SC OCEAN LXI

1 2 3

Jakarta Jakarta Jakarta


OPL OPL OPL
1 Location
0 12.3 11.8
2 Speed (knots)

3 Fuel cons (MT/day) 5.4 11.3 23.9

0 37 129
4.1 ME Cyl Oil Cons (Ltrs/Day)
0 0 0
4.2 ME Sys Cons (Ltrs/Day)
0 0 0
4.3 AE #1 Sys Cons (Ltrs/Day)
0 0 0
4.4 AE #2 SYS (Ltrs/Day)
0 0 0
4.5 AE #3 SYS (Ltrs/Day)
5 ME Daily Running Hours 0 7.6 24
5.1 ME Running Hours since last O/H (last unit) 9948.2 9955.8 9979.8
6 AE Running Hours

6.1 AE #1 daily RH 0 15 20

6.1.1 AE #1 Running Hours since last Major O/H 1947 1962 1982

6.2 AE #2 daily RH 24 24 12
AE #2 Running Hours since last O/H 1498 1522 1534
6.3 AE #3 daily RH 24 2 0
AE #3 Running Hours since last O/H 417 419 419
7.1 FW Production (MT/Day) 16 0 10
7.2 FW Consumption (MT/Day) 7 7 7

SPEED VS FUEL CONSUMPTION ME CYL OIL AND


30 700

600
25

500
20

400

15

300

10

200

100

0
1 2 3 4 5 6 7 8 9 101112131415161718192021222324252627282930 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Speed (knots) Fuel cons (MT/day)
ME Cyl Oil Cons (Ltrs/Day)

AE DAILY RUNNING HOURS


30

25

20

15
25

20

15

10

0
1 2 3 4 5 6 7 8 9 101112131415161718192021222324252627282930

AE #1 daily RH AE #2 daily RH AE #3 daily RH


DAILY

4 5 6 7 8 9 10 11 12 13

Jakarta Jakarta Jakarta Jakarta Jakarta Jakarta Jakarta Jakarta Jakarta Jakarta
OPL OPL OPL OPL OPL OPL OPL OPL OPL OPL

0 0 11.6 11.1 0 0 0 0 0 0

7.99 7.04 20.6 19.4 4.0 4.0 4.0 4.0 4.86 4.85

22 1 96 100 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

0 50 0 0 0 0 0 700 0 0

25 25 0 0 0 25 0 0 0 0

0 50 0 0 0 25 0 0 0 0

4.6 0 20.9 18.7 0 0 0 0 0 0


9984.4 9984.4 10005.3 10024 10024 10024 10024 10024 10024 10024

24 24 24 24 2 0 0 0 15 24

2006 2030 2054 2079 2081 2081 2081 2081 2096 2120

6 20 11 0 0 4 24 24 21 0
1540 1560 1571 1571 1571 1575 1599 1623 1644 1644
0 24 24 24 24 21 11 6 0 11
419 443 467 491 515 536 547 553 553 564
5 0 0 3 16 14 14 3 0 0
7 7 7 7 7 8 7 7 7 7

ME CYL OIL AND SYS OIL CONS


30

25

20

15

10

0
1 2 3 4 5 6
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

ME Cyl Oil Cons (Ltrs/Day) ME Sys Cons (Ltrs/Day)

12

10

6
10

0
1
DAILY REPORT VESSEL

Apr-22
DATE
14 15 16 17 18 19 20 21 22 23

Jakarta Jakarta Jakarta Jakarta Jakarta Jakarta Jakarta Jakarta Jakarta Jakarta
OPL OPL OPL OPL OPL OPL OPL OPL OPL OPL

0 0 13.5 12.2 11.8 0 0 11.7 0 0

4.00 5.80 8.04 23.90 11.38 6.86 5.15 22.24 17.72 4.00

0 0 14 130 45 1 0 114 87 0

0 0 0 0 0 0 650 0 0 0

0 0 0 0 0 25 0 0 0 0

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 25 0 0 0 0

0 0 2.6 24 8.7 0.6 0 22.9 16.8 0


10024 10024 10026.6 10050.8 10059.5 10060.1 10060.1 10083 10099.8 10099.8

24 18 19 11 23 24 24 24 15 0

2144 2162 2181 2192 2215 2239 2263 2287 2302 2302

0 2 5 0 0 0 0 0 0 0
1644 1646 1651 1651 1651 1651 1651 1651 1651 1651
2 24 24 24 10 24 24 9 9 24
566 590 614 638 648 672 696 705 714 738
0 16 16 16 5 0 0 10 16 13
7 7 8 8 7 7 7 7 7 8

