.33 2002.66
Actual rate 4142.41
Rate per set Rs. 47.64 15% conctractor overhead 621.36
Total (Rs.) 4763.78

194 3/22 PVC copper Wire Nepal, Prakash etc.


sources Level Qty Unit Rate/unit cost Total Cost
3190 labour skilled 0.75 nos 775.00 581.25
Semi skilled 1.3 nos 645.00 838.50
un skilled 1.2 nos 600.00 720.00 2139.75
materials a.Cu wire 100 Rm 12.59 1258.89
b.HDP, hooks 100 LS 7.11 711.00
Transportation 3% 59.10 2028.99
Actual rate 4168.74

Prepare By:- Ckecked By:- Approved By:-


Page 294 ELECTRICAL_ANALYSIS 2069 Ilam

Rate per set Rs. 47.94 15% conctractor overhead 625.31


Total (Rs.) 4794.05

Prepare By:- Ckecked By:- Approved By:-


Page 295 ELECTRICAL_ANALYSIS 2069 Ilam

195 3/20 PVC copper Wire Nepal, Prakash etc.


sources Level Qty Unit Rate/unit cost Total Cost
3191 labour skilled 0.75 nos 775.00 581.25
Semi skilled 1.3 nos 645.00 838.50
un skilled 1.2 nos 600.00 720.00 2139.75
materials a.Cu wire 100 Rm 18.89 1888.89
b.HDP, hooks 100 LS 7.11 711.00
Transportation 3% 78.00 2677.89
Actual rate 4817.64
Rate per set Rs. 55.40 15% conctractor overhead 722.65
Total (Rs.) 5540.28

196 7/22 PVC copper Wire Nepal, Prakash etc.


sources Level Qty Unit Rate/unit cost Total Cost
3192 labour skilled 0.75 nos 775.00 581.25
Semi skilled 1.3 nos 645.00 838.50
un skilled 1.2 nos 600.00 720.00 2139.75
materials a.Cu wire 100 Rm 31.48 3147.78
b.HDP, hooks 100 LS 9.91 991.00
Transportation 3% 124.16 4262.94
Actual rate 6402.69
Rate per set Rs. 73.63 15% conctractor overhead 960.40
Total (Rs.) 7363.09

197 7/20 PVC copper Wire Nepal, Prakash etc.


sources Level Qty Unit Rate/unit cost Total Cost
3193 labour skilled 1 nos 775.00 775.00
Semi skilled 1.5 nos 645.00 967.50
un skilled 2 nos 600.00 1200.00 2942.50
materials a.Cu wire 100 Rm 50.36 5035.56
b.HDP, hooks 100 LS 9.91 991.00
Transportation 3% 180.80 6207.35
Actual rate 9149.85
Rate per set Rs. 105.22 15% conctractor overhead 1372.48
Total (Rs.) 10522.33

Prepare By:- Ckecked By:- Approved By:-


Page 296 ELECTRICAL_ANALYSIS 2069 Ilam

198 7/18 PVC copper Wire Nepal, Prakash etc.


sources Level Qty Unit Rate/unit cost Total Cost
3194 labour skilled 1 nos 775.00 775.00
Semi skilled 1.5 nos 645.00 967.50
un skilled 2 nos 600.00 1200.00 2942.50
materials a.Cu wire 100 Rm 64.83 6483.33
b.HDP, hooks 100 LS 14.43 1443.00
Transportation 3% 237.79 8164.12
Actual rate 11106.62
Rate per set Rs. 127.73 15% conctractor overhead 1665.99
Total (Rs.) 12772.62

199 7/16 PVC copper Wire Nepal, Prakash etc.


sources Level Qty Unit Rate/unit cost Total Cost
3195 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 3 nos 600.00 1800.00 3865.00
materials a.Cu wire 100 Rm 0.00 0.00
b.HDP, hooks 100 LS 14.43 1443.00
Transportation 3% 43.29 1486.29
Actual rate 5351.29
Rate per set Rs. 61.54 15% conctractor overhead 802.69
Total (Rs.) 6153.98

PVC Copper /Alm Wiring In PVC Listy/PVC conduct Pipe

Surface Wiring

200 1/18 PVC copper Wire Nepal, Prakash etc.


sources Level Qty Unit Rate/unit cost Total Cost
3196 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.75 nos 645.00 483.75
un skilled 1.5 nos 600.00 900.00 1771.25
materials a.Cu wire 100 Rm 12.33 1233.33
b.PVC Listy/Conduit Pipe 100 LS 11.50 1150.00
Transportation 3% 71.50 2454.83
Actual rate 4226.08

Prepare By:- Ckecked By:- Approved By:-


Page 297 ELECTRICAL_ANALYSIS 2069 Ilam

Rate per set Rs. 48.60 15% conctractor overhead 633.91


Total (Rs.) 4860.00

Prepare By:- Ckecked By:- Approved By:-


Page 298 ELECTRICAL_ANALYSIS 2069 Ilam

201 3/22 PVC copper Wire Nepal, Prakash etc.


sources Level Qty Unit Rate/unit cost Total Cost
3197 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.75 nos 645.00 483.75
un skilled 1.5 nos 600.00 900.00 1771.25
materials a.Cu wire 100 Rm 12.59 1258.89
b.PVC Listy/Conduit Pipe 100 LS 11.50 1150.00
Transportation 3% 72.27 2481.16
Actual rate 4252.41
Rate per set Rs. 48.90 15% conctractor overhead 637.86
Total (Rs.) 4890.27

