SAKA INDONESIA PANGKAH LIMITED

PRODUCED WATER TREATMENT UNIT AT WHP-B


OFFSHORE PANGKAH

FACTORY ACCEPTANCE TEST PROCEDURE

DOC NO. : SAKAP_PWT_WPHB-PS-FAT-005

DOC TYPE : FACTORY ACCEPTANCE TEST PROCEDURE

CLIENT : SAKA INDONESIA PANGKAH LIMITED

PROJECT TITLE : REB PRODUCED WATER TREATMENT WHP B

CONTRACT NO : 4500613331

LOCATION : WHP-B OFFSHORE PANGKAH, EAST JAVA – INDONESIA

A 27-Jun-23 For Approval EKS/DH DH DC


By Date
REV. DATE DESCRIPTION Prep’d Check’d Appv’d
Client Appv’d
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 2 of 53

TABULATION OF REVISED PAGES

REVISION REVISION
SHEET SHEET
A A
1 X
2 X
3 X
4 X
5 X
6 X
7 X
8 X
9 X
10 X
11 X
12 X
13 X
14 X
15 X
16 X
17 X
18 X

ATTACHMENT/APPENDIX
1 X
2 X
3 X
4 X
5 X
6 X
7 X
8 X
9 X
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 3 of 53

DESCRIPTION OF CHANGE

Rev. Date Description


A 27-Jun-2023 For Approval
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 4 of 53

COMMENT RESPONSE SHEET

SECTION
No AND COMMENTS VENDOR RESPONSE REMARKS
PAGE
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 5 of 53

CONTENTS

TABULATION OF REVISED PAGES ................................................................................................... 2


DESCRIPTION OF CHANGE ................................................................................................................ 3
COMMENT RESPONSE SHEET........................................................................................................... 4
CONTENTS........................................................................................................................................... 5
1 INTRODUCTION ......................................................................................................................... 6
1.1 Objective .......................................................................................................................... 6
2 DEFINITIONS AND ABBREVIATION ......................................................................................... 6
2.1 Definitions ........................................................................................................................ 6
2.2 Abbreviation & Definition .................................................................................................. 6
3 TESTING ..................................................................................................................................... 7
3.1 Scope of Testing .............................................................................................................. 7
3.2 Method of Testing ............................................................................................................. 7
3.3 Equipment Involved .......................................................................................................... 7
4 ROLES AND RESPONSIBILITIES ............................................................................................. 8
4.1 PT. Yokogawa Indonesia (YIN)......................................................................................... 8
4.2 PT. Rekayasa Energi Bersama (REB) .............................................................................. 9
4.3 PGN SAKA PANGKAH LIMITED ...................................................................................... 9
5 FAT SCHEDULE AND LOCATION ............................................................................................. 9
6 FAT DOCUMENTATION ........................................................................................................... 10
6.1 Change Management ..................................................................................................... 10
7 TEST PROCEDURE ................................................................................................................. 12
7.1 Hardware Inspection Check............................................................................................ 12
7.2 Hardware Functional Test............................................................................................... 13
7.3 I/O Assignment Check .................................................................................................... 15
7.4 Graphics Panel Check .................................................................................................... 16
7.5 PCS Logic Check ........................................................................................................... 17
7.6 SGS Logic Check ........................................................................................................... 18
8 APPENDICES ........................................................................................................................... 19
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 6 of 53

1 INTRODUCTION

The purpose of this document is to define the methods and documentation that will be used to carry out the
Factory Acceptance Test (FAT) on Yokogawa’s PCS (Process Control System) CENTUM VP and SGS
(Safety Guard System) PROSAFE RS. The FAT is performed to ensure that the system is properly
configured, assembled and functional in accordance with the intended design as specified in the approved
documents.

1.1 Objective

The objective of FAT is to demonstrate to PT. Rekayasa Energi Bersama and PGN SAKA PANGKAH
LIMITED that the system software & hardware are built in accordance to requirements as specified in the
approved documents.

PT. Rekayasa Energi Bersama would witness to verify the test. Upon successful completion of the test, a
FAT Test Certificate and Shipping Release Notice would be signed by Yokogawa and PT. Rekayasa Energi
Bersama and PGN SAKA PANGKAH LIMITED to signify the acceptance of the test and approval of shipment
of the equipment.

2 DEFINITIONS AND ABBREVIATION

2.1 Definitions

No. Term Definitions

1. Vendor Defined as PT. YOKOGAWA INDONESIA (YIN)

2. End User / COMPANY / CPY Defined as PGN SAKA PANGKAH LIMITED

3. Client User / COMPANY / CPY Defined as PT. REAKAYASA ENERGI BERSAMA

2.2 Abbreviation & Definition

CPU : Central Processing Unit


EWS : Engineering Workstation
FA : For Approval
FCS : Field Control Station
FAT : Factory Acceptance Test
FI : For Information
GRP : Graphic
HIS : Human Interface Station
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 7 of 53

New Doc : New Document


RPT : Report
SAT : Site Acceptance Test
SCH : Schedule
SPC : Specification
VDL : Vendor Document List
YIN : Yokogawa Indonesia

3 TESTING

3.1 Scope of Testing

The scope of DCS FAT is limited to Hardware and and software for both PCS and SGS systems. The scope
of testing for FAT is specified in this chapter, including the types of equipment involved and the order of
testing and activities to be carried out.

3.2 Method of Testing

Detailed test procedure for each test item is described in section 7 in this document. Check sheets will be
provided for items to be tested. All test results shall be recorded in check sheets. Colour marking shall be
used on the print-out of the check sheets, drawings, graphics and supporting design documents such as
I/O lists, control narratives etc. The following colour codes and mark-ups shall be used in the testing:
• Yellow marker – Items that were checked and cleared

• Pink marker – Items that were having problems

• Green marker – Items that were checked after completion of recovery.

• Cloud marks – In (additions)

• Hatched Cloud – Out (deletions)

PCS and SGS software function test will test all software applications. It will be conducted using the
CENTUM VP AND Prosafe RS Test Function software tool without connection to any physical I/O. Test
Function will be used to simulate process input, digital signal and alarms to FCS and SCS so that typical
loops, complex loops and logic/sequence blocks can be tested without connecting to physical input and
output devices. Dynamic graphics check shall be a part of the PCS Software function test.

3.3 Equipment Involved

PCS and SGS components for PRODUCED WATER TREATMENT WHP B project will be configured and
tested as per Bill of Materials (BOM) at Yokogawa office or staging.
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 8 of 53

4 ROLES AND RESPONSIBILITIES

Roles and Responsibilities for each party involved in the FAT are defined here-under to ensure the execution
and successful completion of the FAT in accordance with the test procedure. It also ensures that there shall
be authorized personnel(s) from Company and Yokogawa to facilitate any decisions and schedule changes
resulted from the FAT.

The Responsibility Matrix of the FAT is shown in Table 1.

Table 1 – Responsibility Matrix

PT. Yokogawa PT. Rekayasa Energi PGN SAKA


Item / Party
Indonesia (YIN) Bersama (REB) PANGKAH LIMITED
Conduct Test  - -

Witness Test -  -

Approve Test - - 

Clear Punch Items  - -

Witness the Cleared -  -


Punch Items

Approved the Cleared - - 


Punch Items

Note:

•  : Required

• – : Not applicable

4.1 PT. Yokogawa Indonesia (YIN)

PT. YOKOGAWA INDONESIA as supplier of PCS and SGS is responsible to organise and manage all
aspects of the FAT. Yokogawa shall conduct the testing and record the test results on a daily basis together
with the Client User and End User.

YIN engineers shall conduct the testing in accordance with the approved FAT procedure, provide test
comments if any, fill out appropriate test document, resolve the punch items, and sign off test document
associated with the test conducted by them. They shall compile test documents to form the FAT Report upon
completion of FAT.
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 9 of 53

4.2 PT. Rekayasa Energi Bersama (REB)

Client User being the purchaser of the DCS Programming Modification Project is the primary party for
witnessing the FAT.

Client User shall assign at least one engineer to associate with each vendor test team. Client User engineers
shall witness the testing, provide test comments, fill out appropriate test document, ensure the testing is
carried out as defined in FAT procedure and documented correctly, sign off on the test document associated
with the test witnessed by them. They shall raise the punch record where they find the implementation is not
in accordance with the documents or where they desire a modification to the implementation due to deficiency
in the input document. They shall sign off on the punch records upon the confirmation of closure.

4.3 PGN SAKA PANGKAH LIMITED

The End-user is PGN SAKA PANGKAH LIMITED, full participation of End-user in the FAT is essential. End-
user shall appoint an Inspector Test Approver to witness the FAT. The Test Approver would have the
authority to sign-off upon the successful completion of all tests. Once signed off, the test will be deemed
accepted and the decision will be final. The Inspector shall participate in the test and observe the test results
on a daily basis. The Test Approver shall approve the inspection items based on the approved specification
and the test results recorded.

5 FAT SCHEDULE AND LOCATION

Date Location

24 – 28 July 2023 Plaza Oleos Lantai 3 PT.Yokogawa Indonesia

Daily testing hour are from:

Time Agenda

9:00 a.m. to 12:00 p.m. Inspection and Test

12:00 p.m. to 1:00 p.m. Lunch

1:00 p.m. to 4:30 p.m. Inspection and Test

4:30 p.m. to 5:00 p.m. Daily review meeting including next day’s schedule planning

4:30 p.m. to 5:00 p.m. is reserved for short daily review meeting to discuss on progress, non-
conformities or deviation encountered during the day and possible resolutions and actions. It is
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 10 of 53

proposed that daily tests end at 5.00 p.m. so that minor recovery can be made at the end of the day.
This will allow as much as possible Test Incident Record to be cleared.

A wrap-up meeting will be held on the last evening of the FAT.

Once all the inspection item approval forms have been successfully completed and signed off, the Factory
Acceptance Test Certificate shall be approved and signed off with the date recorded.

6 FAT DOCUMENTATION

Yokogawa will prepare all required FAT documentation prior to the start of FAT, including input document,
approved Yokogawa document, internal test records and etc. All the related documents, drawings and check
sheets. As listed in this procedure will be organised in indexed binders. A master index will be provided and
maintained by Yokogawa.

All FAT reference documents and test documents shall be stamped “FAT MASTER” on every page/sheet.
Any additional documents as required and generated later during FAT shall also be stamped, and indexes
amended accordingly.

Before the start of each test, the following administrative items are checked:

• Approved test procedure and documents / drawings for the test

• AFC or officially submitted latest revision customer inputs as source and/or test reference documents
for the test. Latest document verification and/or implementation will be planned subject as part of
punch management process.

• All test instruments to be used during the test are identified in the Test Equipment Record

6.1 Change Management

All shortcomings found or modifications required during the test shall be recorded in Punch Records. Each
punch record shall cover one punch item. A Punch Ledger will be used to summarize all the punch records.

Punch items are classified as follows:

• C = Correction: item is to be corrected by Yokogawa (not complying with specification)

• M = Modification: item is to be modified or deleted due to design input changes

• A = Addition: item is to be added due to design input changes

Punch record will be reviewed during the daily meeting, the punch category codes (C/M/A) will be confirmed
and the action to be taken will be discussed and finalised. This is to ensure that the punch is clearly
understood and accepted by all parties. Upon satisfactory review with all parties, the punch will be accepted
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 11 of 53

by YIN FAT test engineer, officially recorded in the punch ledger and assigned with a unique punch reference
number.

