Max Max Sec 1 Omda

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

REINFORCED CONCRETE I

TANTA UNIVERSITY
2 nd Year Structures
FACULTY OF ENGINEERING
First Semester

Max Max straining action


Presented by
Eng. Mohamed Elithy Eng. Emad El-Din Ogail

Eng. Abd El-aziz Nabil Eng. Mohamed hindawy

Eng. Mohamed hesham Mowafy Eng. Osama Ibrahim hegab


Span (bc)
Example Solution steps
• Draw max-max straining actions
𝑮 = 𝟓𝟎𝑲𝑵 𝑮 = 𝟒𝟎𝑲𝑵
Uniform load Concentrated load 1 – Ultimate and minimum loads
𝑷 = 𝟏𝟎𝑲𝑵 𝑷 = 𝟐𝟎𝑲𝑵 𝒖𝒍𝒕𝒊𝒎𝒂𝒕𝒆 𝒖𝒍𝒕𝒊𝒎𝒂𝒕𝒆 𝑳. 𝑳
≤ 𝟎. 𝟕𝟓
𝒈 = 𝟐𝟎 𝑲𝑵/𝒎 𝒑 𝟐𝟎 𝑷 𝟏𝟎 𝑫. 𝑳
𝒈 = 𝟐𝟎 𝑲𝑵/𝒎 𝒈 = 𝟒𝟎 𝑲𝑵/𝒎 = = 𝟎. 𝟓𝟎 ≤ 𝟎. 𝟕𝟓 = = 𝟎. 𝟐𝟎 ≤ 𝟎. 𝟕𝟓
𝒑 = 𝟏𝟎 𝑲𝑵/𝒎 𝑮 𝟓𝟎 𝑼 = 𝟏. 𝟓𝟎 (𝑫. 𝑳 + 𝑳. 𝑳)
𝒑 = 𝟐𝟎 𝑲𝑵/𝒎 𝒈 𝟒𝟎
𝑾𝒖 = 𝟏. 𝟓𝟎(𝒈 + 𝒑) 𝑷𝒖 = 𝟏. 𝟓𝟎(𝑷 + 𝑮) 𝑳. 𝑳
𝒂 𝒃 𝒄 𝒅 Ultimate > 𝟎. 𝟕𝟓
𝟐. 𝟎𝟎 𝒎 𝟑. 𝟎𝟎 𝒎 𝟑. 𝟎𝟎 𝒎 𝟐. 𝟎𝟎 𝒎 𝑷𝒖 = 𝟏. 𝟓𝟎 𝟓𝟎 + 𝟏𝟎 = 𝟗𝟎 𝑲𝑵 𝑫. 𝑳
𝑾𝒖 = 𝟏. 𝟓𝟎 𝟒𝟎 + 𝟐𝟎 = 𝟗𝟎 𝑲𝑵/𝒎∖
𝑼 = 𝟏. 𝟒𝟎𝑫. 𝑳 + 𝟏. 𝟔𝟎𝑳. 𝑳
Solution 𝒎𝒊𝒏𝒊𝒎𝒖𝒎
𝒎𝒊𝒏𝒊𝒎𝒖𝒎
1- Ultimate & min Loads 𝑾𝒎𝒊𝒏 = 𝟎. 𝟗𝟎 × 𝒈 𝑷𝒎𝒊𝒏 = 𝟎. 𝟗𝟎 × 𝑮 𝑳. 𝑳 = 𝒛𝒆𝒓𝒐
𝑷𝒎𝒊𝒏 = 𝟎. 𝟗𝟎 × 𝟓𝟎 = 𝟒𝟓𝑲𝑵 𝑼 = 𝟏. 𝟒𝟎 × 𝑫. 𝒍
‫نقسم المسألة أجزاء ونشتغل كل جزء لوحده‬ 𝑾𝒎𝒊𝒏 = 𝟎. 𝟗𝟎 × 𝟒𝟎 = 𝟑𝟔𝑲𝑵/𝒎∖

