Download as pdf or txt
Download as pdf or txt
You are on page 1of 33

SAKA INDONESIA PANGKAH LIMITED

PRODUCED WATER TREATMENT UNIT AT WHP-B


OFFSHORE PANGKAH

TYPICAL LOGIC SPECIFICATION

DOC NO. : SAKAP_PWT_WPHB-DI-TLS-003

DOC TYPE : TYPICAL LOGIC SPECIFICATION

CLIENT : SAKA INDONESIA PANGKAH LIMITED

PROJECT TITLE : REB PRODUCED WATER TREATMENT WHP B

CONTRACT NO : 4500613331

LOCATION : WHP-B OFFSHORE PANGKAH, EAST JAVA – INDONESIA

A 27-Jun-23 For Approval EKS/DH DH DC


By Date
REV. DATE DESCRIPTION Prep’d Check’d Appv’d
Client Appv’d
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 2 of 33

TABULATION OF REVISED PAGES

REVISION REVISION
SHEET SHEET
A
1 X
2 X
3 X
4 X
5 X
6 X
7 X
8 X
9 X
10 X
11 X
12 X
13 X
14 X
15 X
16 X
17 X
18 X
19 X
20 X
21 X
22 X
23 X
24 X
25 X
26 X
27 X
28 X
29 X
30 X
31 X
32 X ATTACHMENT/APPENDIX
33 X
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 3 of 33

DESCRIPTION OF CHANGE

Rev. Date Description


A 27-Jun-2023 For Approval
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 4 of 33

COMMENT RESPONSE SHEET

SECTION
No AND COMMENTS VENDOR RESPONSE REMARKS
PAGE
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 5 of 33

CONTENTS

TABULATION OF REVISED PAGES ................................................................................................... 2


DESCRIPTION OF CHANGE ................................................................................................................ 3
COMMENT RESPONSE SHEET........................................................................................................... 4
CONTENTS........................................................................................................................................... 5
1 INTRODUCTION ......................................................................................................................... 7
1.1 Objective .......................................................................................................................... 7
2 DEFINITIONS AND ABBREVIATION ......................................................................................... 7
2.1 Definitions ........................................................................................................................ 7
2.2 Abbreviation & Definition .................................................................................................. 7
3 PCS LOGIC MANUAL ................................................................................................................ 8
3.1 732PIC202 ....................................................................................................................... 8
3.2 732LIC201 ........................................................................................................................ 9
3.3 732LDIC202 ................................................................................................................... 10
3.4 732FIC201 ..................................................................................................................... 11
3.5 742FIC001 ..................................................................................................................... 12
3.6 742FIC002 ..................................................................................................................... 13
3.7 742PIC004 ..................................................................................................................... 14
3.8 742LIC001 ...................................................................................................................... 15
3.9 742LIC002A ................................................................................................................... 16
4 SGS LOGIC MANUAL .............................................................................................................. 17
4.1 732PZT201A .................................................................................................................. 17
4.2 732PZT201B .................................................................................................................. 18
4.3 732LZT204 ..................................................................................................................... 19
4.4 732LDZT203 .................................................................................................................. 20
4.5 742PZT001 .................................................................................................................... 21
4.6 732SDY203 .................................................................................................................... 22
4.7 732SDY202 .................................................................................................................... 23
4.8 732SDY201A.................................................................................................................. 24
4.9 732SDY201B.................................................................................................................. 25
4.10 742SDY001 .................................................................................................................... 26
4.11 757GDC030 ................................................................................................................... 27
4.12 757GDC031 ................................................................................................................... 28
4.13 757GDC032 ................................................................................................................... 29
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 6 of 33

4.14 757GDT109 .................................................................................................................... 30


4.15 757GDT110 .................................................................................................................... 31
4.16 757IRD149 ..................................................................................................................... 32
4.17 757IRD150 ..................................................................................................................... 33
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 7 of 33

1 INTRODUCTION
The Typical Logic Specification provides detailed information about the implementation of PCS (Process
Control System) and SGS (Safety Guard System) logic in this project.

1.1 Objective
The Typical Logic Specification outlines the specific guidelines and methodologies to be followed for
configuration of PCS and SGS. This specification covers various aspects such as control, interlocks, alarms,
sequences, and other critical logic functionalities. By providing a thorough understanding of the logic
implementation, the Typical Logic Specification plays a crucial role in ensuring the reliable and efficient
operation of the PCS and SGS systems throughout the project lifecycle.

