Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

BULAN KE-1 BULAN KE-2

BOBOT
NO. URAIAN PEKERJAAN
JUMLAH (%)
MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8
HARGA

A PEKERJAAN ARSITEKTUR
A.1. Pekerjaan Lantai
1 Perataan nat keramik eksisting Oker 13.152.114,54 2,0829 2,0829
2 Vinyl Layer, Anti Mikroba, Cleanroom Grade
a. R. Ekstrasi Non Infectios 5.616.108,00 0,8894 0,8894
b. R. Masterix 4.056.078,00 0,6423 0,6423
c. R. Penambahan DNA 4.212.081,00 0,6671 0,6671
d. R. PCR 4.160.080,00 0,6588 0,6588
e. Koridor 5.720.110,00 0,9059 0,9059
f. R. Airlock Infectious 2.496.048,00 0,3953 0,3953
g. R. Ekstraksi Infectious 8.632.166,00 1,3670 1,3670
h. R. Destruksi 2.808.054,00 0,4447 0,4447
i. R. Antara I 3.016.058,00 0,4776 0,4776
3 Curving r = 4 mm antara lantai dengan dinding Alumunium Extruction
a. R. Ekstraksi Non Infectious 1.776.126,30 0,2813 0,2813
b. R. Masterix 1.531.826,40 0,2426 0,2426
c. R. Penambahan DNA 1.558.237,20 0,2468 0,2468
d. R. PCR 1.584.648,00 0,2510 0,2510
e. Koridor 2.324.150,40 0,3681 0,3681
f. R. Airlock Infectious 1.274.321,10 0,2018 0,2018
g. R. Ekstraksi Infectious 2.244.918,00 0,3555 0,3555
h. R. Destruksi 1.313.937,30 0,2081 0,2081
i. R. Shower 1.287.526,50 0,2039 0,2039
j. R. Antara I 1.366.758,90 0,2164 0,2164
k. R. Koridor Maintenance 2.905.188,00 0,4601 0,4601
4 Accessories 3-way Alumunium Extruction
a. R. Ekstraksi Non Infectious 416.000,00 0,0659 0,0659
b. R. Masterix 416.000,00 0,0659 0,0659
c. R. Penambahan DNA 416.000,00 0,0659 0,0659
d. R. PCR 624.000,00 0,0988 0,0988
e. Koridor 416.000,00 0,0659 0,0659
f. R. Airlock Infectious 416.000,00 0,0659 0,0659
g. R. Ekstraksi Infectious 416.000,00 0,0659 0,0659
h. R. Destruksi 416.000,00 0,0659 0,0659
i. R. Shower 416.000,00 0,0659 0,0659
j. R. Antara I 416.000,00 0,0659 0,0659
k. R. Koridor Maintenance 416.000,00 0,0659 0,0659
5 Accessories Door dan Alumunium Extruction
a. R. Ekstraksi Non Infectious 104.000,00 0,0165 0,0165
b. R. Masterix 104.000,00 0,0165 0,0165
c. R. Penambahan DNA 104.000,00 0,0165 0,0165
d. R. PCR 104.000,00 0,0165 0,0165
e. Koridor 104.000,00 0,0165 0,0165
f. R. Airlock Infectious 104.000,00 0,0165 0,0165
g. R. Ekstraksi Infectious 104.000,00 0,0165 0,0165
BULAN KE-1 BULAN KE-2
BOBOT
NO. URAIAN PEKERJAAN
JUMLAH (%)
MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8
HARGA
h. R. Destruksi 104.000,00 0,0165 0,0165
i. R. Shower 208.000,00 0,0329 0,0329
j. R. Antara I 52.000,00 0,0082 0,0082
6 Floor Opening untuk Drainase & Grouting
a. R. Shower (Shower & Washing Machine) 192.000,00 0,0304 0,0304
b. R. Antara I (Washtafel & Eye Shower) 192.000,00 0,0304 0,0304
JUMLAH 79.296.535,64 12,5579 0,0000 0,0000 0,0000 0,0000 0,0000 2,3166 10,2413 0,0000 0,0000
A.2. Wall
1 Pembongkaran eks Pintu Eksisting
a. Double Door 254.600,00 0,0403 0,0403
b. Single Door 509.200,00 0,0806 0,0806
2 Perapihan