If the recovery work involved is minor and agreed by all parties, the recovery work can be carried out on the
same day and will be re-tested/demonstrated immediately if required on the following day.

If the recovery work involves major change/modification, YIN will advise the schedule for retesting. Major
Modification/Addition will be carried out after DCR is approved.

Upon witnessed retest and verification, all parties shall sign off the punch record to close the punch.

YIN shall clear all punch items at factory before ship-out. Any punch items that could not be cleared due to
sourcing of material or hardware with long lead-time or other limitations shall be recorded as “Outstanding
Punches” and will be attached to the FAT Completion Certificate.

Upon completion of the FAT, FAT Completion Certificate shall be signed off by vendor, client user, and end
user. The purpose of these document is to certify that the FAT has been completed and accepted by client
user and end user and agree that the system is in order and can be released for shipment to installation
location at field. However, if the tested system is to be shipped out partially for what-so-ever reasons, client
user, and end user shall advice and issue the Shipping Release Note accordingly.
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 12 of 53

7 TEST PROCEDURE

7.1 Hardware Inspection Check

Outline
The hardware manufactured for this project is subject to client visual inspection to confirm that all
components are in accordance with the specifications and the quantities are as per the approved BOM.
Objective
To verify that the following hardware are in accordance with project specification, model number of
each component, component number of each component as per BOM.
Reference
• SAKAP_PWT_WPHB-PS-BOM-003 Bill of Material
Procedure
For each component, visually inspect and verify the following:
• Model numbers and type are correct as per Bill of Materials
• Quantity of items as per Bill of Materials.
Criteria
• All components shall conform to Bill of Materials
• Check Sheet Appendix 1
Comments:

The above checks for all related components are conducted and witnessed by the following
representatives:
Test Result: PASS / FAIL
Conducted By: Signature: Date:

___________ ___________ ___________


Witnessed By: Signature: Date:

___________ ___________ ___________


Approved By: Signature: Date:

___________ __________ ___________


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 13 of 53

7.2 Hardware Functional Test

Outline
All I/O modules are assigned according to the I/O assignments. The position and quantity of these
items in the specific system.
Objective
To verify that all I/O modules are correctly supplied, installed, and work properly.
Reference
• SAKAP_PWT_WPHB-PS-BOM-003 Bill of Material
• SAKAP_PWT_WPHB-DS-IOL-001 I/O Assignment
Procedure
• Analog input:
Simulate appropriate analog input signals using the portable calibrator and record corresponding PCS and
SGS reading displayed in the corresponding faceplate at the HIS.
For Analog Input points, input signals shall be simulated:
- Signal 1 = 4.00mA, corresponding to 0% at HIS.
- Signal 2 = 12.00mA, corresponding to 50% at HIS.
- Signal 3 = 20.00mA, corresponding to100% at HIS.
• Analog output:
From the faceplate at the HIS, set the output (MV) of the tag and measure the corresponding signal output
at the output terminals using an ammeter. For Analog Output points, following output signals shall be set:
- Signal 1 = 0.1%, corresponding to 4mA at output terminals.
- Signal 2 = 50%, corresponding to 12mA at output terminals.
- Signal 3 = 99.9%, corresponding to 20mA at output terminals.
• Digital input:
Open or close the input point at the input terminals and record the status indication for the corresponding
tag faceplate at the HIS. For Digital Input points, 2 input states shall be simulated:
- Signal 1 = 0 or open contact input signal.
- Signal 2 = 1 or close contact input signal.
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 14 of 53

• Digital output:
Set or reset the PCS output point through the faceplate at the HIS and see the status of the output point on
the I/O Module if it is with status indication. For Digital Output points, 2 output states shall be set:
- Signal 1 = 0 or open contact output signal.
- Signal 2 = 1 or close contact output signal.

Criteria
• The simulated signals from I/O points should function and display properly in HIS.
• Tag Value, tag number, tag comment, alarm settings, range, and engineering units should be
generated correctly.
Test Record Reference
• Check Sheet Appendix 2

Comments:

The above checks for all related components are conducted and witnessed by the following
representatives:
Test Result: PASS / FAIL
Conducted By: Signature: Date:

___________ ___________ ___________


Witnessed By: Signature: Date:

___________ ___________ ___________


Approved By: Signature: Date:

___________ __________ ___________


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 15 of 53

7.3 I/O Assignment Check

Outline
I/O Assignment Check aims to adapt the I/O on document with those assigned in System View for PCS
and Workbench for SGS.
Objective
To verify that all I/O Assignment are correctly assign in the PCS and SGS.
Reference
• SAKAP_PWT_WPHB-DS-IOL-001 I/O Assignment
Procedure
• Open System View for PCS or Workbench for SGS
• Check the IOM Module Assignment
• Check the I/O List
Criteria
• I/O Assignment List should be assigned at System View as per I/O List Document
Test Record Reference
• Check Sheet Appendix 3
Comments:

The above checks for all related components are conducted and witnessed by the following
representatives:
Test Result: PASS / FAIL
Conducted By: Signature: Date:

___________ ___________ ___________


Witnessed By: Signature: Date:

___________ ___________ ___________


Approved By: Signature: Date:

___________ __________ ___________


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 16 of 53

7.4 Graphics Panel Check

Outline
Graphics are used for control and monitoring the plant.
Objective
The purpose of this test is to confirm that the graphics are generated and functioning according to the
Graphic Specification
Reference
• P&ID Document
Procedure
• Call up the graphic panel (referring to the above documents)
• Check the display
• Check the dynamic data by changing of process value
• Check the modifier by simulating field conditions
• Check the touch targets and cursor definitions
Criteria
• Graphics should be configured as per specification and commented graphic printout
Test Record Reference
• Check Sheet Appendix 4
Comments:

The above checks for all related components are conducted and witnessed by the following
representatives:
Test Result: PASS / FAIL
Conducted By: Signature: Date:

___________ ___________ ___________


Witnessed By: Signature: Date:

___________ ___________ ___________


Approved By: Signature: Date:

___________ __________ ___________


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 17 of 53

7.5 PCS Logic Check

Outline
Logic is used to running Plant in Automatic System
Objective
To verify all the logic as per input document received.
Reference
• UPD-PS-W2-JN-MT-2001 Control Narrative
• UPD-PS-W2-PR-DR-2004_P&ID Drawing CFU Package R3

• UPD-PS-W2-PR-DR-2003_P&ID Drawing 3-Phase Separator R2

Procedure
• Test function Centum VP
Criteria
• Logic generation and testing should conform to the requirement and latest input document
Test Record Reference
• Check Sheet Appendix 5
Comments:

The above checks for all related components are conducted and witnessed by the following
representatives:
Test Result: PASS / FAIL
Conducted By: Signature: Date:

___________ ___________ ___________


Witnessed By: Signature: Date:

___________ ___________ ___________


Approved By: Signature: Date:

___________ __________ ___________


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 18 of 53

7.6 SGS Logic Check

Outline

Logic is used to running Plant in Automatic System

Objective

To verify all the logic as per input document received.

Reference

• UPD-PS-W2-PR-DR-2004_P&ID Drawing CFU Package R3

• UPD-PS-W2-PR-DR-2003_P&ID Drawing 3-Phase Separator R2

• UPD-PS-W2-JN-CE-2001_CAUSE EFFECT REV.A

Procedure

• Typical loops test

• Test Fuction From EWS System View

Criteria

• Logic generation and testing should conform to the requirement and latest input document

Test Record Reference

• Check Sheet Appendix 6

Comments:

The above checks for all related components are conducted and witnessed by the following
representatives:
Test Result: PASS / FAIL
Conducted By: Signature: Date:

___________ ___________ ___________


Witnessed By: Signature: Date:

___________ ___________ ___________


Approved By: Signature: Date:

___________ __________ ___________


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 19 of 53

8 APPENDICES

Appendix 01 - Bill of Material


Appendix 02 - Hardware Functional Test
Appendix 03 - I/O Assignment Check
Appendix 04 - Graphics Panel Check
Appendix 05 - PCS Logic Check
Appendix 06 - SGS Logic Check
Appendix 07 - FAT Punchlist Form
Appendix 08 - FAT Completion Certificate
Appendix 09 - Shipping Release Note
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 20 of 53

Appendix 01

END USER : PGN SAKA PANGKAH INDONESIA

CLIENT USER : PT. REKAYASA ENERGI BERSAMA

PROJECT : PRODUCED WATER TREATMENT WHP B

YIN PROJECT NO. : 600000180190

DOC. NO. : SAKAP_PWT_WPHB-PS-BOM-003

BILL OF MATERIAL CHECK SHEET


!" # $

- & ; $ < = %

%& % '( (
) *+ (, + "
-. ( !(& */ ( 01 ! 2 .3 2 ( &,
! 4 5 " 66
./7 876 / 11
!"#$ %
"& '( $ ( ( # (# ( & ) ) # %
* + ( $ ,- + ) # +
'( $ ) . ( ) ) " /0% (
12 '( $ 2 0 3 ) # )4 52 " 6

-0 ( ( !(& */ ( 01 ! 2 .3 2 ( &,
! 4 5 " 66
8/7 876 / 11
* 7 8 7%
"& '( $ ( ( # (# ( & ) ) # %
* + ( $ ,- + ) # +
'( $ ) . ( ) ) " /0% (
12 '( $ 2 0 3 ) # )4 52 " 6

-7 & !(& *70 2 0/ " & 2 ( &,


! 4 5 " 66 &".8. 876&8 11
9: * 9( ( "#$ : 90 %
" '( $ $3 (
* '( $ ( ;< ( $ - ( #()
'( $ ) . ( )
) " /0% (
19* '( $ 2 0 3 ) # ) ) "#$ ( ( 4 59* " 6

-/ %! ( %& +(% ( * && % & & ,


! 4 5 " 66 /& 13
, 9 5 ) ( = ) ) ( ") !"#$ %
" '( $ ) 3 )3 )
! '( $ ) . ( - ( ) #(

-8 %! ( %& +(% & * && % & & ,


! 4 5 " 66 &8& 13
,9*9 5 ) ( = ) ) 9( ( ( ") "#$ %
" '( $ ) 3 )3 )
! '( $ ) . ( - ( ) #(

-3
! 45 77. !1.1
2= ( 0 3 * "* ( %
" 0 3 $

-9
! 4 5 . .1:
2 ( 0 3 " ( %
" 0 3 $
>= ; =

%& % '( (
) *+ (, + $
-. 4 ; ! 4 */ 01 2 .3 4 2 4 4 ,
! 4 5 +66 ./7 376 %
! #$ ( ( %
"& '( $ & ?5 # (# ( 4? ? + + 6
! '( $ ( # 3 ( ) # ) - ( ) #(
'( $ ) . ) ) " @0%
1 ? '( $ ) A ( ( ( )(

-0 & 4 ; ! 4 *.3 42 0/ " & 2 4 4 ,


! 4 5 +66 &".// 376 %
9: 9( ( !"#$ : 90 ( ( %
" ) ;
! '( $ ( # 3 ( ) # ) - ( ) #(
'( $ ) . ) ) " @0%
1 ? '( $ ) A ( ( ( )(

