PRECOMMISSIONING TEST SHEET 날짜: 2023.03.26 15:56:50 +09'00'

FLUSHING / BLOWING
PIPING
RDMP PROJECT

Form No. : PRC-PI-001 Item No. : AB-001-AG-D-0057

: Cruide Distillation (CDU IV)


Form Description Piping Flushing / Blowing Test Sheet Item Description :
Hydrocarbon Drain Header

Unit : 001
26071-800-M6-001-00272
Ref. Drawing :
26071-800-M6-001-00012
Sub-System No. : 001-P300-981
Subsystem
: Slop Oil
Description

Water Demi. Water Steam Air


Flushing Medium:
Degreasing Acid Cleaning Mech. Cleaning Other

PIPEWORK INDEX

NO. TP No. / Method Acceptance Criteria & Result DATE

1 001-AG-D-0057 / Continuous Blowing Air color change to clear / Visually dry

2 Drying No water inside


Cloth or tape will be used if required.
3 Target
Visual inspection will be applied.
4

10

11

12

13

14

15

16

17
REMARKS

- For continuous blowing items, perform manual cleaning at site using cloth and WD40 if possible after blowing

JO's System Completion Owner's QA/QC or Construction Owner's System Completion

Name Name Name

Signature Signature Signature

Date Date Date


PREPARATION CHECK LIST

FLUSHING / BLOWING
PIPING
Form No. : PRC-PI-001 Item No : AB-001-AG-D-0057

Form Item
: Flushing / Blowing Preparation Check List : Cruide Distillation (CDU IV)Hydrocarbon Drain Header
Description Description

Unit : 001 Task Number :


Subsystem No. : 001-P300-981 Sheet No. : 1 of 1
Subsystem
: Slop Oil
Description
Applicability
NO. CHECK LIST RESULT
(YES, NO, N/A)
1 Check Job safety analysis or task based risk assessment has been performed

2 Check permit to work has been approved

3 PPE Prepared such as ear protection, gloves, coverall, goggle

4 Safety precaution or warning sign posted around the area

5 Check the line-up condition as per mark-up P&ID

Check any drums to be used as an air reservoirs have its associated relief valves in normal
6
operation

7 Confirm air quality and internals at which confirmation is repeated

Confirm proper signage at discharge point, that equipment / Instruments around dischage are
8 protected, and that discharge is properly oriented to minimize impacts. if required, Wood plank
cover may be provided for each air blowing discharge points to protect the surrounding.

9 Confirm siren available

10 Conduct toolbox meeting

Confirm devices are removed from line and provide list of tags,
11
Refer to Reinstatement Check List.

Review items from HSE checklist in paragraph 9 of 26071-100-530-GST-00002 as below


- Proper approach for valve operation
12
- Low point drains and high point vent are checked
- Emergency rescue team provided

Confirm portable air compressor is suitable for air blowing,


13
Refer to 26071-100-530-GST-00002-001
REMARKS : POTENTIAL HAZARDS:
PRE-OPERATIONAL SAFETY CHECKS FOR COMPRESSOR: 1. Noise & dust - Move the air compressor outside or move bystanders.
1. Check compressor and motor oil levels and top up as required. (For petrol Wear hearing/eye protection
powered motor and electric 2. Electricity - RCD circuit, check cords
3. Compressed Air - Do not point towards any body part. Avoid exposure
powered compressors). Refer to operator manual.
when checking hoses for leaks.
2. Examine power lead for obvious damage (for electric motor compressors)
HOUSEKEEPING:
3. Check that drive belt and pulley guards are fitted, secure and functional.
1. Clean away any oil and debris from in and around engine and compressor
4. Check the drive belts are properly tensioned. when job complete.
5. Examine all air hoses, connections and couplings. 2. Keep the work area in a clean and tidy condition.
6. Check any air tools and accessories for serviceability. 3. Roll up hoses at end of work and store handles to avoid damage.
7. Locate and be familiar with ON/OFF controls. 4. Check and drain air tank and lines for water as per manufacturer’s
8. Faulty equipment must not be used. Report faulty machinery immediately recommendations.
9. Pressure gauge will be calibrated (certified) 5. Check compressor motor for lubricating oil.
6. Ensure drive belts are tensioned as per manufacturer’s recommendation.