2 DEFINITIONS AND ABBREVIATION

2.1 Definitions
No. Term Definitions
1. Vendor Defined as PT. YOKOGAWA INDONESIA (YIN)
2. End User / COMPANY / CPY Defined as PGN SAKA PANGKAH LIMITED
3. Client User / COMPANY / CPY Defined as PT. REAKAYASA ENERGI BERSAMA

2.2 Abbreviation & Definition

CPU : Central Processing Unit


EWS : Engineering Workstation
FA : For Approval
FCS : Field Control Station
FAT : Factory Acceptance Test
FI : For Information
GRP : Graphic
HIS : Human Interface Station
New Doc : New Document
RPT : Report
SAT : Site Acceptance Test
SCH : Schedule
SPC : Specification
VDL : Vendor Document List
YIN : Yokogawa Indonesia
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 8 of 33

3 PCS LOGIC MANUAL

3.1 732PIC202
The separator operating pressure is maintained by pressure controller (732-PIC-202), which modulates a
pressure control valve 732-PV-202 on the gas outlet line from the separator. The pressure controller (732-
PIC-202) shall be configured for direct acting control mode with 4-20 mA analogue input and send it to PCS
output signals to 732-PV-202.
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 9 of 33

3.2 732LIC201
The normal liquid level is maintained at oil section of this 3 Phase Separator by a level controller (732-LIC-
201) which modulates a level control valve 732-LV-201. The liquid level controller (732-LIC-201) shall be
configured for direct acting control mode with 4-20 mA analogue input and send it to PCS output signals to
732-LV-201 at the liquid outlet.
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 10 of 33

3.3 732LDIC202
The oil-water interface level is maintained by the interface level controller (732-LDIC-202) which modulates
an interface level control valve 732-LV-202. The liquid level controller (732-LDIC-202) shall be configured
for direct acting control mode with 4-20 mA analogue input and send it to PCS output signals to 732-LV-
202 at the water outlet.
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 11 of 33

3.4 732FIC201
The separator water flow rate is maintained by flow controller (732-FIC-201), which modulates a flow control
valve 732-FV-201 on production manifold line. The flow controller (732-FIC-201) shall be configured for
direct acting control mode with 4-20 mA analogue input and send it to PCS output signals to 732-FV-201.
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 12 of 33

3.5 742FIC001
The flow controller (742-FIC-001) is configured in a direct acting control mode to modulate the flow control
valve (742-FV-001).
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 13 of 33

3.6 742FIC002
The flow controller (742-FIC-002) is configured in a direct acting control mode to modulate the flow control
valve (742-FV-002).
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 14 of 33

3.7 742PIC004
The flow controller (742-PIC-004) is configured in a direct acting control mode to modulate the flow control
valve (742-PV-004).
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 15 of 33

3.8 742LIC001
The flow controller (742-LIC-001) is configured in a direct acting control mode to modulate the flow control
valve (742-LV-001).
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 16 of 33

3.9 742LIC002A
The flow controller (742-LIC-002A) is configured in a direct acting control mode to modulate the flow control
valve (742-LV-002).
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 17 of 33

4 SGS LOGIC MANUAL


This Typical Logic refer to the Cause & Effect Document “ 5. Emergency Shutdown Cause & Effect Matrices “
and Document “UPD-ME-W2-JN-CE-6101-A WHP-B Cause & Effect Matrices” and the result can be seen on below.

4.1 732PZT201A
Refer on Cause & Effect “UPD-ME-W2-JN-CE-6101-A WHP-B Cause & Effect Matrices” , when 732PZT201A
reach High High condition :

- 732SDV201A , 732SDV202 & 732SDV203 will be closed.

732SDV201A , 732SDV202 & 732SDV203 will be closed.

Refer on Cause & Effect “5. Emergency Shutdown Cause & Effect Matrices” , when 732PZT201A reach
High High condition :

- Process Shutdown (PSD) will tiggered & will be activated 757XA377 Audible & Visual Alarm on ON
WHP-B & Drilling Rig.
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 18 of 33

732PZT201A HH Triggered PSD & 757XA377 Audible & Visual Alarm ON WHP-B & Drilling Rig.

732PZT201A on New Graphic

4.2 732PZT201B
Refer on Cause & Effect “5. Emergency Shutdown Cause & Effect Matrices” , when 732PZT201B reach High High
condition :

- 732SDV201B , 732SDV202 & 732SDV203 will be closed.

732SDV201B , 732SDV202 & 732SDV203 will be closed.


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 19 of 33

- Process Shutdown (PSD) will Triggered & will be activated 757XA377 Audible & Visual Alarm on ON
WHP-B & Drilling Rig.

732PZT201B HH Triggered PSD & 757XA377 Audible & Visual Alarm ON WHP-B & Drilling Rig

732PZT201B on New Graphic

4.3 732LZT204
Refer on Cause & Effect “5. Emergency Shutdown Cause & Effect Matrices” , when 732LZT204 reach High High
condition :

- 732SDV201A , 732SDV201B, 732SDV202 & 732SDV203 will be closed.