202 3/20 PVC copper Wire Nepal, Prakash etc.


sources Level Qty Unit Rate/unit cost Total Cost
3198 labour skilled 0.5 nos 775.00 387.50
Semi skilled 0.75 nos 645.00 483.75
un skilled 1.5 nos 600.00 900.00 1771.25
materials a.Cu wire 100 Rm 18.89 1888.89
b.PVC Listy/Conduit Pipe 100 LS 11.50 1150.00
Transportation 3% 91.17 3130.06
Actual rate 4901.31
Rate per set Rs. 56.37 15% conctractor overhead 735.20
Total (Rs.) 5636.50

203 7/22 PVC copper Wire Nepal, Prakash etc.


sources Level Qty Unit Rate/unit cost Total Cost
3199 labour skilled 0.75 nos 775.00 581.25
Semi skilled 1.3 nos 645.00 838.50
un skilled 1.5 nos 600.00 900.00 2319.75
materials a.Cu wire 100 Rm 31.48 3147.78
b.PVC Listy/Conduit Pipe 100 LS 15.00 1500.00
Transportation 3% 139.43 4787.21
Actual rate 7106.96
Rate per set Rs. 81.73 15% conctractor overhead 1066.04

Prepare By:- Ckecked By:- Approved By:-


Page 299 ELECTRICAL_ANALYSIS 2069 Ilam

Total (Rs.) 8173.01

Prepare By:- Ckecked By:- Approved By:-


Page 300 ELECTRICAL_ANALYSIS 2069 Ilam

204 7/20 PVC copper Wire Nepal, Prakash etc.


sources Level Qty Unit Rate/unit cost Total Cost
3200 labour skilled 0.75 nos 775.00 581.25
Semi skilled 1.3 nos 645.00 838.50
un skilled 1.5 nos 600.00 900.00 2319.75
materials a.Cu wire 100 Rm 50.36 5035.56
b.PVC Listy/Conduit Pipe 100 Ls 15.00 1500.00
Transportation 3% 196.07 6731.62
Actual rate 9051.37
Rate per set Rs. 104.09 15% conctractor overhead 1357.71
Total (Rs.) 10409.08

205 7/18 PVC copper Wire Nepal, Prakash etc.


sources Level Qty Unit Rate/unit cost Total Cost
3201 labour skilled 0.75 nos 775.00 581.25
Semi skilled 1.3 nos 645.00 838.50
un skilled 1.5 nos 600.00 900.00 2319.75
materials a.Cu wire 100 Rm 64.83 6483.33
b.PVC Listy/Conduit Pipe 100 Ls 18.00 1800.00
Transportation 3% 248.50 8531.83
Actual rate 10851.58
Rate per set Rs. 124.79 15% conctractor overhead 1627.74
Total (Rs.) 12479.32

206 7/16 PVC copper Wire Nepal, Prakash etc.


sources Level Qty Unit Rate/unit cost Total Cost
3202 labour skilled 1 nos 775.00 775.00
Semi skilled 1.5 nos 645.00 967.50
un skilled 2 nos 600.00 1200.00 2942.50
materials a.Cu wire 100 Rm 0.00 0.00
b.PVC Listy/Conduit Pipe 100 Ls 30.50 3050.00
Transportation 3% 91.50 3141.50
Actual rate 6084.00
Rate per set Rs. 69.97 15% conctractor overhead 912.60
Total (Rs.) 6996.60

Prepare By:- Ckecked By:- Approved By:-


Page 301 ELECTRICAL_ANALYSIS 2069 Ilam

Point Wiring in PVC Listy

207 2x3/22 PVC copper Wire Nepal, Prakash etc Light Pt. Med.(15m wire)
sources Level Qty Unit Rate/unit cost Total Cost
3203
Point Wiring inPVCPipe/Listy 1 Pts 733.54 733.54 733.54
Actual rate 733.54
Rate per set Rs. 843.57 15% conctractor overhead 110.03
Total (Rs.) 843.57

208 2x3/22 PVC copper Wire Nepal, Prakash etc Light Pt. Long (18m wire)
sources Level Qty Unit Rate/unit cost Total Cost
3204
Point Wiring inPVCPipe/Listy 1 Pts 880.25 880.25 880.25
Actual rate 880.25
Rate per set Rs. 1012.29 15% conctractor overhead 132.04
Total (Rs.) 1012.29

209 2x3/20 PVC copper Wire Nepal, Prakash etc.Light Pt. (15m wire)
sources Level Qty Unit Rate/unit cost Total Cost
3205 Point Wiring inPVCPipe/Listy 1 Pts 845.48 845.48 845.48
Actual rate 845.48
Rate per set Rs. 972.30 15% conctractor overhead 126.82
Total (Rs.) 972.30

210 2x3/20 PVC copper Wire Nepal, Prakash etc.Light Pt. Long
sources Level Qty Unit Rate/unit cost Total Cost
3206 Point Wiring 1 Pts 1014.57 1014.57 1014.57
Actual rate 1014.57
Rate per set Rs. 1166.76 15% conctractor overhead 152.19

