I.3. COLUMNS
C1 : 60 pieces
𝑉 = (𝐻) (𝑊) (𝑇)
𝑉 = (16. 4 𝑚) (0. 55 𝑚) (0. 55 𝑚)
3
𝑉 = (4. 96 𝑚 ) (60 𝑝𝑖𝑒𝑐𝑒𝑠)
𝑉(𝐶1) = 297. 6 𝑚3
C2 : 92 pieces
𝑉 = (𝐻) (𝑊) (𝑇)
𝑉 = (16. 4 𝑚) (0. 55 𝑚) (0. 55 𝑚)
3
𝑉 = (4. 96 𝑚 ) (92 𝑝𝑖𝑒𝑐𝑒𝑠)
𝑉(𝐶2) = 456. 32 𝑚3
3 3
𝑉(𝑇𝑂𝑇𝐴𝐿) = 456. 32 𝑚 + 297. 6 𝑚
3
𝑉(𝑐𝑜𝑙𝑢𝑚𝑛𝑠) = 753. 92 𝑚
I.4. BEAMS
𝑃𝑇𝐵1 = [3(11 − (2 × 0. 28) − 0. 55)] + [4(3 − 2(0. 28))] + [12 − (2 × 0. 28) − 0. 55]
𝑃𝑇𝐵2 = [18(11 − (2 × 0. 28) − 0. 55] + [20(3 − 2(0. 28)] + [8(12 − (2 × 0. 28) − 0. 55]
3 3
𝑉𝑇𝐵1 = 𝑉𝑅𝐵1 = 𝑉2𝐵1 = 𝑉3𝐵1 = (43. 38 𝑚 )(4) = 173. 52 𝑚
3 3
𝑉𝑅𝐵2 = 𝑉2𝐵2 = 𝑉3𝐵2 = (142. 96 𝑚 )(3) = 428. 88 𝑚
3
𝑉𝑇𝐵2 = 112. 54 𝑚
I.5. SLAB
3 3
𝑉1 = (25 𝑚)(14 𝑚)(0. 125 𝑚) = 43. 75 𝑚 (2) = 87. 5 𝑚
3
𝑉2 = (70 𝑚)(30 𝑚)(0. 125 𝑚) = 262. 5 𝑚
3 3
𝑉𝑠𝑙𝑎𝑏 = 87. 5 𝑚 + 262. 5 𝑚
3
𝑉𝑠𝑙𝑎𝑏 = 350 𝑚
I.6. STAIRS
Quantity : 4 stairs
For Steps
Quantity : 20 steps
2 2
𝑏= (3) + (1. 98) = 3. 59 𝑚
2 2
𝑐= (3) + (1. 98) = 3. 59 𝑚
2 2
𝑎= (0. 33) + (0. 22) = 0. 40 𝑚
0.22×0.33×0.4 3
𝑉1 = ⎡20( )⎤ = 0. 29 𝑚
⎣ 2 ⎦
3
𝑉2 = (4. 0 𝑚)(1. 0 𝑚)(0. 125 𝑚) = 0. 5 𝑚
3 3
𝑉3 = (3. 59 𝑚)(1. 90 𝑚)(0. 125 𝑚) = 0. 85 𝑚 (2) = 1. 7 𝑚
3 3 3 3
𝑉𝑇𝑂𝑇𝐴𝐿 = 𝑉1 + 𝑉2 + 𝑉3 = 0. 29 𝑚 + 0. 5 𝑚 + 1. 7 𝑚 = 2. 49 𝑚
3
𝑉𝑠𝑡𝑎𝑖𝑟𝑠 = (2. 49 𝑚 )(4 𝑠𝑡𝑎𝑖𝑟𝑠)(3 𝑓𝑙𝑜𝑜𝑟 𝑙𝑒𝑣𝑒𝑙𝑠)
3
𝑉𝑠𝑡𝑎𝑖𝑟𝑠 = 29. 88 𝑚
For Slab
10 m 6m 0.15 m
10 m 6m 4” = 0.10 m
VOLUME (m3)
COLUMNS 753.92 m3
BEAMS 714.94 m3
SLABS 350 m3
STAIRS 29.88 m3
SEPTIC TANK 15 m3
3
𝐶𝑒𝑚𝑒𝑛𝑡40𝑘𝑔 = (2395. 51 𝑚 )(9. 0) = 21559. 59 ~ 21560 𝑏𝑎𝑔𝑠
3 3
𝑆𝑎𝑛𝑑 = (2395. 51 𝑚 )(0. 5) = 1197. 76 𝑚
3 3
𝐺𝑟𝑎𝑣𝑒𝑙 = (2395. 51 𝑚 )(1. 0) = 2395. 51 𝑚