a. Pengecatan Dinding Bata Luar (D-2) 960.000,00 0,1520 0,1520
b. Pengecatan Dinding Bata Luar (D-3) 172.800,00 0,0274 0,0274
3 Pembongkaran Jendela eksisting dan dirapihkan kembali dengan acian (PD-1) 1.321.500,00 0,2093 0,2093
4 Pembongkaran Dinding untuk Pintu Maintenance (PD-2) 77.528,00 0,0123 0,0123
5 Dinding Baru
Expandable Polystyrene Wall Panel, T = 50 mm (D-1)
a. R. Ekstraksi Non Infectious 13.499.200,00 2,1378 2,1378
b. R. Masterix 10.331.200,00 1,6361 1,6361
c. R. Penambahan DNA 10.410.400,00 1,6487 1,6487
d. R. PCR 6.600.000,00 1,0452 1,0452
e. R. Airlock Infectious 2.112.000,00 0,3345 0,3345
f. R. Ekstraksi Infectious 11.220.000,00 1,7769 1,7769
g. R. Destruksi 6.564.800,00 1,0396 1,0396
h. R. Shower 6.432.800,00 1,0187 1,0187
i. R. Antara I 2.508.000,00 0,3972 0,3972
Dinding Bata Ringan
a. Pemasangan Dinding dari Lantai sampai Ceiling (D-2) 8.541.600,00 1,3527 1,3527
b. Pemasangan Dinding eks opening pintu (D-3) 1.127.491,20 0,1786 0,1786
6 Wall Opening including flashing
a. For Passbox 88.100,00 0,0140 0,0140
b. For Electrical Installation
- R. Ekstraksi Non Infectious 264.300,00 0,0419 0,0419
- R. Masterix 132.150,00 0,0209 0,0209
- R. Ekstraksi Infectious 176.200,00 0,0279 0,0279
- R. PCR 484.550,00 0,0767 0,0767
- Koridor 88.100,00 0,0140 0,0140
- R. Ekstraksi Infectious 308.350,00 0,0488 0,0488
- R. Destruksi 88.100,00 0,0140 0,0140
- R. Shower 44.050,00 0,0070 0,0070
- R. Antara I 88.100,00 0,0140 0,0140
7 Curving r = 4 mm antara dinding dengan dinding Alumunium Extruction
a. R. Ekstraksi Non Infectious 1.584.648,00 0,2510 0,2510
b. R. Masterix 1.584.648,00 0,2510 0,2510
c. R. Penambahan DNA 1.584.648,00 0,2510 0,2510
BULAN KE-1 BULAN KE-2
BOBOT
NO. URAIAN PEKERJAAN
JUMLAH (%)
MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8
HARGA
d. R. PCR 2.376.972,00 0,3764 0,3764
e. Koridor 1.584.648,00 0,2510 0,2510
f. R. Airlock Infectious 1.584.648,00 0,2510 0,2510
g. R. Ekstraksi Infectious 1.584.648,00 0,2510 0,2510
h. R. Destruksi 1.584.648,00 0,2510 0,2510
i. R. Shower 1.584.648,00 0,2510 0,2510
j. R. Antara I 1.584.648,00 0,2510 0,2510
k. R. Koridor Maintenance 1.584.648,00 0,2510 0,2510
PEKERJAAN TAMBAH
a. Cat Epoxy Dinding Bata Dalam (D4) 12.243.000,00 1,9389 1,9389
b. Cat Epoxy Dinding Bata Dalam (D2) 7.950.000,00 1,2590 1,2590
c. Cat Epoxy Dinding Bata Dalam (D3) 1.431.000,00 0,2266 0,2266
d. Pengerokan Cat Lama Dinding Bata Dalam (D4) 600.600,00 0,0951 0,0951
e. Pengerokan Cat Lama Dinding Bata Luar (D2) 390.000,00 0,0618 0,0618
f. Pengerokan Cat Lama Dinding Bata Dalam (D2) 390.000,00 0,0618 0,0618
g. Pengerokan Cat Lama Dinding Bata Luar (D3) 70.200,00 0,0111 0,0111
h. Pengerokan Cat Lama Dinding Bata Dalam (D3) 70.200,00 0,0111 0,0111
i. Pemasangan Dinding Bata Ringan dari Lantai sampai Balok Tengah 2.277.760,00 0,3607 0,3607
j. Plester Dinding 480.000,00 0,0760 0,0760
