Professional Documents
Culture Documents
So61 - Daily Work Done - Apr 2022
So61 - Daily Work Done - Apr 2022
1 2 3
0 37 129
4.1 ME Cyl Oil Cons (Ltrs/Day)
0 0 0
4.2 ME Sys Cons (Ltrs/Day)
0 0 0
4.3 AE #1 Sys Cons (Ltrs/Day)
0 0 0
4.4 AE #2 SYS (Ltrs/Day)
0 0 0
4.5 AE #3 SYS (Ltrs/Day)
5 ME Daily Running Hours 0 7.6 24
5.1 ME Running Hours since last O/H (last unit) 9948.2 9955.8 9979.8
6 AE Running Hours
6.1 AE #1 daily RH 0 15 20
6.1.1 AE #1 Running Hours since last Major O/H 1947 1962 1982
6.2 AE #2 daily RH 24 24 12
AE #2 Running Hours since last O/H 1498 1522 1534
6.3 AE #3 daily RH 24 2 0
AE #3 Running Hours since last O/H 417 419 419
7.1 FW Production (MT/Day) 16 0 10
7.2 FW Consumption (MT/Day) 7 7 7
600
25
500
20
400
15
300
10
200
100
0
1 2 3 4 5 6 7 8 9 101112131415161718192021222324252627282930 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Speed (knots) Fuel cons (MT/day)
ME Cyl Oil Cons (Ltrs/Day)
25
20
15
25
20
15
10
0
1 2 3 4 5 6 7 8 9 101112131415161718192021222324252627282930
4 5 6 7 8 9 10 11 12 13
Jakarta Jakarta Jakarta Jakarta Jakarta Jakarta Jakarta Jakarta Jakarta Jakarta
OPL OPL OPL OPL OPL OPL OPL OPL OPL OPL
0 0 11.6 11.1 0 0 0 0 0 0
7.99 7.04 20.6 19.4 4.0 4.0 4.0 4.0 4.86 4.85
22 1 96 100 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 50 0 0 0 0 0 700 0 0
25 25 0 0 0 25 0 0 0 0
0 50 0 0 0 25 0 0 0 0
24 24 24 24 2 0 0 0 15 24
2006 2030 2054 2079 2081 2081 2081 2081 2096 2120
6 20 11 0 0 4 24 24 21 0
1540 1560 1571 1571 1571 1575 1599 1623 1644 1644
0 24 24 24 24 21 11 6 0 11
419 443 467 491 515 536 547 553 553 564
5 0 0 3 16 14 14 3 0 0
7 7 7 7 7 8 7 7 7 7
25
20
15
10
0
1 2 3 4 5 6
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
12
10
6
10
0
1
DAILY REPORT VESSEL
Apr-22
DATE
14 15 16 17 18 19 20 21 22 23
Jakarta Jakarta Jakarta Jakarta Jakarta Jakarta Jakarta Jakarta Jakarta Jakarta
OPL OPL OPL OPL OPL OPL OPL OPL OPL OPL
4.00 5.80 8.04 23.90 11.38 6.86 5.15 22.24 17.72 4.00
0 0 14 130 45 1 0 114 87 0
0 0 0 0 0 0 650 0 0 0
0 0 0 0 0 25 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 25 0 0 0 0
24 18 19 11 23 24 24 24 15 0
2144 2162 2181 2192 2215 2239 2263 2287 2302 2302
0 2 5 0 0 0 0 0 0 0
1644 1646 1651 1651 1651 1651 1651 1651 1651 1651
2 24 24 24 10 24 24 9 9 24
566 590 614 638 648 672 696 705 714 738
0 16 16 16 5 0 0 10 16 13
7 7 8 8 7 7 7 7 7 8
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
REQUISITIONS VS PO'S
1 2 3 4 5 6 7
24 25 26 27 28 29 30 Avg
0 0 0 0 0 0 0
4.387097
0 0 0 0 0 0
0 43.2
0 0 0 0 0 0
0 21.66667
0 0 25 0 0 0 0
27.83333
0 0 0 0 0 0 0
6
25 0 0 0 0 0 0
6.833333
0 0 0 0 0 0 0 0
10099.8 10099.8 10099.8 14332.6 14332.6 14332.6 14332.6 14332.6
14 0 4 24 24 24 24 24 468
0 0 0 0 0 0 0 0 177
1651 1651 1651 71464 71464 71464 71464 71464
24 24 24 0 0 0 4 4 421
762 786 810 77893 77893 77893 77897 77897
8 0 0 0 0 0 0 0
7 7 7 5 9 8 9 0.3
19 20 21 22 23 24 25 26 27 28 29 30
6 7 8 9 10
DAILY WORK DONE REPORT
1
Anchor Watch, Security & Safety Fire Patrol Carried Out During
1
Every Watch
8
9
10
2
3
4
5
6
Deck Crtiical Equipment jobs done
1.
4 # Oil Level
5 # Nois & Vibration
Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch
Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch
Cleaning FO Strainer of ME Supply Pump
Clean pilot bunner & Check & Clean Spark Plug IGG
Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch
Cleaning in Hospital
Re-Stencil marked for Tank Over Fill Alarm of Cargo Oil Tanks
on Main deck
Tets H & HH Level Alrm Cargo Tank 1-3 P & S Before Loading
Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch
Cleaning RO Strainer
Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch
# Nois
# Fume By Nose
7
Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch
Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch
# Cleaning Evaporator
# Compressor Room
Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch
Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch
Renewed Lub Oil altenator Aux Eng 1 & 3
Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch
Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch
Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch
Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch
Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch
Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch
Saturday Routine
# Em'Cy Fire Pump,Lifboat Engine,Rescue Boat Engine Test
# Test Bilge Alrm Engine Room
17
Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch
Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch
Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch
Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch
Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch
Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch
Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch
Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch
Cleaned up Wheelhouse
Continue Over Haul Aux Eng No. 2 Cyl # 2
Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch
Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch
Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch
Incinerator upper tank filled via seprator oil tank for evaporation
Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch
Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch
accommodation
in progress
Please note forward hydaulic pump room tank oil transferred to
empty drums via pneumatic pp
Daily cleaning Inside Accommodation / Galley Prov. Room including Dry Room, Officer / Crew
Mess Room, A,B,C deck Alley ways, Crew Smoking Room and Praying Room Areas carry out
Anchor Watch, Security & Safety Fire Patrol Carried Out During Every Watch
Both of Deck and Eng Dept. completed drained up Hyd. Oil from tank included winch system
pipes and transferred to empty drums at Forecastle Deck
Refill new Hyd. Oil into winch tank and system. Running tested Fwd windlass/mooring winchs
hydraulic system No. 1 & 2 and found satisfactory.
Cleaned up and housekeeping winch area inside Forecastle Store and drain points area on deck.
Main forward pump room hydraulic system and lines plugs removed from inlet &
out lines and complete system blown by air .Trying to clear previous oil in the system
Forward pump room storage tank again throughly rinse with fresh oil .
System is completely drained and frsh oil drums transferred to stoarge tank
vessel all winches /windlass air purged and tested found satisfactory
Open crank case door of main air compressor no.3 for inspection
Open discharge valve & cooler for checking of main air compressor no.3
EM Comp ,bilge alarm ,oil mis detector ,oily water separator digital 15 ppm meter
funnel flaps,etc