Songadh 3

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

GENERAL
M M

L L

K K

J J

CONCRETE WORK
I I

Ld+10 x db
UPPER LVL.
COLUMN

EXTRA TOP IN BEAM


H BEAM AT FLOOR H
TOP STEEL

Ld+10 x db
CONFINING TIES BOTTOM STEEL
(REFER COLUMN SCHEDULE) 2-#12 U-TYPE BAR
G G

Ld = DEVELOPMENT LENGTH
= 50 TIMES DIA OF BAR.
db = BAR DIAMETER
COLUMN / SW
LOWER LVL.
COLUMN
CONFINING TIES AT LOCATION OF
F
SPLICE (SHALL BE SAME AS INDICATED TYPICAL DETAIL AT COLUMN & FLOOR / PLINTH
F FOR 'lO' IN COLUMN SCHEDULE.) BEAM JUNCTION LEVEL

REST TRANSVERSE TIES (TYP.)


Ld+10 x db(TYP.) TOP STEEL
E

CONFINING TIES

Ld+10 x db
(REFER COLUMN SCHEDULE)

E
FOR REVIEW AND APPROVAL
BOTTOM STEEL D
2-#12 U-TYPE BAR
Ld = DEVELOPMENT LENGTH
PLINTH/FLOOR BEAM
= 50 TIMES DIA OF BAR.
EXTRA TOP IN BEAM db = BAR DIAMETER

LOWER LVL.
D COLUMN
REV.NO DATE REVISION STR ARCH MEP
TYPICAL DETAIL OF TIES ARRANGEMENT OF TYPICAL DETAIL AT COLUMN & ROOF BEAM
JUNCTION LEVEL CLIENT NAME :- C
COLUMN BETWEEN FLOOR TO FLOOR
EXECUTIVE ENGINEER, UKAI DIVISION NO-1 UKAI
/
COLUMN / SW
BASEMENT FLOOR LEVEL PROJECT NAME :-
VERTI.STEEL CONSULTANCY SERVICE FOR SONGADH L.I. SCHEME FROM RESERVOIR
C
.
HORI.STEEL
/ TITLE :- STRUCTURAL GENERAL NOTES
BUT 4510 MINIMUM
UP TO HARD ROCK

Ld = DEVELOPMENT LENGTH IN TENSION


FOR SUMP & PUMP HOUSE WITH CONTROL PANEL AT B
d b = BAR DIAMETER CHAMPAVADI POND

TYP. DETAIL FOR THE LAP, SPLICE IN BEAM B-10 KRISHNA IND. ESTATE,
B GEO DESIGNS OPP. B.I.D.C GORWA ESTATE,
VADODARA - 390 016
& TELEFAX : 91-265-2290222
2283081,2282305
RESEARCH (P) LTD. E-mail : geotesthouse@gmail.com
DRAWN BY NAITIK PATEL APPROVED BY DRG. NO. GDR-2017-EE-01-STR-GN-01
DESIGNED BY SADDAM BANDI PROJECT NO SHEET NO REVISION A
EXISTING P.C.C
A TYPICAL DETAIL OF COLUMN AND FOOTING REVIEWED BY MEHUL PATEL
SCALE N.T.S 2017 01 OF 01 R0
DATE 03-08-2018 DESIGN HEAD
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
.

THIS DRAWING IS THE PROPERTY OF GEO DESIGNS & RESEARCH (P) LTD. (GDR) AND SHALL NOT BE COPIED OR LENT WITHOUT THE WRITTEN PERMISSION OF GDR. .
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

NOTE:-
V
FOOTING SCHEDULE UNDER WATER R.C.C ELEMENT SHOULD BE PROTECTED
M M
BY BITUMEN COATING.
COLUMN MARKED C1 TO C19 C46 TO C60 C61 TO C75 C23,C26 C24

20
48000
3152

F1 F1

FOOTING
L L
19 C21
533

C1 C2
18
V
4415

F1 F1 FOOTING MARKED F1 F2 F3 F4 F5 F.G.L

17 COLUMN SCHEDULE
C3 C4

DEPTH REFER SECTION


K COLUMN C23,C25,C26, K
C1 TO C20 C21,C22 C24 & C29 C31 TO C75
C27,C28,C30
4981

F1 F1

PLINTH LEVEL TO
ROOF SLAB
16

D
300 300
C5 C6 FDN.L=137.70

`B'

75
4981

J `Bc' J
SECTION-A-A
F1 F1

FOUNDATION TO
PLINTH LEVEL
15
C7 C8
'b'
A A
4991

`Lc'
`L'