SAND 1,197.76 m3
GRAVEL 2,395.51 m3
Area
2
𝐹𝑖𝑟𝑠𝑡 𝑓𝑙𝑜𝑜𝑟 = 314(4 − 0. 45) = 1114. 7 𝑚
2
𝑆𝑒𝑐𝑜𝑛𝑑 𝑓𝑙𝑜𝑜𝑟 = 320(5 − 0. 45) = 1456 𝑚
2
𝑇ℎ𝑖𝑟𝑑 𝑓𝑙𝑜𝑜𝑟 = 320(4 − 0. 45) = 1136 𝑚
2 2 2 2
𝑇𝑜𝑡𝑎𝑙 𝐴𝑟𝑒𝑎 = 1114. 7 𝑚 + 1456 𝑚 + 1136 𝑚 = 3706. 7 𝑚
(FE)D/5 11 (FE)D/5 10
W/6 = 4.5 6 27
W/9 = 11.5 2 23
𝐻 = (4 − 0. 45) = 3. 55 𝑚
2
𝐴𝑇 = (314)(3. 55) = 1114. 7 𝑚
2 2
𝑊/1 = 32(2. 24) = 71. 68 𝑚 𝐷/5 = 12(1. 68) = 20. 16 𝑚
2 2
𝑊/2 = 10(3. 36) = 33. 36 𝑚 𝐷/1 = 1(7. 25) = 7. 25 𝑚
2
𝐹𝐼𝑅𝑆𝑇 𝐹𝐿𝑂𝑂𝑅 = 1114. 7 − 162. 33 = 952. 37 𝑚
952. 37(12. 5𝑃𝐶𝑆) = 11904. 625 ~ 11, 905 𝑝𝑐𝑠 𝑜𝑓 𝐶𝐻𝐵
𝐻 = (5 − 0. 45) = 4. 55 𝑚
2
𝐴𝑇 = 320(4. 55) = 1456 𝑚
2 2
𝑊/1 = 44(2. 24) = 98. 56 𝑚 𝑊/8 = 4(0. 48) = 1. 92 𝑚
2 2
𝑊/2 = 16(3. 36) = 53. 76 𝑚 𝑊/9 = 1(11. 5) = 11. 5 𝑚
2 2
𝑊/6 = 6(4. 5) = 27 𝑚 𝐷/3 = 6(3. 78) = 22. 68 𝑚
2 2
𝑊/7 = 4(1. 35) = 5. 4𝑚 𝐷/5 = 11(1. 68) = 18. 48 𝑚
2
𝐴𝑇 = 239. 3 𝑚
2
𝑆𝐸𝐶𝑂𝑁𝐷 𝐹𝐿𝑂𝑂𝑅 = 1456 − 239. 3 = 1216. 7 𝑚
1216. 7(12. 5) = 15208. 75~15209 𝑝𝑐𝑠 𝑜𝑓 𝐶𝐻𝐵
𝐻 = (4 − 0. 45) = 3. 55 𝑚
2
𝐴𝑇 = 320(3. 55) = 1136 𝑚
2 2
𝑊/3 = 45(3. 20) = 144 𝑚 𝑊/9 = 1(11. 5) = 11. 5 𝑚
2 2
𝑊/4 = 16(5. 16) = 82. 56 𝑚 𝐷/3 = 3(3. 78) = 11. 34 𝑚
2 2
𝑊/7 = 11(1. 35) = 14. 85 𝑚 𝐷/4 = 1(3. 78) = 3. 78 𝑚
2 2
𝑊/8 = 4(0. 48) = 1. 92 𝑚 𝐷/5 = 10(1. 68) = 16. 8 𝑚
2
𝑇𝐻𝐼𝑅𝐷 𝐹𝐿𝑂𝑂𝑅 = 1136 − 286. 75 = 849. 25 𝑚
849. 25(12. 5) = 10, 615. 625~10, 616 𝑝𝑐𝑠 𝑜𝑓 𝐶𝐻𝐵
𝑇𝑂𝑇𝐴𝐿 𝐶𝐻𝐵 𝑂𝐹 𝐸𝑋𝑇𝐸𝑅𝐼𝑂𝑅 𝑊𝐴𝐿𝐿𝑆 = 11, 905 + 15, 209 + 10, 616 = 37, 730 𝑝𝑐𝑠
2
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐸𝑥𝑡𝑒𝑟𝑖𝑜𝑟 𝑊𝑎𝑙𝑙𝑠 = 3018. 08 𝑚
𝑆𝑖𝑧𝑒 𝑜𝑓 𝐶𝐻𝐵 = 15𝑥20𝑥40
Plaster
2 2
𝑆𝑢𝑟𝑓𝑎𝑐𝑒 𝐴𝑟𝑒𝑎 𝑜𝑓 𝐸𝑥𝑡𝑒𝑟𝑖𝑜𝑟 𝑊𝑎𝑙𝑙𝑠 = 3018. 08 𝑚 (2 𝑠𝑖𝑑𝑒𝑠) = 6036. 16 𝑚