JO's System Completion Owner's QA/QC or Construction Owner's System Completion

Name Name Name

Signature Signature Signature

Date Date Date


PRECOMMISSIONING TEST SHEET

FLUSHING / BLOWING
PIPING
RDMP PROJECT
HYDRO PACKAGE LIST
(FLUSHING / BLOWING)

PACKAGE NO. : AB-001-AG-D-0057

NO. Hydro Package No. Remark

1 001-AG-D-0057

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

GENERAL NOTES
E-1-112A/B/C/D E-1-106A E-1-105A E-1-105A E-1-105B E-1-105B E-1-105C E-1-105C E-1-107A E-1-107B E-1-107A E-1-114B E-1-102 E-1-102 1. FOR ABBREVIATIONS, SYMBOLS & GENERAL NOTES, REFER TO LEGEND
M6-001-00020 M6-001-00012 M6-001-00008 M6-001-00008 M6-001-00008 M6-001-00008 M6-001-00008 M6-001-00008 M6-001-00012 M6-001-00012 M6-001-00012 M6-001-00008 M6-001-00008 M6-001-00008
SHEETS 26071-100-M6-000-00001 THROUGH 26071-100-M6-000-00065.
D D D D D D D D D D D D D D
2. ALL DRAWING CHANGES FROM PREVIOUS REVISION HAVE CLOUDS AND
15120 5247 25183 25182 31498 31497 31499 31496 13488 6523 4245 31494 2487 5256 REVISION MARKS (TRIANGLE) TO INDICATE WHICH REVISION THE CHANGE
A A
WAS LAST MADE.

001-D-875-3/4"-1CB2S01-NI

001-D-876-3/4"-1CB2S01-NI

001-D-878-3/4"-1CB2S01-NI

001-D-879-3/4"-1CB2S01-NI

001-D-888-3/4"-1CB2S01-NI

001-D-889-3/4"-1CB2S01-NI

001-D-897-3/4"-1CB2S01-NI

001-D-829-3/4"-1CB2S01-NI

001-D-890-3/4"-1CB2S01-NI
AB-001-AG-D-0057

001-D-873-1"-1CB2S01-NI

001-D-874-1"-1CB2S01-NI

001-D-898-1"-1CB2S01-NI

001-D-891-1"-1CB2S01-NI

001-D-892-1"-1CB2S01-NI
NOTES
C.O
1. UNDERGROUND PIPING TO BE CATHODICALLY PROTECTED.
Air Blowing Procedure: 6"x4"

1. Air hose is to be connected as per mark-up P&ID. AG 1CB2S01


UG 1CB2B22
2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2"
B B
(By mobile air compressor) 001-D-871-6"-1CB2B22-NI
1m
200 m
SLOPE
002
C.O
BLOW OUT POINT
2. Check the line-up condition as per mark-up P&ID 002 002
6"x4"
2" 2" 2" 2"
3. Supervision & Set the warning tape around blow- UG 1CB2B22
AG 1CB2S01

001-D-811-6"-1CB2B22-NI

001-D-872-1"-1CB2S01-NI

001-D-870-1"-1CB2S01-NI

001-D-880-1"-1CB2S01-NI

001-D-882-1"-1CB2S01-NI
off
C
4. Line will be disassembled and cleaned by air. C
(Continuous Air Blowing)
5. Once foreign matters are not visible at the blow-out
14376 13490 23531 23627
point, blowing is completed. D
M6-001-00018
D
M6-001-00012
D
M6-001-00007
D
M6-001-00007
6. Piping after blowing will be inspected visually E-1-110B E-1-106A E-1-103A E-1-103A 002 002 002

HYDROCARBON DRAIN 1m
200 m C.O E-1-108 E-1-108 E-1-110D 001-FV-0863 E-1-106B E-1-106B E-1-103B 001-FV-0854 001-FV-0855 E-1-103B E-1-104A E-1-104A E-1-114A 001-FV-0853 E-1-104B E-1-104B E-1-114A E-1-114B 001-SC-858 001-FV-0862 E-1-107B
001-D-001-6"-1CB2B22-NI SLOPE M6-001-00017 M6-001-00017 M6-001-00018 M6-001-00012 M6-001-00012 M6-001-00012 M6-001-00007 M6-001-00007 M6-001-00008 M6-001-00007 M6-001-00007 M6-001-00007 M6-001-00008 M6-001-00007 M6-001-00007 M6-001-00007 M6-001-00008 M6-001-00008 M6-001-00008 M6-001-00012 M6-001-00012
D M6-001-00271 14692 D
6"x4" D D D D D D D D D D D D D D D D D D D D D
TO C-1-107
14113 3289 3247 1236 3225 13493 31492 1370 1371 31491 22077 22109 2453 1372 31489 31490 18363 5154 29727 1365 3254
2" 2" 2" 2" 2"
UG 1CB2B22