-7 & 4( ; ! 4 *.3 42 0/ " & 2 4 4 ,


! 4 5 +66 &"8/. 376 %
9:* 9( ( 7 !"#$ : 90 ( ( %
!" # $

- & ; $ < = %

" ) ;
! '( $ ( # 3 ( ) # ) - ( ) #(
'( $ ) . ) ) " @0%
1 ? '( $ ) A ( ( ( )(

-/ 4 4 * 4 & 4% 2 .3 4 > 0,
! 4 5 +66 /& .3
, 9 5 ) ( = ) ( 9 "? ! #$ - %
" '( $ ) 3 )3 )
! '( $ ) . - ( ) #(

-8 & 4 4 * 4 & 4% 2 .3 4 > 0,


! 4 5 +66 &/& .3
,9 9 9( ( 5 ) ( = ) ( 9 "? ! #$ - %
" '( $ ) 3 )3 )
! '( $ ) . - ( ) #(

-3 4 ?4 *81 81 ; , *$ ? ) &".//6 &"87.6 &"87 6 &"8/.6 ./8 4 ,


! 45 77. !1.16 &".//
2= ( 0 3 * "* ( % )# #( 3 9: 1 9:* 1 9:* 1 9:* 1 5 * 5 ) ( = ) %
" B $
1 9: #( # 3 ) 9: ) ) "? %

-9 4 ?4 *81 81 ; , *$ ? ) &".//6 &"87.6 &"87 6 &"8/.6 ./8 4 ,


! 45 77. !1.16 &"8/.
2= ( 0 3 * "* ( % )# #( 3 9: 1 9:* 1 9:* 1 9:* 1 5 * 5 ) ( = ) %
" B $
1 9:* #( # 3 ) 9:* ) ) "? %

-@ 4 ?4 */1 /1 ; ,
! 4 5 . .1: 6 ./7
2 ( 0 3 " ( %
" B $
>= ; =
1 #( # 3 ) ) ) "? %

%& % '( (

-. %! ( %& % '
' ( ) ) ,C ' ( )

-0 + '% '
$ (- 0 # ) ,C $ (- 0 # !

-7 %! (
) B

-/ 4 ?4
0 3 +* * ) ,C (A B # B
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 23 of 53

Appendix 02

END USER : PGN SAKA PANGKAH INDONESIA

CLIENT USER : PT. REKAYASA ENERGI BERSAMA

PROJECT : PRODUCED WATER TREATMENT WHP B

YIN PROJECT NO. : 600000180190

DOC. NO. :

HARDWARE FUNCTIONAL TEST


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 24 of 53

Appendix 2: Hardware Functional Test

Equipment ID: Hardware Functional Test: Reference documents:


(Approved/Commented)
SDV541-S63 - DIGITAL OUTPUT
MODULE SAKAP_PWT_WPHB-DS-IOL-001

Date: Test Phase: FAT

Name of Tester: Signature:

Witnessed by: Signature:

Approved by: Signature:


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 25 of 53

DO TEST
CHANNEL TAG NUMBER RESULT REMARK
GOOD BAD
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 26 of 53

Appendix 2: Hardware Functional Test

Equipment ID: Hardware Functional Test: Reference documents:


(Approved/Commented)
SDV144-S63 – DIGITAL INPUT
MODULE SAKAP_PWT_WPHB-DS-IOL-001

Date: Test Phase: FAT

Name of Tester: Signature:

Witnessed by: Signature:

Approved by: Signature:


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 27 of 53

DO TEST
CHANNEL TAG NUMBER RESULT REMARK
GOOD BAD
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 28 of 53

Appendix 2: Hardware Functional Test

Equipment ID: Hardware Functional Test: Reference documents:


(Approved/Commented)
ADV151-S63 – DIGITAL INPUT
MODULE SAKAP_PWT_WPHB-DS-IOL-001

Date: Test Phase: FAT

Name of Tester: Signature:

Witnessed by: Signature:

Approved by: Signature:


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 29 of 53

DO TEST DO TEST
CHANNEL TAG NUMBER RESULT REMARK CHANNEL TAG NUMBER RESULT REMARK
GOOD BAD GOOD BAD
1 17
2 18
3 19
4 20
5 21
6 22
7 23
8 24
9 25
10 26
11 27
12 28
13 29
14 30
15 31
16 32
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 30 of 53

Appendix 2: Hardware Functional Test

Equipment ID: Hardware Functional Test: Reference documents:


(Approved/Commented)
SAI143-H – ANALOG INPUT
MODULE SAKAP_PWT_WPHB-DS-IOL-001

Date: Test Phase: FAT

Name of Tester: Signature:

Witnessed by: Signature:

Approved by: Signature:


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 31 of 53

Channel Tag Name 0% 25 % 50 % 75 % 100 % Remarks


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 32 of 53

Appendix 2: Hardware Functional Test

Equipment ID: Hardware Functional Test: Reference documents:


(Approved/Commented)
AAI143-H – PCS ANALOG INPUT
MODULE (2ea) SAKAP_PWT_WPHB-DS-IOL-001

Date: Test Phase: FAT

Name of Tester: Signature:

Witnessed by: Signature:

Approved by: Signature:


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 33 of 53

Channel Tag Name 0% 25 % 50 % 75 % 100 % Remarks


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Channel Tag Name 0% 25 % 50 % 75 % 100 % Remarks


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 34 of 53

Appendix 2: Hardware Functional Test

Equipment ID: Hardware Functional Test: Reference documents:


(Approved/Commented)
AAI543-S63 – ANALOG OUTPUT
MODULE SAKAP_PWT_WPHB-DS-IOL-001

Date: Test Phase: FAT

Name of Tester: Signature:

Witnessed by: Signature:

Approved by: Signature:


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 35 of 53

Channel Tag Name 0% 25 % 50 % 75 % 100 % Remarks


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 36 of 53

Appendix 03

END USER : PGN SAKA PANGKAH INDONESIA

CLIENT USER : PT. REKAYASA ENERGI BERSAMA

PROJECT : PRODUCED WATER TREATMENT WHP B

YIN PROJECT NO. : 600000180190

DOC. NO. : SAKAP_PWT_WPHB-DS-IOL-001

I/O ASSIGNMENT CHECK


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 37 of 53

Appendix 3: I/O Assignment Check

Equipment ID: I/O Assignment Check Reference documents:


(Approved/Commented)

SAKAP_PWT_WPHB-DS-IOL-001

Date: Test Phase: FAT

Name of Tester: Signature:

Witnessed by: Signature:

Approved by: Signature:


PCS IO Load
Front
Station No : FCS0101
AO DO AI DI RS232 Dummy cover ESB Bus Coupler ESB Bus Coupler CPU CPU PSU PSU
Ch S1 Rv S2 Rv S3 Rv S4 Rv S5 Rv S6 Rv S7 Rv S8 Rv
1 701-HCV-0105 C2 701P01ADD C2 701FT2602 C2 732DI040CFB C2
2 701-HCV-0205 C2 701P01AID C2 (FUTURE) C2 732DI040FB C2
3 701-HCV-0305 C2 701P02ADD C2 (FUTURE) C2 Spare C2
4 701-HCV-0405 C2 701P02AID C2 732-PT-202 C2 Spare C2
5 701-HCV-0505 C2 744P01ADD C2 731TT001 C2 Spare C2
6 701-HCV-0605 C2 744P01AID C2 731TT101 C2 Spare C2
7 701-HCV-0705 C2 748P03ADD C2 732-TT-201 C2 Spare C2
8 701-HCV-0805 C2 748P03AID C2 732-LT-201 C2 Spare C2
9 701-HCV-0905 C2 749P01ADD C2 732-LDT-202 C2 Spare C2
10 701-HCV-1005 C2 749P01AID C2 732-FT-201 C2 Spare C2
11 732LY040X C2 749P02ADD C2 742-PIT-002 C2 Spare C2
12 732VFD040C C2 749P02AID C2 742-PIT-003 C2 Spare C2
13 732VFD040B C2 SPARE C2 742-PIT-004 C2 Spare C2
ADV551-P03/D5A00

ADV151-P03/D5A00
AAI543-H03/K4A00

AAI143-H03/K4A00

14 702LDY001 C2 763XS907 C2 742-FIT-001 C2 Spare C2

ALR121-S01

PW482-11

PW482-11
CP451-11

CP451-11
702LY005 732P040 742-FIT-002 Spare

Node : 1
15 C2 C2 C2 C2

EC401-11

EC401-11
ADCV01
16 732LY040 C2 757COMP001 C2 742-FIT-003 C2 Spare C2 ALR121 ADCV01 ESB Bus ESB Bus
C2 C2 C2 C2
17 732P040C C2 Spare C2 Coupler Coupler
18 SPARE C2 Spare C2
19 SPARE C2 Spare C2
20 SPARE C2 Spare C2
21 SPARE C2 Spare C2
22 SPARE C2 Spare C2
23 SPARE C2 Spare C2
24 SPARE C2 Spare C2
25 SPARE C2 Spare C2
26 SPARE C2 Spare C2
27 SPARE C2 Spare C2
28 SPARE C2 Spare C2
29 SPARE C2 Spare C2
30 SPARE C2 Spare C2
31 SPARE C2 Spare C2
32 SPARE C2 Spare C2

AO DO AO DI DI Dummy Cover Dummy Cover Dummy Cover BUS BUS PSU PSU
Ch S1 Rv S2 Rv S3 Rv S4 Rv S5 Rv S6 Rv S7 Rv S8 Rv
1 701-HCV-1105 C2 701P01BDD C2 732-LV-201 C2 Spare C2 Spare D1
2 701-HCV-1205 C2 701P01BID C2 732-LV-202 C2 Spare C2 Spare D1
3 701-HCV-1305 C2 701P02BDD C2 732-PV-202 C2 Spare C2 Spare D1
4 701-HCV-1405 C2 701P02BID C2 742-FV-001 C2 Spare C2 Spare D1
5 701-HCV-1505 C2 744P01BDD C2 742-FV-002 C2 Spare C2 Spare D1
6 701-HCV-1605 C2 744P01BID C2 742-LV-001 C2 Spare C2 Spare D1
7 701-HCV-1705 C2 748P03BDD C2 742-LV-002 C2 Spare C2 Spare D1
8 701-HCV-1805 C2 748P03BID C2 742-PV-004 C2 Spare C2 Spare D1
9 701-HCV-1905 C2 749P01BDD C2 Spare C2 Spare C2 Spare D1
10 701-HCV-2005 C2 749P01BID C2 Spare C2 Spare C2 Spare D1
11 701-HCV-2105 C2 749P02BDD C2 Spare C2 Spare C2 Spare D1
12 Spare C2 749P02BID C2 Spare C2 Spare C2 Spare D1
13 Spare C2 Spare C2 Spare C2 Spare C2 Spare D1
ADV551-P03/D5A00