B 0.240
Sand 0.020
Area
2
𝐹𝑖𝑟𝑠𝑡 𝑓𝑙𝑜𝑜𝑟 = 460. 25(4 − 0. 45) = 1633. 89 𝑚
2
𝑆𝑒𝑐𝑜𝑛𝑑 𝑓𝑙𝑜𝑜𝑟 = 396(5 − 0. 45) = 1801. 8 𝑚
2
𝑇ℎ𝑖𝑟𝑑 𝑓𝑙𝑜𝑜𝑟 = 439(4 − 0. 45) = 1558. 45 𝑚
2 2 2 2
𝑇𝑜𝑡𝑎𝑙 𝐴𝑟𝑒𝑎 = 1633. 89 𝑚 + 1801. 8 𝑚 + 1558. 45 𝑚 = 4994. 14 𝑚
D/7 7
W/5 = 3 21 63
W/6 = 4.5 4 18
𝐻 = (4 − 0. 45) = 3. 55 𝑚
2
𝐴𝑇 = 460. 25(3. 55) = 1633. 89 𝑚
2 2
𝑊/7 = 7(3) = 21𝑚 𝐷/2 = 1(7. 92) = 7. 92 𝑚
2 2
𝑊/6 = 1(4. 5) = 4. 5 𝑚 𝐷/5 = 10(1. 68) = 16. 8 𝑚
2 2
𝑊/7 = 4(1. 35) = 5. 4 𝑚 𝐷/6 = 2(1. 89) = 3.78 𝑚
2 2
𝐷/3 = 7(3. 78) = 26. 46 𝑚 𝐷/7 = 7(1. 26) = 8. 82 𝑚
𝐻 = (5 − 0. 45) = 4. 55 𝑚
2
𝐴𝑇 = 396(4. 55) = 1801. 8 𝑚
2 2
𝑊/5 = 9(3) = 27 𝑚 𝐷/3 = 12(3. 78) = 45. 36 𝑚
2 2
𝑊/6 = 3(4. 5) = 13. 5𝑚 𝐷/5 = 2(1. 68) = 3. 36 𝑚
2 2
𝑊/7 = 4(1. 35) = 5. 4 𝑚 𝐷/6 = 4(1. 89) = 7.56 𝑚
2
𝐷/2 = 1(7. 92) = 7. 92 𝑚
𝐴𝑇 = 110. 1 𝑚
2
𝑆𝐸𝐶𝑂𝑁𝐷 𝐹𝐿𝑂𝑂𝑅 = 1801. 8 − 110. 01 = 1691. 7 𝑚
1691. 7(12. 5) = 21, 146. 25~21 146 𝑝𝑐𝑠 𝑜𝑓 𝐶𝐻𝐵
𝐻 = (4 − 0. 45) = 3. 55 𝑚
2
𝐴𝑇 = 439(3. 55) = 1558. 45 𝑚
2 2
𝑊/5 = 5(3) = 15 𝑚 𝐷/4 = 6(3. 78) = 22. 68 𝑚
2 2
𝑊/7 = 10(1. 35) = 13. 5𝑚 𝐷/5 = 10(1. 68) = 16. 8 𝑚
2 2
𝐷/2 = 1(7. 92) = 7. 92 𝑚 𝐷/6 = 4(1. 89) = 7. 56 𝑚
2
𝐷/3 = 8(3. 78) = 30. 24 𝑚
2
𝐴𝑇 = 113. 7 𝑚
2
𝑇𝐻𝐼𝑅𝐷 𝐹𝐿𝑂𝑂𝑅 = 1558. 45 − 113. 7 = 1444. 75 𝑚
1444. 75(12. 5) = 18 059. 375~18 059 𝑝𝑐𝑠 𝑜𝑓 𝐶𝐻𝐵
2
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐼𝑛𝑡𝑒𝑟𝑖𝑜𝑟 𝑊𝑎𝑙𝑙𝑠 = 4664. 32 𝑚
𝑆𝑖𝑧𝑒 𝑜𝑓 𝐶𝐻𝐵 = 15𝑥20𝑥40
By area method and referring to the table,
2
𝐶𝐸𝑀𝐸𝑁𝑇: 4664. 32𝑚 (1. 526) = 7117. 75 𝑜𝑟 7118 𝑏𝑎𝑔𝑠
2
𝑆𝐴𝑁𝐷: 4664. 32𝑚 (0. 0844) = 393. 67 𝑐𝑢. 𝑚.
