Inspection note of Shri Arun Arora, PCME. Northern Railway during
14
15
16
ase
18
19
1.10
1.11
it to carriage Workshop, Alambagh, Lucknow on 02.08.2019.
| Shop is about 02 lac KWh, out of which about 50% is being
| generated from Solar Plant. AMV Shop is having existing Solar
Plant Unit of capacity 987 KWp. Case of 1000 KWp Solar Plant
Unit is under process at N. Railway HQ, after installation of which,
AMV Shop will become nearly energy neutral.
Centre of Excellence for Air Brake over! ul, Alternator Section &
‘Machine Shop are under development. Shop should aim for
completin, these COE before Dec’ 2019.
| Presently, AMV Shop us GreenCo ‘Bronze’ certified. Shop should |
aim for upgradation of GreenCo Rating from ‘Bronze’ to ‘Gold’ by
_Dec.'2019.
General ak
Epoxy Flooring/tiles should be provided in the Corridor of the | CWM/AMV
| Administrative Block CWE
A presentation was given by CWM/AMV regarding performance | CWM/AMV
parameters, system improvement, Modernization & Future action
_ plan of AMV Shop.
[The overall average monthly consumption of electricity in AMV | CWE
| CWM/AMV
CWE
Efforts should be made to raise the outturn of NAC coaches to
100 coaches. It was informed that due to ongoing Modernization
work and fitment of Bio-tank on the coaches, the cycle time of |
POH for AC coaches & NAC has increased. Alll out efforts should
be made to reduce the cycle time to 15 DaysiCoach.
CWM/AMV
CWE
AMV Shop should aim for IOH of 08 coach set LHB coach
bogie/month by Dec’ 19.
Water Meter should be provided ‘on the entry & exit of water p pipe
lines. Scada type monitoring and control system on the lines of
CB Workshop should be planed. _
It was informed that staff with upgrade facil
ies is under
| construction. | nai
cwMiAMV
CWE
Heritage Gallery on the line of CB Workshop should be developed
in AMV Shop also. Similarly, family tee & pledge wall should also
be planned in AMV Shop. The photographs of CWM with all
officers, supervisors & staff should be displayed at prominent
places.
completed by Sept’ 2019, Dec.'2019 & March’ 2019. This be
followed up
CWM/AMV
CWE
CWM/AMV
CWE2.0 |MainLab a wa a
2.1 | Main Lab was visited. It was informed that the process of NABL | CWM/AMV
"| upgradation is undergoing, CWE
2.2 | All the equipment should be cleared & painted. The stores rooms | CWM/AMV
adi Main Lab should be cleaned & pantry may be provided. | CWE
3.0 ming Section eae ee
34 od is done in the Trimming Section. Small basket should | CWM/AMV
also be provided between 02 work stations at Sewing machine for | CWE
temporary storage of scrap & cut pieces. Industrial exhausts
should be provided on the roof of the Trimming Section. ea
4,0 __| Roller Bearing Section _ iz E
Roller Bearing Section was inspected. It was informed that Roller
Bearing Section would be converted to dust free section shortly.
Better quality exhaust unit be provided in the Zyglo Lab to avoid
| inhaling of fumes.
No. 407-M/18MG/Insp./2019
Dated: 02.09.2019
( Arun Arora )
Pr. Chief Mechanical Engineer
Copy to:
CWM/AMV
CWE