Prepare By:- Ckecked By:- Approved By:-


Page 302 ELECTRICAL_ANALYSIS 2069 Ilam

Total (Rs.) 1166.76

Prepare By:- Ckecked By:- Approved By:-


Page 303 ELECTRICAL_ANALYSIS 2069 Ilam

211 2x7/22 +1x3/22 PVC copper Wire Nepal, Prakash etc. Power Pt.
sources Level Qty Unit Rate/unit cost Total Cost
3207 Point Wiring inPVCPipe/Listy 1 Pts 1687.40 1687.40 1687.40
Actual rate 1687.40
Rate per set Rs. 1940.51 15% conctractor overhead 253.11
Total (Rs.) 1940.51

212 2x7/22 + 1x3/22 PVC copper Wire Nepal, Prakash etc. Power Pt. Long
3208 sources Level Qty Unit Rate/unit cost Total Cost
Point Wiring inPVCPipe/Listy 1 Pts 1899.76 1899.76 1899.76
Actual rate 1899.76
Rate per set Rs. 2184.73 15% conctractor overhead 284.96
Total (Rs.) 2184.73

Power cable copper conductor Armored Nepal, Prakash Cable Or NS

213 4mm2 4 core Nepal, Prakash Or NS


sources Level Qty Unit Rate/unit cost Total Cost
3209 labour skilled 0.75 nos 775.00 581.25
Semi skilled 1.3 nos 645.00 838.50
un skilled 1.2 nos 600.00 720.00 2139.75
materials a.Cu wire 100 Rm 308.55 30855.00
b.Shaddle,Grips,Screws 100 LS 22.00 2200.00
Transportation 3% 991.65
34046.65
Actual rate 36186.40
Rate per set Rs. 416.14 15% conctractor overhead 5427.96
Total (Rs.) 41614.36

Prepare By:- Ckecked By:- Approved By:-


Page 304 ELECTRICAL_ANALYSIS 2069 Ilam

214 6 mm2 4 core Nepal, Prakash Or NS


3210 sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 1 nos 775.00 775.00
Semi skilled 1.5 nos 645.00 967.50
un skilled 2 nos 600.00 1200.00 2942.50
materials a.Cu wire 100 Rm 0.00 0.00
b.Shaddle,Grips,Screws 100 LS 22.00 2200.00
Transportation 3% 66.00
2266.00
Actual rate 5208.50
Rate per set Rs. 0.00 15% conctractor overhead 781.28
Total (Rs.) 5989.78

215 10 mm2 4 core Nepal, Prakash Or NS


sources Level Qty Unit Rate/unit cost Total Cost
3211 labour skilled 1 nos 775.00 775.00
Semi skilled 1.5 nos 645.00 967.50
un skilled 2 nos 600.00 1200.00 2942.50
materials a. Cu wire 100 Rm 623.15 62315.00
b.Shaddle,Grips,Screws 100 LS 22.00 2200.00
Transportation 3% 1935.45
66450.45
Actual rate 69392.95
Rate per set Rs. 798.02 15% conctractor overhead 10408.94
Total (Rs.) 79801.89

216 16 mm2 4 core Nepal, Prakash Or NS


sources Level Qty Unit Rate/unit cost Total Cost
3212 labour skilled 1 nos 775.00 775.00
Semi skilled 1.5 nos 645.00 967.50
un skilled 2 nos 600.00 1200.00 2942.50
materials a.Cu wire 100 Rm 834.90 83490.00
b.Shaddle,Grips,Screws 100 LS 33.00 3300.00
Transportation 3% 2603.70
89393.70
Actual rate 92336.20
Rate per set Rs. 1061.87 15% conctractor overhead 13850.43

Prepare By:- Ckecked By:- Approved By:-


Page 305 ELECTRICAL_ANALYSIS 2069 Ilam

Total (Rs.) 106186.63

Prepare By:- Ckecked By:- Approved By:-


Page 306 ELECTRICAL_ANALYSIS 2069 Ilam

217 25 mm2 4 core Nepal, Prakash Or NS


sources Level Qty Unit Rate/unit cost Total Cost
3213 labour skilled 1 nos 775.00 775.00
Semi skilled 1.5 nos 645.00 967.50
un skilled 2 nos 600.00 1200.00 2942.50
materials a.Cu wire 100 Rm 1355.20 135520.00
b.Shaddle,Grips,Screws 100 LS 33.00 3300.00
Transportation 3% 4164.60
142984.60
Actual rate 145927.10
Rate per set Rs. 1678.16 15% conctractor overhead 21889.07
Total (Rs.) 167816.17

218 35 mm2 4 core Nepal, Prakash Or NS


sources Level Qty Unit Rate/unit cost Total Cost
3214 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 3 nos 600.00 1800.00 3865.00
materials a.Cu wire 100 Rm 1875.50 187550.00
b.Shaddle,Grips,Screws 100 LS 33.00 3300.00
Transportation 3% 5725.50
196575.50
Actual rate 200440.50
Rate per set Rs. 2305.07 15% conctractor overhead 30066.08
Total (Rs.) 230506.58

219 4 mm22 core Nepal, Prakash Or NS


sources Level Qty Unit Rate/unit cost Total Cost
3215 labour skilled 0.75 nos 775.00 581.25
Semi skilled 1.30 nos 645.00 838.50
un skilled 1.20 nos 600.00 720.00 2139.75
materials a.Cu wire 100 Rm 187.55 18755.00
b.Shaddle,Grips,Screws 100 LS 22.00 2200.00
Transportation 3% 628.65
21583.65
Actual rate 23723.40
Rate per set Rs. 272.82 15% conctractor overhead 3558.51