Span (ab) Span (cd) 𝑴𝒊𝒏 𝒍𝒐𝒂𝒅 = 𝟎. 𝟗𝟎 𝑫. 𝒍


2 – For Max. Max. B.M.D
𝒖𝒍𝒕𝒊𝒎𝒂𝒕𝒆
𝒑 = 𝒛𝒆𝒓𝒐 Uniform load Concentrated load • Cases of loadings for B.M.D
𝒖𝒍𝒕𝒊𝒎𝒂𝒕𝒆 𝒖𝒍𝒕𝒊𝒎𝒂𝒕𝒆
𝑾𝒖 = 𝟏. 𝟒𝟎 × 𝒈 • B.M.D for each case
𝒑 𝟏𝟎 𝑷 𝟐𝟎
= = 𝟎. 𝟓𝟎 ≤ 𝟎. 𝟕𝟓 = = 𝟎. 𝟓𝟎 ≤ 𝟎. 𝟕𝟓
𝑾𝒖 = 𝟏. 𝟒𝟎 × 𝟐𝟎 = 𝟐𝟖𝑲𝑵/𝒎∖ 𝒈 𝟐𝟎 𝑮 𝟒𝟎 • ‫التجميـــــع على رسمة واحدة‬
𝒎𝒊𝒏𝒊𝒎𝒖𝒎 𝑾𝒖 = 𝟏. 𝟓𝟎(𝒈 + 𝒑) ∴ 𝑷𝒖 = 𝟏. 𝟓𝟎(𝑷 + 𝑮) 3 – For Max. Max. S.F.D
𝑾𝒖 = 𝟏. 𝟓𝟎 𝟐𝟎 + 𝟏𝟎 = 𝟒𝟓𝑲𝑵/𝒎∖ ∴ 𝑷𝒖 = 𝟏. 𝟓𝟎 𝟒𝟎 + 𝟐𝟎 = 𝟗𝟎 𝑲𝑵 • Cases of loadings for S.F.D
𝑾𝒎𝒊𝒏 = 𝟎. 𝟗𝟎 × 𝒈
𝒎𝒊𝒏𝒊𝒎𝒖𝒎 𝒎𝒊𝒏𝒊𝒎𝒖𝒎
• S.F.D for each case
𝑾𝒎𝒊𝒏 = 𝟎. 𝟗𝟎 × 𝟐𝟎 = 𝟏𝟖 𝑲𝑵/𝒎∖ 𝑾𝒎𝒊𝒏 = 𝟎. 𝟗𝟎 × 𝒈 𝑷𝒎𝒊𝒏 = 𝟎. 𝟗𝟎 × 𝑮
𝑷𝒎𝒊𝒏 = 𝟎. 𝟗𝟎 × 𝟒𝟎 = 𝟑𝟔𝑲𝑵 • ‫التجميـــــع على رسمة واحدة‬
𝑾𝒎𝒊𝒏 = 𝟎. 𝟗𝟎 × 𝟐𝟎 = 𝟏𝟖 𝑲𝑵/𝒎∖
Example • B.M.D for each case
Solution steps
• Draw max-max straining actions
𝑮 = 𝟓𝟎𝑲𝑵 𝑮 = 𝟒𝟎𝑲𝑵 𝑪𝒂𝒔𝒆 𝟏 𝑪𝒂𝒔𝒆 2
1 – Ultimate and minimum loads
𝑷 = 𝟏𝟎𝑲𝑵 𝑷 = 𝟐𝟎𝑲𝑵 𝟗𝟎 𝟗𝟎 𝑳. 𝑳
𝟑𝟔 𝟒𝟓
≤ 𝟎. 𝟕𝟓
𝒈 = 𝟐𝟎 𝑲𝑵/𝒎 𝟏𝟖 𝟗𝟎 𝟏𝟖 𝟐𝟖 𝟑𝟔 𝟒𝟓 𝑫. 𝑳
𝒈 = 𝟐𝟎 𝑲𝑵/𝒎 𝒈 = 𝟒𝟎 𝑲𝑵/𝒎
𝒑 = 𝟏𝟎 𝑲𝑵/𝒎 𝑼 = 𝟏. 𝟓𝟎 (𝑫. 𝑳 + 𝑳. 𝑳)
𝒑 = 𝟐𝟎 𝑲𝑵/𝒎
𝟐. 𝟎 𝟑. 𝟎 𝟑. 𝟎 𝟐. 𝟎 𝟐. 𝟎 𝟑. 𝟎 𝟑. 𝟎 𝟐. 𝟎 𝑳. 𝑳
𝒂 𝒃 𝒄 𝒅 Ultimate > 𝟎. 𝟕𝟓
