Project Number 4239

Project Name PHRC

Client Nigerian National Petroleum Company

Plant Location Port Harcourt - Rivers State - Nigeria

Document Scope The scope of this document is to define materials which have to be delivered before First Energization date

TB / NTB Building
Prog. BUILDING DESCRIPTION First Energization Material Description / TAG Material Group Scope of Supply Delivery Date
No. TAG

1 2 3 8 9 10 11 12 13

09 TB 6B Substation 1 31B01-BL001A 31/08/2023 Bulk material F&G Subcontractor

10 TB 6B Substation 1 31B01-BL001A 31/08/2023 Lighting panel Lighting Subcontractor

11 TB 6B Substation 1 31B01-BL001A 31/08/2023 Lighting fixtures Lighting Subcontractor

12 TB 6B Substation 1 31B01-BL001A 31/08/2023 Bulk material Lighting Subcontractor

13 TB 6B Substation 1 31B01-BL001A 31/08/2023 Anti-acid tiles Civil Contractor

22 TB 12A Substation 10 (PPU) 31B02-BL001A 11/09/2023 Bulk material F&G Subcontractor


23 TB 12A Substation 10 (PPU) 31B02-BL001A 11/09/2023 Lighting panel Lighting Subcontractor

24 TB 12A Substation 10 (PPU) 31B02-BL001A 11/09/2023 Lighting fixtures Lighting Subcontractor

25 TB 12A Substation 10 (PPU) 31B02-BL001A 11/09/2023 Bulk material Lighting Subcontractor


26 TB 12A Substation 10 (PPU) 31B02-BL001A 11/09/2023 Anti-acid tiles Civil Contractor

31 TB 12B Sub-Substation 10 (PPU) EXT PPU Demineralization Control Room 31B03-BL001A 11/09/2023 Bulk material F&G Subcontractor
32 TB 12B Sub-Substation 10 (PPU) EXT PPU Demineralization Control Room 31B03-BL001A 11/09/2023 Lighting panel Lighting Subcontractor

33 TB 12B Sub-Substation 10 (PPU) EXT PPU Demineralization Control Room 31B03-BL001A 11/09/2023 Lighting fixtures Lighting Subcontractor

34 TB 12B Sub-Substation 10 (PPU) EXT PPU Demineralization Control Room 31B03-BL001A 11/09/2023 Bulk material Lighting Subcontractor
35 TB 12B Sub-Substation 10 (PPU) EXT PPU Demineralization Control Room 31B03-BL001A 11/09/2023 Vinyl floor Civil Subcontractor