ME Daily Running Hours

4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

ME Daily Running Hours

REQUISITIONS VS PO'S
1 2 3 4 5 6 7
24 25 26 27 28 29 30 Avg

Jakarta Jakarta Jakarta Jakarta Jakarta Jakarta Jakarta


OPL OPL OPL OPL OPL OPL OPL

0 0 0 0 0 0 0
4.387097

4.0 4.0 4.0 1.9 1.9 1.9 1.9 9.683

0 0 0 0 0 0
0 43.2

0 0 0 0 0 0
0 21.66667

0 0 25 0 0 0 0
27.83333

0 0 0 0 0 0 0
6

25 0 0 0 0 0 0
6.833333
0 0 0 0 0 0 0 0
10099.8 10099.8 10099.8 14332.6 14332.6 14332.6 14332.6 14332.6

14 0 4 24 24 24 24 24 468

2316 2316 2320 75661 75685 75709 75733 75733

0 0 0 0 0 0 0 0 177
1651 1651 1651 71464 71464 71464 71464 71464
24 24 24 0 0 0 4 4 421
762 786 810 77893 77893 77893 77897 77897
8 0 0 0 0 0 0 0
7 7 7 5 9 8 9 0.3

19 20 21 22 23 24 25 26 27 28 29 30
6 7 8 9 10
DAILY WORK DONE REPORT
1

Daily cleaning Inside Accommodation / Galley Prov. Room


including Dry Room, Officer / Crew Mess Room, A,B,C deck
Alley ways, Crew Smoking Room and Praying Room Areas
Deck Daily Routine Jobs done carry out

Anchor Watch, Security & Safety Fire Patrol Carried Out During
1
Every Watch

Continue Marked Clearly Of Mooring Decks For Closing


2
Observation by SIRE Inspector ( VIQ-9.8 )

Continue Maintenance of Deck Hose crane ( 1st & 2nd


3
coating )

Removed Air pipeline of Stbd side Gangway for repair in


4
Engine Workshop

8
9
10

Deck PMS jobs done

2
3
4
5
6
Deck Crtiical Equipment jobs done
1.

Engine Daily Routine Jobs


1 Cleanning Strainer Low Seachest SW Stbd Side

2 Cleanning SW strainer of LT Cooler 1 & 2

3 Tappet Clearance Aux Eng No. 1 Cyl # 1 - 6

4 Weekly Lathe Macine Check

5 ER Crane Check Monthly

6 Visual Check & Oil Level Check

Engine PMS jobs done

1 Provision Monthly Check No. 1 & 2


2 # Operating Temp
3 # Operating Pressure

4 # Oil Level
5 # Nois & Vibration

Engine criticical equpments jobs done


2

Daily cleaning Inside Accommodation / Galley Prov. Room


including Dry Room, Officer / Crew Mess Room, A,B,C deck
Alley ways, Crew Smoking Room and Praying Room Areas
carry out

Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch

Continue Marked Clearly Of Mooring Decks For Closing


Observation by SIRE Inspector ( VIQ-9.8 )

Continue Maintenance of Deck Hose crane ( Chipping,


Brushing , Coating & Top Coat by white paint )

General inspection for Hose Handling Crane

Hose Handling Crane Oil Sample landing for analysis


Saturday Routine

# Em'Cy Fire Pump,Lifboat Engine,Rescue Boat Engine Test

# Test Bilge Alrm Engine Room

Cleaning Strainer High Seachest SW Port Side

Check & Rectified Sencor Of Smolk Detector Incinerator Area

Tappet Clearance Aux. Eng 3 Cyl 1-6

1. Check Water Treatment FW Cooling System AE 1.2.3


2.Weekly turbo charge turbine side cleaning of AE No. 2
3. General Bruhsles AC Inpection Aux. Eng No. 1
3

Daily cleaning Inside Accommodation / Galley Prov. Room including


Dry Room, Officer / Crew Mess Room, A,B,C deck Alley ways, Crew
Smoking Room and Praying Room Areas carry out

Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch
Cleaning FO Strainer of ME Supply Pump

Claning & Mooping ER 1st Floor

Clean pilot bunner & Check & Clean Spark Plug IGG

Cleaning Cenrifugal Filter of Aux. Eng No.1

INSPECTION N2 GENERATOR HOURLY


# Measure Current For Checking Power Rating
# Check The Fan In Dryer Unit

# Inspect The Fan According To Rotodten Manual


4

Daily cleaning Inside Accommodation / Galley Prov. Room


including Dry Room, Officer / Crew Mess Room, A,B,C deck
Alley ways, Crew Smoking Room and Praying Room Areas
carry out

Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch

Cleaning in Hospital

Continue Maintenance of Deck Hose crane ( Chipping,


Brushing , Coating & Top Coat by white paint )

Re-Stencil marked for Tank Over Fill Alarm of Cargo Oil Tanks
on Main deck

Continue Maintenance On Maindeck Port side ( On Top of


COT-5S )