𝟐. 𝟎𝟎 𝒎 𝟑. 𝟎𝟎 𝒎 𝟑. 𝟎𝟎 𝒎 𝟐. 𝟎𝟎 𝒎
−𝒗𝒆
𝑴𝟏 = 𝟏𝟎𝟖 𝟐𝟕𝟎 𝑫. 𝑳
𝑴𝟐 −𝒗𝒆= 𝟑𝟔 𝟕𝟐 𝟓𝟔
𝑼 = 𝟏. 𝟒𝟎𝑫. 𝑳 + 𝟏. 𝟔𝟎𝑳. 𝑳
Final loads
𝑷𝒖 = 𝟗𝟎 𝑷𝒖 = 𝟗𝟎
𝑷𝒎𝒊𝒏 = 𝟒𝟓 𝑳. 𝑳 = 𝒛𝒆𝒓𝒐
𝑷𝒎𝒊𝒏 = 𝟑𝟔
𝒘𝒍𝟐 𝑷𝑳 𝑼 = 𝟏. 𝟒𝟎 × 𝑫. 𝒍
+
𝑾𝒖 = 𝟐𝟖 𝑾𝒖 = 𝟗𝟎 𝑾𝒖 = 𝟒𝟓 𝑴+𝒗𝒆= 𝟒𝟔𝟖 𝟖 𝟒
𝟔𝟔. 𝟓𝟎
𝑾𝒎𝒊𝒏 = 𝟏𝟖 𝑾𝒎𝒊𝒏 = 𝟑𝟔 𝑾𝒎𝒊𝒏 = 𝟏𝟖 𝟐 𝑴𝒊𝒏 𝒍𝒐𝒂𝒅 = 𝟎. 𝟗𝟎 𝑫. 𝒍
𝑴𝟏 −𝒗𝒆 = (𝟑𝟔 × 𝟐) + 𝟏𝟖 × 𝟐 = 𝟏𝟎𝟖𝒌𝑵. 𝒎
𝒂 𝒃 𝒄 𝒅 𝟐 2 – For Max. Max. B.M.D
𝟐
𝑴𝟐 −𝒗𝒆 = 𝟏𝟖 × 𝟐 = 𝟑𝟔 𝒌𝑵. 𝒎
2 – For Max. Max. B.M.D 𝟐 • Cases of loadings for B.M.D
𝟐
𝑴+𝒗𝒆= 𝟗𝟎 × 𝟔 + 𝟗𝟎 × 𝟔 −𝟕𝟐
• Cases of loadings for B.M.D 𝟖 𝟒
= 𝟒𝟔𝟖 𝒌𝑵. 𝒎
• B.M.D for each case
‫حاالت تحميل العزوم فى المنشات المحددة استاتيكيا‬ ‫التجميـــــع على رسمة واحدة‬
• ‫التجميـــــع على رسمة واحدة‬
‫ والعكس‬min ‫ والكوابيل‬Ult ‫يتم تحميل الباكية‬
𝟐𝟕𝟎 3 – For Max. Max. S.F.D
𝟓𝟔
𝒎𝒊𝒏 𝑼𝒍𝒕 𝒎𝒊𝒏
𝑪𝒂𝒔𝒆 𝟏 𝟑𝟔 𝟏𝟎𝟖 • Cases of loadings for S.F.D
𝑴𝒂𝒙 𝑴𝒂𝒙
𝟔𝟔. 𝟓𝟎 𝑩. 𝑴. 𝑫 • S.F.D for each case
𝑼𝒍𝒕 𝒎𝒊𝒏 𝑼𝒍𝒕
𝑪𝒂𝒔𝒆 2 𝟒𝟔𝟖 • ‫التجميـــــع على رسمة واحدة‬
) ‫حاالت تحميل القص فى جميع الكمرات ( محددة استاتيكيا – وغير محددة استاتيكيا‬
Example ) ‫ عدد حاالت التحميل = عدد الركائز ( كل ركيزة لها حالة تحميل‬- Solution steps