732SDV201A, 732SDV201B , 732SDV202 & 732SDV203 will be closed.


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 20 of 33

- Will Activate 757XA377 Audible & Visual Alarm on ON WHP-B & Drilling Rig.

732LZT204 HH Alarm Trigger 757XA377 Audible & Visual Alarm ON WHP-B & Drilling Rig.

732LZT204 on New Graphic

4.4 732LDZT203
Refer on Cause & Effect “5. Emergency Shutdown Cause & Effect Matrices” , when 732LDZT203 reach High High
or Low Low condition :

- 732SDV201A , 732SDV201B, 732SDV202 & 732SDV203 will be closed.

732SDV201A, 732SDV201B , 732SDV202 & 732SDV203 will be closed.


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 21 of 33

- Will Activate 757XA377 Audible & Visual Alarm on ON WHP-B & Drilling Rig.

732LDZT203 HH Alarm Trigger 757XA377 Audible & Visual Alarm ON WHP-B & Drilling Rig.

732LDZT203 on New Graphic

4.5 742PZT001
Refer on Cause & Effect “UPD-ME-W2-JN-CE-6101-A WHP-B Cause & Effect Matrices” , when 742PZT001 reach
Low Low Condition:

- 742SDV001 will be closed.

742SDV001 will be closed.

742PZT001 on New Graphic


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 22 of 33

4.6 732SDY203
Refer on Cause & Effect “ 5. Emergency Shutdown Cause & Effect Matrices “ and Document “UPD-ME-
W2-JN-CE-6101-A WHP-B Cause & Effect Matrices” , 732SDY203 will be Closed when :

- Process Shutdown triggered


- 703PZT014 on High High Condition
- 703PZT035 on Low Low Condition
- 703PZT030 on High High Condition
- 703PZT036 on Low Low Condition
- 704PZT039 on Low Low Condition
- 744LZT003 on High High Condition
- 704PZT101 on Low Low Condition
- 731PZT104 on High High Condition
- 731PZT104 on Low Condition
- 732PZT201A on High High Condition
- 732PZT201B on High High Condition
- 732LZT204 on High High Condition
- 732LDZT203 on High High Condition
- 732LDZT203 on Low Low Condition
- 757GDC30 triggered
- 757GDC31 triggered
- 757GDC32 triggered
- 757GDT109 triggered
- 757GDT110 triggered
- 757IRD149 triggered
- 757IRD150 triggered
- 732LZT203 on Low Low Condition
- 732LDT202 on Low Low Condition

732SDV203 will be closed.


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 23 of 33

4.7 732SDY202
Refer on Cause & Effect “ 5. Emergency Shutdown Cause & Effect Matrices “ and Document “UPD-ME-
W2-JN-CE-6101-A WHP-B Cause & Effect Matrices”, 732SDY202 will be Closed when :

- Process Shutdown triggered


- 703PZT014 on High High Condition
- 703PZT035 on Low Low Condition
- 703PZT030 on High High Condition
- 703PZT036 on Low Low Condition
- 704PZT039 on Low Low Condition
- 744LZT003 on High High Condition
- 704PZT101 on Low Low Condition
- 731PZT104 on High High Condition
- 731PZT104 on Low Condition
- 732PZT201A on High High Condition
- 732PZT201B on High High Condition
- 732LZT204 on High High Condition
- 732LDZT203 on High High Condition
- 757GDC30 triggered
- 757GDC31 triggered
- 757GDC32 triggered
- 757GDT109 triggered
- 757GDT110 triggered
- 757IRD149 triggered
- 757IRD150 triggered
- 732LZT203 on Low Low Condition

732SDV202 will be closed.


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 24 of 33

4.8 732SDY201A
Refer on Cause & Effect “ 5. Emergency Shutdown Cause & Effect Matrices “ and Document “UPD-ME-
W2-JN-CE-6101-A WHP-B Cause & Effect Matrices”, 732SDY201A will be Closed when :

- Process Shutdown triggered


- 703PZT014 on High High Condition
- 703PZT035 on Low Low Condition
- 703PZT030 on High High Condition
- 703PZT036 on Low Low Condition
- 704PZT039 on Low Low Condition
- 744LZT003 on High High Condition
- 704PZT101 on Low Low Condition
- 731PZT104 on High High Condition
- 731PZT104 on Low Condition
- 732PZT201A on High High Condition
- 732LZT204 on High High Condition
- 732LDZT203 on High High Condition
- 757GDC30 triggered
- 757GDC31 triggered
- 757GDC32 triggered
- 757GDT109 triggered
- 757GDT110 triggered
- 757IRD149 triggered
- 757IRD150 triggered

732SDV201A will be closed.