Assist Engine Staff for Cleaning Cooling of Fwd Windlass

Assist Engine Staff for Refitted of Bunker Pipeline after


renewed

Check / Inspection of Hose Handling Crane Winch


Cleaning Main Burner & Rotari Cup Composite Boiler

Cleaning Flter Air For Air Control Cargo Side

Cleaning Inlet DO Strainer Aux. Eng No. 2

Cleaning Lo Filter Centrifugal Aux. Eng No. 2

Tets H & HH Level Alrm Cargo Tank 1-3 P & S Before Loading

WEEKLY CHECK ME AUX BLOWER NO.1 & 2


# Check Vibration Sound & Temperature Beraring By HAnd
# Rotate The Motor By hand Check For Normaly.

# Check Insulation Resistance.


5

Daily cleaning Inside Accommodation / Galley Prov. Room


including Dry Room, Officer / Crew Mess Room, A,B,C deck
Alley ways, Crew Smoking Room and Praying Room Areas
carry out

Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch

Continue Maintenance of Deck Hose crane ( Chipping,


Brushing , Coating & Top Coat by white paint )

Re-Stencil marked for Reference Height of Cargo Oil Tanks on


Main deck

Continue Maintenance On Maindeck Stb side ( On Top of


COT-5S ) – Chipping, Brushing & 1ST / 2ND Coating
Cleaning LO Filter Centrifugal of Aux. E ng No.3

Cleaning RO Strainer

Renewed Air Filter TC ME Blower Side

Renewed Hour Meter For Steering Gear No.2

Inspect & Clean The Rpm Pick Up sensor ME

Routine Cleaning Strainer SW Side LT Cooler Before Dept

Monthly Visual Check Water Cooling System Aux Eng 2 & 3


ER Crane Limit Swicth Check
Weekly Check Air Cond Unit

# Leakage Of Oil & Refrigant.


# Leakage Of Cooling Water.
# Abnormal Vibration.
6

Daily cleaning Inside Accommodation / Galley Prov. Room including


Dry Room, Officer / Crew Mess Room, A,B,C deck Alley ways,
Crew Smoking Room and Praying Room Areas carry out

Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch

Continue Maintenance of Deck Hose crane ( Chipping, Brushing ,


Coating & Top Coat by white paint )

Continue Re-Stencil marked for Reference Height of Cargo Oil


Tanks on Main deck

Continue Maintenance On Maindeck Stb side ( On Top of COT-5S )


– Chipping, Brushing & 1ST / 2ND Coating

1st & 2nd Coating for Bunker Pipeline after renewed

Monthly Checked/Maintenance for LSA/FFA


Renewed air filter TC Aux. Eng No. 1.2.3

Renwed Steering Gear Hour Meter no.1

Cleaning FO Strainer Boiler Burning Pump

Check The Connection & Bolt Motor Retighten

# Steering Gear Room Suply Van

# Engine Room Van

# Motor Room van

# Air Lock Room Van

# Compressor Room Van

Circulating Or Backwash Cargo Condensor SW Side Of


Reliquifaction No.2

Fore Castle & Bosun Store Fan Check Weekly


# Current
# Vibration

# Nois
# Fume By Nose
7

Daily cleaning Inside Accommodation / Galley Prov. Room


including Dry Room, Officer / Crew Mess Room, A,B,C deck
Alley ways, Crew Smoking Room and Praying Room Areas
carry out

Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch

Continue Maintenance of Deck Hose crane


( Top Coating by Yellow paint for Block of Crane )

Continue Maintenance On Maindeck Stb side ( On Top of


COT-5S ) – Chipping, Brushing & 1st / 2nd Coating

Refitted after renewed the Air pipeline of Gangway Stbd side

Check, greasing and maintenance Hose Handling Crane Block


and Hook

Renewed the Gasket for Heating Coil of COT-5P


Maintenance Air Handling Unit Fan

# Renewed Greas Ball Bearing Blower Fan

# Renewed Air Filter

# Greas Elmot & Megger Test Elmot

Cleanning ME & AE FO Circulating Pump Strainer

Check Lamp & Horn Signal HH Level Cargo Tank

General Check Steering Gear


# Oil Temperatures
# Oill Level In Normal Level

Weekly General Check Aux. Eng No. 1.2.3 All Parameter


8

Daily cleaning Inside Accommodation / Galley Prov. Room


including Dry Room, Officer / Crew Mess Room, A,B,C deck
Alley ways, Crew Smoking Room and Praying Room Areas
carry out

Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch

Continue Maintenance of Deck Hose crane


( Top Coating by Black paint for Block of Crane & Red Marking
of SWL )

Continue the Gasket for Heating Coil of COT-2P, 4S & 5P


(After Conduct Internal pressure Test)