• Draw max-max straining actions ‫ وهكذا‬min ‫ ثم‬ult ‫ ثم‬min ‫ ثم‬ult ‫ للحصول على أكبر قص عند ركيزة يتم تحميل يمين ويسار الركيزة‬-
𝑮 = 𝟓𝟎𝑲𝑵 𝑮 = 𝟒𝟎𝑲𝑵
1 – Ultimate and minimum loads
𝑷 = 𝟏𝟎𝑲𝑵 𝑷 = 𝟐𝟎𝑲𝑵 • S.F.D for each case 𝑳. 𝑳
≤ 𝟎. 𝟕𝟓
𝒈 = 𝟐𝟎 𝑲𝑵/𝒎 𝑫. 𝑳
𝒈 = 𝟐𝟎 𝑲𝑵/𝒎 𝒈 = 𝟒𝟎 𝑲𝑵/𝒎 𝑪𝒂𝒔𝒆 𝟏
𝒑 = 𝟏𝟎 𝑲𝑵/𝒎 𝑪𝒂𝒔𝒆 2 𝑼 = 𝟏. 𝟓𝟎 (𝑫. 𝑳 + 𝑳. 𝑳)
𝒑 = 𝟐𝟎 𝑲𝑵/𝒎 𝟓𝟔 𝟑𝟔
𝟗𝟎 𝟑𝟔
𝑳. 𝑳
𝒂 𝒃 𝒄 𝒅 𝟗𝟎 Ultimate > 𝟎. 𝟕𝟓
𝟐𝟖 𝟏𝟖 𝑫. 𝑳
𝟐. 𝟎𝟎 𝒎 𝟑. 𝟎𝟎 𝒎 𝟑. 𝟎𝟎 𝒎 𝟐. 𝟎𝟎 𝒎
𝑼 = 𝟏. 𝟒𝟎𝑫. 𝑳 + 𝟏. 𝟔𝟎𝑳. 𝑳
Final loads 𝟐. 𝟎 𝟑. 𝟎 𝟑. 𝟎 𝟐. 𝟎
𝑷𝒖 = 𝟗𝟎 𝑷𝒖 = 𝟗𝟎 𝟕𝟐
𝑷𝒎𝒊𝒏 = 𝟒𝟓 𝟑𝟎𝟔. 𝟑𝟑 𝑳. 𝑳 = 𝒛𝒆𝒓𝒐
𝑷𝒎𝒊𝒏 = 𝟑𝟔 𝟑𝟔. 𝟑𝟑 𝟑𝟔
𝑼 = 𝟏. 𝟒𝟎 × 𝑫. 𝒍
𝑾𝒖 = 𝟐𝟖 𝑾𝒖 = 𝟗𝟎 𝑾𝒖 = 𝟒𝟓
𝑾𝒎𝒊𝒏 = 𝟏𝟖 𝑾𝒎𝒊𝒏 = 𝟑𝟔 𝑾𝒎𝒊𝒏 = 𝟏𝟖 𝑴𝒊𝒏 𝒍𝒐𝒂𝒅 = 𝟎. 𝟗𝟎 𝑫. 𝒍
𝟓𝟑. 𝟔𝟕
𝒂 𝒃 𝒄 𝒅 𝟓𝟔 𝟑𝟐𝟑. 𝟔𝟕 2 – For Max. Max. B.M.D
𝟓𝟔 𝟗𝟎
3 – For Max. Max. S.F.D 𝟏𝟎𝟖 • Cases of loadings for B.M.D
𝟗𝟎
• Cases of loadings for S.F.D
• B.M.D for each case
𝟑. 𝟎 𝟑. 𝟎
𝑼𝒍𝒕 𝑼𝒍𝒕 𝒎𝒊𝒏 • ‫التجميـــــع على رسمة واحدة‬
𝟗𝟎 × 𝟔 𝟗𝟎 𝟗𝟎 × 𝟔 𝟗𝟎
𝑪𝒂𝒔𝒆 𝟏 𝟐
+
𝟐 𝟐
+
𝟐
3 – For Max. Max. S.F.D
𝟓𝟐 𝟓𝟐
𝑼𝒍𝒕 𝑼𝒍𝒕 𝟔 𝟔 • Cases of loadings for S.F.D
𝒎𝒊𝒏
𝑪𝒂𝒔𝒆 2 𝟑𝟎𝟔. 𝟑𝟑 𝟑𝟐𝟑. 𝟔𝟕 • S.F.D for each case