'l'
F1 F1
I U I

14
C9 C10
X X `B'

48000
2200 DIA PIPE INLET
COLUMN SECTION `Bc'
4991

TYPICAL DETAIL OF SLOPE FOOTING


FOR R.C.C. COLUMN
F1 F1
U
Y Y
H 13 H
C11 C12 (48 x 48)
4981

F1 F1

12
C13 C14
500 500
G 145.80 G
5000

F1 F1

11
C15 C16

F
4116

B.L=138.80

F F4 F5
F1 F1
10
865

C25
C23 C24
9 2200 DIA PIPE INLET
C17 C18
F4 E
2239

W Rubble Packing Rubble Packing

8
C27
C26
2691

F1
413

E
7
C22 C20 C28 C29
C30
FOR REVIEW AND APPROVAL
6 C19 D
250

5
2345

500
C31 C32 C33 C34 C35 C36 C37 C38 C39 C40 C41 C42 C43 C44 C45
5298

D REV.NO DATE REVISION STR ARCH MEP

F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2
F2
CLIENT NAME :- C
3
EXECUTIVE ENGINEER, UKAI DIVISION NO-1 UKAI
390

2 C60
C46 C47 C48 C49 C50 C51 C52 C53 C54 C55 C56 C57 C58 C59

PROJECT NAME :-
4809

CONSULTANCY SERVICE FOR SONGADH L.I. SCHEME FROM RESERVOIR

500
C F3 F3 F3 F3 F3 F3 F3 F3 F3 F3 F3 F3 F3 F3 F3
500
1
C61 C62 C63 C64 C65 C66 C67 C68 C69 C70 C71 C72 C73 C74 C75 SECTION-U-U
TITLE :- LAYOUT & R.C.C DETAIL OF FOUNDATION
FOR SUMP & PUMP HOUSE WITH CONTROL PANEL AT B
W CHAMPAVADI POND
4260 150 3248 3050 3150 3100 3047 3153 3100 3096 3104 3100 3096 3100 488 2616 2618 630 4604 151

B-10 KRISHNA IND. ESTATE,


B GEO DESIGNS OPP. B.I.D.C GORWA ESTATE,
A B C D E F G H I J K L M N O P Q R S T U
VADODARA - 390 016
& TELEFAX : 91-265-2290222
LAYOUT OF FOUNDATION 2283081,2282305
GRADE OF CONCRETE - M:30 RESEARCH (P) LTD. E-mail : geotesthouse@gmail.com
GRADE OF STEEL Fe-500
DRAWN BY NAITIK PATEL APPROVED BY DRG. NO. GDR-2017-EE-01-STR-FDN-02
DESIGNED BY SADDAM BANDI PROJECT NO SHEET NO REVISION A
A REVIEWED BY MEHUL PATEL
SCALE N.T.S 2017 01 OF 02 R0
DATE 03-08-2018 DESIGN HEAD
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
.

THIS DRAWING IS THE PROPERTY OF GEO DESIGNS & RESEARCH (P) LTD. (GDR) AND SHALL NOT BE COPIED OR LENT WITHOUT THE WRITTEN PERMISSION OF GDR. .
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

NOTE:-
UNDER WATER R.C.C ELEMENT SHOULD BE PROTECTED
M P.L 147.00 M
1500 230
BY BITUMEN COATING.
TOP OF WALL 146.50 TOP OF WALL 146.50

F.G.L 145.50 OVERFLOW CHAMBER BOTTOM OF OVERFLOW CHAMBER 145.50

300
L L

1000

6500
K K
T.L 142.60

J J

G.L=140.00 G.L=140.00

1500

700
230
B.L=138.80 B.L=138.80 B.L=138.80
I I

300

300

700
Rubble Packing

30
Rubble Packing

0
137.35 137.35
Rubble Packing

300

900

900
REFER RETAINING WALL DETAIL 300 FOOTING - F3 300 REFER RETAINING WALL DETAIL
FOOTING - F3
H H
FDN.L=136.45 FDN.L=136.45