42 TB 23 Substation A (Old Refinery) 21B01-BL001A 16/09/2023 Bulk material F&G Subcontractor


43 TB 23 Substation A (Old Refinery) 21B01-BL001A 16/09/2023 Lighting panel Lighting Subcontractor

44 TB 23 Substation A (Old Refinery) 21B01-BL001A 16/09/2023 Lighting fixtures Lighting Subcontractor

45 TB 23 Substation A (Old Refinery) 21B01-BL001A 16/09/2023 Bulk material Lighting Subcontractor


46 TB 23 Substation A (Old Refinery) 21B01-BL001A 16/09/2023 Anti-acid tiles Civil Contractor

53 TB 24 Substation B (Old Refinery) 21B02-BL001A 15/09/2023 Bulk material F&G Subcontractor

54 TB 24 Substation B (Old Refinery) 21B02-BL001A 15/09/2023 Lighting panel Lighting Subcontractor


55 TB 24 Substation B (Old Refinery) 21B02-BL001A 15/09/2023 Lighting fixtures Lighting Subcontractor

56 TB 24 Substation B (Old Refinery) 21B02-BL001A 15/09/2023 Bulk material Lighting Subcontractor


57 TB 24 Substation B (Old Refinery) 21B02-BL001A 15/09/2023 Anti-acid tiles Civil Contractor

64 TB 25 Substation C (Old Refinery) 21B03-BL001A 18/09/2023 Bulk material F&G Subcontractor

65 TB 25 Substation C (Old Refinery) 21B03-BL001A 18/09/2023 Lighting panel Lighting Subcontractor


66 TB 25 Substation C (Old Refinery) 21B03-BL001A 18/09/2023 Lighting fixtures Lighting Subcontractor

67 TB 25 Substation C (Old Refinery) 21B03-BL001A 18/09/2023 Bulk material Lighting Subcontractor

68 TB 25 Substation C (Old Refinery) 21B03-BL001A 18/09/2023 Anti-acid tiles Civil Contractor

Status Page 1 of 5
#VALUE! Last updated at: 24/06/2023

Project Number 4239

Project Name PHRC

Client Nigerian National Petroleum Company

Plant Location Port Harcourt - Rivers State - Nigeria

Document Scope The scope of this document is to define materials which have to be delivered before First Energization date

TB / NTB Building
Prog. BUILDING DESCRIPTION First Energization Material Description / TAG Material Group Scope of Supply Delivery Date
No. TAG

1 2 3 8 9 10 11 12 13

75 TB 26 Substation D (Old Refinery) 21B04-BL001A 17/09/2023 Bulk material F&G Subcontractor

76 TB 26 Substation D (Old Refinery) 21B04-BL001A 17/09/2023 Lighting panel Lighting Subcontractor

77 TB 26 Substation D (Old Refinery) 21B04-BL001A 17/09/2023 Lighting fixtures Lighting Subcontractor

78 TB 26 Substation D (Old Refinery) 21B04-BL001A 17/09/2023 Bulk material Lighting Subcontractor

79 TB 26 Substation D (Old Refinery) 21B04-BL001A 17/09/2023 Anti-acid tiles Civil Contractor

86 TB 20 Substation E (Truck Loading Substation) 41B01-BL001A 19/09/2023 Bulk material F&G Subcontractor
87 TB 20 Substation E (Truck Loading Substation) 41B01-BL001A 19/09/2023 Lighting panel Lighting Subcontractor

88 TB 20 Substation E (Truck Loading Substation) 41B01-BL001A 19/09/2023 Lighting fixtures Lighting Subcontractor

89 TB 20 Substation E (Truck Loading Substation) 41B01-BL001A 19/09/2023 Bulk material Lighting Subcontractor
90 TB 20 Substation E (Truck Loading Substation) 41B01-BL001A 19/09/2023 Anti-acid tiles Civil Contractor

97 TB 27 Substation F (Old Refinery) 21B05-BL001A 20/09/2023 Bulk material F&G Subcontractor


98 TB 27 Substation F (Old Refinery) 21B05-BL001A 20/09/2023 Lighting panel Lighting Subcontractor

99 TB 27 Substation F (Old Refinery) 21B05-BL001A 20/09/2023 Lighting fixtures Lighting Subcontractor

100 TB 27 Substation F (Old Refinery) 21B05-BL001A 20/09/2023 Bulk material Lighting Subcontractor
101 TB 27 Substation F (Old Refinery) 21B05-BL001A 20/09/2023 Anti-acid tiles Civil Contractor