Prepare By:- Ckecked By:- Approved By:-


Page 307 ELECTRICAL_ANALYSIS 2069 Ilam

Total (Rs.) 27281.91

Prepare By:- Ckecked By:- Approved By:-


Page 308 ELECTRICAL_ANALYSIS 2069 Ilam

220 6 mm2 2 core Nepal, Prakash Or NS


sources Level Qty Unit Rate/unit cost Total Cost
3216 labour skilled 1.0 nos 775.00 775.00
Semi skilled 1.5 nos 645.00 967.50
un skilled 2.0 nos 600.00 1200.00 2942.50
materials a.Cu wire 100 Rm 0.00 0.00
b.PVCPipe/Listy 100 LS 22.00 2200.00
Transportation 3% 66.00
2266.00
Actual rate 5208.50
Rate per set Rs. 0.00 15% conctractor overhead 781.28
Total (Rs.) 5989.78

Cable Shoe

221 16 mm2 Cable Shoe


sources Level Qty Unit Rate/unit cost Total Cost
3217 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a.Cable Shoe 1 Rm 20.50 20.50
b.Saddle,Grips, Screws 1 LS 0.00 0.00
Transportation 3% 0.62
21.12
Actual rate 21.12
Rate per set Rs. 24.28 15% conctractor overhead 3.17
Total (Rs.) 24.28

222 25 mm2 Cable Shoe


sources Level Qty Unit Rate/unit cost Total Cost
3218 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a.Cable Shoe 1 Rm 32.50 32.50
b.Saddle,Grips, Screws 1 LS 0.00 0.00
Transportation 3% 0.98
33.48
Actual rate 33.48
Rate per set Rs. 38.50 15% conctractor overhead 5.02

Prepare By:- Ckecked By:- Approved By:-


Page 309 ELECTRICAL_ANALYSIS 2069 Ilam

Total (Rs.) 38.50

Prepare By:- Ckecked By:- Approved By:-


Page 310 ELECTRICAL_ANALYSIS 2069 Ilam

223 35 mm2 Cable Shoe


sources Level Qty Unit Rate/unit cost Total Cost
3219 labour skilled 0 nos 775.00 0.00
Semi skilled 0.00 nos 645.00 0.00
un skilled 0.00 nos 600.00 0.00 0.00
materials a.Cable Shoe 1 Rm 37.50 37.50
b.Saddle,Grips, Screws 1 LS 0.00 0.00
Transportation 3% 1.13
38.63
Actual rate 38.63
Rate per set Rs. 44.42 15% conctractor overhead 5.79
Total (Rs.) 44.42

224 50 mm2 Cable Shoe


sources Level Qty Unit Rate/unit cost Total Cost
3220 labour skilled 0.0 nos 775.00 0.00
Semi skilled 0.0 nos 645.00 0.00
un skilled 0.0 nos 600.00 0.00 0.00
materials a.Cable Shoe 1 Rm 43.00 43.00
b.Saddle,Grips, Screws 1 LS 0.00 0.00
Transportation 3% 1.29
44.29
Actual rate 44.29
Rate per set Rs. 50.93 15% conctractor overhead 6.64
Total (Rs.) 50.93

Power cable copper conductor Un-Armored Nepal, Prakash Cable Or NS

225 4mm2 4 core Nepal, Prakash Or NS


sources Level Qty Unit Rate/unit cost Total Cost
3221 labour skilled 0.75 nos 775.00 581.25
Semi skilled 1.3 nos 645.00 838.50
un skilled 1.2 nos 600.00 720.00 2139.75
materials a.Cu wire 100 Rm 102.00 10200.00
b.Saddle,Grips, Screws 100 LS 22.00 2200.00
Transportation 3% 372.00
12772.00
Actual rate 14911.75
Rate per set Rs. 171.49 15% conctractor overhead 2236.76

Prepare By:- Ckecked By:- Approved By:-


Page 311 ELECTRICAL_ANALYSIS 2069 Ilam

Total (Rs.) 17148.51

Prepare By:- Ckecked By:- Approved By:-


Page 312 ELECTRICAL_ANALYSIS 2069 Ilam

226 6 mm2 4 core Nepal, Prakash Or NS


sources Level Qty Unit Rate/unit cost Total Cost
3222 labour skilled 1 nos 775.00 775.00
Semi skilled 1.5 nos 645.00 967.50
un skilled 2 nos 600.00 1200.00 2942.50
materials a.Cu wire 100 Rm 0.00 0.00
b.PVCPipe/Listy Ls 1700.00
Transportation 3% 51.00
1751.00
Actual rate 4693.50
Rate per set Rs. 0.00 15% conctractor overhead 704.03
Total (Rs.) 5397.53

227 10 mm2 4 core Nepal, Prakash Or NS


sources Level Qty Unit Rate/unit cost Total Cost
3223 labour skilled 1 nos 775.00 775.00
Semi skilled 1.5 nos 645.00 967.50
un skilled 2 nos 600.00 1200.00 2942.50
materials a.Cu wire 100 Rm 160.50 16050.00
b.Saddle,Grips, Screws 100 LS 22.00 2200.00
Transportation 3% 547.50
18797.50
Actual rate 21740.00
Rate per set Rs. 250.01 15% conctractor overhead 3261.00
Total (Rs.) 25001.00