3250 600 3250

100
SECTION-X-X SECTION-Y-Y

450
450
G G

1500
P.L 147.00

575
TOP OF WALL 146.50 TOP OF WALL 146.50

150
543

F.G.L 145.50
F
F

6500
E
FOR REVIEW AND APPROVAL
D

FOOTING - F3
FDN.L=141.95

D REV.NO DATE REVISION STR ARCH MEP

CLIENT NAME :- C

EXECUTIVE ENGINEER, UKAI DIVISION NO-1 UKAI


G.L=140.00 G.L=140.00

FOOTING - F2

1500
FDN.L=139.45
PROJECT NAME :-
CONSULTANCY SERVICE FOR SONGADH L.I. SCHEME FROM RESERVOIR

700
C
B.L=138.80 B.L=138.80
300

TITLE :- LAYOUT & R.C.C DETAIL OF FOUNDATION

700
Rubble Packing
Rubble Packing
FOR SUMP & PUMP HOUSE WITH CONTROL PANEL AT B
CHAMPAVADI POND
B-10 KRISHNA IND. ESTATE,
GEO DESIGNS OPP. B.I.D.C GORWA ESTATE,

900
B REFER RETAINING WALL DETAIL 300
VADODARA - 390 016
FDN.L=136.45 FDN.L=136.45 & TELEFAX : 91-265-2290222
3250 600 3250 2283081,2282305

100
SECTION-W-W
RESEARCH (P) LTD. E-mail : geotesthouse@gmail.com
SECTION-V-V
DRAWN BY NAITIK PATEL APPROVED BY DRG. NO. GDR-2017-EE-01-STR-FDN-02
DESIGNED BY SADDAM BANDI PROJECT NO SHEET NO REVISION A
A REVIEWED BY MEHUL PATEL
SCALE N.T.S 2017 02 OF 02 R0
DATE 03-08-2018 DESIGN HEAD
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
.

THIS DRAWING IS THE PROPERTY OF GEO DESIGNS & RESEARCH (P) LTD. (GDR) AND SHALL NOT BE COPIED OR LENT WITHOUT THE WRITTEN PERMISSION OF GDR. .
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

NOTE:-
UNDER WATER R.C.C ELEMENT SHOULD BE PROTECTED
M M
BY BITUMEN COATING.
4260 6175
LAYOUT OF TIE BEAM AT (138.80 TOP OF BEAM)
C21
C1 C2

1000 1833
TB1

TB1
1000

L L
1000

2000
1000
1000

C3 C4

2000
1000
TB1

TB1
1000

2000
K K
1000
1000

SECTION 1-1 SECTION 1A-1A


2000
1000

C5 C6
L1 L2 L3
1000

2000

TYPICAL DETAIL OF CONTINUOUS BEAM


TB1

TB1
1000
1000

J J
2000
1000

SCHEDULE OF BEAM
1000

C7 C8
2000

SIZE OF BEAM REINFORCEMENT


1000

SPACER BARS
BOTTOM BARS TOP BARS STIRRUPS

@ 1000 C/C
TB1

TB1
1000

SIDE FACE REMARKS


2000

SR. BEAM BREADTH DEPTH THROUGHOUT EXTRA BAR AT THROUGHOUT EXTRA BAR BALANCE PORTION REINF. ON
AT SUPPORT
1000

NO. NO. MIDDLE EACH FACE


I AT SUPPORT (FOR LENGTH 2D) (AT MIDDLE) I
1000

01 TB1 300 450 3-#12 - 3-#12 - #8 @ 150 c/c #8 @ 150 c/c - - 138.80 TOP OF BEAM
2000
1000

C9 C10
02 TB2 300 450 3-#12 - 3-#12 - #8 @ 150 c/c #8 @ 150 c/c - - 139.45 BOTTOM OF BEAM
1000