001-D-565-3/4"-1CB2S01-NI
001-D-806-3/4"-1CB2S01-NI

001-D-809-3/4"-1CB2S01-NI

001-D-810-3/4"-1CB2S01-NI

001-D-844-3/4"-1CB2S01-NI

001-D-858-3/4"-1CB2S01-NI

001-D-899-3/4"-1CB2S01-NI
001-D-865-1"-1CB2S01-NI

001-D-866-1"-1CB2S01-NI

001-D-867-1"-1CB2S01-NI

001-D-868-1"-1CB2S01-NI

001-D-869-1"-1CB2S01-NI

001-D-883-1"-1CB2S01-NI

001-D-884-1"-1CB2S01-NI

001-D-886-1"-1CB2S01-NI

001-D-885-1"-1CB2S01-NI

001-D-887-1"-1CB2S01-NI

001-D-894-1"-1CB2S01-NI

001-D-893-1"-1CB2S01-NI

001-D-895-1"-1CB2S01-NI

001-D-896-1"-1CB2S01-NI
AG 1CB2S01
Disassemble and 002
001-D-803-3/4"-1CB2S01-NI

001-D-804-3/4"-1CB2S01-NI

001-D-807-3/4"-1CB2S01-NI
001-D-805-1"-1CB2S01-NI

001-D-808-2"-1CB2S01-NI

Air Hose Connection


002

E AG 1CB2S01 E
2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" UG 1CB2B22
14501 14498 14495 29704 6816 002 200 m
1m C.O
D D D D D 001-D-861-4"-1CB2B22-NI 002 SLOPE
001-D-821-6"-1CB2B22-NI

M6-001-00265 M6-001-00265 M6-001-00265 M6-001-00162 M6-001-00013 002 200 m C.O


G-1-108A G-1-108B C-1-105 C-1-105 001-XV-9012 1m
SLOPE 001-D-841-6"-1CB2B22-NI 002
6"x4"

1m
2" 2" 2" 2" 2"
G-1-105A G-1-105B G-1-101A G-1-101B G-1-102A G-1-102B UG 1CB2B22 UG 1CB2B22

200 m
E
AG 1CB2S01 AG 1CB2S01 001-D-843-3/4"-1CB2S01-NI

SLOP
M6-001-00015 M6-001-00015 M6-001-00016 M6-001-00016 M6-001-00016 M6-001-00016 2" 18413
F F
001-D-830-3/4"-1CB2S01-NI

D D D D D D D

001-D-848-3/4"-1CB2S01-NI

001-D-847-3/4"-1CB2S01-NI

001-D-846-3/4"-1CB2S01-NI

001-D-555-3/4"-1CB2S01-NI
001-D-851-6"-1CB2B22-NI
6846 6842 6855 6851 6857 6852 M6-001-00010
G-1-107A THIS DRAWING IS DERIVED FROM
001-D-877-3"-1CB2S01-NI 26071-800-M6-001-00271
001-D-812-3/4"-1CB2S01-NI

001-D-813-3/4"-1CB2S01-NI

001-D-816-3/4"-1CB2S01-NI

001-D-817-3/4"-1CB2S01-NI
001-D-814-1"-1CB2S01-NI

001-D-815-1"-1CB2S01-NI

3" 34704
002 D 002
M6-001-00010
4"x2" C-1-113 HOLDS
2" 001-D-842-3/4"-1CB2S01-NI 18416
1. DELETED.
15165 18421 18420 30882 5785 D
1CB2B22 1CB2S01
D D D D D M6-001-00010
UG AG G-1-107B
G M6-001-00014 M6-001-00010 M6-001-00010 M6-001-00010 M6-001-00010 G
001-FV-0870 E-1-132A E-1-132A E-1-132B 001-SC-851 002
AG 1CB2S01
2" 2" 2" 2" 2" 2" UG 1CB2B22
C.O
2" 001-D-845-3/4"-1CB2S01-NI 30883
6"x4" D
002 M6-001-00010
2" 001-D-852-1"-1CB2S01-NI E-1-132B 14539
2" 2" 2" 2" 2" 2" 2" 2"
UG 1CB2B22 UG 1CB2B22 UG 1CB2B22 D
AG 1CB2S01 AG 3CB1S01 AG 1CB2S01 M6-001-00019
001-D-826-3/4"-1CB2S01-NI