Plaster
2 2
𝑆𝑢𝑟𝑓𝑎𝑐𝑒 𝐴𝑟𝑒𝑎 𝑜𝑓 𝐼𝑛𝑡𝑒𝑟𝑖𝑜𝑟 𝑊𝑎𝑙𝑙𝑠 = 4664. 32 𝑚 (2 𝑠𝑖𝑑𝑒𝑠) = 9328. 64 𝑚
20mm THICKNESS ; CLASS “B” MIXTURE
B 0.240
Sand 0.020
2
𝐴 = 46. 34 𝑚
𝐶𝑒𝑚𝑒𝑛𝑡 = 46. 34 × 1. 526 = 70. 71
𝐶𝑒𝑚𝑒𝑛𝑡 = 71 𝑏𝑎𝑔𝑠
𝑆𝑎𝑛𝑑 = 46. 34 × 0. 0844 = 3. 911
3
𝑆𝑎𝑛𝑑 = 3. 91 𝑚
Plaster
20mm THICKNESS ; CLASS “B” MIXTURE
B 0.240
Sand 0.020
3
𝐴 = 46. 34 × 2 = 92. 68 𝑚
𝐶𝑒𝑚𝑒𝑛𝑡 = 92. 68 × 0. 240 = 22. 24
𝐶𝑒𝑚𝑒𝑛𝑡 = 23 𝑏𝑎𝑔𝑠
𝑆𝑎𝑛𝑑 = 92. 68 × 0. 020 = 1. 8536
3
𝑆𝑎𝑛𝑑 = 1. 85 𝑚
For Rebar
= 10(2) = 20
20 𝑝𝑐𝑠 𝑜𝑓 2. 25 𝑚 25 𝑚𝑚Ø 𝑟𝑒𝑏𝑎𝑟
6
= 2.25
= 2. 67
7.5
= 2.25
= 3. 33
9
= 2.25
= 4
II.2. COLUMNS
For Ground floor
𝐿 = 0. 4 + 4 + 3 + 0. 125 + 0. 475 = 8 𝑚
𝑆 = 550 𝑚𝑚
2.
8
= 0.4
= 20 + 1 = 21 𝑙𝑎𝑡𝑒𝑟𝑎𝑙 𝑡𝑖𝑒𝑠 𝑝𝑒𝑟 𝑐𝑜𝑙𝑢𝑚𝑛
3.
= 21 × 152 = 3192 𝑡𝑜𝑡𝑎𝑙 𝑙𝑎𝑡𝑒𝑟𝑎𝑙 𝑡𝑖𝑒𝑠
4.
= 0. 39 × 4 = 1. 56 = 1. 7 𝑚 𝑙𝑒𝑛𝑔𝑡ℎ 𝑝𝑒𝑟 𝑡𝑖𝑒
5.
6
= 1.7
= 3. 53
7.5
= 1.7
= 4. 41
9
= 1.7
= 5. 29
6.
3192
= 9
= 354. 67
5m 0.125 m 0.4 m
𝐿 = 5 + 0. 4 + 0. 125 = 5. 525
𝐿 =6m
8 𝑝𝑐𝑠 𝑜𝑓 6 𝑚 25 𝑚𝑚Ø 𝑟𝑒𝑏𝑎𝑟
1.
