This document is a comment matrix responding to 3 comments on an impact assessment report. Comment 1 asked about construction and resettlement costs, which were included in Table 5.0 on page 10 item 3. Comment 2 noted a revision to the cost for Option One to NGN169,000,000.00 due to additional pavement reconstruction shown in updated Table 5.0. Comment 3 requested checking the functionality of enlarged attenuation and capacity of existing opening of ID 565, which was included as Table 3b on page 7.
This document is a comment matrix responding to 3 comments on an impact assessment report. Comment 1 asked about construction and resettlement costs, which were included in Table 5.0 on page 10 item 3. Comment 2 noted a revision to the cost for Option One to NGN169,000,000.00 due to additional pavement reconstruction shown in updated Table 5.0. Comment 3 requested checking the functionality of enlarged attenuation and capacity of existing opening of ID 565, which was included as Table 3b on page 7.
This document is a comment matrix responding to 3 comments on an impact assessment report. Comment 1 asked about construction and resettlement costs, which were included in Table 5.0 on page 10 item 3. Comment 2 noted a revision to the cost for Option One to NGN169,000,000.00 due to additional pavement reconstruction shown in updated Table 5.0. Comment 3 requested checking the functionality of enlarged attenuation and capacity of existing opening of ID 565, which was included as Table 3b on page 7.
1 Impact assessment for This has been included in Table 5.0 Page 10. construction cost and Item 3. resettlement cost 2 Revised the cost for This has been updated and shown in Table 5.0. Page 10 Option one to The cost has also increased due to the additional Item 3c NGN169,000,000.00 works of pavement reconstruction. 3 Check the functionality This has been included in the report as Table 3b. Page 7 of enlarged attenuation and the capacity of existing opening of ID 565
The FDRE Irrigation Development Commission Contract Addendum No.3 For The Construction Supervision and Contract Administration For Tendaho Youth Irrigation Project