001-D-802-3/4"-1CB2S01-NI
001-D-825-2"-1CB2S01-NI

001-D-827-2"-3CB1S01-NI

001-D-828-2"-3CB1S01-NI

001-D-824-2"-1CB2S01-NI

001-D-823-2"-1CB2S01-NI

001-D-822-2"-1CB2S01-NI

2" 001-D-859-3/4"-1CB2S01-NI 1386 E-1-111A


1m

13461 001-D-849-1"-1CB2S01-NI 2" D REFERENCE DRAWINGS


H 1CB2B22 1CB2S01 H
200 m

D M6-001-00019
E
SLOP

UG AG 001-FV-0875
M6-001-00011
13462 G-1-103A 001-D-850-1"-1CB2S01-NI
001-D-831-6"-1CB2B22-NI

2"
D
M6-001-00011 002 11 Jun 21 RE-ISSUED FOR CONSTRUCTION S.D.LEE K.T.KIM/D.KOO Y.D.KIM
6835 27906 17667 13885 13876 15111 15110 15107 G-1-103B 13463 001-D-855-1"-1CB2S01-NI 2" 001 29 Dec 20 RE-ISSUED FOR CONSTRUCTION S.D.LEE K.T.KIM/D.KOO Y.D.KIM
D D D D D D D D D 2" 001-D-853-1"-1CB2S01-NI 14111 000 31 Aug 20 ISSUED FOR CONSTRUCTION S.D.LEE K.T.KIM/D.KOO Y.D.KIM
M6-001-00015 M6-001-00161 M6-001-00162 M6-001-00023 M6-001-00023 M6-001-00014 M6-001-00014 M6-001-00014 M6-001-00011 1CB2S01 1CB2B22 D
AG UG 00C 29 Apr 20 ISSUED FOR DESIGN S.D.LEE K.T.KIM/D.KOO Y.D.KIM
C-1-102 C-1-102 C-1-102 S-1-101B S-1-101A G-1-104C G-1-104B G-1-104A 002 G-1-103C M6-001-00017
002 00B 04 Dec 19 ISSUED FOR HAZOP S.D.LEE K.T.KIM/D.KOO Y.D.KIM
2" 001-D-554-3/4"-1CB2S01-NI 29730 E-1-109A
I E-1-131A/B C-1-104 001-FV-0872 C-1-104-S1 C-1-102 001-FV-0871 001-FV-0866 001-SC-859 001-FV-0893 REV DATE DESCRIPTION DRAWN CHK'D APP'D I
M6-001-00006 M6-001-00014 M6-001-00016 M6-001-00014 M6-001-00162 M6-001-00016 M6-001-00013 M6-001-00023 M6-001-00013 13494 001-D-856-3/4"-1CB2S01-NI 2" D
1CB2B22 1CB2S01 THIS DRAWING EMBODIES PROPRIETARY INFORMATION OF PT PERTAMINA (PERSERO) THIS DRAWING OR THE MATERIAL
D D D D D D D D D D M6-001-00009-03 002 DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR
UG AG 001-SC-855
2" 001-D-818-2"-1CB2S01-NI 22850 31485 15104 6850 34788 27907 6856 6826 26682 6824 M6-001-00009-03 OTHER THAN THE PURPOSE FOR IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE
002 G-1-109A FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED
D 13495 001-D-857-3/4"-1CB2S01-NI 2" BY PT PERTAMINA (PERSERO).
001-D-835-3/4"-1CB2S01-NI

001-D-834-3/4"-1CB2S01-NI

001-D-836-3/4"-1CB2S01-NI

001-D-838-3/4"-1CB2S01-NI

001-D-566-3/4"-1CB2S01-NI

001-D-106-2"-1CB2S01-NI
001-D-840-2"-1CB2S01-NI

M6-001-00006 D 2" 26362


001-D-832-2"-1CB2S01-NI

001-D-833-2"-1CB2S01-NI

001-D-881-2"-1CB2S01-NI

E-1-101A 1CB2S01 1CB2B22 PROJECT :


M6-001-00009-03 D
G-1-109B AG UG
2" 001-D-819-3/4"-1CB2S01-NI 6830 M6-001-00009-02
AH-1-001
RDMP RU V BALIKPAPAN
D 6" 001-D-863-6"-1CB2S01-NI 35091
M6-001-00015 2447 001-D-860-3/4"-1CB2S01-NI 2" D
001-LV-0851 1CB2B22 1CB2S01 CONTRACTOR :
D M6-001-00009-01
UG AG
J 2" 001-D-820-3/4"-1CB2S01-NI 15118 M6-001-00161
C-1-108A
C-1-108A
RDMP BALIKPAPAN JO J
D AG 1CB2S01 AG 1CB2S01 25032 001-D-559-3/4"-1CB2S01-NI 2"
1CB2B22 1CB2S01 002
M6-001-00014 UG 1CB2B22 UG 1CB2B22 D
UG AG 2" 2" 2" 2" 2" 2" 2" 2" 2" 1CB2S01 1CB2B22 OWNER :
001-LV-0873 001-D-553-3/4"-1CB2S01-NI
C.O M6-001-00009-01 002
001-SC-861 AG UG
2" 29733 PT PERTAMINA
D
6"x4" M6-001-00009-02 002 BALIKPAPAN, INDONESIA
002 6" 001-D-864-6"-1CB2S01-NI 35090 001-SC-850
2" TITLE :
001-D-839-2"-1CB2S01-NI 27908 2414 001-D-862-3/4"-1CB2S01-NI 2"
1CB2B22 1CB2S01
D PIPING & INSTRUMENTATION DIAGRAM
D D M6-001-00009-02
002 M6-001-00162 M6-001-00161
UG AG C-1-108B CRUDE DISTILLATION UNIT (CDU IV)
K C-1-101 C-1-108B 29684 001-D-560-3/4"-1CB2S01-NI 2" C.O
HYDROCARBON DRAIN HEADER K
6" 001-D-837-6"-1CB2S01-NI 002
14486 D
FILE NAME :

1CB2B22 1CB2S01
D
M6-001-00013
M6-001-00009-02 002
001-SC-862
1CB2S01
AG
1CB2B22
UG 6"x4" AB-001-AG-D-0057 PERTAMINA DRAWING NO. REV.
UG AG C-1-101 NONE 26071 26071-800-M6-001-00272 1/1
002
SCALE JOB NO. DOCUMENT NO. SHT NO.
A1 (841x594)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