228 16 mm2 4 core Nepal, Prakash Or NS


sources Level Qty Unit Rate/unit cost Total Cost
3224 labour skilled 1 nos 775.00 775.00
Semi skilled 1.5 nos 645.00 967.50
un skilled 2 nos 600.00 1200.00 2942.50
materials a.Cu wire 100 Rm 225.00 22500.00
b.Saddle,Grips, Screws 100 LS 33.00 3300.00
Transportation 3% 774.00
26574.00
Actual rate 29516.50
Rate per set Rs. 339.44 15% conctractor overhead 4427.48

Prepare By:- Ckecked By:- Approved By:-


Page 313 ELECTRICAL_ANALYSIS 2069 Ilam

Total (Rs.) 33943.98

Prepare By:- Ckecked By:- Approved By:-


Page 314 ELECTRICAL_ANALYSIS 2069 Ilam

229 25 mm2 4 core Nepal, Prakash Or NS


sources Level Qty Unit Rate/unit cost Total Cost
3225 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 3 nos 600.00 1800.00 3865.00
materials a.Cu wire 100 Rm 289.00 28900.00
b.Saddle,Grips, Screws 100 LS 33.00 3300.00
Transportation 3% 966.00
33166.00
Actual rate 37031.00
Rate per set Rs. 425.86 15% conctractor overhead 5554.65
Total (Rs.) 42585.65

230 35 mm2 4 core Nepal, Prakash Or NS


sources Level Qty Unit Rate/unit cost Total Cost
3226 labour skilled 1 nos 775.00 775.00
Semi skilled 2 nos 645.00 1290.00
un skilled 3 nos 600.00 1800.00 3865.00
materials a.Cu wire 100 Rm 655.00 65500.00
b.Saddle,Grips, Screws 100 LS 33.00 3300.00
Transportation 3% 1376.00
70176.00
Actual rate 74041.00
Rate per set Rs. 851.47 15% conctractor overhead 11106.15
Total (Rs.) 85147.15

Transformer and Accessories

231 100 KVA Transformer


sources Level Qty Unit Rate/unit cost Total Cost
3227 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a.Transformer 1 Set 211320.50 211320.50
Transportation 3% 6339.62
217660.12
Actual rate 217660.12
Rate per set Rs. 250309.13 15% conctractor overhead 32649.02

Prepare By:- Ckecked By:- Approved By:-


Page 315 ELECTRICAL_ANALYSIS 2069 Ilam

Total (Rs.) 250309.13

Prepare By:- Ckecked By:- Approved By:-


Page 316 ELECTRICAL_ANALYSIS 2069 Ilam

232 150 KVA Transformer


sources Level Qty Unit Rate/unit cost Total Cost
3228 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a.Transformer 1 Set 299600.00 299600.00
Transportation 3% 8988.00
308588.00
Actual rate 308588.00
Rate per set Rs. 354876.20 15% conctractor overhead 46288.20
Total (Rs.) 354876.20

233 200 KVA Transformer


sources Level Qty Unit Rate/unit cost Total Cost
3229 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a.Transformer 1 Set 417300.00 417300.00
Transportation 3% 12519.00
429819.00
Actual rate 429819.00
Rate per set Rs. 494291.85 15% conctractor overhead 64472.85
Total (Rs.) 494291.85

234 250 KVA Transformer


sources Level Qty Unit Rate/unit cost Total Cost
3230 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a.Transformer 1 Set No Rate #VALUE!
Transportation 3% #VALUE!
#VALUE!
Actual rate #VALUE!
Rate per set Rs. #VALUE! 15% conctractor overhead #VALUE!
Total (Rs.) #VALUE!

Prepare By:- Ckecked By:- Approved By:-


Page 317 ELECTRICAL_ANALYSIS 2069 Ilam

235 350 KVA Transformer


sources Level Qty Unit Rate/unit cost Total Cost
3231 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a.Transformer 1 Set No Rate #VALUE!
Transportation 3% #VALUE!
#VALUE!
Actual rate #VALUE!
Rate per set Rs. #VALUE! 15% conctractor overhead #VALUE!
Total (Rs.) #VALUE!

236 400 KVA Transformer


sources Level Qty Unit Rate/unit cost Total Cost
3232 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a.Transformer 1 Set No Rate #VALUE!
Transportation 3% #VALUE!
#VALUE!
Actual rate #VALUE!
Rate per set Rs. #VALUE! 15% conctractor overhead #VALUE!
Total (Rs.) #VALUE!

237 500 KVA Transformer


sources Level Qty Unit Rate/unit cost Total Cost
3233 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a.Transformer 1 Set No Rate #VALUE!
Transportation 3% #VALUE!
#VALUE!
Actual rate #VALUE!
Rate per set Rs. #VALUE! 15% conctractor overhead #VALUE!
Total (Rs.) #VALUE!