2000

44785
TB1

TB1
1000

44500
1000

2000

H H
1000
1000

C11 C12
2000
1000
TB1

TB1
1000

2000
1000

G G
1000

2000
1000

C13 C14
1000

2000
TB1

TB1
1000
1000

F
2000
1000

F
1000

C15 C16
2000
1000

E
TB1

TB1
1000

2000
1000
1000

C23 C24 C25


E
FOR REVIEW AND APPROVAL
2000

C17
1000

C18
TYPICAL DETAIL AT
COLUMN & BEAM JUNCTION LEVEL D
1000

2000

C26 C27
TB1

TB1
1000
1000

D C22
C19 C20 C30 REV.NO DATE REVISION STR ARCH MEP
C28 C29
CLIENT NAME :- C

EXECUTIVE ENGINEER, UKAI DIVISION NO-1 UKAI


TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2

C31 C32 C33 C34 C35 C36 C37 C38 C39 C40 C41 C42 C43 C44 C45

PROJECT NAME :-
CONSULTANCY SERVICE FOR SONGADH L.I. SCHEME FROM RESERVOIR
C
TB2

TB2

TB2

TB2

TB2

TB2

TB2

TB2

TB2

TB2

TB2

TB2

TB2

TB2

TB2

TITLE :- LAYOUT & R.C.C DETAIL OF TIE BEAM AT (138.80 TOP OF BEAM &
LAYOUT OF TIE BEAM AT (139.45 BOTTOM OF BEAM) 139.45 BOTTOM OF BEAM) B
C60
C46 C47 C48 C49 C50 C51 C52 C53 C54 C55 C56 C57 C58 C59
FOR SUMP & PUMP HOUSE WITH CONTROL PANEL AT CHAMPAVADI POND
B-10 KRISHNA IND. ESTATE,
B GEO DESIGNS OPP. B.I.D.C GORWA ESTATE,
43794 VADODARA - 390 016
& TELEFAX : 91-265-2290222
2283081,2282305
RESEARCH (P) LTD. E-mail : geotesthouse@gmail.com

C61 C62 C63 C64 C65 C66 C67 C68 C69 C70 C71 C72 C73 C74 C75 DRAWN BY NAITIK PATEL APPROVED BY DRG. NO. GDR-2017-EE-01-STR-TB-03
DESIGNED BY SADDAM BANDI PROJECT NO SHEET NO REVISION A
A LAYOUT OF TIE BEAM AT (138.80 TOP OF BEAM & 139.45 BOTTOM OF BEAM) REVIEWED BY MEHUL PATEL
GRADE OF CONCRETE - M:30 SCALE N.T.S 2017 01 OF 01 R0
GRADE OF STEEL Fe-500 DATE 03-08-2018 DESIGN HEAD
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
.

THIS DRAWING IS THE PROPERTY OF GEO DESIGNS & RESEARCH (P) LTD. (GDR) AND SHALL NOT BE COPIED OR LENT WITHOUT THE WRITTEN PERMISSION OF GDR. .
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

NOTE:-
UNDER WATER R.C.C ELEMENT SHOULD BE PROTECTED
M M
BY BITUMEN COATING.
TB1 TB2 LAYOUT OF TIE BEAM AT (142.60 TOP OF BEAM)
C1 C21 C2
TB3

TB4
L L

TB1 TB2

C3 C4
TB3

TB4
K K

TB1 TB2 SECTION 1-1 SECTION 1A-1A

C5 C6
L1 L2 L3

TYPICAL DETAIL OF CONTINUOUS BEAM


TB3

TB4

J J

TB1 TB2

C7 C8 SCHEDULE OF BEAM
SIZE OF BEAM REINFORCEMENT

SPACER BARS
BOTTOM BARS TOP BARS STIRRUPS

@ 1000 C/C
TB3

TB4

SIDE FACE REMARKS


SR. BEAM BREADTH DEPTH THROUGHOUT EXTRA BAR AT THROUGHOUT EXTRA BAR BALANCE PORTION REINF. ON
AT SUPPORT
NO. NO. MIDDLE EACH FACE
I AT SUPPORT (FOR LENGTH 2D) (AT MIDDLE) I
TB1 TB2
01 TB1 300 450 4-#16 - 2-#16 3-#16 #8 @ 100 c/c #8 @ 150 c/c - - 142.60M TOP OF BEAM
C9 C10
02 TB2 300 450 4-#16 - 2-#16 3-#16 #8 @ 100 c/c #8 @ 150 c/c - - 142.60M TOP OF BEAM

03 TB3 300 450 4-#12 - 3-#12 2-#12 #8 @ 100 c/c #8 @ 150 c/c - - 142.60M TOP OF BEAM
TB3

TB4

04 TB4 300 450 4-#12 - 3-#12 2-#12 #8 @ 100 c/c #8 @ 150 c/c - - 142.60M TOP OF BEAM

05 TB5 300 450 4-#12 - 3-#12 2-#12 #8 @ 100 c/c #8 @ 150 c/c - - 141.95M BOTTOM OF BEAM
H H
TB1 TB2 06 TB6 300 450 3-#12 - 3-#12 - #8 @ 150 c/c #8 @ 150 c/c - - 141.95M BOTTOM OF BEAM
C11 C12
TB3

TB4

G TB1 TB2 G

C13 C14
TB3

TB4

F
F TB1 TB2

C15 C16

E
TB3

TB4

TB5 TB5

TB1 TB2 C23 C24 C25


E
C17 FOR REVIEW AND APPROVAL
TB5
C18
TYPICAL DETAIL AT
COLUMN & BEAM JUNCTION LEVEL D

C26 C27
TB3

TB4

TB5

TB1 TB2
D C30 REV.NO DATE REVISION STR ARCH MEP
C19 C22 C20
C28 C29
LAYOUT OF TIE BEAM AT (141.95 BOTTOM OF BEAM) CLIENT NAME :- C

