Safety in Process Design
Safety in Process Design
PROCESS DESIGN
1 SAFETY SEMINAR
CONTENTS
◼ INTRODUCTION
◼ DESIGN CRITERIA
◼ TYPICAL SYSTEMS
➢ REFINERY
➢ PIPELINE
➢ GAS PROCESSING
◼ CONCLUSION
2 SAFETY SEMINAR
INTRODUCTION
3 SAFETY SEMINAR
BASIC ENGINEERING DESIGN DATA
4 SAFETY SEMINAR
DESIGN CRITERIA --TEMPERATURE
5 SAFETY SEMINAR
DESIGN CRITERIA--PRESSURE
◼ FACTORS TO BE CONSIDERED
✓ PUMP SHUT OFF
✓ SYSTEM HYDRAULICS
✓ TEMPERATURE
6 SAFETY SEMINAR
INSTRUMENTATION
◼ REDUNDANCY
◼ PHILOSOPHY OF ALARMS AND TRIPS
◼ SAFETY VALVE NOS, TYPE
◼ EMERGENCY DEPRESSURIZATION
◼ VOTING SYSTEMS
7 SAFETY SEMINAR
TYPICAL HIGH PRESSURE SYSTEMS
8 SAFETY SEMINAR
HAZARD MANAGEMENT PHILOSOPHY
9 SAFETY SEMINAR
CONTROL MEASURES
10 SAFETY SEMINAR
BLOCKED IN LIQUID
UNIT A UNIT B
PUMP
11 SAFETY SEMINAR
OPERATIONAL CONSTRAINTS
12 SAFETY SEMINAR
CRUDE FEED CIRCUIT-PREHEAT AND
DESALTER
PSV
LOCATED FLUSH FLASH
WITH COLUMN ZONE
ATM
COLUMN
DESALTER
BYPASS
13 SAFETY SEMINAR
DESALTER ARRANGEMENT-
LIMITATIONS
14 SAFETY SEMINAR
PSV AS A POTENTIAL HAZARD
SOURCE
PSV
TO FLARE HEADER
VACUUM COLUMN
2”
TO VACUUM SYSTEM
COLD HP SEPARATOR
LC LC
SPEC BREAK
SOUR WATER TO
FLASH DRUM
16 SAFETY SEMINAR
LIKELY CONSTRAINTS
SOV PSV
LSL TO FUEL GAS AMINE TREATER
LC PV
PC
NEW PR.
MAKE UP HYDROGEN
BREAK
PV 20 KC/C,M2 G
VESSEL
LV SDV
RICH AMINE TO ARU
1500 # 150# LV
18 SAFETY SEMINAR
HIGH INTEGRITY PRESSURE
PROTECTION SYSTEMS -HIPPS
◼ SHOULD HAVE THE SAME OR BETTER RELIABILITY
AS COMPARED TO PRESSURE RELIEVING DEVICES
◼ COMPLIANCE WITH DIN 3381
◼ QUICK CLOSING VALVES(<2 SECONDS)
◼ IN SOME CASES SYSTEM DYNAMICS MAY JUSTIFY
HIGHER CLOSING TIMES
◼ DEDICATED INSTRUMENTATION
◼ LOCAL RESET
◼ FAIL CLOSE FOR LOSS OF INST AIR, HYDRAULIC
OR ELECTRIC POWER
19 SAFETY SEMINAR
HIPPS CONFIGURATION –FLARE
SYSTEM
DIRECT INPUT
FROM ESD PURGE GAS
SYSTEM
TO TO FLARE TIP
COMPRESSOR EZV EZV
SUCTION
2 OUT OF 3 VOTING
RUPTURE DISC
FLARE IN
FLARE DRUM
LIQUIDS OUT
20 SAFETY SEMINAR
GAS PROCESSING FACILITIES
•GAS SWEETENING
•C2/C3 RECOVERY
•LPG RECOVERY
PLANT DESIGNS TAKE CARE OF MAXIMUM
TEMPERATURE, PRESSURE REQUIREMENT AND
COMPOSITION CHANGES
CHANGES IN WELL PRESSURES , WELL
CONFIGURATION ETC COULD PUSH THE OPERATION
TO DESIGN LIMITS
21 SAFETY SEMINAR
GAS-OIL SEPARATION
22 SAFETY SEMINAR
GAS PROCESSING UNITS
23 SAFETY SEMINAR
GAS PROCESSING UNITS
24 SAFETY SEMINAR
LIQUID PIPELINE PUMP STATION
LSS
PSHH PSHH
PSH
PSL
PSH PSHH
PUMP TRIP
FILTERS FLOW METERS PUMP WITH VOTING
LOGIC
25 SAFETY SEMINAR
LIQUID PIPELINE SYSTEM CONTROLS
26 SAFETY SEMINAR
GAS PIPELINE-COMPRESSOR
STATION
FV ANTI SURGE
VALVE
PSV
PSHH
PSHH
PSL PSHH TSHH
FLOW
METERS
PSH TSH
TSHH
TSH
27 SAFETY SEMINAR
GAS PIPELINE-SYSTEM CONTROLS
◼ PSV DOWNSTREAM OF EACH
COMPRESSOR
◼ ANTI SURGE PROTECTION
◼ HIGH/ HIGH HIGH PRESSURE AND
TEMPERATURE SWITCHES AT DISCHARGE
OF COMPRESSORS
◼ PRESSURE REDUCTION SYSTEM WITH
STAGGERED SET POINTS AT RECEIPT
TERMINAL OR FLOW CONTROL SYSTEM
◼ SHUT DOWN VALVES AND PSV’S AT
RECEIPT TERMINALS
28 SAFETY SEMINAR
GAS PIPELINE –RECEIPT TERMINAL
PSV
PCV
SDV
TO CONSUMERS
SDV PCV
29 SAFETY SEMINAR
PIPELINES-WHAT COULD GO
WRONG?
30 SAFETY SEMINAR
CORROSION –POTENTIAL AREA
LOCATION—HVY NAPHTHA CR
CIRC REFLUX RETURN SECTION
PROBLEMS
•LOW CR RETURN TEMPERATURE
CR PUMP
31 SAFETY SEMINAR
STORAGE SYSTEMS
32 SAFETY SEMINAR
SAFAFETY IN DESIGN
DELUGE WATER
FIREPROOFING
OF SPHERE
LEGS FIREPROOFED
FIRESAFE ROV
34 SAFETY SEMINAR
HYDROPROCESSNG-SIMPLIFIED
SCHEME
EFF COOLER
MAKE
UP H2
QUENCH
35 SAFETY SEMINAR
HYDROPROCESING-ISSUES TO BE
CONSIDERED
•REACTIONS ARE EXOTHERMIC-QUENCH RATES
DEPEND ON FEED QUALITY, CONVERSION,
SATURATION
•RG COMPRESSOR CAPACITY BASED ON H2/HC RATIO,
QUENCH AND H2 PARTIAL PRESSURE
•START UP-EXOTHERMICITY MAY BE LOW, FEED
RATES AT TURNDOWN LEADING TO LOW QUENCH
REQMTS
•IMPLICATIONS—LIMITATIONS ON COMPRESSOR
PERFORMANCE, HEATER HYDRAULICS, FLOW
PATTERNS (VIBRATION IN SOME SECTIONS)
36 SAFETY SEMINAR
HIGH PRESSURE EQUIPMENT
◼ REACTORS
◼ SEPARATORS
◼ COMPRESSORS
37 SAFETY SEMINAR
HIGH PRESSURE REACTORS
38 SAFETY SEMINAR
POTENTIAL PROBLEMS