• ‫التجميـــــع على رسمة واحدة‬


) ‫حاالت تحميل القص فى جميع الكمرات ( محددة استاتيكيا – وغير محددة استاتيكيا‬
Example ) ‫ عدد حاالت التحميل = عدد الركائز ( كل ركيزة لها حالة تحميل‬- Solution steps
• Draw max-max straining actions ‫ وهكذا‬min ‫ ثم‬ult ‫ ثم‬min ‫ ثم‬ult ‫ للحصول على أكبر قص عند ركيزة يتم تحميل يمين ويسار الركيزة‬-
𝑮 = 𝟓𝟎𝑲𝑵 𝑮 = 𝟒𝟎𝑲𝑵
1 – Ultimate and minimum loads
𝑷 = 𝟏𝟎𝑲𝑵 𝑷 = 𝟐𝟎𝑲𝑵 • S.F.D for each case 𝑳. 𝑳
≤ 𝟎. 𝟕𝟓
𝒈 = 𝟐𝟎 𝑲𝑵/𝒎 𝑫. 𝑳
𝒈 = 𝟐𝟎 𝑲𝑵/𝒎 𝒈 = 𝟒𝟎 𝑲𝑵/𝒎 𝑪𝒂𝒔𝒆 𝟏
𝒑 = 𝟏𝟎 𝑲𝑵/𝒎 𝑪𝒂𝒔𝒆 2 𝑼 = 𝟏. 𝟓𝟎 (𝑫. 𝑳 + 𝑳. 𝑳)
𝒑 = 𝟐𝟎 𝑲𝑵/𝒎 𝟓𝟔 𝟑𝟔
𝟗𝟎 𝟑𝟔 𝟗𝟎 𝟗𝟎
𝟗𝟎
𝑳. 𝑳
𝒂 𝒃 𝒄 𝒅 𝟗𝟎 𝟏𝟖 𝟒𝟓 Ultimate > 𝟎. 𝟕𝟓
𝟐𝟖 𝟏𝟖 𝑫. 𝑳
𝟐. 𝟎𝟎 𝒎 𝟑. 𝟎𝟎 𝒎 𝟑. 𝟎𝟎 𝒎 𝟐. 𝟎𝟎 𝒎
𝟐. 𝟎 𝟑. 𝟎 𝟑. 𝟎 𝟐. 𝟎 𝑼 = 𝟏. 𝟒𝟎𝑫. 𝑳 + 𝟏. 𝟔𝟎𝑳. 𝑳
Final loads 𝟐. 𝟎 𝟑. 𝟎 𝟑. 𝟎 𝟐. 𝟎
𝑷𝒖 = 𝟗𝟎 𝑷𝒖 = 𝟗𝟎 𝟕𝟐 𝟐𝟕𝟔 𝟏𝟖𝟎
𝑷𝒎𝒊𝒏 = 𝟒𝟓 𝟑𝟎𝟔. 𝟑𝟑 𝑳. 𝑳 = 𝒛𝒆𝒓𝒐
𝑷𝒎𝒊𝒏 = 𝟑𝟔 𝟑𝟔 𝟗𝟎
𝟑𝟔. 𝟑𝟑 𝟔 𝑼 = 𝟏. 𝟒𝟎 × 𝑫. 𝒍
𝑾𝒖 = 𝟐𝟖 𝑾𝒖 = 𝟗𝟎 𝑾𝒖 = 𝟒𝟓
𝑾𝒎𝒊𝒏 = 𝟏𝟖 𝑾𝒎𝒊𝒏 = 𝟑𝟔 𝑾𝒎𝒊𝒏 = 𝟏𝟖 𝑴𝒊𝒏 𝒍𝒐𝒂𝒅 = 𝟎. 𝟗𝟎 𝑫. 𝒍
𝟓𝟑. 𝟔𝟕 𝟖𝟒
𝒂 𝒃 𝒄 𝒅 𝟓𝟔 𝟑𝟐𝟑. 𝟔𝟕 𝟑𝟔 𝟑𝟓𝟒 2 – For Max. Max. B.M.D
3 – For Max. Max. S.F.D • Cases of loadings for B.M.D
• Cases of loadings for S.F.D
‫التجميـــــع على رسمة واحدة‬ • B.M.D for each case

