Approved by,

CONTRACTOR DAILY OVERTIME REPORT

DATE : 30-Nov-22 Arief Bayu Stefan A.


No : 30/19/11/SPKL/MEI/22
Photo
No NIK Full Name Dept Fajar PIC Clock In Clock Out Job Description
Before After

1 91100378 Hariyanto ETP Mr. Wagi 16:00 18:00

Job fabrikasi dan painting baseplat shereder 45kw

2 91100400 Tomo Setiawan ETP Mr. Wagi 16:00 18:00

3 91100346 Sukirno PM 1.2 Mr. Wisnu 12:00 13:00

1. Daily cek motor dan panel AVS drive PM1/2 & finishinh
2. Input AVS dan SC
3. Pm1&2 lancar

4 91100331 Hendra Sumitro PM 1.2 Mr. Wisnu 12:00 13:00

1. Daily cek panel drive pm1 dan finishing


2. Input data AVS
5 91100308 Jana Tri P PM 1.2 Mr. Eko 18:00 19:00 3. Trobel wrapng meja hasil tidak bisa turun cek kabel limit
shuwit. Sensor perbaikan ok

6 91100342 Reza Pahlevi SP 1.2 Mr. Kukuh 16:00 18:00

1.pullback lagi kabel 3x300 2 btng untuk mcc 1 stock


7 91100342 Wildan Septian SP 1.2 Mr. Kukuh 16:00 18:00
2.pembuatan jalur rel cran control
1.pullback lagi kabel 3x300 2 btng untuk mcc 1 stock
2.pembuatan jalur rel cran control
Photo
No NIK Full Name Dept Fajar PIC Clock In Clock Out Job Description
Before After

8 91100417 Dedi Dermawan SP 1.2 Mr. Kukuh 16:00 18:00


Photo
No NIK Full Name Dept Fajar PIC Clock In Clock Out Job Description
Before After

9 91100418 Ramdani SP 1.2 Mr. Harianto 16:00 18:00

1.pullback lagi kabel 3x300 2 btng untuk mcc 1 stock


10 91100450 Moch Karyo Aji SP 1.2 Mr. Harianto 16:00 18:00
2.pembuatan jalur rel cran control

11 91100403 Nasrulloh SP 1.2 Mr. Harianto 16:00 18:00

1. Daily Check & Record MDP Panel Electric AC 1-2


20:00 2. Daily Check & Record Preventive Panel Electric AC 1-2,
12 91100417 M. Dhiyauddin SP 1.2 Mr. Herianto 16:00
No Rest 11 & 13 November 2022
3. Pullback Ex Cable Power Panel HT Stock Preparation.

13 91100443 Aldino Eka PM 3.7 Mr. Sartika 12:00 13:00


1. M-B-1 trip over load, cleaning thickner
2. SR-36 amankan module starter guna cleaning screen oleh
produksi
3. Awal shift monitoring sheet break PM7, dari awal shift kertas
putus. Masih mengatasi semprot broke size press penuh
14 91100394 Satria Adi PM 3.7 Mr. Sartika 12:00 13:00

Mr.
15 91100296 Rona L Revo PM 5.8 16:00 18:00
Hariyanto
1. fres skun plus connect inverter panel SF41 Mcc pm 8
2. Pulling kabel kontrol untuk panel P220 dan panel SF41 mcc pm
8

16 91100446 Gani Nata A PM 5.8 Mr. 16:00 18:00


Hariyanto
Photo
No NIK Full Name Dept Fajar PIC Clock In Clock Out Job Description
Before After

Mr.
17 91100256 Haris Munandar PM 5.8 16:00 18:00
Hariyanto

1. fres skun plus connect inverter panel SF41 Mcc pm 8


Mr.
18 91100411 A. Samsul H PM 5.8 16:00 18:00 2. Pulling kabel kontrol untuk panel P220 dan panel SF41 mcc pm
Hariyanto
8

19 91100377 Galeh R PM 5.8 Mr. 16:00 18:00


Hariyanto