Student Name1 (BFT MFT) Amartya

Tiwari
Student email: amartya.tiwari@nift.ac.in
Students phone no: 7000138969
Faculty Mentor: (name) C.S JOSHI
Industry Mentor: MR. VIRENDRA DALAL
G.M I.E AND ADMIN (BANSWARA
GARMENTS DAMAN URBAN) FIG PRODUCT
AUTOMATIC MACHINE OPERATING TIME AND IMPROVEEMNT THROUGH CYCLE TIME
CHANGE ANALYSIS
Background: Research Methodology: Analysis:
In apparel production IN TERMS OF PRODUCTIVITY
industry time study plays REDUCING THE IDLE TIME OF THE
vital role in defining its OPERATORS WILL LEAD TO
standard and to finish the INCREASE IN PRODUCTIVITY
work on time and also to MANUAL COLLECTION: - VIDEO
reduce WIP (work in ANALYSIS THROUGH CYCLE TIME
progress). COLLECTION.
So, firstly is the Project BY AUTOMATIC SYSTEM: -
selection my mentor told PLACING OF THE SENSOR ONTO
me about the low MACHINE AND ANALYSIS CAN BE
productivity (compared to DONE AUTOMATICALLY.
capacity standard) of
trouser line. Final IN TERMS OF EFFICIENCY
production reports and PER DAY CALCULATION OF
the time with which is PRODUCTIVITY (PIECES MADE)
operator is working on AND ANALYSIS OF OFF-TIME OF
standard job. THE MACHINE.
They have set a minimum HELP I.E TEAM TO KEEP A CHECK
capacity of the production ONTO MACHINE TIME ACTUALLY
per line (output from the OPERATED BY THE OPERATOR.
line) but it is not achieved
although, so with this a IN TERMS OF COSTING
further improvement is BANSWARA HAS 4 TROUSER LINE
needed and a system is AND 1 JACKET LINE AND IN PER
needed to check the LINE THEY HAVE AROUND 40
current on-standard time MACHINES.
in particular 8 hours of
job. i.e. What is the actual MY SYSTEM: - 650/-
time/per or full day the DOES NOT REQUIRE ANY EXTRA
operator operated HUMAN INT7ERVENTION DATA IS
machine and the COLLECTED AND STORED IN IOT
production is noted SELECTION OF OPERATIONS FROM CLOUD THIS DATA CN BE
altogether. LINE AND COMPARISION OF EXTRACRTED AND THE RESULTS
Basically, the non- RESULTS FROM PREVIOUS AND CAN BE OBTAINED EASILY.
productive time in which AFTER IMPROVEMENT
the sewing machine is PREVOIUS MANUAL METHOD: -
not working. Keywords: REQUIRES A MANUAL LABOR WITH
Objective: AUTOMATION ITS 9000/- PER MONTH AND THEN
 They didn’t have MACHINE IDLE TIME CALCULATION ALSO THERE ARE ERRORS IN THE
a system which NO HUMAN INVOLVEMENT CALCULATION.
calculates the ARDUINO PROJECT 4 LINES – 9000 * 5 = 45000
actual working IMPROVING PRODUCTIVITY PER MONTH BUT THIS REQUIRES
time of the ONLY ONE TIME INVESTMENT AND
operation. THE PRODUCT IS DURABLE IN
 TO IDENTIFY THE TERMS OF INSTALATINA AND
OPERATION COSTING BOTH.
DONE BY THE
OPERATOR Conclusion:
NEEDS
IMPROVEMENT From the research we concluded
OR NOT. that needle running time (machine
time) is the better efficiency
predictor or indicator, finding out
the reasons for low efficiency is
easier with this method in the
production sector. And the
comparison with the company
standards helpful to differentiate
between the production capacity
planned and achieved by the
particular sector. It also gives the
productivity indication with
respect to time the operator
operates the machine. As per the
overall standards setup by
industry it is not always the same
correspondence to working
according to that.

You might also like