Prepare By:- Ckecked By:- Approved By:-


Page 318 ELECTRICAL_ANALYSIS 2069 Ilam

238 Out Door Type Cable Head


sources Level Qty Unit Rate/unit cost Total Cost
3234 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a.Cable Head 1 Set 1926.00 1926.00
Transportation 3% 57.78
1983.78
Actual rate 1983.78
Rate per set Rs. 22.81 15% conctractor overhead 297.57
Total (Rs.) 2281.35

239 11 KVA Drop Out Fuse


sources Level Qty Unit Rate/unit cost Total Cost
3235 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a.Fuse 1 Rm 18404.00 18404.00
Transportation 3% 552.12
18956.12
Actual rate 18956.12
Rate per set Rs. 21799.54 15% conctractor overhead 2843.42
Total (Rs.) 21799.54

240 Lightning Arrester


sources Level Qty Unit Rate/unit cost Total Cost
3236 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a.Arester 1 Set 14980.00 14980.00
Transportation 3% 449.40
15429.40
Actual rate 15429.40
Rate per set Rs. 17743.81 15% conctractor overhead 2314.41
Total (Rs.) 17743.81

Prepare By:- Ckecked By:- Approved By:-


Page 319 ELECTRICAL_ANALYSIS 2069 Ilam

241 Earthing Set


sources Level Qty Unit Rate/unit cost Total Cost
3237 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a.Cu wire,Plate andAcc 1 Set 2033.00 2033.00
Transportation 3% 60.99
2093.99
Actual rate 2093.99
Rate per set Rs. 2408.09 15% conctractor overhead 314.10
Total (Rs.) 2408.09

242 Pin Insulator


sources Level Qty Unit Rate/unit cost Total Cost
3238 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a.Insulator 1 Set 267.50 267.50
Transportation 3% 8.03
275.53
Actual rate 275.53
Rate per set Rs. 316.85 15% conctractor overhead 41.33
Total (Rs.) 316.85

243 35 mm2 Cable Socket Transfor Tower Set With Clamp Nuts Bolts
sources Level Qty Unit Rate/unit cost Total Cost
3239 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a.Cable Socket 1 Rm No Rate #VALUE!
Transportation 3% #VALUE!
#VALUE!
Actual rate #VALUE!
Rate per set Rs. #VALUE! 15% conctractor overhead #VALUE!
Total (Rs.) #VALUE!

Prepare By:- Ckecked By:- Approved By:-


Page 320 ELECTRICAL_ANALYSIS 2069 Ilam

244 H.T. Tape


sources Level Qty Unit Rate/unit cost Total Cost
3240 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a.H.T Tape 1 Roll No Rate #VALUE!
Transportation 3% #VALUE!
#VALUE!
Actual rate #VALUE!
Rate per set Rs. #VALUE! 15% conctractor overhead #VALUE!
Total (Rs.) #VALUE!

245 3 Core AL/XL Cable 35 Sq mm


sources Level Qty Unit Rate/unit cost Total Cost
3241 labour skilled 0 nos 775.00 0.00
Semi skilled 0 nos 645.00 0.00
un skilled 0 nos 600.00 0.00 0.00
materials a.Cable 1 Rm 1123.50 1123.50
Transportation 3% 33.71
1157.21
Actual rate 1157.21
Rate per set Rs. 1330.79 15% conctractor overhead 173.58
Total (Rs.) 1330.79

Prepare By:- Ckecked By:- Approved By:-


Page 321 ELECTRICAL_ANALYSIS 2069 Ilam

The End

Prepare By:- Ckecked By:- Approved By:-


Page 322 ELECTRICAL_ANALYSIS 2069 Ilam

Prepare By:- Ckecked By:- Approved By:-


Page 323 ELECTRICAL_ANALYSIS 2069 Ilam

Prepare By:- Ckecked By:- Approved By:-


Page 324 ELECTRICAL_ANALYSIS 2069 Ilam

Prepare By:- Ckecked By:- Approved By:-


Page 325 ELECTRICAL_ANALYSIS 2069 Ilam

84 16 Amp 415 Volt DP Main Switch S


3080 sources Level Qty Unit Rate/unit cost
labour skilled 0.5 nos 235.00 117.50
Semi skilled 1 nos 210.00 210.00
un skilled 0 nos 600.00 0.00
materials a. Switch 10 nos 740.00 7400.00
c. CM, Screws, Grips etc. LS 460.00
Transportation 2% #REF!
Actual rate
Rate per set Rs. #REF! 15% conctractor overhead
Total (Rs.)

Prepare By:- Ckecked By:- Approved By:-


Page 326 ELECTRICAL_ANALYSIS 2069 Ilam

Prepare By:- Ckecked By:- Approved By:-


Page 327 ELECTRICAL_ANALYSIS 2069 Ilam

Prepare By:- Ckecked By:- Approved By:-


Page 328 ELECTRICAL_ANALYSIS 2069 Ilam

Prepare By:- Ckecked By:- Approved By:-


Page 329 ELECTRICAL_ANALYSIS 2069 Ilam

Prepare By:- Ckecked By:- Approved By:-


Page 330 ELECTRICAL_ANALYSIS 2069 Ilam

Prepare By:- Ckecked By:- Approved By:-


Page 331 ELECTRICAL_ANALYSIS 2069 Ilam

Prepare By:- Ckecked By:- Approved By:-


Page 332 ELECTRICAL_ANALYSIS 2069 Ilam

Prepare By:- Ckecked By:- Approved By:-


Page 333 ELECTRICAL_ANALYSIS 2069 Ilam

54
966
1878
1932
9180
4590
918
1915
1000
17603

Prepare By:- Ckecked By:- Approved By:-


Page 334 ELECTRICAL_ANALYSIS 2069 Ilam

Prepare By:- Ckecked By:- Approved By:-


Page 335 ELECTRICAL_ANALYSIS 2069 Ilam

Prepare By:- Ckecked By:- Approved By:-


Page 336 ELECTRICAL_ANALYSIS 2069 Ilam

Total Cost

327.50

#REF!
#REF!
#REF!
#REF!

