REPORT NO : Date: 09 Oktober 2021

PROJECT PENGEMBANGAN PIPA CY–III


(LOMANIS – REWULU) NK-CY3-IR-TIR-003 Page : 1 of 1

TIE IN INSPECTION REPORT


COMPANY : PT. PERTAMINA PATRA NIAGA SIZE/MATERIAL : 16 Inch
CONTRACTOR : PT. NINDYA KARYA (PERSERO) WPS NO : 002/WPS/API/NK/TIE-IN/2019
DATE : 09 Oktober 2021

JOINT NO. J - 65 T

PIPE NO 015-C-0271 050-C-0941


HEAT NO K25598 K31984
LENGHT 12,18 12,20

Welder ID No.
Fit-Up Fit-Up Location/
NO JOINT NO Root H/Pass Fill 1 Fill 2 Cap 1 Cap 2 VISUAL Remarks
Date Check KP
R L R L R L R L R L R L
1 J - 65 T 06 28 06 28 06 28 06 28 06 28 06 28 ACC 9-Oct-2021 ACC KP-11

TOTAL :
ELECTRODE SIZE AWS NO
ROOT 3,2 mm A.5.1 : E6010
HOT PAS 4 mm A.5.5 : E7010 - P
FILLER 4 mm A.5.5 : E7010 - P
CAPPING 4 mm A.5.5 : E7010 - P

Prepared/Inspected By, Checked/Witnessed By, Witnessed/Approved By,


PT. NINDYA KARYA (PERSERO) PT. NINDYA KARYA (PERSERO) PT. PERTAMINA PATRA NIAGA

Name : Name : Name :


Date : 09 Oktober 2021 Date : 09 Oktober 2021 Date : 09 Oktober 2021