GENERAL NOTES:
1 - Only for internal use

Status Page 2 of 5
TB / NTB Area WBS Unit WBS Area WBS Subarea Main Item TAG BUILDING DESCRIPTION
TB 1 COMMON
AREA OFFSITE 7 1 B10 71B10-BL001A PROCESS CONTROL BUILDING
WASTE WATER TREATMENT (New Refinery)
TB 4 PROCESS AREAS AND PPU 4 2 B10 42B10-BL001A CONTROL BUILDING
TB 5 TANK FARM 4 1 B10 41B10-BL001A Oil Movement Control Room
TB 6A PPU 3 1 B10 31B10-BL001A PPU Control Room
TB 6B PPU 3 1 B01 31B01-BL001A Substation 1
TB 7 AREA 1 1 1 B01 11B01-BL001A Substation 2 (New Refinery)
TB 8 AREA 2 1 2 B01 12B01-BL001A Substation 3 (New Refinery)
TB 9 AREA 3 1 3 B01 13B01-BL001A Substation 4 (New Refinery)
TB 10 TANK FARM 4 1 B02 41B02-BL001A Substation 5 (New Refinery)
TB 11 TANK FARM 4 1 B03 41B03-BL001A Substation 6 (New Refinery)
TB 12A PPU 3 1 B02 31B02-BL001A Substation 10 (PPU)
TB 12B PPU 3 1 B03 31B03-BL001A Sub-Substation 10 (PPU) EXT PPU Demineralization Control Room
TB 13 TANK FARM
AREA OFFSITE 4 1 B08 41B08-BL001A Substation 51 (Waste Water Treatment Substation)
TB 14 PROCESS AREAS AND PPU 4 2 B01 42B01-BL001A Substation 53 (Waste Water Treatment Substation)
TB 15 TANK FARM 4 1 B04 41B04-BL001A Substation 11 (Offsite Tank Farm Substation)
TB 16 TANK FARM 4 1 B05 41B05-BL001A Substation 11.1 (Offsite Tank Farm Substation)
TB 17 TANK FARM 4 1 B06 41B06-BL001A Substation 12 (Offsite Tank Farm Substation)
TB 18 TANK FARM 4 1 B07 41B07-BL001A Substation 14 (Offsite Tank Farm Substation)
TB 19 AREA 5 2 1 B06 21B06-BL001A Substation 15
TB 20 TANK FARM 4 1 B01 41B01-BL001A Substation E (Truck Loading Substation)
TB 21A1 JETTY 5 1 B01 51B01-BL001A Substation 16A
TB 21A2 JETTY 5 1 B10 51B10-BL001A Control Room / Chief Operator Room
TB 21A JETTY 5 1 B02 51B02-BL001A Substation 16B
TB 22 AREA 5 2 1 B10 21B10-BL001A Old Refinery Control Room
TB 23 AREA 5 2 1 B01 21B01-BL001A Substation A (Old Refinery)
TB 24 AREA 5 2 1 B02 21B02-BL001A Substation B (Old Refinery)
TB 25 AREA 5 2 1 B03 21B03-BL001A Substation C (Old Refinery)
TB 26 AREA 5 2 1 B04 21B04-BL001A Substation D (Old Refinery)
TB 27 AREA 5 2 1 B05 21B05-BL001A Substation F (Old Refinery)
TB28 COMMON 7 1 B20 71B20-BL001A Fire Control Room for New Refinery
NTB 1 COMMON 7 1 B00 71B00-BL001I Workshop (Maintenance offices, Electrical, Instrumentation, Fabrication & welding)
NTB 2 COMMON 7 1 B00 71B00-BL002A Supply Chain Management Dept. (SCMD) Manpower Development (MPD/HR)
NTB 3 COMMON 7 1 B00 71B00-BL003I Wharehouse (Warehouse Maintenance W/S)
NTB 4 COMMON 7 1 B00 71B00-BL004A Garage & Transport Office Building
NTB 5 COMMON 7 1 B00 71B00-BL005A Marketers
NTB 6 COMMON 7 1 B00 71B00-BL006A Model Training Building
NTB 7 OFFSITE 4 1 B00 41B00-BL001A Shipping Administrative
NTB 7A OFFSITE 4 1 B00 41B00-BL002A Shipping Control Room
NTB 8 COMMON 7 1 B00 71B00-BL007I Ullaging Shed
T.E.L.
NTB 9 COMMON 7 1 B00 71B00-BL008A
NTB 10 COMMON 7 1 B00 71B00-BL009I Chemical Storage
NTB 11 5 2 1 B00 21B00-BL002A Medical Center
NTB 12 5 2 1 B00 21B00-BL003A New Administrative Block (New Administrative Building)
NTB 13 5 2 1 B00 21B00-BL004A MAIN CANTEEN

Building Matrix Page 3 of 5


TB / NTB Area WBS Unit WBS Area WBS Subarea Main Item TAG BUILDING DESCRIPTION
NTB 14 COMMON 7 1 B00 71B00-BL0010A MPD (CANTEEN)
NTB 15 COMMON 7 1 B00 71B00-BL0011A Transport Driver Buildings (Drivers building)
TB 2 COMMON 7 1 B00 71B00-BL0012A Laboratory Building
TB 3 COMMON 7 1 B00 71B00-BL0013A Fire Station
- 5 2 1 B00 21B00-BL001I Plan Gate House

Building Matrix Page 4 of 5


Contractor Subcontractor