NOTE 6 GENERAL NOTES


FIRE
E-001-106A /B NOTE 10 E-001-107A /B NOTE 13 001-VF-199-8"-1CB2S01-ST-25 SET @ 22.40 kg/cm^2g 1. FOR ABBREVIATIONS, SYMBOLS & GENERAL NOTES, REFER TO LEGEND
SIZE 4P6 001 SHEETS 26071-100-M6-000-00001 THROUGH 26071-100-M6-000-00065.
DESALTED CRUDE / KERO PRODUCT EXCHANGER DESALTED CRUDE / AR EXCHANGER NI ST25
V 3/4"
A M6-001-00061
AB-001-AG-D-0057
FLOW SIGNAL
SET POINT
6274
TOTAL DESIGN DUTY (MMkcal/hr) 11.280 TOTAL DESIGN DUTY (MMkcal/hr) 14.020 14156 001-VF-127-8"-1CB2S01-NI 1m
200 m
SLOPE NOTE 4
PSV
0830A
+

2. ALL DRAWING CHANGES FROM PREVIOUS REVISION HAVE CLOUDS AND


REVISION MARKS (TRIANGLE) TO INDICATE WHICH REVISION THE CHANGE WAS A
HOT SIDE COLD SIDE HOT SIDE COLD SIDE VF LAST MADE.
TO 001-FIC-328 LO 8"x6"
DESIGN PRESSURE (kg/cm2g) 42.00 / FV 42.00 / FV DESIGN PRESSURE (kg/cm2g) 42.00 / FV 42.00 / FV M6-001-00264 001-VF-198-8"-1CB2S01-NI
FLOW SIGNAL FP 1CB2S01-ST25 6"x4"
ACTUAL DESIGN TEMPERATURE ( C) 245 / 23 225 / 23 DESIGN TEMPERATURE ( C) 281 / 23 240 / 23 NOTE 6
3CB1S01-ST65
5171 M6-001-00061 FIRE D
MOC ALLOY C276 (PLATES) MOC ALLOY C276 (PLATES)
Air Blowing
FROM 001-FIC-328
Procedure:
FLOW SIGNAL SET POINT
INSULATION / TRACING HC INSULATION / TRACING HC
001-VF-126-8"-1CB2S01-ST-25

NI ST25
SET @ 22.40 kg/cm^2g
SIZE 4P6
001 3/4"
LO
NOTES
V 3/4" PSV NOTE 4 1. ALL PSV OUTLET LINES TO CONNECT TO TOP OF HEADER. SLOPE FOR
1. Air hose is to be connected as per mark-up P&ID.
200 m
M6-001-00060 38850 FP
+

1m
SLOPE NOTE 4 0830B INDIVIDUAL BRANCH SHALL BE 1:200.
TO 001-FIC-327
2. DELETED.

MIN.

001-P-705-6"-3CB1S01-ST-65
FLOW SIGNAL
40129 (By mobile
M6-001-00060
ACTUAL air compressor) 1CB2S01-NI
3CB1S01-ST40 2"
LO 8"x6"
FP 1CB2S01-ST25
3CB1S01-ST65
6"x4"
3. MULTI-PURPOSE CONNECTION TO BE PROVIDED BY VENDOR CLOSE TO EACH
HEAT EXCHANGER INLET AND OUTLET NOZZLES. 2" VALVES ON EACH

FREE DRAINING
B FROM 001-FIC-327 MULTIPURPOSE CONNECTION TO BE PROVIDED BY CONTRACTOR. B
2. Check the line-up condition as per mark-up P&ID D
D
4. PSV ISOLATION VALVES TO BE ORIENTATED SUCH THAT THEIR STEM IS IN THE
FLOW SIGNAL 3/4" HORIZONTAL POSITION.
ACTUAL FUTURE PHASE 2 SET POINT
35051 3. M6-001-00022
Supervision & Set the warning tape around blow- 3/4" NOTE 4 LC 5. FLOW INDICATORS FV-0862 AND FV-0863 TO BE READABLE FROM HAND
FP
FROM 001-FIC-1002 2" CONTROL VALVE HV-0853 AND HV-0854 RESPECTIVELY.

off FLOW SIGNAL SET POINT FUTURE PHASE 2 ACTUAL LC


001-P-706-6"-3CB1S01-ST-65
6. PSV SET PRESSURE SHALL BE ADJUSTED CONSIDERING ACTUAL LOCATION
FOR LIQUID FULL SERVICE LINE.
M6-001-00022 35052 MASTER FLOW CONTROLLER SET POINT 7. DELETED.
4. Line will be disassembled and cleaned by air.
TO 001-FIC-1002 NOTE 17
001-P-594-10"-3CB1S01-ST-65
FREE DRAINING
M6-001-00017 14105
AR 8. UPSTREAM AND DOWNSTREAM STRAIGHT LENGTH REQUIREMENTS FOR
FLOW SIGNAL FLOW METERS SHALL BE DETERMINED TAKING INTO ACCOUNT THE SPECIFIC

