Professional Documents
Culture Documents
Exhibits Samples
Exhibits Samples
Exhibits Samples
5737 Windfern
Houston, Texas 77041
MASTER COPY
18. EXHIBITS
Q.C.M A.I.
REVISON SUMMARY DATE DATE
SIGNATURE & SIGNATURE &
DRAWING TRANSMITTAL
BILL OF MATERIALS
TO:
REQ’D DELIVERY DATE SHIPPING METHOD TAXABLE PAYMENT TERMS SIGNATURE & DATE
YES NO
TAX
TOTAL
CHECK LIST
1. APPEARANCE: ______________________________________________________
2. THICKNESS: ______________________________________________________
3. DEFECTS: ______________________________________________________
4. TRACEABILITY: ______________________________________________________
7. DIMENSIONS: ______________________________________________________
8. MISCELLANEOUS:_____________________________________________________
Job Number:__________
SECTION:
INSPECTION TRAVELERS SHEET
O.D. ________________ I.D. _______________ REMARKS
VESSEL ____________ PIPE ______________ CUSTOMER/INSPECTO
Q.C. A.I. *A.I. HOLD
R
POINTS
CALCULATIONS
SERIAL NUMBER
DRAWING NUMBER
NATIONAL BOARD NUMBER
DATA REPORT
MILL TEST REPORTS
SHELL THICKNESS
HEAD THICKNESS
FORMED SECTIONS
HEAT NUMBER, SHELL
HEAT NUMBER, HEAD
GRADE OF MATERIAL, SHELL
GRADE OF MATERIAL, HEAD
CUT EDGES
PIPE SURFACE
PLATE SURFACE
INSPECTION FITTINGS
ALIGNMENT
WELDING PROCEDURE
WELDER QUALIFICATION
WELDER SYMBOLS
PREHEAT
WELDING APPEARANCE
POST WELD HEAT TREATMENT
X-RAY, R-1, R-2, R-3, R-4
MAGNA FLUX-DYE PENETRANT
HYDRO TEST
NAME PLATE, STAMPED OR ATTACHED
TEST GAUGE NUMBER
INTERIOR OR EXTERIOR COATING
MATERIAL IDENTIFICATION
ITEM HEAT NO. MNFR SLAB MIKE
H-
H-
RG-1
RG-2
RG-3
RG-4
RG-5
SPECIAL NOTES:
SPECIAL NOTES:
NONCONFORMANCE REPORTS
WORK ORDER NO: REPORT NO.
CUSTOMER:
DESCRIPTION OF NONCONFORMITY:
SIGNED: ___________________
QC INSPECTOR
RECOMMENDED DISPOSITION
USE-AS-IS REPAIR/REWORK SCRAP/RETURN TO VENDOR
DISPOSITION APPROVAL:
DESIGN ENGINEER: DATE:
Q.C. MANAGER: DATE:
AUTHORIZED INSPECTOR: DATE:
DISPOSITION VERIFIED:
INSPECTED BY: DATE:
REJECTED
SIGNED: DATE:
DATE: ______________
NAME: _______________________ STAMP NO.: ________________ YEAR: ___________
CHECK THE MONTHS DURING WHICH THE WELDER WELDED UNDER THE
FOLLOWING PROCEDURE:
WPS _____________________________________
PROCESS ________________________________
JANUARY ______________ FEBRUAURY ___________ MARCH ____________
APRIL ______________ MAY ___________ JUNE ____________
JULY ______________ AUGUST ____________ SEPTEMBER ____________
OCTOBER ______________ NOVEMBER ___________ DECEMBER ___________
_____________________________
PRODUCTION MANAGER
STATUS
MAINTENANCE HISTORY
Stamping in this area shall comply with the requirements of the applicable
construction code
The size of the National Board stamping shall not be less than that required by the applicable
code of construction for the item being stamped.
National Board markings shall appear only on pressure retaining items registered with the
National Board.