Continue Maintenance On Maindeck Stb side ( On Top of


WBT-5S ) –
Chipping, Brushing & 1st / 2nd Coating

Re-Arrange FFA/LSA Store on Bridge deck

Renewed Gasket for Heating Coil of COT-2P, 4S & 5P


Maintenance Unit Van AC Engine Control Room

# Greasing Bearing Van

# Cleaning Evaporator

# Greasing Bearing & Megger Test Motor Van

Visual Examination of Aux. Eng running No.3

# Check FO, LO & FW System Piping For Leak

# Record All Parameter Temperature & Pressure

# Check Level Oil Sump Tank Normal Level

Check,Test Lamp & Horn Indicator

# Air Lock Motor Room

# Compressor Room

Pressure Test F.I.V of Aux. Eng No. 1 Cyl # 1 - 6


Refrigrating Compresoor Weekly Cheks No 1 :
# Check Daily Operting Pressure

# Check Daily Operting Pressure Temperatures


# Check Daily Oil Level & Pressure
# Check Daily Abnormal Nois & Vibrations
9

Daily cleaning Inside Accommodation / Galley Prov. Room


including Dry Room, Officer / Crew Mess Room, A,B,C deck
Alley ways, Crew Smoking Room and Praying Room Areas
carry out

Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch

Continue the Gasket for Heating Coil of COT-5S


(After Conduct Internal pressure Test)

Continue Maintenance ( Top Coating by Deck Green ) On


Maindeck Port side ( On Top of COT-5S & WBT-5S )

Conduct Weekly Checked for Lifeboat Equipment’s & Engine


Tested

Renewed Gasket for Heating Coil of COT-5S


Saturday Routine

# Em'Cy Fire Pump,Lifboat Engine,Rescue Boat Eng Test

# Test Bilge Alrm Engine Room

# Test Alarm FO leak ME & AE 1.2.3

Blowdown Aux. Boiler Water & Surface Water

Cleaning Strainer FO Stranfer Pump Forwart

Preapare Inspection From B.K.I

Visual Examination of Aux. Eng running No. 2 & 3

# Check FO, LO & FW System Piping For Leak

# Record All Parameter Temperature & Pressure

# Check Level Oil Sump Tank Normal Level

Check Water Treatment ME & AE Cooling System


10

Daily cleaning Inside Accommodation / Galley Prov. Room


including Dry Room, Officer / Crew Mess Room, A,B,C deck
Alley ways, Crew Smoking Room and Praying Room Areas
carry out

Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch
Renewed Lub Oil altenator Aux Eng 1 & 3

Weekly Check ME Bridge Manoevering System

Cleanning Workshop & Steering Gear Area

Cleaning Strainer LT Cooler No 1 &2 SW Side

Visual Examination of Aux. Eng running No.2 & 3

# Check FO, LO & FW System Piping For Leak

# Record All Parameter Temperature & Pressure

# Check Level Oil Sump Tank Normal Level

Emergency Air Compressor Check


# Periodically ExamineOil In Crankcase And Ensure That It Is
Not Contaminated With Condensate

# Check Oil Level


11

Daily cleaning Inside Accommodation / Galley Prov. Room


including Dry Room, Officer / Crew Mess Room, A,B,C deck
Alley ways, Crew Smoking Room and Praying Room Areas
carry out

Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch

Continue Maintenance (Chipping, Brushing, 1st & 2nd Coating)


On Maindeck Stb side ( Top of WBT-5S )

Chipping, Brushing, 1st/2nd coating and Top coat by white


paint on Bridge Superstructure (Fwd Bulkhead)
Renew Plate condenser & evaporator of FWG

Visual Examination of Aux. Eng running No.2 & 3

# Check FO, LO & FW System Piping For Leak

# Record All Parameter Temperature & Pressure

# Check Level Oil Sump Tank Normal Level

Renew Lub Oil system of Aux Eng No. 1


Cleaning sump tank of Aux Eng No. 1
Renew Lub Oil filter of Aux Eng No. 1

Record crank web deflection of Aux Eng No. 1


Crankcase inspection of Aux Eng No. 1
12

Daily cleaning Inside Accommodation / Galley Prov. Room


including Dry Room, Officer / Crew Mess Room, A,B,C deck
Alley ways, Crew Smoking Room and Praying Room Areas
carry out

Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch

Chipping, Brushing, 1st/2nd coating and Top coat by white


paint on Bridge Superstructure (Fwd Bulkhead)
Check & Cleanning Swirler Of Aux. Boiler

Open & Check Non Return Valve IGG To Deck (3 Monthly)

Blowdown Aux. Boiler Water & Surface Water

ME Weekly Online Led Indicator and Unit Function Test

Visual Examination of Aux. Eng running No.1 & 2

# Check FO, LO & FW System Piping For Leak

# Record All Parameter Temperature & Pressure

# Check Level Oil Sump Tank Normal Level

Hyper System,High Prssure Pump Check


1. Check The In take And Delevery Lines,And Make Sure
They are Tightly attached To The Pump

2. Make Sure The Pump Is Tightly The Installed On The


Structure It Is Mounted On
3. Check safety Valve.
4. Check The Guard On The Power Take Off
13