𝑼𝒍𝒕 𝑼𝒍𝒕 𝒎𝒊𝒏 • ‫التجميـــــع على رسمة واحدة‬


𝟑𝟎𝟔. 𝟑𝟑 𝟏𝟖𝟎
𝑪𝒂𝒔𝒆 𝟏
𝟐𝟕𝟔 𝟑𝟔. 𝟑𝟑 𝟕𝟐 𝟗𝟎 3 – For Max. Max. S.F.D
𝟑𝟔 𝑴𝒂𝒙 𝑴𝒂𝒙
𝟔
𝑼𝒍𝒕 𝑼𝒍𝒕 𝟑𝟔
𝑺. 𝑭. 𝑫 • Cases of loadings for S.F.D
𝒎𝒊𝒏 𝟓𝟑. 𝟔𝟕
𝑪𝒂𝒔𝒆 2 𝟓𝟔 𝟑𝟐𝟑. 𝟔𝟕 • S.F.D for each case
𝟖𝟒
𝟑𝟓𝟒
• ‫التجميـــــع على رسمة واحدة‬
1 – Ultimate loads
Example 𝑷𝒖 = 𝟏𝟔𝟒 𝑲𝑵 Solution steps
Span (ab)
• Draw max-max straining actions 𝑾𝒖 = 𝟗𝟎𝑲𝑵/𝒎∖
𝑮 = 𝟔𝟎𝑲𝑵 1 – Ultimate and minimum loads
𝑷 = 𝟓𝟎𝑲𝑵
Uniform load 𝑳. 𝑳
𝒑 = 𝟐𝟎𝑲𝑵/𝒎∖ 𝒑 𝟐𝟎 4.00 400 ≤ 𝟎. 𝟕𝟓
= = 𝟎. 𝟓𝟎 ≤ 𝟎. 𝟕𝟓 𝑫. 𝑳
𝒈 = 𝟒𝟎 𝑲𝑵/𝒎∖
𝒈 𝟒𝟎
𝟒𝟒𝟐 𝟒𝟒𝟐 𝑼 = 𝟏. 𝟓𝟎 (𝑫. 𝑳 + 𝑳. 𝑳)
𝒂 𝒃 ∴ 𝑾𝒖 = 𝟏. 𝟓𝟎(𝒈 + 𝒑)
𝑳. 𝑳
𝟒. 𝟎𝟎 𝒎 𝟒. 𝟎𝟎 𝒎 ∴ 𝑾𝒖 = 𝟏. 𝟓𝟎 𝟒𝟎 + 𝟐𝟎 2 – For Max. Max. B.M.D Ultimate 𝑫. 𝑳
> 𝟎. 𝟕𝟓
= 𝟗𝟎 𝑲𝑵/𝒎∖
‫الفكرة‬ 𝟗𝟎 × 𝟖𝟐 𝟏𝟔𝟒 × 𝟖 𝑼 = 𝟏. 𝟒𝟎𝑫. 𝑳 + 𝟏. 𝟔𝟎𝑳. 𝑳
𝑴= +
𝑼𝒍𝒕 𝒎𝒊𝒏 𝟐𝟒 𝟏𝟔
Concentrated load = 𝟑𝟐𝟐 𝒌𝑵. 𝒎
𝑳. 𝑳 = 𝒛𝒆𝒓𝒐
𝑷 𝟓𝟎
= = 𝟎. 𝟖𝟑 > 𝟎. 𝟕𝟓 𝑼 = 𝟏. 𝟒𝟎 × 𝑫. 𝒍
𝑮 𝟔𝟎
𝑾𝒎𝒊𝒏 × 𝒍𝟐 ∴ 𝑷𝒖 = 𝟏. 𝟒𝟎𝑮 + 𝟏. 𝟔𝟎𝑷 𝑴𝒊𝒏 𝒍𝒐𝒂𝒅 = 𝟎. 𝟗𝟎 𝑫. 𝒍
𝑾𝒖 × 𝒍𝟐 𝟖 ∴ 𝑷𝒖 = 𝟏. 𝟒𝟎 × 𝟔𝟎 + (𝟏. 𝟔𝟎 × 𝟓𝟎) 𝟗𝟎 × 𝟖𝟐 𝟏𝟔𝟒 × 𝟖 2 – For Max. Max. B.M.D
= 𝟏𝟔𝟒𝑲𝑵 𝑴= +
𝟖 𝟖 𝟒
= 𝟏𝟎𝟖𝟒 𝒌𝑵. 𝒎 • Cases of loadings for B.M.D

𝒎𝒊𝒏 3 – For Max. Max. S.F.D • B.M.D for each case

𝑼𝒍𝒕 • ‫التجميـــــع على رسمة واحدة‬


𝟒𝟒𝟐
3 – For Max. Max. S.F.D
: ‫الخالصة‬ 𝟖𝟐
• Cases of loadings for S.F.D
‫ يتم تحميل‬Simple beam ‫فى حالة الكمرة الـ‬
‫ فقط مع وضع عزم‬Ultimate ‫الكمرة بـ‬ • S.F.D for each case
‫التثبيت الجزئي عند الركائز الطرفية‬ 𝟖𝟐
• ‫التجميـــــع على رسمة واحدة‬
𝟒𝟒𝟐
Thanks for attention

You might also like