Awm

You might also like

Download as pdf
Download as pdf
You are on page 1of 2
Inspection note of Shri Arun Arora, PCME. Northern Railway during 14 15 16 ase 18 19 1.10 1.11 it to carriage Workshop, Alambagh, Lucknow on 02.08.2019. | Shop is about 02 lac KWh, out of which about 50% is being | generated from Solar Plant. AMV Shop is having existing Solar Plant Unit of capacity 987 KWp. Case of 1000 KWp Solar Plant Unit is under process at N. Railway HQ, after installation of which, AMV Shop will become nearly energy neutral. Centre of Excellence for Air Brake over! ul, Alternator Section & ‘Machine Shop are under development. Shop should aim for completin, these COE before Dec’ 2019. | Presently, AMV Shop us GreenCo ‘Bronze’ certified. Shop should | aim for upgradation of GreenCo Rating from ‘Bronze’ to ‘Gold’ by _Dec.'2019. General ak Epoxy Flooring/tiles should be provided in the Corridor of the | CWM/AMV | Administrative Block CWE A presentation was given by CWM/AMV regarding performance | CWM/AMV parameters, system improvement, Modernization & Future action _ plan of AMV Shop. [The overall average monthly consumption of electricity in AMV | CWE | CWM/AMV CWE Efforts should be made to raise the outturn of NAC coaches to 100 coaches. It was informed that due to ongoing Modernization work and fitment of Bio-tank on the coaches, the cycle time of | POH for AC coaches & NAC has increased. Alll out efforts should be made to reduce the cycle time to 15 DaysiCoach. CWM/AMV CWE AMV Shop should aim for IOH of 08 coach set LHB coach bogie/month by Dec’ 19. Water Meter should be provided ‘on the entry & exit of water p pipe lines. Scada type monitoring and control system on the lines of CB Workshop should be planed. _ It was informed that staff with upgrade facil ies is under | construction. | nai cwMiAMV CWE Heritage Gallery on the line of CB Workshop should be developed in AMV Shop also. Similarly, family tee & pledge wall should also be planned in AMV Shop. The photographs of CWM with all officers, supervisors & staff should be displayed at prominent places. completed by Sept’ 2019, Dec.'2019 & March’ 2019. This be followed up CWM/AMV CWE CWM/AMV CWE 2.0 |MainLab a wa a 2.1 | Main Lab was visited. It was informed that the process of NABL | CWM/AMV "| upgradation is undergoing, CWE 2.2 | All the equipment should be cleared & painted. The stores rooms | CWM/AMV adi Main Lab should be cleaned & pantry may be provided. | CWE 3.0 ming Section eae ee 34 od is done in the Trimming Section. Small basket should | CWM/AMV also be provided between 02 work stations at Sewing machine for | CWE temporary storage of scrap & cut pieces. Industrial exhausts should be provided on the roof of the Trimming Section. ea 4,0 __| Roller Bearing Section _ iz E Roller Bearing Section was inspected. It was informed that Roller Bearing Section would be converted to dust free section shortly. Better quality exhaust unit be provided in the Zyglo Lab to avoid | inhaling of fumes. No. 407-M/18MG/Insp./2019 Dated: 02.09.2019 ( Arun Arora ) Pr. Chief Mechanical Engineer Copy to: CWM/AMV CWE

You might also like