ADV151-P03/D5A00

ADV151-P03/D5A00
AAI543-H03/K4A00

AAI543-H03/K4A00

14 702PY006 C2 744XY052 C2 Spare C2 Spare C2 Spare D1

PW482-11

PW482-11
SB401-11

SB401-11
Spare Spare Spare Spare Spare

Node : 2
15 C2 C2 C2 C2 D1
ADCV01

ADCV01

ADCV01
16 Spare C2 Spare C2 Spare C2 Spare C2 Spare D1
ADCV01 C2 ADCV01 C2 ADCV01 C2
17 Spare C2 Spare C2 Spare D1
18 Spare C2 Spare C2 Spare D1
19 Spare C2 Spare C2 Spare D1
20 Spare C2 Spare C2 Spare D1
21 Spare C2 Spare C2 Spare D1
22 Spare C2 Spare C2 Spare D1
23 Spare C2 Spare C2 Spare D1
24 Spare C2 Spare C2 Spare D1
25 Spare C2 Spare C2 Spare D1
26 Spare C2 Spare C2 Spare D1
27 Spare C2 Spare C2 Spare D1
28 Spare C2 Spare C2 Spare D1
29 Spare C2 Spare C2 Spare D1
30 Spare C2 Spare C2 Spare D1
31 Spare C2 Spare C2 Spare D1
32 Spare C2 Spare C2 Spare D1

New IO Assignment
For I/O CFU & 3PS

REV. PJ DOC No. TITLE BLOCKCODE


IFA1 SAKAP_PWT_WPHB-DS-IOL-001 I/O ASSIGNMENT
REMARKS

7 of 9
PCS IO Load
Front
Station No : FCS0101
AI AI AI AI DI DI DI DI BUS BUS PSU PSU
Ch S1 Rv S2 Rv S3 Rv S4 Rv S5 Rv S6 Rv S7 Rv S8 Rv
1 704FT0102 C2 701TT0111 C2 701ZT0105 C2 704PT0103 C2 701ZSO0102 C2 701ZSC0102 C2 701ZSO0101 C2 703ZSC001 C2
2 704FT0202 C2 701TT0211 C2 701ZT0205 C2 704PT0203 C2 701ZSO0202 C2 701ZSC0202 C2 701ZSO0201 C2 703ZSC002 C2
3 704FT0302 C2 701TT0311 C2 701ZT0305 C2 704PT0303 C2 701ZSO0302 C2 701ZSC0302 C2 701ZSO0301 C2 703ZSC003 C2
4 704FT0402 C2 701TT0411 C2 701ZT0405 C2 704PT0403 C2 701ZSO0402 C2 701ZSC0402 C2 701ZSO0401 C2 703ZSC004 C2
5 704FT0502 C2 701TT0511 C2 701ZT0505 C2 704PT0503 C2 701ZSO0502 C2 701ZSC0502 C2 701ZSO0501 C2 703ZSC005 C2
6 704FT0602 C2 701TT0611 C2 701ZT0605 C2 704PT0603 C2 701ZSO0602 C2 701ZSC0602 C2 701ZSO0601 C2 703ZSC017 C2
7 704FT0702 C2 701TT0711 C2 701ZT0705 C2 704PT0703 C2 701ZSO0702 C2 701ZSC0702 C2 701ZSO0701 C2 703ZSC018 C2
8 704FT0802 C2 701TT0811 C2 701ZT0805 C2 704PT0803 C2 701ZSO0802 C2 701ZSC0802 C2 701ZSO0801 C2 703ZSC019 C2
9 704FT0902 C2 701TT0911 C2 701ZT0905 C2 704PT0903 C2 701ZSO0902 C2 701ZSC0902 C2 701ZSO0901 C2 703ZSC020 C2
10 704FT1002 C2 701TT1011 C2 701ZT1005 C2 704PT1003 C2 701ZSO1002 C2 701ZSC1002 C2 701ZSO1001 C2 703ZSC021 C2
11 702TT0003 C2 701PT0811 C2 732VFI040 C2 Spare C2 701ZSO0103 C2 701ZSC0103 C2 701P01AFD C2 703XA001 C2
12 Spare C2 Spare C2 732VFI040C C2 Spare C2 701ZSO0203 C2 701ZSC0203 C2 701P01ARD C2 703XA002 C2
13 704PT061 C2 Spare C2 732LT040 C2 767PI818 C2 701ZSO0303 C2 701ZSC0303 C2 701P02AFD C2 703XA003 C2

ADV151-P03/D5A00

ADV151-P03/D5A00

ADV151-P03/D5A00

ADV151-P03/D5A00
AAI143-H03/K4A00

AAI143-H03/K4A00

AAI143-H03/K4A00

AAI143-H03/K4A00
14 702LDT001 C2 702FT011 C2 744LT006 C2 767TI816 C2 701ZSO0403 C2 701ZSC0403 C2 701P02ARD C2 703XA004 C2

PW482-11

PW482-11
SB401-11
SB401-11
701PT118 702FT014 Spare 702PT006 701ZSO0503 701ZSC0503 744P01AFD 703XA005

Node : 3
15 C2 C2 C2 C2 C2 C2 C2 C2
16 701PT119 C2 702FT021 C2 744LT016 C2 767MI817 C2 701ZSO0603 C2 701ZSC0603 C2 744P01ARD C2 703XA017 C2
17 701ZSO0703 C2 701ZSC0703 C2 748P03AFD C2 703XA018 C2
18 701ZSO0803 C2 701ZSC0803 C2 748P03ARD C2 703XA019 C2
19 701ZSO0903 C2 701ZSC0903 C2 749P01AFD C2 703XA020 C2
20 701ZSO1003 C2 701ZSC1003 C2 749P01ARD C2 703XA021 C2
21 701ZSO0104 C2 701ZSC0104 C2 749P02AFD C2 731ZSC047 C2
22 701ZSO0204 C2 701ZSC0204 C2 749P02ARD C2 731ZSC048 C2
23 701ZSO0304 C2 701ZSC0304 C2 Spare C2 731ZSC049 C2
24 701ZSO0404 C2 701ZSC0404 C2 Spare C2 731ZSC050 C2
25 701ZSO0504 C2 701ZSC0504 C2 Spare D2 731ZSC051 C2
26 701ZSO0604 C2 701ZSC0604 C2 P_N3S7C26 D1 731ZSC063 C2
27 701ZSO0704 C2 701ZSC0704 C2 Spare 01 731ZSC064 C2
28 701ZSO0804 C2 701ZSC0804 C2 Spare 01 731ZSC065 C2
29 701ZSO0904 C2 701ZSC0904 C2 762XA911A C2 731ZSC067 C2
30 701ZSO1004 C2 701ZSC1004 C2 762XL912A C2 731ZSC068 C2
31 Spare C2 Spare C2 767XA813A C2 701P03FD C2
32 Spare C2 744XL026 C2 767XL815A C2 701P03RD C2

AI AI AI AI DI DI DI DI BUS BUS PSU PSU


Ch S1 Rv S2 Rv S3 Rv S4 Rv S5 Rv S6 Rv S7 Rv S8 Rv
1 704FT1102 C2 701TT1111 C2 701ZT1105 C2 704PT1103 C2 701ZSO1102 C2 701ZSC1102 C2 701ZSO1101 C2 703ZSO001 C2
2 704FT1202 C2 701TT1211 C2 701ZT1205 C2 704PT1203 C2 701ZSO1202 C2 701ZSC1202 C2 701ZSO1201 C2 703ZSO002 C2
3 704FT1302 C2 701TT1311 C2 701ZT1305 C2 704PT1303 C2 701ZSO1302 C2 701ZSC1302 C2 701ZSO1301 C2 703ZSO003 C2
4 704FT1402 C2 701TT1411 C2 701ZT1405 C2 704PT1403 C2 701ZSO1402 C2 701ZSC1402 C2 701ZSO1401 C2 703ZSO004 C2
5 Spare C2 701TT1511 C2 701ZT1505 C2 Spare C2 701ZSO1502 C2 701ZSC1502 C2 701ZSO1501 C2 703ZSO005 C2
6 704FT1602 C2 Spare C2 701ZT1605 C2 704PT1603 C2 701ZSO1602 C2 701ZSC1602 C2 701ZSO1601 C2 703ZSO017 C2
7 701FT1602 C2 701TT1711 C2 701ZT1705 C2 Spare C2 701ZSO1702 C2 701ZSC1702 C2 701ZSO1701 C2 703ZSO018 C2
8 704FT1802 C2 701TT1811 C2 701ZT1805 C2 704PT1803 C2 701ZSO1802 C2 701ZSC1802 C2 701ZSO1801 C2 703ZSO019 C2
9 704FT1902 C2 701TT1911 C2 701ZT1905 C2 704PT1903 C2 701ZSO1902 C2 701ZSC1902 C2 701ZSO1901 C2 703ZSO020 C2
10 704FT2002 C2 701TT2011 C2 701ZT2005 C2 704PT2003 C2 701ZSO2002 C2 701ZSC2002 C2 701ZSO2001 C2 703ZSO021 C2
11 704FT2102 C2 701TT2111 C2 701ZT2105 C2 704PT2103 C2 701ZSO1103 C2 701ZSC1103 C2 701P01BFD C2 731XA047 C2
12 704FT2202 C2 742-LT-001 C2 Spare C2 704PT2203 C2 701ZSO1203 C2 701ZSC1203 C2 701P01BRD C2 731XA048 C2
13 Spare C2 701PT2610 C2 732PT033 C2 749LT001 C2 701ZSO1303 C2 701ZSC1303 C2 701P02BFD C2 731XA049 C2
ADV151-P03/D5A00

ADV151-P03/D5A00

ADV151-P03/D5A00

ADV151-P03/D5A00
AAI143-H03/K4A00

AAI143-H03/K4A00

AAI143-H03/K4A00

AAI143-H03/K4A00

14 702LT005 C2 742-LT-002A C2 744PT001 C2 703TT001 C2 701ZSO1403 C2 701ZSC1403 C2 701P02BRD C2 731XA050 C2

PW482-11

PW482-11
SB401-11
SB401-11
701PT123 732FT045 704TT062 746PT022 701ZSO1503 701ZSC1503 744P01BFD 731XA051

Node : 4
15 C2 C2 C2 C2 C2 C2 C2 C2
16 701PT124 C2 Spare C2 748LT015 C2 704FT040 D1 701ZSO1603 C2 701ZSC1603 C2 744P01BRD C2 731XA063 C2
17 701ZSO1703 C2 701ZSC1703 C2 748P03BFD C2 731XA064 C2
18 701ZSO1803 C2 701ZSC1803 C2 748P03BRD C2 731XA065 C2
19 701ZSO1903 C2 701ZSC1903 C2 749P01BFD C2 731XA067 C2
20 701ZSO2003 C2 701ZSC2003 C2 749P01BRD C2 731XA068 C2
21 701ZSO1104 C2 701ZSC1104 C2 749P02BFD C2 731ZSO047 C2
22 701ZSO1204 C2 701ZSC1204 C2 749P02BRD C2 731ZSO048 C2
23 701ZSO1304 C2 701ZSC1304 C2 Spare C2 731ZSO049 C2
24 701ZSO1404 C2 701ZSC1404 C2 Spare C2 731ZSO050 C2
25 Spare C2 Spare C2 Spare D2 731ZSO051 C2
26 701ZS01604 C2 701ZSC1704 C2 Spare D1 731ZSO063 C2
27 Spare C2 Spare C2 Spare 01 731ZSO064 C2
28 701ZSO1804 C2 701ZSC1804 C2 Spare 01 731ZSO065 C2
29 701ZSO1904 C2 701ZSC1904 C2 762XA911B C2 731ZSO067 C2
30 Spare C2 Spare C2 762XL912B C2 731ZSO068 C2
31 Spare C2 Spare C2 767XA813B C2 744HS053 C2
32 Spare C2 Spare C2 767XL815B C2 762XL913 C2