Prepare By:- Ckecked By:- Approved By:-


Designation (mm2)
AWG Sq mm 1 2 3 4 7
18 0.82 0.82 1.64 2.46 3.28 5.74
20 0.52 0.52 1.04 1.56 2.08 3.64
22 0.33 0.33 0.66 0.99 1.32 2.31

eqvalent
cable size
2x3/20 = 3.12 Sqmm 3 Sqmm
1x1/18 = 0.82 Sqmm 0.5 Sqmm
2x7/22 = 4.62 Sqmm 4 Sqmm
1x3/22 = 0.99 Sqmm 1 Sqmm
2x7/18 = 11.48 Sqmm 10 sqmm
24440
18460
Page 339 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


Dyna / CPL or equivalent Switch & Socket

42 1 Gang 1 one way Switch S


sources Code Level Qty Unit Rate/unit cost Total Cost
3038 labour 1.08 skilled 0.5 nos 835.00 417.50
1.09 Semi skilled 1 nos 660.00 660.00
1.03 un skilled 0 nos 615.00 0.00 1077.50
materials 15.62.01 a. Switch 10 nos 193.00 1930.00
15.57.01 b.PVC/Metal Box (4"x4") 10 nos 20.57 205.70
c. CM, Screws, Grips etc. 10 LS 30.00 300.00
2435.70
Actual rate 3513.20
Rate per set Rs. 382.98 13% Vat 316.64
Total (Rs.) 3829.84

44 2Gang 2 one way Switch S


sources Code Level Qty Unit Rate/unit cost Total Cost
3040 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.03 un skilled 0 nos 600.00 0.00 1032.50
materials 15.62.02 a. Switch 10 nos 272.25 2722.50
15.57.01 15.57.01 b.PVC/Metal Box (4"x4") 10 nos 20.57 205.70
c. CM, Screws, Grips etc. 10 LS 30.00 300.00
3228.20
Actual rate 4260.70
Rate per set Rs. 468.03 13% Vat 419.67
Total (Rs.) 4680.37

48 4 Gang 4 one way Switch S


sources Code Level Qty Unit Rate/unit cost Total Cost
3044 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 1 nos 645.00 645.00
1.03 un skilled 0 nos 600.00 0.00 1032.50
materials 15.62.04 a. Switch 10 nos 332.75 3327.50
15.57.01 b.PVC/Metal Box (4"x4") 10 nos 20.57 205.70
c. CM, Screws, Grips etc. 10 LS 30.00 300.00
3833.20
Actual rate 4865.70
Rate per set Rs. 536.40 13% Vat 498.32
Total (Rs.) 5364.02

50 6 Gang 6 one way Switch S


sources Code Level Qty Unit Rate/unit cost Total Cost
3046 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 2 nos 645.00 1290.00
1.03 un skilled 0 nos 600.00 0.00 2065.00
materials 15.62.06 a. Switch 10 nos 665.50 6655.00
15.57.01 b..PVC/Metal Box (4"x6") 10 nos 37.51 375.10
c. CM, Screws, Grips etc. 10 LS 30.00 300.00
7330.10
Actual rate 9395.10
Page 340 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


Rate per set Rs. 1034.80 13% Vat 952.91
Total (Rs.) 10348.01

70 Angle/ Batten Holder


sources Code Level Qty Unit Rate/unit cost Total Cost
3066 labour 1.08 skilled 0.25 nos 775.00 193.75
1.09 Semi skilled 0.25 nos 645.00 161.25
1.03 un skilled 0 nos 600.00 0.00 355.00
materials a. Holder 10 nos 27.83 278.30
b. CM, Screws, Grips etc. LS 30.00 300.00
578.30
Actual rate 933.30
Rate per set Rs. 100.84 13 % Vat 75.18
Total (Rs.) 1008.48

70 LED Bulb 15 watt


sources Code Level Qty Unit Rate/unit cost Total Cost
3066 labour 1.08 skilled 0.25 nos 775.00 193.75
1.09 Semi skilled 0.25 nos 645.00 161.25
1.03 un skilled 0 nos 600.00 0.00 355.00
materials a. Holder 10 nos 27.83 278.30
b. LED Bulb 10 nos 266.20 2662.00
c. CM, Screws, Grips etc. LS 30.00 300.00
3240.30
Actual rate 3595.30
Rate per set Rs. 401.65 13 % Vat 421.24
Total (Rs.) 4016.54

71 Ceiling Rose
sources Code Level Qty Unit Rate/unit cost Total Cost
3067 labour 1.08 skilled 0.25 nos 775.00 193.75
1.09 Semi skilled 0.25 nos 645.00 161.25
1.03 un skilled 0 nos 600.00 0.00 355.00
materials a. Ceiling rose 10 nos 27.83 278.30
b. CM, Screws, Grips etc. LS 30.00 300.00
578.30
Actual rate 933.30
Rate per set Rs. 100.84 13 % Vat 75.18
Total (Rs.) 1008.48