𝑆 = 16𝑑𝑏 = 16(25) = 400 𝑚𝑚
𝑆 = 550 𝑚𝑚
2.
6
= 0.4
= 15 + 1 = 16 𝑝𝑐𝑠 𝑜𝑓 𝑙𝑎𝑡𝑒𝑟𝑎𝑙 𝑡𝑖𝑒𝑠 𝑝𝑒𝑟 𝑐𝑜𝑙𝑢𝑚𝑛
3.
= 16 × 152 = 2432 𝑙𝑎𝑡𝑒𝑟𝑎𝑙 𝑡𝑖𝑒𝑠
4.
= 0. 39 × 4 = 1. 56 = 1. 7𝑚 𝑙𝑒𝑛𝑔𝑡ℎ 𝑝𝑒𝑟 𝑡𝑖𝑒
5.
6
= 1.7
= 3. 53
7.5
= 1.7
= 4. 41
9
= 1.7
= 5. 29
6.
2432
= 9
= 270. 22
Length of Column
4m 0.4 m
𝐿 = 4 + 0. 4 = 4. 4
𝐿 = 5𝑚
8 𝑝𝑐𝑠 𝑜𝑓 5 𝑚 25 𝑚𝑚Ø 𝑟𝑒𝑏𝑎𝑟
1.
𝑆 = 16𝑑𝑏 = 16(25) = 400 𝑚𝑚
𝑆 = 550 𝑚𝑚
2.
5
= 0.4
= 12. 5 = 13 + 1 = 14 𝑙𝑎𝑡𝑒𝑟𝑎𝑙 𝑡𝑖𝑒𝑠 𝑝𝑒𝑟 𝑐𝑜𝑙𝑢𝑚𝑛
3.
= 14 × 152 = 2128 𝑡𝑜𝑡𝑎𝑙 𝑙𝑎𝑡𝑒𝑟𝑎𝑙 𝑡𝑖𝑒𝑠
4.
= 0. 39 × 4 = 1. 56 = 1. 7 𝑚 𝑙𝑒𝑛𝑔𝑡ℎ 𝑝𝑒𝑟 𝑡𝑖𝑒
5.
6
= 1.7
= 3. 53
7.5
= 1.7
= 4. 41
9
= 1.7
= 5. 29
6.
2128
= 9
= 236. 44
III.3. WALLS
Reinforcement of Wall
2
2 − 𝑆14 𝑎𝑛𝑑 3 − 𝑆14 = 1. 5 × 4 = 6 𝑚
2
= 6 𝑚 × 2 𝑝𝑐𝑠
2
𝐴1 = 12 𝑚
𝐴𝑇 = 12 + 6 + 12. 76 + 12. 5 + 15
2
𝐴𝑇 = 58. 26 𝑚
2
𝐴𝑇 = 58. 26 𝑚 , 𝑆𝑝𝑎𝑐𝑖𝑛𝑔 = 15 𝑐𝑚, 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑟𝑒𝑏𝑎𝑟 = 9 𝑚, 𝑙𝑒𝑛𝑔𝑡ℎ 𝑝𝑒𝑟 𝑡𝑖𝑒 = 30 𝑐𝑚
2
@6𝑚 = 58. 26 𝑚 × 2. 584 = 150. 54384 ~150. 54
2
@7. 5𝑚 = 58. 26 𝑚 × 2. 004 = 116. 75304~116. 75
2
@9𝑚 = 58. 26 𝑚 × 1. 636 = 95. 31336~95. 31
@12𝑚 = 58. 26 × 1. 197 = 69. 73722~69. 74
@7. 5𝑚 = 117 𝑝𝑐𝑠 𝑜𝑓 7. 5 𝑚 25𝑚𝑚Ø 𝑟𝑒𝑏𝑎𝑟
-Tie Wire
2
@30𝑐𝑚 = 58. 26 𝑚 × 0. 217 = 12. 64242~12. 64
@30𝑐𝑚 = 13 𝑘𝑔𝑠 𝑜𝑓 𝐺𝐼 𝑡𝑖𝑒 𝑤𝑖𝑟𝑒
1-3/A-C = 2 11 m 8m 176 m2
1-3/L-M
1-3/C-D = 2 3m 8m 48 m2
1-3/K-L
3-5/C-D = 4 3m 4m 48 m2
3-5/I-L
5-6/A-C = 4 5.5 m 4m 88 m2
5-6/L-M
6-7/A-C = 2 3m 5m 30 m2
6-7/K-L
5-6/C-D = 2 3m 4m 24 m2
5-6/K-L
6-13/C-D 14 3m 4m 168 m2
1-3/D-F 1 12 m 8m 96 m2
3-5/D-F 1 12 m 8m 96 m2
