01 WMS - Mobilization of Manpower
01 WMS - Mobilization of Manpower
Mobilization of Manpower’s
1.3 1. Mobilization of 1.Improper handling of 1. Person will handle office material cautiously.
manpower for office office instrument
material Shifting. material may lead to 2. Person will enter on site with mandatory PPE'S
Chair, instrument injury like safety helmet, hand gloves, safety shoes,
etc. reflective jacket, safety goggle etc.
1.5 1.Movement of 1.Weather condition 1. In critical situations like heavy wind, rain,
manpower on site rainy /windy chances person shall collect at safe shelter point. Unless &
of slips, trips, falls until safe situation resumes.
hazard 2. Person shall enter on site with proper
mandatory PPEs like safety shoes, safety helmet,
reflective jacket, safety goggle etc.
3. Person shall not allow for movement in rainy &
critical situations.
1.6 1. Movement of 1.Movement of 1.Person will move on the site with area known
personnel near civil personnel nearby civil representative only,should not goto civil activities
activities area activities area may area.
lead to body injury 2.Person will enter by wearing with mandatory
PPE's like safety helmet,safety shoes,reflective
jacket,safety goggle etc.
1.7 1.Personnel 1. Personnel Speaking 1.Movement of personnel shall be with area known
speaking on mobile on mobile phone while site representative only.
phone while moving movement. May slip, 2.Safe distance shall be maintained from extended
from staircase, lead to body injury. pipimg & material storage areas.3.Person shall
ladder for walk nearby barricading area very cautiously by
measurement. making safe distance.
1.11 1. Movement of 1.While moving the 1. Movement of personnel shall be with area
personnel for the personnel for the known site representative only.
inspection, cross inspection at edge of 2. Edge protection & proper anchoring point
checking of the the peripheral should be providing for peripheral area.
area. resulting unbalance 3. Person should not walk on the periphery
may fall lead to body inspection to be done.
injury 4. Person will enter on site with mandatory PPE'S
like safety helmet, hand gloves, safety shoes,
reflective jacket, and safety goggle.
1.12 1.Lack of awareness 1. If unaware about 1.In safety Induction training awareness shall be
in case of the emergency exits, given about emergency exits,assembly points etc.
emergency assembly point, by 2.Personnel shall move with area known site
chance any emergency representative only.
occur may lead to 3.Person shall not enter to unknown area on site.
injury while 4.Person shall follow the emergency assembly
movement. point,exits ways in case of any emergency.
5.Awareness training about site emergency plan.
6.Emergency assembly point should be display at
site & Awareness to all personnel about assembly
point.
1.13 1.Housekeeping 1.STF leads to personal 1.Daily Tool Box Talk includes the housekeeping
injury necessity.
2. PPE's (Safety shoes, helmet, goggle, jacket,
Gloves) is provided.
3. Daily Safety Observation Tour (SOT) is
conducted.
Note :
If required for a specific work, detailed method of control for any additional hazards will be provided
separately.