C
2479 (Continuous
M6-001-00011
FROM 001-FI-0861
ACTUAL
Air Blowing) ACTUAL FROM E-1-109 DEVICE PARAMETERS AND PIPING INSTALLATION-IN ADDITION TO ANY
RELEVANT INTERNATIONAL STANDARDS AND MANUFACTURER C
MIN. 200 m
RECOMMENDATIONS.
5. Once foreign matters are not visible at the blow-out 002
SLOP
E 1m 001-VFL-101-12"-1CB2S02-NI 4504
VFL
9. LOCATE AT HIGH POINT AND ACCESSIBLE TO OPERATOR.
10. PHASE 1 : 1 x 100%
point, blowing is completed.

NOTE 1

NOTE 1
001-VFL-161-8"-1CB2S02-NI 001-VFL-102-8"-1CB2S02-NI 001-VFL-126-8"-1CB2S02-NI M6-001-00263 E-1-106A ON DUTY
3CB2S01 3CB1S01 NOTE 6 NOTE 6 NOTE 6

NOTE 1
002 E-1-106B NOT USED
002
6. Piping after blowing will be inspected visually FIRE FIRE FIRE 002 PHASE 2 : 2 x 100% (SERIES)

1m

1m

1m
001-P-836-8"-3CB1S01-ST-65
001-P-810-6"-3CB1S01-ST-65
SET @ 42.51 kg/cm^2g SET @ 40.49 kg/cm^2g SET @ 40.49 kg/cm^2g E-1-106A ON DUTY

200 m

200 m

200 m
001 SIZE 4M6 001 SIZE 4M6 001 SIZE 4M6 E-1-106B ON DUTY

E
SLOP

SLOP

SLOP
6"
001-P-809-6"-3CB1S01-HC-40 PSV V 3/4" PSV V 3/4" PSV V 3/4"
+ + +

0814C NOTE 4 0814B NOTE 4 0814A NOTE 4 11. DELETED.


6" 002 12. DELETED.
002 8"x6" LO 8"x6" LO 8"x6" LO
001 HC65 HC40 001 FP 002 FP FP 13. PHASE 1 : 2 x 50% (PARALLEL)
D E-1-107A ON DUTY D

MIN.
TW TW 6"x4" NI 1CB2S02 6"x4" NI 1CB2S02 6"x4" NI 1CB2S02
1139 1086 E-1-107B ON DUTY
NOTE 3 NOTE 3 HC40 3CB1S01 HC40 3CB1S01 HC40 3CB1S01
2" NOTE 13 2" D D D PHASE 2 : 2 x 50% (PARALLEL)
V 3/4" V 3/4"
NOTE 9 NI 1CB2S02
NOTE 9 E-1-107A ON DUTY
001 3/4" 2" HC30 3CB1S01 3/4" 3/4" E-1-107B ON DUTY
TI LO RS RS LO LC LO
0881 LO NOTE 4 NOTE 4 NOTE 4 14. FUTURE SCOPE FOR PHASE 2 IS EXCLUDED FROM PROJECT SCOPE.
L FP FP FP
D SPACE ALLOCATION SHALL BE CONSIDERED FOR FUTURE.
10"x8" 002 15. SYMMETRICAL PIPE CONFIGURATION MUST BE CONSIDERED TO AVOID
RS RS LO 3/4" 002

DRAINING

DRAINING

DRAINING
LO 001-P-668-6"-3CB1S01-HC-40
001-P-827-8"-3CB1S01-HC-65

PREFERENTIAL FLOW.
001-P-837-8"-3CB2S01-ST-40

2" 2" 001-P-897-6"-3CB1S01-HC-40

FREE

FREE

FREE
NOTE 15
001 001 E-001-107B 2"

001-P-834-8"-3CB1S01-HC-40
NOTE 3 NOTE 3 001-P-896-6"-3CB1S01-HC-40 16. FOR DETAILS, REFER TO SYMBOL AND LEGENDS DETAILS P&ID
PI TT 3/4" 001 001 3/4" LC
10"x8" 002 26071-100-M6-000-00031.
0887 0881 TW TW H
E 1136 1135 001 17. MASTER FLOW CONTROLLER COLLECTS ACTUAL FLOW INFORMATION FROM E
FIC

001-P-667-10"-3CB1S01-HC-40
FREE DRAINING 001-P-667-10"-3CB1S01-HC-40 EACH FLOW CONTROLLER AND PROVIDES REQUIRED SET POINT OBTAINED
TYPE B 0862 NOTE 5
MIN. BY FLOW NORMALLIZATION TO EACH FLOW CONTROLLER.
NOTES 5, 18 001
001 001 001 001 18. FOR CONTROL VALVE CLOSED VENT AND DRAIN DETAILS, SEE P&ID
001 PG PT TE TG FI
0862L 26071-800-M6-001-00182.
FV +

