The Ethiopian economy has been registering extraordinary, double digit, and
economic growth for the last nine years. When there exist fast economic growth in
one nation, the income of the citizen also increase this phenomena changes the life
style and modernization of the citizen
In order to keep the economic growth long lasting there should be parallel growth and
linkage sectors of the economy such as manufacturing and service ( tertiary) sector.
The development of children's playground and recreational services as one part of
service sector has a great contribution to the economy in different ways.
However the expansion of children's playground and recreational services are
concentrates in main town of the nation hence further investments in these areas are
very vital for better service provision for the citizens through that it supports the
economic development.
The government of Ethiopia has developed conductive investment policy packages
and other sectorial reforms at federal and regional level to attract a huge private
investment for the wellbeing of the nation and its citizens as a whole. Besides it is also
currently implementing the five years growth and transformation plan that gave a
space for the development industrialization and tertiary sector by private sector.
Like the federal government investment policy packages and incentives, the Afar
regional state government has been excreting its maximum effort to expand
investment opportunities in the region, so as to foster the economic development of
the region and subduing the regions big enemy that is the trap of poverty. Therefore
the regional government has been prepared a viable business environment to attract
many domestic and foreign investors so that the dream of making poverty history
turns to be true.
Therefore the visible market gap attractive investment policies and deep interest to
contribute for the development of birth Town attracts the owner of the envisioned
1-4
Besides during the construction work of the project extra jobs will be created
particularly for local community in construction part.
4 Benefit for local community
Apart from employment opportunity for local community, as a corporate
responsibility the project has been engaged in different development activities. This
will better worth the community in particular and contribute for the development of
the nation as a whole
5 Stimulate the local economy
The project will increase economic relationships and transaction among different
actors in the local economy.
2.3-Market supply
In the area there exist few service provider organizations. Besides all quality services
in one organization is almost nonexistent in the town.
2.4-Target customers
1-7
Sr Production Quantity
.No. Item Description Unit Daily Monthly Annualy
1 Coffe Cup 70 2,100.00 25,200.00
2 Tea Cup 40 1,200.00 14,400.00
3 Milk Cup 30 900.00 10,800.00
4 Machiato Cup 60 1,800.00 21,600.00
5 Soft Drinks Bottle 100 3,000.00 36,000.00
6 Juices Cup 20 600.00 7,200.00
7 Cake Pcs 40 1,200.00 14,400.00
8 Food Pcs 60 1,800.00 21,600.00
9 Ice Cream Pcs 35 1,050.00 12,600.00
10 Candy pop Pcs 20 600.00 7,200.00
11 Indoor Playground Games No of Games 60 1,800.00 21,600.00
12 Outdoor Playground Games No of Games 30 900.00 10,800.00
13 Children’s Toys Pcs 15 450.00 5,400.00
14 Children’s Cloth Lump 0.00 0.00
15 Supermarket Items Lump 0.00 0.00
1. Machinery and Equipment
The total cost of machinery and equipment with the envisaged capacity is estimated at Birr 4.47
million,The list of machinery and equipment required by the envisaged plant is given in Table 5.1.
Unit
Sr.No. Description Qty.(No.)
INDOOR PLAYGROUND
PCS
1 Electric playing machines 30
M2
2 Plastic Inflated playing materials 800
PCS
3 Playstation Game with Tvs 10
PCS
4 Other Playing Materials 10
OUTDOOR PLAYGROUND
M2
1 Plastic Inflated playing materials 300
PCS
2 Fixed Metal playing Materials 15
OTHERS
1 Restaurant and café Equipments LUMP 1
2 Office Equipments LUMP 1
1-9
The total area required by the project is 5,000 m2, of which 3,800 m2 is built-up area. The cost of
building at unit cost of Birr 3,000 per m2 is, thus, estimated at Birr 11,400,000.
Total human resource required is 67 persons. The total annual cost human resource is estimated at
Birr 1,372,500. The details of the human resource requirement and the estimated annual labor cost
including employees’ benefit are given in Table 6.1.
1-10
B. TRAINING REQUIREMENT
On-site training program is believed to be adequate for key production, maintenance and quality
control personnel by the experts of machinery and technology supplier during commissioning and
performance testing period. The total cost of training is estimated at Birr 75,000.
Source of Fund
% Amount (in
Sr.No. Description Share Birr)
Total
Annual Remaining
Year Principal Payment Interest 10% Payment Balance
0 0 0 16,388,062.50
Depreciation Schedule
Sr.No. Description Original Value Depreciation Depreciation
In Birr rate in % per year
Revenue Projection
Based on the productioncapacity and programe of the project indicated in previous chapter the
revenue of the organization projected as indicated in the table below.
Unit
Sr Annualy
Item Description Unit Price Total Price Assumption
.No. Production
Balance Sheet
Asset
Current Asset Cost
Cash 5,075,750.00
Inventory of raw materials and
0
inputs
Sub total Current Asset 5,075,750.00
Fixed Asset
Land, Building and civil work 11,400,000.00
Machinery and equipment 4,475,000.00
Vehicles 700,000.00
Office furniture and equipment 200000
Total Asset 16,775,000.00
Liability
Accounts payable 16,388,062.50
Owners Equity
Capital 5,462,687.50
Total Liability& Owners Equity 21,850,750.00
The total investment cost of the project including working capital is estimated at Birr 21.85 million
(see Table below).
INITIAL INVESTMENT COST (‘Birr)
Total
Sr.No Cost Items Cost
1 Fixed investment
1.1 Land, Building and civil work 11,400,000.00
1.2 Machinery and equipment 4,475,000.00
1.3 Vehicles 700,000.00
1.4 Office furniture and equipment 200000
Sub total 16,775,000.00
2 Pre operating cost *
2.1 Pre operating cost 50,000.00
Sub total 50,000.00
3 Working capital ** 5,025,750.00
Grand Total 21,850,750.00
1-15
B. PRODUCTION COST
The annual production cost at full operation capacity is estimated at Birr 5.02 million (see Table
below).