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 25 of 33

4.9 732SDY201B
Refer on Cause & Effect “ 5. Emergency Shutdown Cause & Effect Matrices “ and Document “UPD-ME-
W2-JN-CE-6101-A WHP-B Cause & Effect Matrices”, 732SDY201B will be Closed when :

- Process Shutdown triggered


- 703PZT014 on High High Condition
- 703PZT035 on Low Low Condition
- 703PZT030 on High High Condition
- 703PZT036 on Low Low Condition
- 704PZT039 on Low Low Condition
- 744LZT003 on High High Condition
- 704PZT101 on Low Low Condition
- 731PZT104 on High High Condition
- 731PZT104 on Low Condition
- 732PZT201B on High High Condition
- 732LZT204 on High High Condition
- 732LDZT203 on High High Condition
- 757GDC30 triggered
- 757GDC31 triggered
- 757GDC32 triggered
- 757GDT109 triggered
- 757GDT110 triggered
- 757IRD149 triggered
- 757IRD150 triggered

732SDV201B will be closed.


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 26 of 33

4.10 742SDY001
Refer on Cause & Effect “UPD-ME-W2-JN-CE-6101-A WHP-B Cause & Effect Matrices” , 742SDY001 will
be closed when :

- 757GDC30 triggered
- 757GDC31 triggered
- 757GDC32 triggered
- 757GDT109 triggered
- 757GDT110 triggered
- 757IRD149 triggered
- 757IRD150 triggered
- 742PZT001 on Low Low Condition
- 742LT002A on Low Condition
- 742LZT002B on Low Condition

742SDV001 will be closed.


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 27 of 33

4.11 757GDC030
Refer on Cause & Effect “UPD-ME-W2-JN-CE-6101-A WHP-B Cause & Effect Matrices” , when 757GDC030
triggered :

- 732SDV201A , 732SDV201B, 732SDV202, 732SDV203 & 742SDV001 will be closed.

732SDV201A, 732SDV201B , 732SDV202 & 732SDV203 will be closed.

757GDC030 on New Graphic


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 28 of 33

4.12 757GDC031
Refer on Cause & Effect “UPD-ME-W2-JN-CE-6101-A WHP-B Cause & Effect Matrices” , when 757GDC031
triggered :

- 732SDV201A , 732SDV201B, 732SDV202, 732SDV203 & 742SDV001 will be closed.

732SDV201A, 732SDV201B , 732SDV202 & 732SDV203 will be closed.

757GDC031 on New Graphic


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 29 of 33

4.13 757GDC032
Refer on Cause & Effect “UPD-ME-W2-JN-CE-6101-A WHP-B Cause & Effect Matrices” , when 757GDC032
triggered :

- 732SDV201A , 732SDV201B, 732SDV202, 732SDV203 & 742SDV001 will be closed.

732SDV201A, 732SDV201B , 732SDV202 & 732SDV203 will be closed.

757GDC032 on New Graphic


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 30 of 33

4.14 757GDT109
Refer on Cause & Effect “UPD-ME-W2-JN-CE-6101-A WHP-B Cause & Effect Matrices” , when 757GDT109
triggered :

- 732SDV201A , 732SDV201B, 732SDV202, 732SDV203 & 742SDV001 will be closed.

732SDV201A, 732SDV201B , 732SDV202 & 732SDV203 will be closed.

757GDT109 on New Graphic


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 31 of 33

4.15 757GDT110
Refer on Cause & Effect “UPD-ME-W2-JN-CE-6101-A WHP-B Cause & Effect Matrices” , when 757GDT110
triggered :

- 732SDV201A , 732SDV201B, 732SDV202, 732SDV203 & 742SDV001 will be closed.

732SDV201A, 732SDV201B , 732SDV202 & 732SDV203 will be closed.

757GDT110 on New Graphic


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 32 of 33

4.16 757IRD149
Refer on Cause & Effect “UPD-ME-W2-JN-CE-6101-A WHP-B Cause & Effect Matrices” , when 757IRD149
triggered :

- 732SDV201A , 732SDV201B, 732SDV202, 732SDV203 & 742SDV001 will be closed.

732SDV201A, 732SDV201B , 732SDV202 & 732SDV203 will be closed.

757IRD149 on New Graphic


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-DI-
TLS-003
TYPICAL LOGIC SPECIFICATION Rev. A Page 33 of 33

4.17 757IRD150
Refer on Cause & Effect “UPD-ME-W2-JN-CE-6101-A WHP-B Cause & Effect Matrices” , when 757IRD150
triggered :

- 732SDV201A , 732SDV201B, 732SDV202, 732SDV203 & 742SDV001 will be closed.

732SDV201A, 732SDV201B , 732SDV202 & 732SDV203 will be closed.