Lifetime Design Thursday, June 8, 2023

P. Antasari No.70 LD Cluster


Jakarta Selatan Bintaro

Volume Selisih
NO ITEM PEKERJAAN VOLUME KETERANGAN KETERANGAN
Lapangan Lapangan
Perbandingan Volume dan Spek Material
D Pekerjaan Penutup Atap
D. 1. Atap Bangunan Utama (Genteng Beton Flat)
1. Penutup Atap + Rangka m2 63.81 Genteng Bitumen CTI Motif Standard 68.87 5.06 Genteng Bitumen CTI Motif Standard
2. Nok Atap m' 14.69 Genteng Bitumen CTI Motif Standard 17.57 2.88 Genteng Bitumen CTI Motif Standard
3. List Plank m' 13.50 GRC Lebar 20 cm, Motif Polos 16.38 2.88 GRC Lebar 20 cm, Motif Polos
4. Talang Bjls (Area Jurai Atap) m' 3.79 Seng Galvalum 0.3mm x 90cm 6.67 2.88 Seng Galvalum 0.3mm x 90cm

A. 6. Pekerjaan Finishing Penutup Lantai Lantai 1


1. Penutup Lantai Area
Granite Tile Setara Platinum 60 x 60 cm
- Granit Tile m2 1.21 1.21275 - Granite Tile Setara Sandimas 60 x 60 cm
Motif Bolton
Granite Tile Setara Platinum 60 x 60 cm
- Granit Tile m2 36.22 36.216075 - Granite Tile Setara Sandimas 60 x 60 cm
Motif Havard Grey
Granite Tile Setara Platinum 30 x 60 cm
- Granit Tile m2 9.65 9.647925 - Granite Tile Setara Sandimas 60 x 60 cm
Motif Havard Grey
3. Finishing Penutup Lantai
Granite Tile Setara Platinum 60 x 60 cm
- Dinding Kamar Mandi m2 17.47 17.472 Granite Tile Setara Sandimas 60 x 60 cm
Motif Havard Grey

A. 7. Pekerjaan Finishing Penutup Lantai Dan Dinding Lantai 2


1. Penutup Lantai Area
Granite Tile Setara Platinum 60 x 60 cm
- Granit Tile m2 40.87 40.866 Granite Tile Setara Sandimas 60 x 60 cm
Motif Havard Grey
3. Penutup Dinding Area
Granite Tile Setara Platinum 60 x 60 cm
- Dinding Kamar Mandi m2 44.52 44.52 Granite Tile Setara Sandimas 60 x 60 cm
Motif Havard Grey
- Sika Top Lantai Kamar Mandi + Dinding 50 cm m2 23.47 Sika Top 107 Seal, 1 : 4,5 (2 Lapis) 23.4675 Sika Top 107 Seal, 1 : 4,5 (2 Lapis)

C PEKERJAAN LAINLAIN
1 Pekerjaan Railing
Railing
Railing Hollow 40 x 80 x 1,2 mm + 40 x 40 Railing Hollow 40 x 80 x 1,2 mm + 40 x 40 x 0,8
- Railing Tangga Utama Bangunan + Void m' 7.56 8.56 1.00
x 0,8 mm, Fin. Cat, T = 1 Meter mm, Fin. Cat, T = 1 Meter
Railing Hollow 40 x 80 x 1,2 mm + 40 x 40 Railing Hollow 40 x 80 x 1,2 mm + 40 x 40 x 0,8
- Railing Balkon m' 2.78 2.9 0.13
x 0,8 mm, Fin. Cat, T = 1 Meter mm, Fin. Cat, T = 1 Meter
A. 1. Pekerjaan Dinding Rumah Lantai 1
1 Pasangan Dinding
Dinding Baru
- Pasangan Dinding Baru Lt. 1 m2 222.86 Bata Merah 5 x 10 x 20 cm + 1 ps : 5 pp 294.86 72.00 Bata Merah 5 x 10 x 20 cm + 1 ps : 5 pp
- Plasteran Dinding Baru Lt. 1 m2 372.97 Tebal 2 cm, 1 sp : 5 pp 471.77 98.80 Tebal 2 cm, 1 sp : 5 pp
- Acian Lt. 1 m2 387.52 Semen Tiga Roda, Gersik 471.77 84.25 Semen Tiga Roda, Gersik
Perbandingan Nilai RAB
Ld Cluster Nomer 1 IDR 753,405,309.71 Ld Cluster nomer 10,11,12,3,4 IDR 753,405,309.71