New IO Assignment

REV. PJ DOC No. TITLE BLOCKCODE


IFA1 SAKAP_PWT_WPHB-DS-IOL-001 I/O ASSIGNMENT
REMARKS

8 of 9
SGS IO Load
Front
Station No : SGS0102
AI AI DI DO DO DO ESB Bus Coupler ESB Bus Coupler CPU CPU PSU PSU
Ch S1 Rv S2 Rv S3 Rv S4 Rv S5 Rv S6 Rv S7 Rv S8 Rv
1 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻜㻝㻝㻜 C2 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻜㻝㻝㻞 C2 㻌㻣㻜㻟㻙㼆㻿㻯㻌㻌㻌㻙㻜㻝㻢 C2 㻌㻣㻜㻝㻙㼄㻿㻌㻌㻌㻌㻙㻜㻝㻟㻝 C2 㻌㻣㻠㻠㻙㻼㻜㻝㻭㻌㻌㻙㻱㻱 C2 㻣㻟㻞㻙㻿㻰㼅㻙㻞㻜㻟 C2
2 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻜㻞㻝㻜 C2 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻜㻞㻝㻞 C2 㻌㻣㻜㻟㻙㼆㻿㻯㻌㻌㻌㻙㻜㻟㻞 C2 㻌㻣㻜㻝㻙㼄㻿㻌㻌㻌㻌㻙㻜㻞㻟㻝 C2 㻌㻣㻠㻤㻙㻼㻜㻟㻭㻌㻌㻙㻱㻱 C2 㻣㻟㻞㻙㻿㻰㼅㻙㻞㻜㻞 C2
3 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻜㻟㻝㻜 C2 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻜㻟㻝㻞 C2 㻌㻣㻜㻠㻙㼆㻿㻯㻌㻌㻌㻙㻜㻟㻤 C2 㻌㻣㻜㻝㻙㼄㻿㻌㻌㻌㻌㻙㻜㻟㻟㻝 C2 㻌㻣㻠㻥㻙㻼㻜㻝㻭㻌㻌㻙㻱㻱 C2 㻣㻟㻞㻙㻿㻰㼅㻙㻞㻜㻝㻭 C2
4 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻜㻠㻝㻜 C2 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻜㻠㻝㻞 C2 㻌㻣㻟㻝㻙㼆㻿㻯㻌㻌㻌㻙㻜㻡㻞 C2 㻌㻣㻜㻝㻙㼄㻿㻌㻌㻌㻌㻙㻜㻠㻟㻝 C2 㻌㻣㻠㻥㻙㻼㻜㻞㻭㻌㻌㻙㻱㻱 C2 㻣㻟㻞㻙㻿㻰㼅㻙㻞㻜㻝㻮 C2
5 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻜㻡㻝㻜 C2 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻜㻡㻝㻞 C2 㻌㻣㻟㻝㻙㼆㻿㻯㻌㻌㻌㻙㻜㻣㻥 C2 㻌㻣㻜㻝㻙㼄㻿㻌㻌㻌㻌㻙㻜㻡㻟㻝 C2 㻌㻣㻜㻟㻙㻿㻰㼅㻌㻌㻌㻙㻜㻝㻢 C2 㻣㻠㻞㻙㻿㻰㼅㻙㻜㻜㻝 C2

SDV144-S33(ESD)

SDV541-S33(ESD)

SDV541-S33(ESD)

SDV541-S33(ESD)
SAI143-H33(ESD)

SAI143-H33(ESD)

6 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻜㻢㻝㻜 C2 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻜㻢㻝㻞 C2 㻌㻣㻠㻢㻙㼆㻿㻯㻌㻌㻌㻙㻜㻜㻢 C2 㻌㻣㻜㻝㻙㼄㻿㻌㻌㻌㻌㻙㻜㻢㻟㻝 C2 㻌㻣㻜㻟㻙㻿㻰㼅㻌㻌㻌㻙㻜㻟㻞 C2 㻌㻿㼜㼍㼞㼑 C2

SPW482-13

SPW482-13
SCP451-11

SCP451-11
㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻜㻣㻝㻜 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻜㻣㻝㻞 㻌㻣㻠㻤㻙㼆㻿㻯㻌㻌㻌㻙㻜㻝㻡 㻌㻣㻜㻝㻙㼄㻿㻌㻌㻌㻌㻙㻜㻣㻟㻝 㻌㻣㻜㻠㻙㻿㻰㼅㻌㻌㻌㻙㻜㻟㻤 㻌㻿㼜㼍㼞㼑

SEC401-11

SEC401-11

Node : 1
7 C2 C2 C2 C2 C2 C2
8 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻜㻤㻝㻜 C2 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻜㻤㻝㻞 C2 㻿㼜㼍㼞㼑 D3 㻌㻣㻜㻝㻙㼄㻿㻌㻌㻌㻌㻙㻜㻤㻟㻝 C2 㻌㻣㻟㻝㻙㻿㻰㼅㻌㻌㻌㻙㻜㻡㻞 C2 㻌㻿㼜㼍㼞㼑 C2 ESB Bus Coupler ESB Bus Coupler
C2 C2
9 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻜㻥㻝㻜 C2 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻜㻥㻝㻞 C2 㻡㻣㻜㻙㼄㻿㻙㻝㻣㻞 C2 㻌㻣㻜㻝㻙㼄㻿㻌㻌㻌㻌㻙㻜㻥㻟㻝 C2 㻌㻣㻜㻝㻙㻿㻰㼅㻌㻌㻌㻙㻜㻜㻝 D3 㻌㻿㼜㼍㼞㼑 C2
10 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻝㻜㻝㻜 C2 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻝㻜㻝㻞 C2 㻣㻜㻝㻙㼄㻿㻙㻜㻝㻡 C2 㻌㻣㻜㻝㻙㼄㻿㻌㻌㻌㻌㻙㻝㻜㻟㻝 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2
11 㻌㻣㻠㻢㻙㻼㼆㼀㻌㻌㻌㻙㻜㻞㻣㻭 C2 㻌㻣㻠㻢㻙㻼㼆㼀㻌㻌㻌㻙㻜㻞㻣㻯 C2 㻣㻜㻝㻙㼆㻿㻻㻙㻜㻝㻡 C2 㻌㻣㻜㻝㻙㻼㻜㻝㻭㻌㻌㻙㻱㻱 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2
12 㻌㻣㻠㻠㻙㻼㼆㼀㻌㻌㻌㻙㻜㻞㻡㻭 C2 㻌㻣㻜㻠㻙㻸㼆㼀㻌㻌㻌㻙㻜㻜㻟 C2 㻣㻜㻝㻙㼆㻿㻻㻙㻜㻝㻢 C2 㻌㻣㻜㻝㻙㻼㻜㻞㻭㻌㻌㻙㻱㻱 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2
13 㻌㻣㻢㻜㻙㻸㼆㼀㻌㻌㻌㻙㻜㻜㻤㻭 C2 㻌㻣㻜㻟㻙㻼㼆㼀㻌㻌㻌㻙㻜㻝㻠 C2 㻣㻟㻝㻙㼆㻿㻻㻙㻝㻜㻝 C2 㻌㻣㻜㻝㻙㼄㻿㻌㻌㻌㻌㻙㻝㻞㻜 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2
14 㻌㻣㻠㻤㻙㻸㼆㼀㻌㻌㻌㻙㻜㻜㻟 C2 㻌㻣㻜㻟㻙㻼㼆㼀㻌㻌㻌㻙㻜㻟㻜 C2 㻣㻟㻝㻙㼆㻿㻻㻙㻝㻝㻝 C2 㻌㻣㻢㻞㻙㼄㻿㻌㻌㻌㻌㻙㻥㻝㻠㻭 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2
15 㻌㻣㻠㻤㻙㻸㼆㼀㻌㻌㻌㻙㻜㻜㻠 C2 㻌㻣㻟㻝㻙㻼㼆㼀㻌㻌㻌㻙㻜㻢㻝 C2 㻌㻣㻜㻠㻙㼆㻿㻻㻙㻝㻜㻞 C2 㻌㻣㻠㻢㻙㼄㻿㻌㻌㻌㻌㻙㻜㻝㻝㻭 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2
16 㻌㻣㻟㻞㻙㻸㼆㼀㻌㻌㻌㻙㻜㻠㻞 C2 㻌㻣㻟㻝㻙㻼㼆㼀㻌㻌㻌㻙㻜㻣㻣 C2 㻌㻣㻜㻠㻙㼆㻿㻻㻙㻝㻜㻟 C2 㻌㻣㻢㻜㻙㼄㻿㻌㻌㻌㻌㻙㻜㻞㻜㻭 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2

AI AI DI DO DO AI DI Dummy cover BUS BUS PSU PSU


Ch S1 Rv S2 Rv S3 Rv S4 Rv S5 Rv S6 Rv S7 Rv S8 Rv
1 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻝㻝㻝㻜 C2 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻝㻝㻝㻞 C2 㻌㻣㻜㻟㻙㼆㻿㻻㻌㻌㻌㻙㻜㻝㻢 C2 㻌㻣㻜㻝㻙㼄㻿㻌㻌㻌㻌㻙㻝㻝㻟㻝 C2 㻌㻣㻠㻠㻙㻼㻜㻝㻮㻌㻌㻙㻱㻱 C2 㻣㻜㻝㻙㻼㼆㼀㻙㻝㻞㻡 C2 㻣㻟㻞㻙㼆㻿㻻㻙㻞㻜㻟
2 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻝㻞㻝㻜 C2 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻝㻞㻝㻞 C2 㻌㻣㻜㻟㻙㼆㻿㻻㻌㻌㻌㻙㻜㻟㻞 C2 㻌㻣㻜㻝㻙㼄㻿㻌㻌㻌㻌㻙㻝㻞㻟㻝 C2 㻌㻣㻠㻤㻙㻼㻜㻟㻮㻌㻌㻙㻱㻱 C2 㻣㻟㻞㻙㻼㼆㼀㻙㻞㻜㻝㻭 C2 㻣㻟㻞㻙㼆㻿㻯㻙㻞㻜㻟
3 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻝㻟㻝㻜 C2 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻝㻟㻝㻞 C2 㻌㻣㻜㻠㻙㼆㻿㻻㻌㻌㻌㻙㻜㻟㻤 C2 㻌㻣㻜㻝㻙㼄㻿㻌㻌㻌㻌㻙㻝㻟㻟㻝 C2 㻌㻣㻠㻥㻙㻼㻜㻝㻮㻌㻌㻙㻱㻱 C2 㻣㻟㻞㻙㻼㼆㼀㻙㻞㻜㻝㻮 C2 㻣㻟㻞㻙㼆㻿㻻㻙㻞㻜㻞
4 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻝㻠㻝㻜 C2 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻝㻠㻝㻞 C2 㻌㻣㻟㻝㻙㼆㻿㻻㻌㻌㻌㻙㻜㻡㻞 C2 㻌㻣㻜㻝㻙㼄㻿㻌㻌㻌㻌㻙㻝㻠㻟㻝 C2 㻌㻣㻠㻥㻙㻼㻜㻞㻮㻌㻌㻙㻱㻱 C2 㻣㻟㻞㻙㻼㻰㼆㼀㻙㻞㻜㻟 C2 㻣㻟㻞㻙㼆㻿㻯㻙㻞㻜㻞
5 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻝㻡㻝㻜 C2 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻝㻡㻝㻞 C2 㻌㻣㻟㻝㻙㼆㻿㻻㻌㻌㻌㻙㻜㻣㻥 C2 㻌㻣㻜㻝㻙㼄㻿㻌㻌㻌㻌㻙㻝㻡㻟㻝 C2 㻌㻣㻟㻝㻙㻿㻰㼅㻌㻌㻌㻙㻜㻣㻥 C2 㻣㻟㻞㻙㻸㼆㼀㻙㻞㻜㻠 C2 㻣㻟㻞㻙㼆㻿㻻㻙㻞㻜㻝㻭
SDV144-S33(ESD)

