SOP For Operation of Effulent Treatment Plant
SOP For Operation of Effulent Treatment Plant
SOP For Operation of Effulent Treatment Plant
Page 1 of 3
Standard Operating Procedure
SOP No.:
SOP/ENG/05-04
Title: Operation of Effluent Treatment Plant Supersedes:
None
Prepared By Checked By Authorized By Effective Date
…………
Review date
QA Officer Production In-Charge Factory Manager
Date: Date: Date: …………..
1.0 PURPOSE:
1.1 To establish a procedural guidelines for operation of effluent treatment plant.
2.0 SCOPE:
2.1 This SOP is applicable for operation of effluent treatment plant to be followed at
formulation plant.
3.0 RESPONSIBILITIES:
3.1 It is the responsibility of Engineering Officer / Executive for the execution of this
procedure.
3.2 It is responsibility of Engineering manager for the implementation of this SOP.
3.3 Head QA/designee shall be responsible for compliance of this SOP.
4.0 SCHEDULE:
4.1 None
5.0 LIST OF ATTACHMENTS / FORMATS:
5.1 None
6.0 RELATABLE DOCUMENTS:
6.1 None
7.0 PROCEDURE:
7.1 Turn on the main from the switch located in the control panel.
7.2 Press the start button of blower 1 located at the control panel, run the blower
alternatively for 3 hours each.
7.3 Press start button of Pump A located at the control panel. This pumps the Raw
Effluent from the storage tank to the Equilization Tank. Flow from this tank allows
the Raw Effluent to be collected to the Neutralization Tank.
CTL Pharmaceuticals Pvt. Ltd. Page 2 of 3
Standard Operating Procedure
SOP No.:
SOP/ENG/05-04
Title: Operation of Effluent Treatment Plant Supersedes:
None
Prepared By Checked By Authorized By Effective Date
…………
Review date
QA Officer Production In-Charge Factory Manager
Date: Date: Date: …………..
SOP No.:
SOP/ENG/05-04
Title: Operation of Effluent Treatment Plant Supersedes:
None
Prepared By Checked By Authorized By Effective Date
…………
Review date
QA Officer Production In-Charge Factory Manager
Date: Date: Date: …………..
7.14 After the solids in the collector tank dries, remove the waste every 15 days.
Preparation of Solutions: (;f]n';g agfpg] t/Lsf)
CHEMICAL WEIGHT WATER TANK
SOLUTION
8.0 ABBREVIATION:
MBBR: Moving Bed Biofilm Reactor
QA : Quality Assurance
SOP : Standard Operating Procedure