Daily cleaning Inside Accommodation / Galley Prov. Room including


Dry Room, Officer / Crew Mess Room, A,B,C deck Alley ways, Crew
Smoking Room and Praying Room Areas carry out

Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch

Chipping, Brushing, 1st/2nd coating and Top coat by white


paint on Bridge Superstructure (Fwd Bulkhead)

Maintenance Chipping, Brushing and Coating on Top of Pump


Room
Circulating / Backwash Cargo Condenser SW Side Of Reliquifaction
No.3

Check Control Valve Supply N2 Generator

Check & Overhaul Spring Loaded Valve F.W.G

Visual Examination of Aux. Eng running No.1 & 3

# Check FO, LO & FW System Piping For Leak

# Record All Parameter Temperature & Pressure

# Check Level Oil Sump Tank Normal Level

Record crank web deflection of Aux Eng No. 2


Cleaning LO Centrifugal Straner of Aux Eng No. 2
Renewed Lub Oil altenator of Aux Eng No. 2
14

Daily cleaning Inside Accommodation / Galley Prov. Room


including Dry Room, Officer / Crew Mess Room, A,B,C deck
Alley ways, Crew Smoking Room and Praying Room Areas
carry out

Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch

Chipping, Brushing, 1st/2nd coating and Top coat by white


paint on Bridge Superstructure (Fwd Bulkhead)

Continue Maintenance Chipping, Brushing and Coating on Top


of Pump Room

Rcvd Store/Spare Parts


Circulating / Backwash Cargo Condenser SW Side Of
Reliquifaction No.1

Cleaning pipe line Disposal due clogged

Cleaning LO centrifugal filter of Aux. Eng No. 3

Cleaning DO filter of Aux. Eng No. 3

Check Vibration, Sound & Temperature Of Bearing ME Aux


Blower No.1

Visual Examination of Aux. Eng running No.1

# Check FO, LO & FW System Piping For Leak

# Record All Parameter Temperature & Pressure

# Check Level Oil Sump Tank Normal Level

Refrigrating Compressor No. 1 Weekly Cheks :


# Check Daily Operting Pressure
# Check Daily Operting Pressure Temperatures

# Check Daily Oil Level & Pressure


# Check Daily Abnormal Nois & Vibrations
15

Daily cleaning Inside Accommodation / Galley Prov. Room


including Dry Room, Officer / Crew Mess Room, A,B,C deck
Alley ways, Crew Smoking Room and Praying Room Areas
carry out

Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch

Chipping, Brushing, 1st/2nd coating and Top coat by white


paint on Bridge Superstructure (Fwd Bulkhead)

Continue Maintenance Chipping, Brushing and Coating on Top


of Pump Room
Check Floating Censor Alarm Sewage

Cleaning Condenser Boiler SW side

Cleanning Strainer Do Inlet Aux. Eng No. 1

Cleaning centrifugal LO Strainer Aux. Eng No. 1

Visual Examination of Aux. Eng running No.1 & 3

# Check FO, LO & FW System Piping For Leak

# Record All Parameter Temperature & Pressure

# Check Level Oil Sump Tank Normal Level

Examinane The Piping System For Leaks AE 1 monthly


1. Retighyen All Bolt & Nuts In The Piping System.
2. Eazy Move All Valves In The Piping System.

3. Check Flexible Conection For Leaks


4. Check Manometers & Thermo For Posible Damage
16

Daily cleaning Inside Accommodation / Galley Prov. Room


including Dry Room, Officer / Crew Mess Room, A,B,C deck
Alley ways, Crew Smoking Room and Praying Room Areas
carry out

Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch

Chipping, Brushing, 1st/2nd coating and Top coat by white


paint on Bridge Superstructure (Fwd Bulkhead)
Over Haul Aux Eng 2 Cylinder #3

1. Renewed Cylinder Liner

2. Renewed Piston & Ring Piston Completed

3. Renewed Connecting Rod

4. Renewed Crank Pin Bearing

5. Cleaning & Renewed LO Sump Tank

6. Change Cylinder Head By Spare

Saturday Routine
# Em'Cy Fire Pump,Lifboat Engine,Rescue Boat Engine Test
# Test Bilge Alrm Engine Room
17

Daily cleaning Inside Accommodation / Galley Prov. Room


including Dry Room, Officer / Crew Mess Room, A,B,C deck
Alley ways, Crew Smoking Room and Praying Room Areas
carry out

Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch

Rcvd Store/Spare Parts


Continue Over Haul Aux Eng 2 Cylinder #3

1. Renewed Cylinder Liner

2. Renewed Piston & Ring Piston Completed

3. Renewed Connecting Rod

4. Renewed Crank Pin Bearing

5. Cleaning & Renewed LO Sump Tank

6. Change Cylinder Head By Spare

Blow down & Surface Boiler water

Cleaning Furnace & Add Cement Incinerator

Weekly Water test Treatmen Aux Eng 1.2.3


18

Daily cleaning Inside Accommodation / Galley Prov. Room


including Dry Room, Officer / Crew Mess Room, A,B,C deck
Alley ways, Crew Smoking Room and Praying Room Areas
carry out

Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch

Re-arrange the Paints in Paint Store room

Continue Chipping, Brushing, 1st/2nd coating on Bridge


Superstructure and Deck Wings Bridge

Continue Maintenance Chipping, Brushing and Coating on Top


of Pump Room

Renewed the Gasket for Heating Coil of COT-5P & 5S


Continue Over Haul Aux Eng 2 Cylinder #3

1. Renewed Cylinder Liner

2. Renewed Piston & Ring Piston Completed

3. Renewed Connecting Rod

4. Renewed Crank Pin Bearing

5. Cleaning & Renewed LO Sump Tank

6. Change Cylinder Head By Spare

Examinane The Piping System For Leaks AE 2 monthly


1. Retighyen All Bolt & Nuts In The Piping System.
2. Eazy Move All Valves In The Piping System.

3. Check Flexible Conection For Leaks


4. Check Manometers & Thermo For Posible Damage
19

Daily cleaning Inside Accommodation / Galley Prov. Room


including Dry Room, Officer / Crew Mess Room, A,B,C deck
Alley ways, Crew Smoking Room and Praying Room Areas
carry out

Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch

Removed vinyl wax with stripper and cleaned up crew


messroom floor

Continue Chipping, Brushing, 1st coating on Bridge Deck


Wings

Continue Maintenance Chipping, Brushing and 1st Coating on


Top of Pump Room

Fixed Port & Stb Manifold seal points nuts

Renewed the Gasket for Heating Coil of COT-2P


Continue Over Haul Aux Eng 2 Cylinder #3

Renew Lub Oil system of Aux Eng No. 2

Cleaning sump tank of Aux Eng No. 2

Record crank web deflection of Aux Eng No. 2

Crankcase inspection of Aux Eng No. 2

WEEKLY CHECK ME AUX BLOWER NO.1 & 2


# Check Vibration Sound & Temperature Beraring By HAnd

# Rotate The Motor By hand Check For Normaly.


# Check Insulation Resistance.
20

Daily cleaning Inside Accommodation / Galley Prov. Room


including Dry Room, Officer / Crew Mess Room, A,B,C deck Alley
ways, Crew Smoking Room and Praying Room Areas carry out

Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch

Removed vinyl wax with stripper and cleaned up officer messroom


floor

Continue Chipping, Brushing, 1st coating on Bridge Deck Wings

Continue Maintenance Chipping, Brushing and 1st Coating on Top


of Pump Room

Overhauled IG Branch Valve COT 4P


Received Bunker MFO & MDO

Cleanning Strainer LT Cooler SW side No 1 & 2

Visual Examination of Aux. Eng running No.1 & 3

# Check FO, LO & FW System Piping For Leak

# Record All Parameter Temperature & Pressure

# Check Level Oil Sump Tank Normal Level

Check Engine Room Crane


1.Check the Safety Latch Is In Order And Function Good
2.Check The Hook & it is associate parts any visible damage

3.Check Rotates Smoothly Is In Good Mesh With The


4.Check The Set Bolt,Nuts,Pins Are Loose Or Missing
21

Daily cleaning Inside Accommodation / Galley Prov. Room


including Dry Room, Officer / Crew Mess Room, A,B,C deck
Alley ways, Crew Smoking Room and Praying Room Areas
carry out

Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch

Continue Removed vinyl wax with stripper and cleaned up


officer messroom floor

Continue Maintenance Chipping, Brushing and 1st Coating on


Top of Pump Room

Overhauled IG Branch Valve COT 4S


Over Haul Aux Eng No. 2 Cyl # 1

Cleaning Suction Filter Glycool Pump 1 & 2

Cleaning Strainer Discharge Condenser SW Pump

Cleanning strainer SW Side RO


22

Daily cleaning Inside Accommodation / Galley Prov. Room


including Dry Room, Officer / Crew Mess Room, A,B,C deck
Alley ways, Crew Smoking Room and Praying Room Areas
carry out

Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch

Daily Cleaning Outside of Acommodation

Continue Maintenance Chipping, Brushing and 1st Coating on


Top of Pump Room

Overhauled IG Branch Valve COT 3S

Monthly maintenance Radar,Ecdis


Continue Over Haul Aux Eng No. 2 Cyl # 1

Renewed Air Filter Altenator AE 1

Clening & Renewed Oil Hose Crane Midle

Refrigrating Compressor No. 1&2 Weekly Cheks :


# Check Daily Operting Pressure
# Check Daily Operting Pressure Temperatures

# Check Daily Oil Level & Pressure


# Check Daily Abnormal Nois & Vibrations
23

Daily cleaning Inside Accommodation / Galley Prov. Room


including Dry Room, Officer / Crew Mess Room, A,B,C deck
Alley ways, Crew Smoking Room and Praying Room Areas
carry out

Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch

Cleaning Outside of Acommodation

2nd stripped and applied 1st.2nd .3rd Polish Crew Messroom


Floor

Apllied 1st.2nd.3rd Polish Deck A Passage Floor

Applied 1st.2nd.3rd. Polish Officer Messroom Floor

Re-Arrange/housekeeping LSA on the Bridge

Continue Maintenance White Painting 1st Coanting on Top of


Pump Room

Rcvd Fresh Water


Over Haul Aux Eng No. 2 Cyl # 2

Renewed Air Filter Turbo Charge ME

Feed Rod Lubrication Lathe Check:


Regulary Monitor The Lubricating
Saturday Routine

# Em'Cy Fire Pump,Lifboat Engine,Rescue Boat Engine Test


# Test Bilge Alrm Engine Room
24

Daily cleaning Inside Accommodation / Galley Prov. Room


including Dry Room, Officer / Crew Mess Room, A,B,C deck
Alley ways, Crew Smoking Room and Praying Room Areas
carry out

Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch

Cleaned up Wheelhouse
Continue Over Haul Aux Eng No. 2 Cyl # 2

Cleaning Air Cooler Air Side of Aux. Eng No. 2


25

Daily cleaning Inside Accommodation / Galley Prov. Room


including Dry Room, Officer / Crew Mess Room, A,B,C deck
Alley ways, Crew Smoking Room and Praying Room Areas
carry out

Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch

Removed Vinyl Wax With Stipper Stairway Deck A to Deck B

Chipping Brushing and 1st Primmer Nav Bridge Deck

Chipping Brushing and 1st Primmer Stb Accommodation

Overhauled IG Branch COT 1P

Overhauled IG Branch COT 2P


Overhauled IG Branch COT 2S

Monthly check and test ODME


Over Haul Aux Eng No. 2 Cylinder # 6

Cleaning Plate of Central Cooler System FW No.1

Overhaul MDO purifier


26

Daily cleaning Inside Accommodation / Galley Prov. Room


including Dry Room, Officer / Crew Mess Room, A,B,C deck
Alley ways, Crew Smoking Room and Praying Room Areas
carry out

Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch

Continue Removed Vinyl Wax With Stipper Stairway Deck B to


Deck C

Continue Chipping Brushing and 1st Primmer Nav Bridge Deck

Continue Chipping Brushing and 1st Primmer Stb


Accommodation / Lifeboat Davit

Overhauled IG Branch COT 1S

Overhauled IG Branch COT 5S


Over Haul Aux Eng No. 2 Cylinder # 4 & 5

Cleaning Plate of Central Cooler System No.2

Continue Overhaul MDO purifier

1. Cleaning Bowl Completed

2. Renewed Oil Crank Case

3. Renewed Bearing Vertical Shaft

Renewed Anemo Meter

Cleaning Strainer Of Cargo Heater

Refrigrating Compressor No. 1&2 Weekly Cheks :


# Check Daily Operting Pressure
# Check Daily Operting Pressure Temperatures

# Check Daily Oil Level & Pressure


# Check Daily Abnormal Nois & Vibrations
27

Daily cleaning Inside Accommodation / Galley Prov. Room


including Dry Room, Officer / Crew Mess Room, A,B,C deck
Alley ways, Crew Smoking Room and Praying Room Areas
carry out

Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch

Continue Removed Vinyl Wax With Stipper Stairway Deck C to


Wheelhouse Entrance

Continue Chipping Brushing and 1st Primmer Nav Bridge Deck

Continue Chipping Brushing and 1st Primmer Stb


Accommodation / Lifeboat Davit

Continue Final Coating (White paint) Pump Room

Overhauled IG Branch COT 6P


Main engine spare piston with rod shiftred from securing stand

Main engine spare piston seucred on stand ,piston


crown ,rings
grooves are cleaned .Piston crown top surface worn out
meassured
Piston all fours grooves well cleaned and its h1 meassured
14.8mm

last three grooves well with in limits

Piston rod surface throughly inspected found normal .

Spare pistom pressure tested up to 6~7 kg/cm2no leakage is


observed

Engine room cosmatic wrok in progress

Engine room machinery cleaned and top coat engine green


paint applied

Fresh water generator chemical cleaning completed .