k. Acian 240.000,00 0,0380 0,0380
JUMLAH 128.771.331,20 20,3931 2,5894 0,0000 6,6472 4,5669 6,5896 0,0000 0,0000 0,0000 0,0000
A.3. Ceiling
1 Expandable Polystyrene Panel, T = 50 mm
a. R. Ekstraksi Non Infectious 5.130.000,00 0,8124 0,8124
b. R. Masterix 3.705.000,00 0,5867 0,5867
c. R. Penambahan DNA 3.847.500,00 0,6093 0,6093
d. R. PCR 3.800.000,00 0,6018 0,6018
e. Koridor 5.225.000,00 0,8275 0,8275
f. R. Airlock Infectious 2.280.000,00 0,3611 0,3611
g. R. Ekstraksi Infectious 7.885.000,00 1,2487 1,2487
h. R. Destruksi 2.565.000,00 0,4062 0,4062
i. R. Shower 2.375.000,00 0,3761 0,3761
j. R. Antara I 2.755.000,00 0,4363 0,4363
2 Struktur Plafon
a. Pekerjaan Besi Hollow 40x60x1,7 Struktur Plafon 4.300.000,00 0,6810 0,6810
b. Span Screw m12 1.125.000,00 0,1782 0,1782
c. Sling 12mm 2.970.000,00 0,4703 0,4703
d. Klem Sling 3.250.000,00 0,5147 0,5147
e. Dynabolt 625.000,00 0,0990 0,0990
f. Pengecatan Hollow 475.000,00 0,0752 0,0752
g. Pengelasan 375.000,00 0,0594 0,0594
3 Curving r = 4 mm antara dinding dengan plafon
a. R. Ekstraksi Non Infectious 1.776.126,30 0,2813 0,2813
b. R. Masterix 1.531.826,40 0,2426 0,2426
c. R. Penambahan DNA 1.558.237,20 0,2468 0,2468
d. R. PCR 1.584.648,00 0,2510 0,2510
BULAN KE-1 BULAN KE-2
BOBOT
NO. URAIAN PEKERJAAN
JUMLAH (%)
MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8
HARGA
e. Koridor 2.324.150,40 0,3681 0,3681
f. R. Airlock Infectious 1.274.321,10 0,2018 0,2018
g. R. Ekstraksi Infectious 2.244.918,00 0,3555 0,3555
h. R. Destruksi 1.313.937,30 0,2081 0,2081
i. R. Shower 1.287.526,50 0,2039 0,2039
j. R. Antara I 1.366.758,90 0,2164 0,2164
JUMLAH 68.949.950,10 10,9194 0,0000 0,0000 0,0000 0,0000 0,0000 8,3439 2,5754 0,0000 0,0000
A.4. Door and Windows
Frameworks, Alumunium Doors Panels, Windows, Completed with support,
Installation and Accessories
1 Insulated Panel Door with Accessories
a. D2, Single Door + Viewing Glass, 2100 x 900 x 50 22.346.366,00 3,5389 1,7695 1,7695
b. D3, Single Door, 2100 x 900 x 50 10.335.983,00 1,6369 0,8184 0,8184
c. D7, Single Door, 2100 x 900 x 50 + Door Closer 10.563.983,00 1,6730 0,8365 0,8365
2 Windows (Single Glass, Tempered Glass, Frame Alumunium)
a. W1, (Single Glass) 1000 x 1000 x 50 12.135.429,00 1,9218 0,9609 0,9609
b. W2, (Double Glass) 1000 x 1000 x 50 18.135.429,00 2,8720 1,4360 1,4360
c. W3, (Double Glass) 1000 x 750 x 50 5.645.183,00 0,8940 0,4470 0,4470
d. W4, Single Glass) 1000 x 750 x 50 3.885.143,00 0,6153 0,3076 0,3076
PEKERJAAN TAMBAH
a. D1, Single Door, 2100 x 1000 x 50 10.303.183,00 1,6317 1,6317
b. D4, Single Door, 2100 x 1000 x 50 + Door Closer 10.885.983,00 1,7240 1,7240
c. D5, Single Door, 2100 x 1000 x 50 + Viewing Glass 35.549.949,00 5,6299 5,6299
d. D6, Single Door, 2100 x 1000 x 50 Viewing Glass + Door Closer 24.155.966,00 3,8255 3,8255
JUMLAH 163.942.597,00 25,9631 6,5760 6,5760 0,0000 12,8111 0,0000 0,0000 0,0000 0,0000 0,0000