SDV541-S33(ESD)

SDV541-S33(ESD)

SDV144-S33(ESD)
SAI143-H33(ESD)

SAI143-H33(ESD)

SAI143-H33(ESD)
6 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻝㻢㻝㻜 C2 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻝㻢㻝㻞 C2 㻌㻣㻠㻢㻙㼆㻿㻻㻌㻌㻌㻙㻜㻜㻢 C2 㻌㻣㻜㻝㻙㼄㻿㻌㻌㻌㻌㻙㻝㻢㻟㻝 C2 㻌㻣㻠㻢㻙㻿㻰㼅㻌㻌㻌㻙㻜㻜㻢 C2 㻣㻟㻞㻙㻸㻰㼆㼀㻙㻞㻜㻟 C2 㻣㻟㻞㻙㼆㻿㻯㻙㻞㻜㻝㻭

SDCV01(ESD)

SPW482-13

SPW482-13
SSB401-13

SSB401-13
㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻝㻣㻝㻜 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻝㻣㻝㻞 㻌㻣㻠㻤㻙㼆㻿㻻㻌㻌㻌㻙㻜㻝㻡 㻌㻣㻜㻝㻙㼄㻿㻌㻌㻌㻌㻙㻝㻣㻟㻝 㻌㻣㻠㻤㻙㻿㻰㼅㻌㻌㻌㻙㻜㻝㻡 㻣㻠㻞㻙㻼㼆㼀㻙㻜㻜㻝 㻣㻟㻞㻙㼆㻿㻻㻙㻞㻜㻝㻮

Node : 2
7 C2 C2 C2 C2 C2 C2
8 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻝㻤㻝㻜 C2 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻝㻤㻝㻞 C2 㻌㻿㼜㼍㼞㼑 D3 㻌㻣㻜㻝㻙㼄㻿㻌㻌㻌㻌㻙㻝㻤㻟㻝 C2 㻌㻿㼜㼍㼞㼑 D1 㻣㻠㻞㻙㻸㼆㼀㻙㻜㻜㻞㻮 C2 㻣㻟㻞㻙㼆㻿㻯㻙㻞㻜㻝㻮 SDCV01(ESD)
C2 C2
9 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻝㻥㻝㻜 C2 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻝㻥㻝㻞 C2 㻡㻣㻜㻙㼄㻿㻙㻝㻣㻝 C2 㻌㻣㻜㻝㻙㼄㻿㻌㻌㻌㻌㻙㻝㻥㻟㻝 C2 㻌㻿㼜㼍㼞㼑 D1 㻌㻿㼜㼍㼞㼑 C2 㻣㻠㻞㻙㼆㻿㻻㻙㻜㻜㻝
10 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻞㻜㻝㻜 C2 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻞㻜㻝㻞 C2 㻡㻣㻜㻙㼄㻿㻙㻝㻣㻟 C2 㻌㻣㻜㻝㻙㼄㻿㻌㻌㻌㻌㻙㻞㻜㻟㻝 C2 㻌㻣㻢㻜㻙㼄㻿㻌㻌㻌㻌㻌㻙㻜㻟㻡 01 㻌㻿㼜㼍㼞㼑 C2 㻣㻠㻞㻙㼆㻿㻯㻙㻜㻜㻝
11 㻌㻣㻠㻢㻙㻼㼆㼀㻌㻌㻌㻙㻜㻞㻣㻮 C2 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻝㻜㻣 C2 㻣㻜㻝㻙㼆㻿㻯㻙㻜㻝㻡 C2 㻌㻣㻜㻝㻙㻼㻜㻝㻮㻌㻌㻙㻱㻱 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑
12 㻌㻣㻠㻠㻙㻼㼆㼀㻌㻌㻌㻙㻜㻞㻡㻮 C2 㻌㻣㻜㻝㻙㻼㼆㼀㻌㻌㻌㻙㻝㻜㻤 C2 㻣㻜㻝㻙㼆㻿㻯㻙㻜㻝㻢 C2 㻌㻣㻜㻝㻙㻼㻜㻞㻮㻌㻌㻙㻱㻱 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑
13 㻌㻣㻢㻜㻙㻸㼆㼀㻌㻌㻌㻙㻜㻜㻤㻮 C2 㻌㻣㻜㻟㻙㻼㼆㼀㻌㻌㻌㻙㻜㻟㻡 C2 㻣㻟㻝㻙㼆㻿㻯㻙㻝㻜㻝 C2 㻌㻣㻜㻝㻙㼄㻿㻌㻌㻌㻌㻙㻝㻞㻝 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑
14 㻌㻣㻠㻠㻙㻸㼆㼀㻌㻌㻌㻙㻜㻜㻟 C2 㻌㻣㻜㻟㻙㻼㼆㼀㻌㻌㻌㻙㻜㻟㻢 C2 㻣㻟㻝㻙㼆㻿㻯㻙㻝㻝㻝 C2 㻌㻣㻢㻞㻙㼄㻿㻌㻌㻌㻌㻙㻥㻝㻠㻮 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑
15 㻌㻣㻜㻠㻙㻼㼆㼀㻌㻌㻌㻙㻜㻟㻥 C2 㻌㻣㻟㻝㻙㻼㼆㼀㻌㻌㻌㻙㻜㻤㻜 C2 㻌㻣㻜㻠㻙㼆㻿㻯㻙㻝㻜㻞 C2 㻌㻣㻠㻢㻙㼄㻿㻌㻌㻌㻌㻙㻜㻝㻝㻮 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑
16 㻌㻣㻜㻝㻙㻸㼆㼀㻌㻌㻌㻙㻝㻜㻥 C2 㻌㻣㻟㻝㻙㻼㼆㼀㻌㻌㻌㻙㻜㻤㻝 C2 㻌㻣㻜㻠㻙㼆㻿㻯㻙㻝㻜㻟 C2 㻌㻣㻢㻜㻙㼄㻿㻌㻌㻌㻌㻙㻜㻞㻜㻮 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑

AI AI AI LMDI LMDI LMDI DI DO BUS BUS PSU PSU


Ch S1 Rv S2 Rv S3 Rv S4 Rv S5 Rv S6 Rv S7 Rv S8 Rv
1 㻌㻣㻡㻣㻙㻳㻰㻯㻌㻌㻌㻙㻜㻞㻢 C2 㻌㻣㻡㻣㻙㻳㻰㻯㻌㻌㻌㻙㻜㻞㻤 C2 㻌㻣㻡㻣㻙㻵㻾㻰㻌㻌㻌㻙㻝㻟㻝 C2 㻌㻣㻡㻝㻙㻴㻿㻌㻌㻌㻌㻙㻝㻜㻡㻭 C2 㻌㻣㻡㻝㻙㻴㻿㻌㻌㻌㻌㻙㻝㻜㻡㻯 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻡㻣㻙㼄㻸㻌㻌㻌㻌㻙㻥㻡㻞 C2 㻌㻣㻡㻣㻙㻴㼄㻌㻌㻌㻌㻙㻝㻣㻝 C2
2 㻌㻣㻡㻣㻙㻳㻰㼀㻌㻌㻌㻙㻜㻤㻜 C2 㻌㻣㻡㻣㻙㻳㻰㼀㻌㻌㻌㻙㻜㻤㻞 C2 㻌㻣㻡㻣㻙㻵㻾㻰㻌㻌㻌㻙㻝㻟㻟 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻡㻣㻙㼄㻸㻌㻌㻌㻌㻙㻥㻡㻟 C2 㻌㻣㻡㻣㻙㻴㼄㻌㻌㻌㻌㻙㻝㻣㻞 C2
3 㻌㻣㻡㻣㻙㻳㻰㼀㻌㻌㻌㻙㻜㻤㻟 C2 㻌㻣㻡㻣㻙㻳㻰㼀㻌㻌㻌㻙㻜㻤㻡 C2 㻌㻣㻡㻣㻙㻵㻾㻰㻌㻌㻌㻙㻝㻟㻡 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻢㻜㻙㼄㻭㻌㻌㻌㻌㻙㻜㻟㻜㻭 C2 㻌㻣㻡㻣㻙㻴㼄㻌㻌㻌㻌㻙㻝㻣㻟 C2
4 㻌㻣㻡㻣㻙㻳㻰㼀㻌㻌㻌㻙㻜㻤㻢 C2 㻌㻣㻡㻣㻙㻳㻰㼀㻌㻌㻌㻙㻜㻤㻤 C2 㻌㻣㻡㻣㻙㻵㻾㻰㻌㻌㻌㻙㻝㻟㻣 C2 㻌㻣㻡㻣㻙㻴㻿㻌㻌㻌㻌㻙㻟㻜㻝 C2 㻌㻣㻡㻣㻙㻴㻿㻌㻌㻌㻌㻙㻟㻜㻟 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻢㻜㻙㼄㻭㻌㻌㻌㻌㻙㻜㻟㻜㻮 C2 㻌㻣㻡㻣㻙㻿㼄㻌㻌㻌㻌㻙㻞㻝㻢 C2
5 㻌㻣㻡㻣㻙㻳㻰㼀㻌㻌㻌㻙㻜㻥㻜 C2 㻌㻣㻡㻣㻙㻳㻰㼀㻌㻌㻌㻙㻜㻥㻞 C2 㻌㻣㻡㻣㻙㻵㻾㻰㻌㻌㻌㻙㻝㻟㻥 C2 㻌㻣㻡㻣㻙㻴㻿㻌㻌㻌㻌㻙㻟㻜㻠 C2 㻌㻣㻡㻣㻙㻴㻿㻌㻌㻌㻌㻙㻟㻜㻤 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻢㻜㻙㼄㻭㻌㻌㻌㻌㻙㻜㻟㻝㻭 C2 㻌㻣㻡㻣㻙㻿㼄㻌㻌㻌㻌㻙㻞㻝㻣 C2
SDV144-S33(F&G)

SDV144-S33(F&G)

SDV144-S33(F&G)

SDV144-S33(F&G)

SDV541-S33(F&G)
SAI143-H33(F&G)

SAI143-H33(F&G)

SAI143-H33(F&G)

6 㻌㻣㻡㻣㻙㻳㻰㼀㻌㻌㻌㻙㻜㻥㻟 C2 㻌㻣㻡㻣㻙㻳㻰㼀㻌㻌㻌㻙㻜㻥㻡 C2 㻌㻣㻡㻣㻙㻵㻾㻰㻌㻌㻌㻙㻝㻠㻝 C2 㻌㻣㻡㻣㻙㻴㻿㻌㻌㻌㻌㻙㻟㻝㻝 C2 㻌㻣㻡㻣㻙㻴㻿㻌㻌㻌㻌㻙㻟㻝㻟 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻢㻜㻙㼄㻭㻌㻌㻌㻌㻙㻜㻟㻝㻮 C2 㻌㻣㻡㻣㻙㻿㼄㻌㻌㻌㻌㻙㻞㻝㻤 C2

