Cobrain Holdings Sdn Bhd – Environmental, Safety & Health (ESH) Manual

DOC REF NO: KKLW/BELB/PRA/5/2017-PMU-TL-KBRAN-ESH-EVR-001 (Rev 0)


___________________________________________________________________________________________

Project : ___________________________________________ Date : ____________


Doc Reference : ___________________________________________ Person in Charge : ____________
Sub-contractor : __________________________________________ Trade : ____________

STRINGING SAFETY CHECKLIST

NO STRINGING YES NO N/A REMARKS


.
1 Personnel Protective Equipment use and is maintained

2 Scaffolding in erected and secured

3 Proper approved equipment used

4 Guards to protect workers from moving parts are in place

5 Earthing installed on equipment

6 Tools of proper size

7 Both conductor ends grounded and bonded during splicing

COMMENT: