PT. PETRA ENERGY INTERNATIONAL REPORT NO.

460054824-TR-QCR.01-
PRE-CONCRETE INSPECTION REPORT 04/20
:PROJECT TITLE
PAGE :
EXTEND WORKSHOP PT. TRAKINDO UTAMA 1 OF 2
OWNER : PT. VALE INDONESIA INSPECTION DATE : 14/2/2020
CLIENT : PT. VALE INDONESIA DWG NO./REV. NO. : 435-2441-C
SUBJECT : CIVIL PEDESTAL OIL TANK : 435-2442-C
AREA : WORKSHOP PT. TRAKINDO UTAMA DESCRIPTION : STRUCTURAL PONDATION

FORMWORK RE - BAR SUB - FOUNDATION


√ SURVEY CHECKED √ GRADE √ PILES
N/A ORIENTATION √ SIZE N/A COMPACTION
√ LOCATION √ SPLICES √ CLEANLINESS
√ SIZE √ SPACING √ MOISTURE
√ ELEVATION √ CLEARANCE N/A BLINDING LAYER
√ CLEAN AND OILED √ CLEANLINESS N/A ELEVATION
√ CHAMFER N/A ADEQUATE SUPPORT N/A U/G MECH &ELECT
√ STRAIGHT, LEVEL, PLUMB N/A WIREMESH
N/A ADEQUATE BRACING

EMBEDMENTS MISC.
√ ANCHOR BOLTS (DIAMETER, LENGTH, TYPE) N/A KEYWAYS
√ ANCHOR BOLTS (LOCATION, PROJECTION) N/A BLOCKOUTS
N/A ANCHOR BOLT SLEEVES N/A SURFACE ROUGHENED
N/A ANCHOR BOLT GROUNDING N/A BONDING AGENT
N/A THREAD PROJECTION N/A TYPE OF FINISH
N/A WELD PADS N/A SETS/TEST SPECIMEN
N/A ANGLE IRON N/A HOT/COLD WEATHER PROTECTION
N/A INSERTS REBAR FOR LIFTING N/A JOINTS
N/A PIPES √ SPECIAL PLACING EQUIP. REQUIRED
N/A CONDUITS (TREMIES PUMP,FORM VIBRATORS)
N/A GROUND WIRE
N/A WATER STOP
N/A CRACKING CONTROL

ORDER CONCRETE TO THE FOLLOWING SPECIFICATIONS


MIX DESIGN 28 Mpa QUANTITY 10 M³
MAX. AGGREGATE SIZE NO. OF TEST CYLINDERS/SET
SLUMP 80 mm NO. SETS REQUIRED
ADMIXTURES DATE AND TIME OF POUR

Notes:

Prepared By, Withness / Review By Reviewed/Witnessed/Approved By,


PT. Petra Energy Internasional PT. Petra Energy Internasional PT. Vale Indonesia, Tbk

Lismon J Silalahi Fadhlin Azmi


QC Inspector Construction Manager
PT. PETRA ENERGY INTERNATIONAL REPORT NO. 460054824-
PRE-CONCRETE INSPECTION REPORT TR-QCR.01-04/20
:PROJECT TITLE
PAGE :
EXTEND WORKSHOP PT. TRAKINDO UTAMA 1 OF 1

Install Form Work (reabar)

SLUMP TEST (80 mm) Using Vibrator

Finishing
PT. PETRA ENERGY INTERNATIONAL REPORT NO. 460054824-
PRE-CONCRETE INSPECTION REPORT TR-QCR.01-04/20
:PROJECT TITLE
PAGE :
EXTEND WORKSHOP PT. TRAKINDO UTAMA 1 OF 1

Sample Compressi Test

Anchor Bolt Test


Jenis Benda Uji PT.TU Pedestal Oil Tank
Mutu Beton Rencanan : 28 Mpa
Tanggal Umur Slump Berat Tekanan Tegangan
No.
Kode Cylinder Cylinder Hancur Hancur
Cylinder Buat Test (Hari) (mm)
(Kg) (KN) (Mpa)
1 Pedestal Oil Tank 17/02/2020 24/02/2020 7 80 349.7 19.79
2 Pedestal Oil Tank 17/02/2020 24/02/2020 7 80 379.2 21.09

n= 2
∂bm= 280.6
PT PETRA ENERGY I

LAPORAN PENGUJIAN BENDA UJI CYLINDER

Tanggal Umur Slump Berat Tekanan Tegangan Tanggal


Cylinder Hancur Hancur
Buat Test (Hari) (mm) Buat Test
(Kg) (KN) (Mpa)
17/02/2020 2/3/2020 14 80 475.4 26.9 17/02/2020 14/03/2020
17/02/2020 2/3/2020 14 80 461 26.09 17/02/2020 14/03/2020

Cylinder S
kg/cm²
∑24_1^𝑁▒ 〖 (┤) 𝑥^𝑘 𝑎^(𝑛−𝑘) 〗
Umur Slump Berat Tekanan Tegangan Konversi
Cylinder Hancur Hancur Teganngan
(mm)
(Hari) (Kg) (KN) (Mpa) (Mpa)
28 80 14,42 576.2 32.6
28 80 14.42 546.1 30.9
Tottal= 561.15 31.75
PT. PETRA ENERGY INTERNATIONAL REPORT NO.
460054824-TR-QCR.01-
PRE-CONCRETE INSPECTION REPORT 04/20
:PROJECT TITLE
PAGE :
EXTEND WORKSHOP PT. TRAKINDO UTAMA 1 OF 2
OWNER : PT. VALE INDONESIA INSPECTION DATE : 14/2/2020
CLIENT : PT. VALE INDONESIA DWG NO./REV. NO. : 435-2441-C
SUBJECT : CIVIL PEDESTAL OIL TANK : 435-2442-C
AREA : WORKSHOP PT. TRAKINDO UTAMA DESCRIPTION : STRUCTURAL PONDATION

7 Days 14 Days 28 Days

Note: Untuk 28Mpa 7 hari=28x64,94 = 18,18 N/mm2


Dari Pengujian yang dilakukan didapatkan Nilai 7hari = 19,79 N/mm2 & 21,09 N/mm2

Prepared By, Withness / Review By Approved By


PT. Petra Energy Internasional PT. Petra Energy Internasional PT. Vale Indonesia, Tbk

Lismon J Silalahi Fadhlin Azmi


QC Inspector Construction Manager
PT. PETRA ENERGY INTERNATIONAL REPORT NO.
460054824-TR-QCR.01-
PRE-CONCRETE INSPECTION REPORT 04/20
:PROJECT TITLE
PAGE :
EXTEND WORKSHOP PT. TRAKINDO UTAMA 1 OF 2
OWNER : PT. VALE INDONESIA INSPECTION DATE : 14/2/2020
CLIENT : PT. VALE INDONESIA DWG NO./REV. NO. : 435-2441-C
SUBJECT : CIVIL PEDESTAL OIL TANK : 435-2442-C
AREA : WORKSHOP PT. TRAKINDO UTAMA DESCRIPTION : STRUCTURAL PONDATION

7 Days 14 Days 28 Days

Note:

Prepared By, Withness / Review By Reviewed/Witnessed/Approved By,


PT. Petra Energy Internasional PT. Petra Energy Internasional PT. Vale Indonesia, Tbk

Lismon J Silalahi Fadhlin Azmi


QC Inspector Construction Manager
PT. PETRA ENERGY INTERNATIONAL REPORT NO.
460054824-TR-QCR.01-
PRE-CONCRETE INSPECTION REPORT 04/20
:PROJECT TITLE
PAGE :
EXTEND WORKSHOP PT. TRAKINDO UTAMA 3 OF 3
OWNER : PT. VALE INDONESIA INSPECTION DATE : 14/2/2020
CLIENT : PT. VALE INDONESIA DWG NO./REV. NO. : 435-2441-C
SUBJECT : CIVIL PEDESTAL OIL TANK : 435-2442-C
AREA : WORKSHOP PT. TRAKINDO UTAMA DESCRIPTION : STRUCTURAL PONDATION

7 Days 14 Days 28 Days

Note:

Prepared By, Withness / Review By Reviewed/Witnessed/Approved By,


PT. Petra Energy Internasional PT. Petra Energy Internasional PT. Vale Indonesia, Tbk

Lismon J Silalahi Fadhlin Azmi


QC Inspector Construction Manager