SPW482-13

SPW482-13
SSB401-13

SSB401-13
㻌㻣㻡㻣㻙㻳㻰㼀㻌㻌㻌㻙㻜㻥㻢 㻌㻣㻡㻣㻙㻳㻰㼀㻌㻌㻌㻙㻜㻥㻤 㻌㻣㻡㻣㻙㻵㻾㻰㻌㻌㻌㻙㻝㻠㻟 㻌㻣㻡㻣㻙㻴㻿㻌㻌㻌㻌㻙㻟㻝㻠 㻌㻣㻡㻣㻙㻴㻿㻌㻌㻌㻌㻙㻟㻝㻢 㻌㻿㼜㼍㼞㼑 㻌㻣㻢㻜㻙㼄㻸㻌㻌㻌㻌㻙㻜㻟㻞㻭 㻌㻣㻡㻣㻙㼄㻭㻌㻌㻌㻌㻙㻟㻣㻣

Node : 3
7 C2 C2 C2 C2 C2 C2 C2 C2
8 㻌㻣㻡㻣㻙㻳㻰㼀㻌㻌㻌㻙㻜㻥㻥 C2 㻌㻣㻡㻣㻙㻳㻰㼀㻌㻌㻌㻙㻝㻜㻤 C2 㻌㻣㻡㻣㻙㻵㻾㻰㻌㻌㻌㻙㻝㻠㻡 C2 㻌㻣㻡㻣㻙㻴㻿㻌㻌㻌㻌㻙㻟㻝㻤 C2 㻌㻣㻡㻣㻙㻴㻿㻌㻌㻌㻌㻙㻟㻞㻜 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻢㻜㻙㼄㻸㻌㻌㻌㻌㻙㻜㻟㻞㻮 C2 㻌㻣㻡㻣㻙㼄㻭㻌㻌㻌㻌㻙㻟㻣㻤 C2
9 㻌㻣㻡㻣㻙㻳㻰㼀㻌㻌㻌㻙㻝㻜㻢 C2 㻌㻣㻡㻣㻙㻳㻾㼄㻌㻌㻌㻙㻜㻜㻟 C2 㻌㻣㻡㻣㻙㻵㻾㻰㻌㻌㻌㻙㻝㻠㻣 C2 㻌㻣㻡㻣㻙㻴㻿㻌㻌㻌㻌㻙㻟㻞㻝 C2 㻌㻣㻡㻣㻙㻴㻿㻌㻌㻌㻌㻙㻟㻞㻟 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻢㻜㻙㼄㻸㻌㻌㻌㻌㻙㻜㻟㻠㻭 C2 㻌㻣㻡㻣㻙㼄㻭㻌㻌㻌㻌㻙㻟㻣㻥 C2
10 㻌㻣㻡㻣㻙㻳㻾㼄㻌㻌㻌㻙㻜㻜㻝 C2 㻌㻣㻡㻣㻙㻳㻾㼄㻌㻌㻌㻙㻜㻜㻣 C2 㻌㻣㻡㻣㻙㻳㻰㻯㻌㻌㻌㻙㻜㻞㻥 C2 㻌㻣㻡㻣㻙㻴㻿㻌㻌㻌㻌㻙㻟㻞㻠 C2 㻌㻣㻡㻣㻙㻴㻿㻌㻌㻌㻌㻙㻟㻞㻢 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻢㻜㻙㼄㻸㻌㻌㻌㻌㻙㻜㻟㻠㻮 C2 㻌㻣㻡㻝㻙㻹㼅㻌㻌㻌㻌㻙㻝㻜㻝 C2
11 㻌㻣㻡㻣㻙㻳㻾㼄㻌㻌㻌㻙㻜㻜㻡 C2 㻌㻣㻡㻣㻙㻳㻾㼄㻌㻌㻌㻙㻜㻝㻟 C2 㻌㻿㼜㼍㼞㼑 D1 㻌㻣㻡㻣㻙㻴㻿㻌㻌㻌㻌㻙㻟㻞㻣 C2 㻌㻣㻡㻣㻙㻴㻿㻌㻌㻌㻌㻙㻟㻞㻥 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻢㻣㻙㼄㻸㻌㻌㻌㻌㻙㻤㻝㻝 C2 㻣㻢㻡㻙㼄㻿㻙㻜㻜㻝 01
12 㻌㻣㻡㻣㻙㻳㻾㼄㻌㻌㻌㻙㻜㻝㻝 C2 㻌㻣㻡㻣㻙㻳㻾㼄㻌㻌㻌㻙㻝㻜㻟 C2 㻌㻿㼜㼍㼞㼑 D1 㻌㻣㻡㻣㻙㻴㻿㻌㻌㻌㻌㻙㻟㻟㻜 C2 㻌㻣㻡㻣㻙㻴㻿㻌㻌㻌㻌㻙㻟㻟㻟 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻣㻜㻙㻴㻿㻌㻌㻌㻌㻙㻣㻜㻣 C2 㻌㻿㼜㼍㼞㼑 C2
13 㻌㻣㻡㻣㻙㻳㻾㼄㻌㻌㻌㻙㻝㻜㻝 C2 㻌㻣㻡㻣㻙㻵㻾㻰㻌㻌㻌㻙㻝㻞㻟 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻡㻣㻙㻴㻿㻌㻌㻌㻌㻙㻟㻟㻣 C2 㻌㻣㻣㻜㻙㻴㻿㻌㻌㻌㻌㻙㻣㻜㻟 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻣㻜㻙㻴㻿㻌㻌㻌㻌㻙㻣㻜㻥 C2 㻌㻿㼜㼍㼞㼑 C2
14 㻌㻣㻡㻣㻙㻵㻾㻰㻌㻌㻌㻙㻝㻞㻝 C2 㻌㻣㻡㻣㻙㻵㻾㻰㻌㻌㻌㻙㻝㻞㻢 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻡㻣㻙㻹㻭㻯㻌㻌㻌㻙㻞㻡㻝 C2 㻌㻣㻡㻣㻙㻹㻭㻯㻌㻌㻌㻙㻞㻡㻟 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻡㻣㻙㼄㻸㻌㻌㻌㻌㻙㻥㻡㻠 D1 㻌㻿㼜㼍㼞㼑 C2
15 㻌㻣㻡㻣㻙㻵㻾㻰㻌㻌㻌㻙㻝㻞㻠 C2 㻌㻣㻡㻣㻙㻴㻰㻾㻌㻌㻌㻙㻝㻣㻟 C2 㻣㻡㻣㻙㻴㻰㻾㻌㻌㻌㻙㻝㻣㻝 D1 㻌㻣㻡㻣㻙㻹㻭㻯㻌㻌㻌㻙㻞㻣㻝 C2 㻌㻣㻡㻣㻙㻹㻭㻯㻌㻌㻌㻙㻞㻣㻟 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻡㻣㻙㼄㻸㻌㻌㻌㻌㻙㻥㻡㻡 D1 㻌㻿㼜㼍㼞㼑 C2
16 㻌㻣㻡㻣㻙㻵㻾㻰㻌㻌㻌㻙㻝㻞㻣 C2 㻌㻣㻡㻣㻙㻿㻰㻼㻌㻌㻌㻙㻞㻝㻤 C2 㻣㻡㻣㻙㻿㻰㻼㻌㻌㻌㻙㻞㻝㻢 D1 㻌㻣㻡㻣㻙㻹㻭㻯㻌㻌㻌㻙㻞㻥㻝 C2 㻌㻣㻡㻣㻙㻹㻭㻯㻌㻌㻌㻙㻞㻥㻟 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻡㻣㻙㻼㻭㻸㻌㻌㻌㻙㻥㻡㻢 D1 㻌㻿㼜㼍㼞㼑 C2

AI AI AI LMDI LMDI SDVC01 DI DO BUS BUS PSU PSU


Ch S1 Rv S2 Rv S3 Rv S4 Rv S5 Rv S6 Rv S7 Rv S8 Rv
1 㻌㻣㻡㻣㻙㻳㻰㻯㻌㻌㻌㻙㻜㻞㻣 C2 㻣㻡㻣㻙㻳㻰㻯㻙㻜㻟㻜 C2 㻌㻣㻡㻣㻙㻵㻾㻰㻌㻌㻌㻙㻝㻟㻞 C2 㻌㻣㻡㻝㻙㻴㻿㻌㻌㻌㻌㻙㻝㻜㻡㻮 C2 㻌㻣㻡㻣㻙㻴㻿㻌㻌㻌㻌㻙㻟㻟㻢 C2 㻌㻣㻡㻣㻙㻼㻭㻸㻌㻌㻌㻙㻥㻡㻣 D3 㻌㻣㻣㻜㻙㼄㻭㻌㻌㻌㻌㻙㻣㻝㻜 C2
2 㻌㻣㻡㻣㻙㻳㻰㼀㻌㻌㻌㻙㻜㻤㻝 C2 㻣㻡㻣㻙㻳㻰㻯㻙㻜㻟㻝 C2 㻌㻣㻡㻣㻙㻵㻾㻰㻌㻌㻌㻙㻝㻟㻠 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻡㻣㻙㻹㻭㻯㻌㻌㻌㻙㻞㻡㻠 C2 㻌㻣㻡㻣㻙㼄㻸㻌㻌㻌㻌㻌㻌㻙㻥㻡㻤 D3 㻌㻣㻣㻜㻙㼄㻭㻌㻌㻌㻌㻙㻣㻝㻝 C2
3 㻌㻣㻡㻣㻙㻳㻰㼀㻌㻌㻌㻙㻜㻤㻠 C2 㻣㻡㻣㻙㻳㻰㻯㻙㻜㻟㻞 C2 㻌㻣㻡㻣㻙㻵㻾㻰㻌㻌㻌㻙㻝㻟㻢 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻡㻣㻙㻹㻭㻯㻌㻌㻌㻙㻞㻢㻟 C2 㻣㻡㻣㻙㻴㻿㻌㻌㻌㻌㻙㻟㻠㻜 01 㻌㻣㻣㻜㻙㼄㻭㻌㻌㻌㻌㻙㻣㻝㻞 C2
4 㻌㻣㻡㻣㻙㻳㻰㼀㻌㻌㻌㻙㻜㻤㻣 C2 㻣㻡㻣㻙㻳㻰㼀㻙㻝㻜㻥 C2 㻌㻣㻡㻣㻙㻵㻾㻰㻌㻌㻌㻙㻝㻟㻤 C2 㻌㻣㻡㻣㻙㻴㻿㻌㻌㻌㻌㻙㻟㻜㻞 C2 㻌㻣㻡㻣㻙㻹㻭㻯㻌㻌㻌㻙㻞㻣㻠 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻣㻜㻙㼄㻿㻌㻌㻌㻌㻙㻣㻜㻠 C2
5 㻌㻣㻡㻣㻙㻳㻰㼀㻌㻌㻌㻙㻜㻥㻝 C2 㻣㻡㻣㻙㻳㻰㼀㻙㻝㻝㻜 C2 㻌㻣㻡㻣㻙㻵㻾㻰㻌㻌㻌㻙㻝㻠㻜 C2 㻌㻣㻡㻣㻙㻴㻿㻌㻌㻌㻌㻙㻟㻜㻢 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻣㻜㻙㼄㻿㻌㻌㻌㻌㻙㻣㻜㻡 C2
SDV144-S33(F&G)