5-6/D-F 2 6m 4m 48 m2
6-8/D-E 2 6m 5m 60 m2
6-8/E-F 2 6m 5m 60 m2
4-5/F-G 6m 4m 24 m2
6-8/F-G 2 6m 5m 60 m2
4-5/G-H 2 6m 4m 48 m2
7-9/G-H 2 6m 5m 60 m2
4-5/H-I 6m 4m 24 m2
6-8/H-I 2 6m 5m 60 m2
1-4/F-I 1 18 m 12 m 216 m2
1-4/I-K 1 12 m 12 m 144 m2
4-5/I-K 2 6m 4m 48 m2
5-6/I-K 2 6m 4m 48 m2
4-5/J-K 2 6m 4m 48 m2
5-6/J-K 2 6m 4m 48 m2
6-8/J-K 2 6m 5m 60 m2
ATOTAL 2396 m2
2
𝐴𝑇 = 2396 𝑚 , 𝑆𝑝𝑎𝑐𝑖𝑛𝑔 = 15 𝑐𝑚, 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑟𝑒𝑏𝑎𝑟 = 9𝑚, 𝑙𝑒𝑛𝑔𝑡ℎ 𝑝𝑒𝑟 𝑡𝑖𝑒 = 30 𝑐𝑚
Rebar
2
@6 𝑚 = 2396 𝑚 × 3. 221 = 7717. 52
2
@7. 5 𝑚 = 2396 𝑚 × 2. 296 = 5501. 22
2
@9 𝑚 = 2396 𝑚 × 1. 921 = 4602. 72
2
@12 𝑚 = 2396 𝑚 × 1. 382 = 3311. 272
@9 𝑚 = 4603 𝑝𝑐𝑠 𝑜𝑓 9𝑚 25𝑚𝑚Ø 𝑟𝑒𝑏𝑎𝑟
-Tie Wire
2
@30 𝑐𝑚 = 2396 𝑚 × 0. 257 = 615. 77
@30𝑐𝑚 = 616 𝑘𝑔𝑠 𝑜𝑓 𝐺𝐼 𝑡𝑖𝑒 𝑤𝑖𝑟𝑒
2
2 − 𝑆14 𝑎𝑛𝑑 3 − 𝑆14 = 1. 5 × 4 = 6 𝑚
2
= 6 𝑚 × 2 𝑝𝑐𝑠 × 2 𝑓𝑙𝑜𝑜𝑟𝑠
𝐴𝑇 = 24 + 12 + 25. 52 + 25 + 30
2
𝐴𝑇 = 116. 52 𝑚
2
𝐴𝑇 = 116. 52 𝑚 , 𝑆𝑝𝑎𝑐𝑖𝑛𝑔 = 15 𝑐𝑚, 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑟𝑒𝑏𝑎𝑟 = 9 𝑚, 𝑙𝑒𝑛𝑔𝑡ℎ 𝑝𝑒𝑟 𝑡𝑖𝑒 = 30 𝑐𝑚
-Rebar
2
@6 𝑚 = 116. 52 𝑚 × 2. 584 = 301. 09
2
@7. 5 𝑚 = 116. 52 𝑚 × 2. 004 = 233. 51
2
@9 𝑚 = 116. 52 𝑚 × 1. 636 = 190. 63
2
@12 𝑚 = 116. 52 𝑚 × 1. 197 = 139. 47
@9 𝑚 = 191 𝑝𝑐𝑠 𝑜𝑓 9 𝑚 25 𝑚𝑚Ø 𝑟𝑒𝑏𝑎𝑟
-Tie Wire
2
@30𝑐𝑚 = 116. 52 𝑚 × 0. 214 = 24. 94
@30𝑐𝑚 = 25 𝑘𝑔𝑠 𝑜𝑓 𝐺𝐼 𝑡𝑖𝑒 𝑤𝑖𝑟𝑒
1-5/A-N 1 70 m 16 m
5-6/A-N 2 26 m 4m
5-6/F-G 2 2.5 m 4m
6-7/A-G 2 26.5 m 5m
7-8/A-N 1 70 m 5m
8-13/A-D 2 14 m 25 m
8-9/G-H 1 5m 6m
𝐴 = (16 × 70) + (4 × 26)2 + (2. 5 × 4)2 + (25. 5 × 5)2 + (70 × 5) + (14 × 25)2