A.5. Passbox and Sanitary
1 Washtafel + Automatic Water Tap 6.800.008,00 1,0769 1,0769
2 Mirror with Stainless Steel Frame uk. 800 x 600 x 5 mm 1.200.000,00 0,1900 0,1900
3 PB 1 uk. 750 x 750 x 750 19.200.040,00 3,0406 3,0406
Wall Mounted, Mechanical Interlocking Doors, Double Clear Tempered Glass t=5
mm for Vision Glass, Outer and Inner Material SUS 304, Air-Tight-Seal
Additional Aux
- Buzzer and light indicator for Operation Mode
- UVC Stenitizer
4 PB 2 uk. 500 x 500 x 500 19.200.040,00 3,0406 3,0406
Wall Mounted, Mechanical Interlocking Doors, Double Clear Tempered Glass t=5
mm for Vision Glass, Outer and Inner Material SUS 304, Air-Tight-Seal
Additional Aux
- Buzzer and light indicator for Operation Mode
- UVC Stenitizer
JUMLAH 46.400.088,00 7,3482 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 7,3482 0,0000
A.6. Showering
a. Showering Set 7.600.040,00 1,2036 1,2036
b. Emergency Eye Washer 3.040.000,00 0,4814 0,4814
BULAN KE-1 BULAN KE-2
BOBOT
NO. URAIAN PEKERJAAN
JUMLAH (%)
MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8
HARGA
JUMLAH 10.640.040,00 1,6850 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 1,6850 0,0000
B ELECTRICAL WORKS
B.1. Electrical Panel
Panel SDP dan Panel BSL2 (Critical dan Non-Critical) - Panel Analog 15.049.210,00 2,3833 2,3833
JUMLAH 15.049.210,00 2,3833 0,0000 0,0000 0,0000 2,3833 0,0000 0,0000 0,0000 0,0000 0,0000
B.2. Cable and Tray
PEKERJAAN TAMBAH
a. Cable TIC 4x70 mm dari Gardu PLN ke Panel SDP BSL-2 27.214.000,00 4,3098 4,3098
JUMLAH 27.214.000,00 4,3098 0,0000 0,0000 0,0000 4,3098 0,0000 0,0000 0,0000 0,0000 0,0000
B.3. Lighting & Power Installation
Lighting
- Switch Modular 10 gang 524.377,00 0,0830 0,0830
- Saklar Single untuk koridor atas 118.563,00 0,0188 0,0188
- Lampu LED 29 Watt 10.418.050,00 1,6499 1,6499
- Lampu LED 40 Watt 23.236.920,00 3,6800 3,6800
- Lampu LED TKI 2 x 10 Watt 846.600,00 0,1341 0,1341
a. R. Ekstraksi Non Infectious
Lighting Intallation LP. Q2.07 1.163.760,00 0,1843 0,1843
b. R. Mastermix
Lighting Intallation LP. Q2.08 1.163.760,00 0,1843 0,1843
c. R. Penambahan DNA
Lighting Intallation LP. Q2.09 1.163.760,00 0,1843 0,1843
d. R. PCR
Lighting Intallation LP. Q2.10 1.163.760,00 0,1843 0,1843
e. Koridor
Lighting Intallation LP. Q1.02 1.163.760,00 0,1843 0,1843
f. R. Airlock Infectious
Lighting Intallation LP. Q1.05 1.163.760,00 0,1843 0,1843
g. R. Ekstraksi Infectious
Lighting Intallation LP. Q2.06 1.163.760,00 0,1843 0,1843
h. R. Destruksi
Lighting Intallation LP. Q1.04 1.163.760,00 0,1843 0,1843
i. R. Shower
Lighting Intallation LP. Q1.03 1.163.760,00 0,1843 0,1843
j. R. Antara I
Lighting Intallation LP. Q1.01 1.163.760,00 0,1843 0,1843
k. Koridor Maintenance
Lighting Intallation LP. Q2.11 1.939.600,00 0,3072 0,3072
Power Outlet
Socket 4.515.540,00 0,7151 0,7151
Instalasi Power Passbox 720.000,00 0,1140 0,1140
