This drawing is being updated and should not be used for structural requirements. Refer to Bridge Technical Note 033 for structural requirements for reinforced concrete drainage pits. The geometric dimensions on this drawing can be used as a guide but must be modified as needed to comply with structural requirements.
Original Description:
Original Title
Standard Drawing 1231 Side Entry Pit CD2 Channel 10m Inlet April 2023
This drawing is being updated and should not be used for structural requirements. Refer to Bridge Technical Note 033 for structural requirements for reinforced concrete drainage pits. The geometric dimensions on this drawing can be used as a guide but must be modified as needed to comply with structural requirements.
This drawing is being updated and should not be used for structural requirements. Refer to Bridge Technical Note 033 for structural requirements for reinforced concrete drainage pits. The geometric dimensions on this drawing can be used as a guide but must be modified as needed to comply with structural requirements.
DISCLAIMER (APRIL ‘23): THIS DRAWING IS IN THE PROCESS OF BEING UPDATED.
FOR ALL STRUCTURAL REQUIREMENTS
REFER BRIDGE TECHNICAL NOTE (BTN) 033: STRUCTURAL REQUIREMENTS FOR REINFORCED CONCRETE DRAINAGE PITS. GEOMETRIC DIMENSIONS SHOWN ON THIS DRAWING MAY BE USED AS A GUIDE AND MODIFIED WHERE NECESSARY TO ACHIEVE COMPLIANCE.