SCOPE

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

SCOPE OF WORK

The work shall comprise the following:

a) Supply, install and commission of HVAC Systems as indicated in the


layout, Specification and detailed in the Equipment Schedules.

b) Provide As-Built drawings and Commissioning Report for the systems


installed under this contract.

c) Provide warranty on the systems, equipment and workmanship as


detailed in the Specifications.

CONTRACTOR’S GUARANTEE

a) The guarantee period for the complete HVAC installations shall be


one year from the acceptance date.

b) The Client reserves the right to effect, during the guarantee period,
any new series of tests, which he deems necessary after having
warned the Contractor in good time.

c) During this period, the Contractor shall be obliged to make good any
new detect including to the minor works; he shall proceed with the
replacement of any defective element of the installation at his
expense (parts and labor).

d) The Contractor shall have a period of 30 days unless otherwise


agreed with the Client, to make good any defects upon notification
thereof, once this period has passed, the Client may have these
works carried out at the expense and risk of the defaulting Contractor.

You might also like