Cleaning & painting floor composite boiler area

Incinerator upper tank filled via seprator oil tank for evaporation

Aft moing winch lubrication defectiv e pipes renewed 3 in nos.

Check Water Treatment ME & AE Cooling System


28

Daily cleaning Inside Accommodation / Galley Prov. Room


including Dry Room, Officer / Crew Mess Room, A,B,C deck
Alley ways, Crew Smoking Room and Praying Room Areas
carry out

Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch

Continue Removed Vinyl Wax With Stipper Stairway Deck A to


Upper Deck Alleyway

Continue Chipping Brushing and 1st Primmer Nav Bridge


Deck /Wings Bridge(Port side)

Final Coating (White Paint) at Port Wings Bridge

Lifted store and Lub Oil

Applied lubricant/grease to Mooring Winch at Poop Deck


Main engine spare piston with rod gland overhualed with spare
scrapper rings/new rubber ring is used.
Auxiliary engine no 2 sump doors opened and oil transferred to
incinerator tank via penumatic pump
Auxiliary engine no 2 sump an oil is renewed on
28.04.2022( 1000 ltrs )is used.
Deck seal pipe was leak ,defective pipe taken out and new pipe
fabricated
Deck seal pipe was replaced by new fabicated ones and tested
found satisfactory .
Auxiliary change over MDO /LSFO lever and change over
missing plate and indicator was installed properly .change over
indciation can easliy monitor in ECR panel .

Main spare piston secured on ecr deck for next overhauling .

Electrical engineer carges tube lights in Engine room upper


deck
Main engine frsh cooler (LT) water side cleaned and tested
found satisfactory .

HFO purifier is started for filling Auxiliary boiler service tank


on safe level
Renewed L.O sump tk of aux engine no.2
29

Daily cleaning Inside Accommodation / Galley Prov. Room


including Dry Room, Officer / Crew Mess Room, A,B,C deck
Alley ways, Crew Smoking Room and Praying Room Areas
carry out

Anchor Watch, Security & Safety Fire Patrol Carried Out During
Every Watch

Both of Engine and Deck Dept. shifted new hydraulic oil to


Forecastle Deck.

Drained up Hyd. Oil from tank included system pipe and


transferred to empty drums at Forecastle Deck

Shifted previous Hyd. Oil drum to Poop Deck and transferred


Hyd. Oil to empty drums at Funnel Deck area.

Final Coating (White Paint) at Navigation Bridge Deck.

Fixed seal point nuts at COT's vapour lock.


Please not vessel received Chevron Randoz 100-TURALIK
69 Package 209
Newly received oil shifted forward pump room ,existing oil
condition was

detoriated ,oil colour milky.


Approximately 2500 ltrs collected in empty drums and shifted
aft of

accommodation

Same oil again shifted on top of paint store via pneumatie


pump and still

in progress
Please note forward hydaulic pump room tank oil transferred to
empty drums via pneumatic pp

All drums shifted aft as mentioned above .


winch /windlass piping plugs opened from several location to
dained

this oil as much as possible to avoid intermxing of previous oil .


hydaulic - piping system blown by air to drain an oil as much
as possible
Forward hydraulic pump room storage tank cleaned and
charging tank
cleaning in progress .

hydraulic system coolers,filters & strainer completely drained .


Engine room routine jobs in progress
Engine room cosmatic paint jobs in progress
Please not following jobs completed with the help of
deck/engine staff
30

Daily cleaning Inside Accommodation / Galley Prov. Room including Dry Room, Officer / Crew
Mess Room, A,B,C deck Alley ways, Crew Smoking Room and Praying Room Areas carry out

Anchor Watch, Security & Safety Fire Patrol Carried Out During Every Watch

Both of Deck and Eng Dept. completed drained up Hyd. Oil from tank included winch system
pipes and transferred to empty drums at Forecastle Deck

Refill new Hyd. Oil into winch tank and system. Running tested Fwd windlass/mooring winchs
hydraulic system No. 1 & 2 and found satisfactory.

Cleaned up and housekeeping winch area inside Forecastle Store and drain points area on deck.
Main forward pump room hydraulic system and lines plugs removed from inlet &

out lines and complete system blown by air .Trying to clear previous oil in the system

Forward pump room storage tank again throughly rinse with fresh oil .

System is completely drained and frsh oil drums transferred to stoarge tank

aprroximately 2090 ltrs ..

vessel all winches /windlass air purged and tested found satisfactory

Open crank case door of main air compressor no.3 for inspection

Open discharge valve & cooler for checking of main air compressor no.3

Saturday routine : =Test emergency fire pump,emergency generator,engine life

EM Comp ,bilge alarm ,oil mis detector ,oily water separator digital 15 ppm meter

funnel flaps,etc