a. R. Ekstraksi Non Infectious
Electric Power Installation (Group 1) NYM 3 x 2.5 mm2 432.000,00 0,0684 0,0684
Electric Power Installation (Group 2) NYM 3 x 2.5 mm2 720.000,00 0,1140 0,1140
b. Koridor & R. Interlock Infectious
Electric Power Installation (Group 3) NYM 3 x 2.5 mm2 576.000,00 0,0912 0,0912
BULAN KE-1 BULAN KE-2
BOBOT
NO. URAIAN PEKERJAAN
JUMLAH (%)
MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8
HARGA
c. R. Ekstraksi Infectious
Electric Power Installation (Group 4) NYM 3 x 2.5 mm2 576.000,00 0,0912 0,0912
Electric Power Installation (Group 5) NYM 3 x 2.5 mm2 576.000,00 0,0912 0,0912
d. R. Mastermix
Electric Power Installation (Group 6) NYM 3 x 2.5 mm2 720.000,00 0,1140 0,1140
e. R. Penambahan DNA
Electric Power Installation (Group 7) NYM 3 x 2.5 mm2 720.000,00 0,1140 0,1140
Electric Power Installation (Group 8) NYM 3 x 2.5 mm2 720.000,00 0,1140 0,1140
f. R. PCR
Electric Power Installation (Group 9) NYM 3 x 2.5 mm2 864.000,00 0,1368 0,1368
Electric Power Installation (Group 10) NYM 3 x 2.5 mm2 864.000,00 0,1368 0,1368
g. R. Destruksi / R. Shower / R. Antara I
Electric Power Installation (Group 11) NYM 3 x 2.5 mm2 720.000,00 0,1140 0,1140
Electric Power Installation (Group 12) NYM 3 x 2.5 mm2 720.000,00 0,1140 0,1140
Electric Power Installation for Autoclave NYM 3 x 4 mm2 576.000,00 0,0912 0,0912
Electric Power Installation for Exhaust Fan (Panel Non-Critical) NYM 3 x 4 mm2 576.000,00 0,0912 0,0912
JUMLAH 63.317.250,00 10,0273 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 10,0273 0,0000 0,0000
B.4. Grounding / Earthing
Nilai Maksimal Tahanan 1 Ohm
a. Grounding Panel Critical 7.444.776,00 1,1790 1,1790
JUMLAH 7.444.776,00 1,1790 0,0000 0,0000 0,0000 1,1790 0,0000 0,0000 0,0000 0,0000 0,0000
C. ELECTRONIC WORKS
C.1. Telecommunication
1 Outlet Data (RJ 45) Ruang PCR 283.154,00 0,0448 0,0448
2 Outlet Data Installation, Cable CAT, 6 in Conduit 723.304,00 0,1145 0,1145
3 Intercom Installation 1.084.956,00 0,1718 0,1718
4 Switch Hub 8 port 371.977,00 0,0589 0,0589
5 Connection to existing Switch Hub 240.000,00 0,0380 0,0380
Intercom Unit (Pintu Akses, Ekstraksi Infectious, Ekstraksi Non-Infectious, Koridor
6 1.167.908,00 0,1850
dekat Passbox 0,1850
JUMLAH 3.871.299,00 0,6131 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,6131 0,0000
D. KESELAMATAN KERJA
Rambu-rambu K3, Test Swab, Rencana Kerja, Sosialisasi & Promosi K3, APK, APD, P3K,
16.548.579,44 2,6207 2,6207
Asuransi, Personil K3, Pengendalian Resiko K3 dll
JUMLAH 16.548.579,44 2,6207 2,6207 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000
JUMLAH HARGA 631.445.656,38
PPN 10% 63.144.565,64 100 11,7861 6,5760 6,6472 25,2501 6,5896 10,6606 22,8441 9,6463 100
TOTAL 694.590.222,02
BOBOT RENCANA KOMULATIF (%) 11,7861 18,36 25,01 50,26 56,85 67,51 90,35 100,00
BOBOT REALISASI KOMULATIF (%)
SELISIH

You might also like