EEMC-PQP-PF-02-Technical Briefing

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

Elemec Electromechanical Contracting LLC

TECHNICAL BRIEFING

Technical briefing has been given on the following topics Date

Subject

Sl. No. Name Signature


1 DESCRIPTION OF WORK

1.1 Method of Work (Method Statement)

1.2 Approved Drawings

2 MATERIALS

2.1 Approved Material submittal

2.2 Storage & Safe Handling of Materials

2.3 Inspection of Materials (Random on damage, expiry etc)

3 WORK PERMISSIONS

3.1 NOC Awareness ( If any)

3.2 Excavation Permit / Awareness of Existing Services

4 WORK INSPECTIONS

4.1 Quality of Workmanship

4.2 Inspection and testing of Work as per Spec

4.3 Plant/Machinery Random Inspection (Test Certificate etc)

5 GENERAL INFORMATION

5.1 Wastage of Materials

5.2 Protection of Materials ( before & after use)

5.3 Usage of Labour & Plant (Productivity)

6 SAFETY

6.1 Housekeeping

6.2 Protection of Work (Barricading)

7 Others

Technical Briefing given by,

Name

Signature

Doc. Ref.: EEMC-PQP-PF-02 Rev. 00 Date: 10-03-2015 Page 1 of 1