79 5-15 Amp Power Socket


sources Code Level Qty Unit Rate/unit cost Total Cost
3075 labour 1.08 skilled 1 nos 775.00 775.00
1.09 Semi skilled 2 nos 645.00 1290.00
1.03 un skilled 0 nos 600.00 0.00 2065.00
materials a. Switch 10 nos 320.65 3206.50
b.PVC /M Box 10 nos 37.51 375.10
c. CM, Screws, Grips etc. 10 LS 25.00 250.00
3831.60
Actual rate 5896.60
Rate per set Rs. 639.47 13% Vat 498.11
Page 341 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


Total (Rs.) 6394.71

MCB Geco ISI or equivalent


142 6-32 Amp SP MCB
sources Code Level Qty Unit Rate/unit cost Total Cost
3138 labour 1.08 skilled 0 nos 775.00 0.00
1.09 Semi skilled 0 nos 645.00 0.00
1.10 un skilled 0 nos 600.00 0.00 0.00
materials a. M.C.B 10 nos 166.38 1663.75
b. CM, Screws, Grips etc. LS 0.00
1663.75
Actual rate 1663.75
Rate per set Rs. 188.00 13% vat 216.29
Total (Rs.) 1880.04

Distribution Board DB.Geco ISIor equivalent of Nepal.

150 4 Way SPN DB Double Cover


sources Code Level Qty Unit Rate/unit cost Total Cost
3146 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.75 nos 645.00 483.75
1.10 un skilled 0 nos 600.00 0.00 871.25
materials a. Cover 1 nos 1197.90 1197.90
b. CM, Screws, Grips etc. LS 0.00
1197.90
Actual rate 2069.15
Rate per set Rs. 2224.88 13% Vat 155.73
Total (Rs.) 2224.88
Fan: Almonard/Bajaj or equivalent.

161 36" Ceiling Fan


sources Code Level Qty Unit Rate/unit cost Total Cost
3157 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.5 nos 645.00 322.50
1.10 un skilled 0 nos 600.00 0.00 710.00
materials a. Fan 1 nos 3025.00 3025.00
b. Iron clamps LS 0.00
c. Ceiling rose 1 nos 27.83 26.00
d. CM, Screws, Grips etc. LS 0.00
3051.00
Actual rate 3761.00
Rate per set Rs. 4157.63 13% vat 396.63
Total (Rs.) 4157.63
Multistrand Flexible wire( 1 coil=90.00Meter)
Surface Wiring
201 1.50 mm2 PVC insulated copper wire
sources Code Level Qty Unit Rate/unit cost Total Cost
3201 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.75 nos 645.00 483.75
Page 342 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


1.10 un skilled 1.5 nos 600.00 900.00 1771.25
materials MM2 a.Cu wire 100 Rm 22.79 2278.83
b.PVC Listy/Conduit Pipe 100 LS 11.50 1150.00
3428.83
Actual rate 5200.08
Rate per Rm Rs. 52.00
Total (Rs.) 5200.08

Surface Wiring
201 2.50 mm2 PVC insulated copper wire
sources Code Level Qty Unit Rate/unit cost Total Cost
3201 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.75 nos 645.00 483.75
1.10 un skilled 1.5 nos 600.00 900.00 1771.25
materials MM3 a.Cu wire 100 Rm 39.50 3949.98
b.PVC Listy/Conduit Pipe 100 LS 11.50 1150.00
5099.98
Actual rate 6871.23
Rate per Rm Rs. 68.71
Total (Rs.) 6871.23
Surface Wiring
201 1 mm2 PVC insulated copper wire
sources Code Level Qty Unit Rate/unit cost Total Cost
3201 labour 1.08 skilled 0.5 nos 775.00 387.50
1.09 Semi skilled 0.75 nos 645.00 483.75
1.10 un skilled 1.5 nos 600.00 900.00 1771.25
materials MM1 a.Cu wire 100 Rm 16.68 1667.88
b.PVC Listy/Conduit Pipe 100 LS 11.50 1150.00
2817.88
Actual rate 4589.13
Rate per Rm Rs. 45.89
Total (Rs.) 4589.13

2 x2.5 mm. +1 x 1 mm. PVC cu. Wire for fan pointand power socket 1/2" hdp polythine pipe
3151
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.0075 nos 775.00 5.81
Semi skilled 0.013 nos 645.00 8.39
un skilled 0.012 nos 600.00 7.20 21.40
materials a.Cu wire 2.5 mm. 10 Rm 34.96 349.56
b.Cu wire 1 mm. 5 Rm 14.76 73.80
b.HDP 16 mm dia, hooks & Laying 5 Rm 40.00 200.00
623.36
Actual rate 644.75
Rate per set Rs. 725.79 13% Vat 81.04
Total (Rs.) 725.79

3151 2x1.5 mm. PVC cu. Wire for light point 1/2" hdp polythine pipe

sources Level Qty Unit Rate/unit cost Total Cost


labour skilled 0.0075 nos 775.00 5.81
Semi skilled 0.013 nos 645.00 8.39
un skilled 0.012 nos 600.00 7.20 21.40
Page 343 of 343

इटहरी उपमहानगरपालिका २०७८/७९ विद्युत दर विश्लेषण


materials a.Cu wire 1.5 .mm. 10 Rm 14.76 147.60
b.HDP 16 mm dia, hooks & Laying 5 Rm 40.00 200.00
347.60
Actual rate 369.00
Rate per set Rs. 414.19 13% Vat 45.19
Total (Rs.) 414.19

The End