0877 0887 0881 0882 6523 3254


0862 001 001 001 001 001
10"x8" D OWS OWS D FT TI TT TE TG
DESALTED CRUDE 0862 001 0879 0879 0880
M6-001-00272 NOTE 16 NOTE 16 M6-001-00272 0879
M6-001-00013 14254 NOTE 15 FE
+

NOTE 16 NOTE 16 0862


TO C-1-101 10" 001 001 10"x8"
D 3/4" FO 10"x8" TW TW 001-P-540-10"-3CB1S01-HC-40 DESALTED CRUDE
001-P-522-10"-3CB1S01-HC-65 002 3/4" 001-P-826-10"-3CB1S01-HC-65 1141 1088 NOTE 15 M6-001-00011 13465
TYP 4A 10"x8" NOTE 3 NOTE 3
F NOTE 8 16"x10" FROM G-1-103 F
V 3/4" 2" NOTE 13 2" V 3/4" 10"x8"
NOTE 15 NOTE 9 NOTE 9
001-P-515-16"-3CB1S01-HC-50
10"x8" LO RS RS
LO NOTE 5
1365 NOTE 8
001
D OWS RS RS LO FI 001 3/4"

FUTURE PHASE 2
LO 2" 2" 0863L FE
M6-001-00272 NOTE 16
+

E-001-107A

NOTE 14
NOTE 16 NOTE 3 NOTE 3 0863 HOLDS
001 001 H
3/4" TW TW 3/4" 001 001
1138 1084 FIC FT 1. DELETED.
0863 0863 2. DELETED.
TO E-1-115 3. DELETED.
G 13514 M6-001-00022 4. DELETED. G
DESALTED CRUDE 5. DELETED.
001 13488 4245

001-P-518-10"-3CB1S01-HC-40
TI 6. DELETED.
D OWS OWS D 001-P-860-8"-3CB1S01-HC-65
0885
L M6-001-00272 NOTE 16 NOTE 16 M6-001-00272
NOTE 16 NOTE 16 001 001 H 002
001
HC65 HC40 PI TT TI
0890 0887 0887
001 001 001-P-806-6"-3CB1S01-HC-40
PI TT
0889 0885 6"
001 001
3CB2S01 3CB1S01 PG PT 001 001
H TYPE B 001-P-811-6"-3CB1S01-ST-65 0818 0890 TE TG REFERENCE DRAWINGS H
0887 0888 001-P-575-10"-3CB2S01-ST-50
NOTES 5, 18 001 001 001 001 26103-800-M6-001-00007 DESALTED CRUDE / KERO & AR EXCH.
001 PT PG TE TG 6"
0889 0837 0885 0886 AR
FV +

0863 14257 M6-001-00005


DESALTED CRUDE 001-P-831-10"-3CB1S01-HC-65 TO E-1-19
M6-001-00013 2381 002 11 Jun 21 RE-ISSUED FOR CONSTRUCTION S.D.LEE K.T.KIM/D.KOO Y.D.KIM

TO C-1-101 10" 001 29 Dec 20 RE-ISSUED FOR CONSTRUCTION S.D.LEE K.T.KIM/D.KOO Y.D.KIM
D 3/4" FO H 001-P-102-10"-3CB1S01-HC-65 001-P-819-10"-3CB1S01-HC-65
001-P-519-10"-3CB1S01-HC-65 002 3/4" 001 000 31 Aug 20 ISSUED FOR CONSTRUCTION S.D.LEE K.T.KIM/D.KOO Y.D.KIM
TYP 4A TI 10" 10" 00C 29 Apr 20 ISSUED FOR DESIGN S.D.LEE K.T.KIM/D.KOO Y.D.KIM
0883
00B 04 Dec 19 ISSUED FOR HAZOP S.D.LEE K.T.KIM/D.KOO Y.D.KIM
001-P-844-10"-3CB1S01-HC-40 001-P-832-10"-3CB1S01-HC-65
I REV DATE DESCRIPTION DRAWN CHK'D APP'D I
10" Disassemble and 10" THIS DRAWING EMBODIES PROPRIETARY INFORMATION OF PT PERTAMINA (PERSERO) THIS DRAWING OR THE MATERIAL
1236 001 001 HC65 HC40 001 001 DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR
OWS D TT PI Air Hose Connection TW TW
001-P-572-10"-3CB1S01-HC-65 OTHER THAN THE PURPOSE FOR IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE
0883 0888 1097 1096 FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED
M6-001-00272 NOTE 3 NOTE 3
NOTE 16 001 001 BY PT PERTAMINA (PERSERO).
V 3/4" 2" NOTE 10 2" V 3/4"
NOTE 16 TW TW NOTE 9 16"x10" 16"x10" NOTE 9 KEROSENE PRODUCT
1093 1092 PROJECT :
NOTE 3 NOTE 3 M6-001-00017 14101
LO RS RS LO
001
TG
001
TE
001
PT
001
PG NOTE 9
V 3/4"
16"x10"
2" NOTE 10 2"
16"x10"
3/4" V
NOTE 9 001-P-833-10"-3CB1S01-HC-65 16"x10" 16"x10"
FROM E-1-108 RDMP RU V BALIKPAPAN
0884 0883 0888 0817
LO RS RS LO LO RS RS LO
KEROSENE PRODUCT 001-P-574-10"-3CB1S01-HC-65 2" 2" CONTRACTOR :
16"x10" 16"x10"
1" NOTE 3 E-001-106B NOTE 3 1"
J M6-001-00008 12462
TO E-1-105 LO RS RS LO
001
TW
001
TW
RDMP BALIKPAPAN JO J

