SAES-L-450 PDF Download - On-Land and Near-Shore Pipelines - PDFYAR

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

7/3/23, 4:30 PM SAES-L-450 PDF Download - On-Land and Near-Shore Pipelines

PDFYAR - Engineering Notes, Documents & Lectures

Search for...

SAES-L-450 PDF Download – On-Land And Near-Shore Pipelines


May 16, 2023

This article is about SAES-L-450 which is about Construction of On-Land and Near-Shore Pipelines and
download SAES-L-450 PDF for piping and mechanical engineers, supervisors and project managers. This
is saudi aramco standard based on international codes and standards and useful for piping and
mechanical engineering knowledge to get job as engineers, QC Supervisors and QC managers,
Engineering managers and technicians.

SAES-L-450 PDF Download

https://pdfyar.com/saes-l-450-pdf-download-on-land-and-near-shore-pipelines/ 1/6
7/3/23, 4:30 PM SAES-L-450 PDF Download - On-Land and Near-Shore Pipelines

SAES-L-450 Download PDF

SAES-L-450 On-Land And Near-Shore Pipelines

This standard serves as a supplement to the ASME B31.4 and ASME B31.8 transportation piping codes. It
provides additional construction requirements specifically for onshore cross-country pipelines. The
standard covers both metallic and non-metallic line pipes used in these pipelines.

It’s important to note that this standard does not apply to offshore and sub-sea pipelines. Different
standards and regulations typically govern the design and construction of pipelines in offshore and sub-sea
environments due to unique considerations and challenges specific to those settings.

Pipeline Route, Profile And Right Of Way

In accordance with the mentioned standard, the following requirements apply to the pipeline route, profile,
and right of way:

Pipeline Route And Profile:

The Construction Contractor is responsible for surveying and staking the pipeline route as specified in the
Issued for Construction (IFC) drawings. Changes to the original routing may be allowed with prior approval
as per Section 6.

The Construction Contractor must verify the original vertical profile of the pipeline, including the amount of
cover, location and degree of elastic and preformed bends. This verification should be done in accordance
with the standard and construction drawings. The change in slope of the pipeline at a normal spacing of 30
meters and at intermediate stations, as required, should be calculated.

Fills and cuts should be made to minimize the number and magnitude of overbends and sagbends in the
pipeline. However, fills should be avoided in areas where they would affect the natural drainage of the
surrounding area.

https://pdfyar.com/saes-l-450-pdf-download-on-land-and-near-shore-pipelines/ 3/6
7/3/23, 4:30 PM SAES-L-450 PDF Download - On-Land and Near-Shore Pipelines

Precautions should be taken to prevent wash-out of the pipeline cover by rainstorms if the pipeline
construction alters the natural drainage pattern.

Pipeline Right Of Way (ROW):

The construction right-of-way should be graded to a flat or smooth rolling surface and maintained in a
condition accessible to standard four-wheel drive vehicles on at least one side of the line throughout the
construction period. Irregularities should not obstruct access for construction equipment.

In sabkha areas, fills should be provided as needed to support construction equipment. The width of these
fills and cuts should not be less than the area requiring stabilization as outlined in Section 14. The slopes
adjacent to the fills should not be steeper than four to one. The construction and final right-of-way width
should not be less than 6 meters.

In sand dune areas, the leveled and stabilized right-of-way width should be 3 meters on each side of the
pipeline, with an additional 1 meter for every 1 meter of dune height or fill height in both the cut and fill
areas.

The final finished right-of-way should have a minimum width of 5 meters (6 meters in sabkha areas and 3
meters in sand dune areas) measured from the bottom edge of the pipeline berm. It should be completed
in a manner that allows routine operation and maintenance access using standard four-wheel drive
vehicles.

General Fabrication Requirements

According to the mentioned standard, the following general fabrication requirements apply:

Vents and drains should not be installed unless they are included in the approved design drawings. The
design drawings should comply with SAES-L-110.

Installation of temporary vents and drains is not permitted without prior approval. If temporary vents are
field installed, nipples and valves should be removed, and bosses should be plugged, seal welded, and
penetrant tested after the hydrostatic test.

Drains should not be installed at the bottom of the pipe for buried pipelines.

https://pdfyar.com/saes-l-450-pdf-download-on-land-and-near-shore-pipelines/ 4/6
7/3/23, 4:30 PM SAES-L-450 PDF Download - On-Land and Near-Shore Pipelines

The assembly of bolted flange joints should follow the guidelines provided in SAEP-351.

Connections to existing piping systems using hot tap and stoppling techniques should be carried out in
accordance with SAEP-311.

Pipeline kilometer marker plates should conform to the specifications outlined in Standard Drawings AB-
036907 and AD-036973.

FAQs Related To SAES-L-450 PDF Download

Q: What Is The Scope Of SAES-L-450?

1. SAES-L-450 is a standard that supplements the ASME B31.4 and ASME B31.8 transportation
piping codes. It defines additional construction requirements for onshore cross-country pipelines.
The standard applies to both metallic and non-metallic line pipe.

Q: Are Offshore Pipelines Covered By SAES-L-450?

No, SAES-L-450 is not applicable to offshore and sub-sea pipelines. It specifically focuses on onshore
pipelines.
Q: Which Piping Codes Are Supplemented By SAES-L-450?

A: SAES-L-450 supplements the ASME B31.4 and ASME B31.8 transportation piping codes. These
codes provide guidelines for the design, construction, and operation of pipelines.
Q: Can Changes Be Made To The Original Pipeline Route?

A: Changes to the original routing may be acceptable with prior approval as specified in Section 6 of
SAES-L-450. The Construction Contractor is responsible for surveying and staking the pipeline route.
Q: How Is The Pipeline Profile Verified During Construction?

A: The Construction Contractor is required to field verify the original vertical profile of the pipeline,
including the amount of cover, location, and degree of elastic and preformed bends. The change in
slope at regular spacing and intermediate stations should be calculated.
Q: Are There Any Guidelines For Managing Overbends And Sagbends In The Pipeline?

A: Fills and cuts should be made to reduce the number and magnitude of overbends and sagbends
in the pipeline. However, fills should be avoided in areas where the natural drainage of the
surrounding area would be affected.
https://pdfyar.com/saes-l-450-pdf-download-on-land-and-near-shore-pipelines/ 5/6
7/3/23, 4:30 PM SAES-L-450 PDF Download - On-Land and Near-Shore Pipelines

Q: What Are The Requirements For The Pipeline Right-Of-Way (ROW)?

A: The construction right-of-way should be graded to a flat or smooth rolling surface and
maintained accessible with standard four-wheel drive vehicles on at least one side of the line during
the construction period. The final finished right-of-way should be a minimum width, depending on
the terrain, to allow routine operation and maintenance access.

Tags: SAUDI ARAMCO PIPING STANDARDS

Leave A Reply

Logged in as Zahid1078. Edit your profile. Log out? Required fields are marked *

Comment *

Post Comment

Neve | Powered by WordPress