This document provides specifications for room numbering to be used in facility design, construction, and as-built documents. It requires the architect/engineer to use Ford Land's established room numbering system in the BIM model and exported Archibus information. It also mandates a coordination meeting with Ford Land to review the room numbering requirements where the architect, BIM manager, and Ford Land project manager and BIM representative must attend.
This document provides specifications for room numbering to be used in facility design, construction, and as-built documents. It requires the architect/engineer to use Ford Land's established room numbering system in the BIM model and exported Archibus information. It also mandates a coordination meeting with Ford Land to review the room numbering requirements where the architect, BIM manager, and Ford Land project manager and BIM representative must attend.
This document provides specifications for room numbering to be used in facility design, construction, and as-built documents. It requires the architect/engineer to use Ford Land's established room numbering system in the BIM model and exported Archibus information. It also mandates a coordination meeting with Ford Land to review the room numbering requirements where the architect, BIM manager, and Ford Land project manager and BIM representative must attend.
This document provides specifications for room numbering to be used in facility design, construction, and as-built documents. It requires the architect/engineer to use Ford Land's established room numbering system in the BIM model and exported Archibus information. It also mandates a coordination meeting with Ford Land to review the room numbering requirements where the architect, BIM manager, and Ford Land project manager and BIM representative must attend.
PART 1 GENERAL 1.01 SUMMARY A. Room numbering used for facilities for design, construction, record and as-built models and documents is set by Ford Land. B. Related Requirements 1. Section 00 21 13 - Instructions for Procurement. 2. Section 00 22 25 - 2D CAD Specifications. 3. Section 00 22 33 - 3-D BIM for Facilities (including Attachments). 4. Section 01 92 20 - Facility Operation - Asset Data Integration (including Attachments). C. Submittals 1. BIM - Building Information Model. a. Autodesk Revit file with Ford Land room numbering system. b. Archibus information exported from Autodesk Revit file. Refer to Attachment E, Section 00 22 33, 3-D BIM for Facilities. D. Coordination 1. Architect/Engineer shall schedule a meeting with Owner to review requirements for room numbering. a. Attendees shall include: 1) Architect/Engineer Project Manager 2) Architect/Engineer BIM Manager 3) Ford Land Project Manager 4) Ford Land BIM/CAD Representative PART 2 PRODUCTS - NOT USED PART 3 EXECUTION 3.01 PROJECT REQUIREMENTS A. Architect/Engineer shall use room numbering system established by Ford Land. B. For open office areas, leave space on documents for addition of cubicle numbering system. C. Closeout Procedures 1. Architect/Engineer shall provide Ford Land with BIM model in Autodesk Revit format that includes Ford Land room numbering system. 2. Architect/Engineer shall provide Ford Land with Archibus information exported from Autodesk Revit file. END OF SECTION