Professional Documents
Culture Documents
3-Pile Group
3-Pile Group
3-Pile Group
Y
1
2.30
1 2 0.40
1 0.3 2 0.8
0.43
0.5 C
2.10
rzi
3
3
= 0.80 rxi
COLUMN C1
MOMENT DUE TO SHEAR AT PILECAP BASE (MX') 50.00 kN.m
MOMENT DUE TO SHEAR AT PILECAP BASE (MZ') -100.00 kN.m
TOTAL BENDING MOMENT (MX) -100.00 kN.m
TOTAL BENDING MOMENT (MZ) -25.00 kN.m
TOTAL VERTICAL UNFACTORED FORCE 1296.34 kN
PILE NO. rxi (m) rxi2 rzi (m) rzi2 FINAL FORCES
IN PILE (kN)
1 0.750 0.56 0.433 0.19 410
2 0.750 0.56 0.433 0.19 377
3 0.000 0.00 0.866 0.75 509
Σrxi2 = 1.13 Σrzi2 = 1.13
1 2
410 kN 377 kN
X
Z
509 kN
3
MAXIMUM ULTIMATE BENDING MOMENT (MUX) = 661 kN.m P3 x rzi rzi=2/3h
MAXIMUM ULTIMATE BENDING MOMENT (MUZ) = 462 kN.m (P1 or P2) x rxi rxi=S/2
EFFECTIVE DEPTH ALONG-X DIRECTION = 0.932 m
EFFECTIVE DEPTH ALONG-Z DIRECTION = 0.916 m
X-DIRECTION
Ast REQUIRED = 1170 mm2
MIN. Ast REQUIRED = 1268 mm2
DIA. OF MAIN BARS = 16 mm
DIA. OF DISTRIBUTION BARS = 12 mm
REQUIRED NO. OF MAIN BARS IN GIVEN WIDTH =6 (MN. STEEL)
PROVIDED NO. OF MAIN BARS IN GIVEN WIDTH =7
REQUIRED SPACING OF DISTRIBUTION BARS = 98 mm
PROVIDED SPACING OF DIST. BARS = 150 mm
Z-DIRECTION
Ast REQUIRED = 1728 mm2
MIN. Ast REQUIRED = 1246 mm2
DIA. OF MAIN BARS = 16 mm
DIA. OF DISTRIBUTION BARS = 12 mm
REQUIRED NO. OF MAIN BARS IN GIVEN WIDTH =9
PROVIDED NO. OF MAIN BARS IN GIVEN WIDTH =8
REQUIRED SPACING OF DISTRIBUTION BARS = 100 mm
PROVIDED SPACING OF DIST. BARS = 150 mm
CHECK FOR SHEAR
ONE-WAY SHEAR
ALONG-X
AREA = 800
DIA = 12
NO 7