+ (5 × 6)
𝐴 = 1120 + 208 + 20 + 255 + 350 + 700 + 300
𝐴 = 2683 × 2
2
𝐴 = 5366 𝑚
2
𝐴 = 5366 𝑚 , 𝑆𝑝𝑎𝑐𝑖𝑛𝑔 = 15 𝑐𝑚, 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑟𝑒𝑏𝑎𝑟 = 6 𝑚, 𝑙𝑒𝑛𝑔𝑡ℎ 𝑝𝑒𝑟 𝑡𝑖𝑒 = 30 𝑐𝑚
-Rebar
2
@6 𝑚 = 5366 𝑚 × 3. 221 = 17283. 89
2
@7. 5 𝑚 = 5366 𝑚 × 2. 296 = 12320. 34
2
@9 𝑚 = 5366 𝑚 × 1. 921 = 10308. 09
2
@12 𝑚 = 5366 𝑚 × 1. 382 = 7415. 81
@6 𝑚 = 17284 𝑝𝑐𝑠 𝑜𝑓 6 𝑚 25𝑚𝑚Ø 𝑟𝑒𝑏𝑎𝑟
Tie Wire
2
@30 𝑐𝑚 = 5366 𝑚 × 0. 350 = 1878. 1
@30 𝑐𝑚 = 1879 𝑘𝑔𝑠 𝑜𝑓 𝐺𝐼 𝑡𝑖𝑒 𝑤𝑖𝑟𝑒
III.6. STAIRS
For Waist slab
𝐿 = 3𝑚
𝑠𝑝𝑎𝑐𝑖𝑛𝑔 = 15 𝑐𝑚,
𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑠𝑡𝑒𝑒𝑙 𝑏𝑎𝑟 = 12 𝑚, 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑡𝑖𝑒𝑠 = 30 𝑐𝑚
-Rebars
@6 𝑚 = 4 × 2. 584 = 10. 34
@7. 5 𝑚 = 4 × 2. 004 = 8. 016
@9 𝑚 = 4 × 1. 636 = 6. 54
@12 = 4 × 1. 197 = 4. 79
@12 = 5 𝑝𝑐𝑠 𝑜𝑓 25 𝑚𝑚Ø 𝑟𝑒𝑏𝑎𝑟
For Steps
1.
𝑆 = 16𝑑𝑏 = 16(25) = 400 𝑚𝑚
𝑆 = 442. 2 𝑚𝑚
2.
3
= 0.4422
= 6. 78 = 7 + 1 = 8 𝑙𝑎𝑡𝑒𝑟𝑎𝑙 𝑡𝑖𝑒𝑠 𝑝𝑒𝑟 𝑠𝑡𝑎𝑖𝑟
3.
= 8 × 18 = 144 𝑡𝑜𝑡𝑎𝑙 𝑡𝑖𝑒𝑠
4.
= 0. 17 + 0. 18 + 0. 06 = 0. 41 = 0. 5
= 0. 6𝑚 𝑙𝑒𝑛𝑔𝑡ℎ 𝑝𝑒𝑟 𝑡𝑖𝑒
5.
6
= 0.6
= 10
6.
144
= 6
= 24
172.8
= 53𝑚/𝑘𝑔
= 3. 26
= 22 × 5. 85 = 128. 7
128.7
= 6
= 21. 45
= 4 × 9. 85 = 39. 4
39.4
= 10.5
= 3. 75
Stairs 12 5 1
(Landings)
Stairs (Steps) 6 24 4
Septic Tank 12 7
(Walls, Vertical
Bars)
Septic Tank 9 12
(Walls,
Horizontal Bars)
Septic Tank 12 22 40
(Slab of
Leaching
Chamber)
Septic Tank 9 69 9
(Slab of
Digestion
Chamber)
Septic Tank 6 22
(Slab of Vault
Cover)
STIRRUPS 17,405