2" 2" 1144 1094


1"
001
NOTE 3 E-001-106A NOTE 3 001
1"
OWNER :
001-P-518-10"-3CB1S01-HC-40
TW
1142
TW
1090 PT PERTAMINA
BALIKPAPAN, INDONESIA
TITLE :
PIPING & INSTRUMENTATION DIAGRAM
5247 13490 13493 3225
CRUDE DISTILLATION UNIT (CDU IV)
K D OWS D OWS D OWS D OWS DESALTED CRUDE AND KEROSENE AND AR K
M6-001-00272 NOTE 16 M6-001-00272 NOTE 16 M6-001-00272 NOTE 16 M6-001-00272 NOTE 16 AB-001-AG-D-0057 EXCHANGER
FILE NAME :

NOTE 16 NOTE 16 NOTE 16 NOTE 16


PERTAMINA DRAWING NO. REV.
001-P-830-10"-3CB1S01-HC-65
NONE 26071 26071-800-M6-001-00012 1/1
002
SCALE JOB NO. DOCUMENT NO. SHT NO.
A1 (841x594)
1 2 3 4 5 6 BLOW OUT7 POINT 8 9 10 11 12 13 14 15 16
ISO DWG NO. 001A02-D-870 SHT 01 REV. 000 BILL OF MATERIALS
N
SHOP MATERIALS

PT SIZE MATERIAL MAT'L


NO DESCRIPTION (IN) CODE QTY CLASS INS

1 PIPE, CS A106-B SMLS PE B36.10M S-160 1 I14043378 0.2 M 1CB2S01 NI

FIELD MATERIALS

PT SIZE MATERIAL MAT'L


NO DESCRIPTION (IN) CODE QTY CLASS INS
CLASS:
1CB2S01 2 90 DEG ELL, CS A105N SWE B16.11 CL6000 1 I9856851 1 1CB2S01 NI
4
CLASS: 36
28 00 3 RSW FLG, CS A105N FF B16.5 CL300 S-160 2X1 I165919731 1 1CB2S01 NI
3CB1S01
L +1
E
4 ISO KIT, MFG-STD TEFLON CL300 FF 3MM THK 2 I81704516 1 1CB2S01 NI
MFR-STD & B16.5 W/INSULATING WASHER TEFLON
CONN ISO. 3mm THK, STEEL WASHER CARBON STEEL 3mm THK,
001A02-P-518 SLEEVE TEFLON 1mm THK
2
SHT:04 28
E 2306572 PD
1"N
N 2359500
EL +100364

184
1"NPD

F3 G4
2X1"NPD

CONN ISO. CLASS:


001U01-D-870 1CB2S01
SHT:01
E 2306600 CLASS:
N 2359500 1CB2B22
EL +100150

THIS DRAWING EMBODIES PROPRIETARY INFORMATION OF PT PERTAMINA (PERSERO) THIS DRAWING OR THE MATERIAL
DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR
OTHER THAN THE PURPOSE FOR IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE
FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED
BY PT PERTAMINA (PERSERO).
PROJECT
RDMP RU V BALIKPAPAN
OPER. DESIGN TEST INSULATION CONTRACTOR
NPS MAT'L PAINT
PRESS. TEMP. PRESS. TEMP. PRESS. PWHT NDE
CLASS
(kg/cm2[g]) (° C) (kg/cm2[g]) (° C) (kg/cm2[g]) TYPE CODE TH'K (mm) CODE
RDMP BALIKPAPAN JO
2" 1CB2S01 0.2 33 7 150 10.5 H NI - Lb N 5%
1" 1CB2S01 0.2 33 7 150 10.5 H NI - Lb N 5% OWNER
PT PERTAMINA
BALIKPAPAN, INDONESIA
000 22/12/2020 ISSUED FOR CONSTRUCTION KHK JSC JKP AREA NO. A UNIT NO. 001 SUB-UNIT NO. 00 CA NO. 001A02
P&ID NO. M6-001-00272 LINE NO. 001-D-870-2"-1CB2S01-NI
REV. DATE DESCRIPTION DRAWN CHECK'D APPR'D
STRESS PKG. NO. - ISO DWG NO. 001A02-D-870 SHT 01 REV. 000
SUB SYSTEM NO : 001-P300-981 2020-12-17 14:03:49 TOTAL SHEET : 1

You might also like