SDV144-S33(F&G)

SDV144-S33(F&G)

SDV541-S33(F&G)
SAI143-H33(F&G)

SAI143-H33(F&G)

SAI143-H33(F&G)

6 㻌㻣㻡㻣㻙㻳㻰㼀㻌㻌㻌㻙㻜㻥㻠 C2 㻣㻡㻣㻙㻵㻾㻰㻙㻝㻠㻥 C2 㻌㻣㻡㻣㻙㻵㻾㻰㻌㻌㻌㻙㻝㻠㻞 C2 㻌㻣㻡㻣㻙㻴㻿㻌㻌㻌㻌㻙㻟㻝㻞 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻣㻜㻙㼄㻿㻌㻌㻌㻌㻙㻣㻜㻢 C2


SDCV01(F&G)

SPW482-13

SPW482-13
SSB401-13

SSB401-13
㻌㻣㻡㻣㻙㻳㻰㼀㻌㻌㻌㻙㻜㻥㻣 㻣㻡㻣㻙㻵㻾㻰㻙㻝㻡㻜 㻌㻣㻡㻣㻙㻵㻾㻰㻌㻌㻌㻙㻝㻠㻠 㻌㻣㻡㻣㻙㻴㻿㻌㻌㻌㻌㻙㻟㻝㻡 㻌㻿㼜㼍㼞㼑 㻌㻿㼜㼍㼞㼑 㻌㻣㻡㻣㻙㼄㻿㻌㻌㻌㻌㻙㻥㻡㻝

Node : 4
7 C2 C2 C2 C2 C2 C2 C2
8 㻌㻣㻡㻣㻙㻳㻰㼀㻌㻌㻌㻙㻝㻜㻜 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻡㻣㻙㻵㻾㻰㻌㻌㻌㻙㻝㻠㻢 C2 㻌㻣㻡㻣㻙㻴㻿㻌㻌㻌㻌㻙㻟㻝㻥 C2 㻌㻿㼜㼍㼞㼑 C2 SDCV01(F&G) 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻡㻣㻙㼄㻭㻌㻌㻌㻌㻙㻟㻤㻜 01
C2
9 㻌㻣㻡㻣㻙㻳㻰㼀㻌㻌㻌㻙㻝㻜㻣 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻡㻣㻙㻵㻾㻰㻌㻌㻌㻙㻝㻠㻤 C2 㻌㻣㻡㻣㻙㻴㻿㻌㻌㻌㻌㻙㻟㻞㻞 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻢㻣㻙㼄㻿㻌㻌㻌㻌㻙㻤㻝㻞 C2
10 㻌㻣㻡㻣㻙㻳㻾㼄㻌㻌㻌㻙㻜㻜㻞 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻡㻣㻙㻳㻾㼄㻌㻌㻌㻙㻝㻜㻠 D1 㻌㻣㻡㻣㻙㻴㻿㻌㻌㻌㻌㻙㻟㻞㻡 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻡㻣㻙㻲㻳㻷㻌㻌㻙㻟㻟㻥㻾 C2
11 㻌㻣㻡㻣㻙㻳㻾㼄㻌㻌㻌㻙㻜㻜㻢 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 D1 㻌㻣㻡㻣㻙㻴㻿㻌㻌㻌㻌㻙㻟㻞㻤 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2
12 㻌㻣㻡㻣㻙㻳㻾㼄㻌㻌㻌㻙㻜㻝㻞 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 D1 㻌㻣㻡㻣㻙㻴㻿㻌㻌㻌㻌㻙㻟㻟㻝 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2
13 㻌㻣㻡㻣㻙㻳㻾㼄㻌㻌㻌㻙㻝㻜㻞 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻡㻣㻙㻹㻭㻯㻌㻌㻌㻙㻞㻢㻞 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2
14 㻌㻣㻡㻣㻙㻵㻾㻰㻌㻌㻌㻙㻝㻞㻞 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻡㻣㻙㻹㻭㻯㻌㻌㻌㻙㻞㻡㻞 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2
15 㻌㻣㻡㻣㻙㻵㻾㻰㻌㻌㻌㻙㻝㻞㻡 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻡㻣㻙㻴㻰㻾㻌㻌㻌㻙㻝㻣㻞 D1 㻌㻣㻡㻣㻙㻹㻭㻯㻌㻌㻌㻙㻞㻣㻞 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2
16 㻌㻣㻡㻣㻙㻵㻾㻰㻌㻌㻌㻙㻝㻞㻤 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻣㻡㻣㻙㻿㻰㻼㻌㻌㻌㻙㻞㻝㻣 D1 㻌㻣㻡㻣㻙㻹㻭㻯㻌㻌㻌㻙㻞㻥㻞 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2 㻌㻿㼜㼍㼞㼑 C2

New IO Assignment
For I/O CFU & 3PS

REV. PJ DOC No. TITLE BLOCKCODE


IFA1 SAKAP_PWT_WPHB-DS-IOL-001 I/O ASSIGNMENT
REMARKS

㻥㻌㼛㼒㻌㻌㻥
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 42 of 53

Appendix 04

END USER : PGN SAKA PANGKAH INDONESIA

CLIENT USER : PT. REKAYASA ENERGI BERSAMA

PROJECT : PRODUCED WATER TREATMENT WHP B

YIN PROJECT NO. : 600000180190

DOC. NO. : SAKAP_PWT_WPHB-DD-GPO-004

APPLICATION GRAPHIC TEST


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 43 of 53

Appendix 4: DCS OPERATOR DISPLAY TEST

Equipment ID: DCS Operator Display Reference documents:


(Approved/Commented)

• UPD-PS-W2-PR-DR-2004_P&ID
Drawing CFU Package R3

• UPD-PS-W2-PR-DR-2003_P&ID
Drawing 3-Phase Separator R2

Date: Test Phase: FAT

Name of Tester: Signature:

Witnessed by: Signature:

Approved by: Signature:

No. Graphic Name Description Checked Remarks


1. CPU New Graphic
2. 3PS New Graphic
3. F&G Detector Existing Graphic
Maindeck
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 44 of 53

Appendix 05

END USER : PGN SAKA PANGKAH INDONESIA

CLIENT USER : PT. REKAYASA ENERGI BERSAMA

PROJECT : PRODUCED WATER TREATMENT WHP B

YIN PROJECT NO. : 600000180190

DOC. NO. :

PCS LOGIC CHECK


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 45 of 53

Appendix 5 : PCS Logic Check

Equipment ID: PCS Logic Reference documents:


(Approved/Commented)

• UPD-PS-W2-PR-DR-2004_P&ID
Drawing CFU Package R3

• UPD-PS-W2-PR-DR-2003_P&ID
Drawing 3-Phase Separator R2

• UPD-PS-W2-JN-MT-2001 Control
Narrative

Date: Test Phase: FAT

Name of Tester: Signature:

Witnessed by: Signature:

Approved by: Signature:


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 46 of 53

Appendix 06

END USER : PGN SAKA PANGKAH INDONESIA

CLIENT USER : PT. REKAYASA ENERGI BERSAMA

PROJECT : PRODUCED WATER TREATMENT WHP B

YIN PROJECT NO. : 600000180190

DOC. NO. :

SGS LOGIC CHECK


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 47 of 53

Appendix 6 : SGS Logic Check

Equipment ID: SGS Logic Reference documents:


(Approved/Commented)

• UPD-PS-W2-PR-DR-2004_P&ID
Drawing CFU Package R3

• UPD-PS-W2-PR-DR-2003_P&ID
Drawing 3-Phase Separator R2

• UPD-PS-W2-JN-CE-2001_CAUSE
EFFECT REV.A

Date: Test Phase: FAT

Name of Tester: Signature:

Witnessed by: Signature:

Approved by: Signature:


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 48 of 53

Appendix 07

END USER : PGN SAKA PANGKAH INDONESIA

CLIENT USER : PT. REKAYASA ENERGI BERSAMA

PROJECT : PRODUCED WATER TREATMENT WHP B

YIN PROJECT NO. : 600000180190

DOC. NO. : SAKAP_PWT_WPHB-PS-FAT-005

FAT PUNCHLIST FORM


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 49 of 53

FAT PUNCH RECORD Punch Record No. Date

Process Area: System:

Test reference / item: Classification :


Correction (Code C) 
Modification (Code M) 
Addition (Code A) 
Punch Item description: (Attach Separate sheets/attachments, if necessary)

Related to: Hardware  Software  Documentation 

Details of change required: (Attach Separate sheets/attachments, if necessary)

Tester (Name) Signature Date

Witness (Name) Signature Date

Repeat the test? : YES  NO 

If NO, reason: _______________________________________________________________________

Resolution: (Attach Separate sheets/attachments, if necessary)

FAT CLOSURE APPROVAL SIGNATORIES BY :

Names Company Signatures Date

Prepared By YIN

Witnessed By REB

Approved By SAKA
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 50 of 53

Appendix 07

END USER : PGN SAKA PANGKAH INDONESIA

CLIENT USER : PT. REKAYASA ENERGI BERSAMA

PROJECT : PRODUCED WATER TREATMENT WHP B

YIN PROJECT NO. : 600000180190

DOC. NO. : SAKAP_PWT_WPHB-PS-FAT-005

FAT COMPLETION CERTIFICATE


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 51 of 53

CERTIFICATE OF FACTORY ACCEPTANCE TEST (FAT)

END USER : PGN SAKA PANGKAH INDONESIA

CLIENT USER : PT. REKAYASA ENERGI BERSAMA

PROJECT : PRODUCED WATER TREATMENT WHP B

YIN PROJECT NO. : 600000180190

[COMMENTS]

Result : Pass / Fail

PGN SAKA PANGKAH PT. REAKAYASA ENERGI PT. YOKOGAWA


LIMITED BERSAMA INDONESIA

Signature : Signature : Signature :


Date : Date : Date :
SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 52 of 53

Appendix 08

USER : PGN SAKA PANGKAH INDONESIA

CLIENT : PT. Rekayasa Energi Bersama

PROJECT : PRODUCED WATER TREATMENT WHP B

YIN PROJECT NO. : 600000180190

DOC. NO. : SAKAP_PWT_WPHB-PS-FAT-001

SHIPPING RELEASE NOTE


SAKA INDONESIA PANGKAH LIMITED
PRODUCED WATER TREATMENT UNIT AT WHP-B
OFFSHORE PANGKAH
SAKAP_PWT_WPHB-PS-
FAT-005
FACTORY ACCEPTANCE TEST PROCEDURE Rev. A Page 53 of 53

RELEASE NOTE FOR SHIPMENT

END USER : PGN SAKA PANGKAH INDONESIA

CLIENT USER : PT. REKAYASA ENERGI BERSAMA

PROJECT : PRODUCED WATER TREATMENT WHP B

YIN PROJECT NO. : 600000180190

This is to certify that it is mutually agreed by all parties that all items covered under the above Purchase Orders
can be released for shipment, subject to fulfillment by YIN of all actions required to be completed prior to shipment,
as per the "Punch List".

[COMMENTS]

Result : Pass / Fail

PGN SAKA PANGKAH PT. REAKAYASA ENERGI PT. YOKOGAWA


LIMITED BERSAMA INDONESIA

Signature : Signature : Signature :


Date : Date : Date :