WORK METHOD STATEMENT

Job/ Activity/Task: Mobilization of manpower Ref: MS/SAEPL/HVAC/WMS/001


Codes/Standards applicable:
HVAC PROJECT NAME : MORGAN STANELY – PARIVARTAN
Project Location: Goregaon, Mumbai Area / Floor: 9th to 14th Floor
Risk assessment reference:
Prepared by: Mr. Himanshu Niveriya Reviewed by: Mr. Amod Mande
Designation: Project Manager Designation: Project Head
Date: 28/03/2023
Activity Carried by: - M/s Safe Air Engineers Pvt Ltd
Engineer available at site: -
 Mr. Tushar Gaikwad
 Mr. Nilesh Handure
 Mr. Nandukumar Mallshette
HSE Officers Available at Site : -
 Mr. Hannan Khan
 Mr. Mahesh Nikale
 Mr. Sharad Pawshe
Scope of work:

 Mobilization of Manpower’s

Activity Sub Activities Identified Hazard and Controls


(Break the job down Assessment (What you are going to do to make this step as
into steps) (What can cause a high safe as possible, include equipment to be used
degree of harm?) where appropriate)
1.1 1.Mobilization of 1.Unaware about site
1.Gate pass issued after safety induction training
manpower. hazards leads to body
only.
injury
2.Personnel will enter on site only with wearing
mandatory PPE's like safety helmet,safety
shoes,reflective jacket,safety glasses,hand gloves
etc. .
3.Person will move on site with site area known
representative only.
4.Person will not move to the unknown area.
5.Person will respect & follow on site signages.
6.Ensure without PPE person will not crossing the
barricated path way.Use PPE”s Like cut
Resistanace handgloves ,
helmet,Googles,Reflective jacket, Safety Shoe
Etc.
7.While loading and unloading of pipe material
signal man along with foreman to be ensured.
8.Flagman to be deployed along with green and
red flag.
1.2 1. Movement of 1. Speaking on mobile
1.Gate pass shall be issued after safety Induction
personnel on site for phone while
Training only.
measurement, moving on site may
inspection, visual STF lead to body 2.Mobile phone speaking is strictly prohibited
cross checking injury while moving on site (May safe access area
consider)
3.Person should follow the signages and site
procedures.
4.Only path way should be use for manpower
movement at site.

1.3 1. Mobilization of 1.Improper handling of 1. Person will handle office material cautiously.
manpower for office office instrument
material Shifting. material may lead to 2. Person will enter on site with mandatory PPE'S
Chair, instrument injury like safety helmet, hand gloves, safety shoes,
etc. reflective jacket, safety goggle etc.

1.4 1. Movement of 1.Stacking with


1.Ensure person shall not be crossing the
personnel nearby material handling
barricading.
closest area of equipment’s may lead
material handling to serious body injury 2.Personnel will enter on site only with wearing
equipment’s like mandatory PPE's like safety helmet,safety
hydra etc. For shoes,reflective jacket,safety glasses,hand gloves
measurement etc.
3.Ensure designated walkway shall be used.

1.5 1.Movement of 1.Weather condition 1. In critical situations like heavy wind, rain,
manpower on site rainy /windy chances person shall collect at safe shelter point. Unless &
of slips, trips, falls until safe situation resumes.
hazard 2. Person shall enter on site with proper
mandatory PPEs like safety shoes, safety helmet,
reflective jacket, safety goggle etc.
3. Person shall not allow for movement in rainy &
critical situations.

1.6 1. Movement of 1.Movement of 1.Person will move on the site with area known
personnel near civil personnel nearby civil representative only,should not goto civil activities
activities area activities area may area.
lead to body injury 2.Person will enter by wearing with mandatory
PPE's like safety helmet,safety shoes,reflective
jacket,safety goggle etc.
1.7 1.Personnel 1. Personnel Speaking 1.Movement of personnel shall be with area known
speaking on mobile on mobile phone while site representative only.
phone while moving movement. May slip, 2.Safe distance shall be maintained from extended
from staircase, lead to body injury. pipimg & material storage areas.3.Person shall
ladder for walk nearby barricading area very cautiously by
measurement. making safe distance.

1.8 1. Movement of 1.Movement of 1.Movement of personnel shall be with area known


personnel nearby personnel nearby site representative only.
extended material / extended piping 2.Safe distance shall be maintained from extended
piping storage area. storage area may hit to pipimg & material storage areas.
body lead to body 3.Person shall walk nearby barricading area very
injury cautiously by making safe distance.

1.9 1.Movement of 1.Movement of 1.Watery & oily,slipery area dried / housekeeping


personal nearby personnel nearby should done before allowing the personnel
slippery/watery, slivery/watery, oily movement at site.
oily surface area area may slip, fall lead 2.Person shall walk through slipery/watery ,oily
to body injury surfaces very cautiously, and by making safe
distance.
3.Person shall respect & follow the signages
1.10 1. Movement of 1.While moving the 1.Person will handle measuring tape cautiously.
personnel for the personnel for the 2.Person will enter on site with mandatory PPE'S
inspection, cross inspection at edge of like safety helmet,hand gloves,safety
checking of the the peripheral shoes,reflective jacket,safety goggle etc.
area. resulting unbalance
may fall lead to body
injury.

1.11 1. Movement of 1.While moving the 1. Movement of personnel shall be with area
personnel for the personnel for the known site representative only.
inspection, cross inspection at edge of 2. Edge protection & proper anchoring point
checking of the the peripheral should be providing for peripheral area.
area. resulting unbalance 3. Person should not walk on the periphery
may fall lead to body inspection to be done.
injury 4. Person will enter on site with mandatory PPE'S
like safety helmet, hand gloves, safety shoes,
reflective jacket, and safety goggle.

1.12 1.Lack of awareness 1. If unaware about 1.In safety Induction training awareness shall be
in case of the emergency exits, given about emergency exits,assembly points etc.
emergency assembly point, by 2.Personnel shall move with area known site
chance any emergency representative only.
occur may lead to 3.Person shall not enter to unknown area on site.
injury while 4.Person shall follow the emergency assembly
movement. point,exits ways in case of any emergency.
5.Awareness training about site emergency plan.
6.Emergency assembly point should be display at
site & Awareness to all personnel about assembly
point.
1.13 1.Housekeeping 1.STF leads to personal 1.Daily Tool Box Talk includes the housekeeping
injury necessity.
2. PPE's (Safety shoes, helmet, goggle, jacket,
Gloves) is provided.
3. Daily Safety Observation Tour (SOT) is
conducted.

Note :
If required for a specific work, detailed method of control for any additional hazards will be provided
separately.

Accepted by: ____________________