EXECUTIVE ENGINEER, UKAI DIVISION NO-1 UKAI


TB6 TB6 TB6 TB6 TB6 TB6 TB6 TB6 TB6 TB6 TB6 TB6 TB6 TB6

C31 C32 C33 C34 C35 C36 C37 C38 C39 C40 C41 C42 C43 C44 C45

PROJECT NAME :-
CONSULTANCY SERVICE FOR SONGADH L.I. SCHEME FROM RESERVOIR
C
TB6

TB6

TB6

TB6

TB6

TB6

TB6

TB6

TB6

TB6

TB6

TB6

TB6

TB6

TB6

TITLE :- LAYOUT & R.C.C DETAIL OF TIE BEAM AT (141.95 BOTTOM OF BEAM
LAYOUT OF TIE BEAM AT (141.95 BOTTOM OF BEAM) & 142.60 TOP OF BEAM) B
TB6 TB6 TB6 TB6 TB6 TB6 TB6 TB6 TB6 TB6 TB6 TB6 TB6 TB6
C60
C46 C47 C48 C49 C50 C51 C52 C53 C54 C55 C56 C57 C58 C59
FOR SUMP & PUMP HOUSE WITH CONTROL PANEL AT CHAMPAVADI POND
B-10 KRISHNA IND. ESTATE,
B GEO DESIGNS OPP. B.I.D.C GORWA ESTATE,
TB6

TB6

TB6

TB6

TB6

TB6

TB6

TB6

TB6

TB6

TB6

TB6

TB6

TB6

TB6

VADODARA - 390 016


& TELEFAX : 91-265-2290222
2283081,2282305
RESEARCH (P) LTD. E-mail : geotesthouse@gmail.com

C61 C62 C63 C64 C65 C66 C67 C68 C69 C70 C71 C72 C73 C74 C75 DRAWN BY NAITIK PATEL APPROVED BY DRG. NO. GDR-2017-EE-01-STR-TB-04
DESIGNED BY SADDAM BANDI PROJECT NO SHEET NO REVISION A
A
LAYOUT OF TIE BEAM AT (141.95 BOTTOM OF BEAM & 142.60 TOP OF BEAM) REVIEWED BY MEHUL PATEL
GRADE OF CONCRETE - M:30
SCALE N.T.S 2017 01 OF 01 R0
GRADE OF STEEL Fe-500
DATE 03-08-2018 DESIGN HEAD
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
.

THIS DRAWING IS THE PROPERTY OF GEO DESIGNS & RESEARCH (P) LTD. (GDR) AND SHALL NOT BE COPIED OR LENT WITHOUT THE WRITTEN PERMISSION OF GDR. .
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

NOTE:-
UNDER WATER R.C.C ELEMENT SHOULD BE PROTECTED
M M
BY BITUMEN COATING.
PB1 PB1

C1 C21 C2

S3 S2
PB2

PB2
L L

PB1 PB1

C3 C4

S3 S2
PB2

PB2

K K

PB1 PB1 SECTION 1-1 SECTION 1A-1A

C5 C6
L1 L2 L3
PB4

S3 TYPICAL DETAIL OF CONTINUOUS BEAM


PB2

PB2

S2

PB4
J J
PB1 PB1

C7 C8 SCHEDULE OF BEAM
SIZE OF BEAM REINFORCEMENT
PB4

SPACER BARS
S3 BOTTOM BARS TOP BARS STIRRUPS

@ 1000 C/C
PB2

PB2

S2
PB1 SIDE FACE REMARKS
SR. BEAM BREADTH DEPTH THROUGHOUT EXTRA BAR AT THROUGHOUT EXTRA BAR BALANCE PORTION REINF. ON
AT SUPPORT
NO. NO. MIDDLE EACH FACE
I AT SUPPORT (FOR LENGTH 2D) (AT MIDDLE) I
PB1 PB1
01 PB1 300 450 2-#20+2-#16 - 3-#16 3-#20 #8 @ 100 c/c #8 @ 150 c/c - - 147.0 M TOP OF BEAM
C9 C10
02 PB2 300 450 3-#16 - 2-#16 3-#16 #8 @ 100 c/c #8 @ 150 c/c - - 147.0 M TOP OF BEAM
PB4
03 PB3 300 450 3-#16 - 2-#16 3-#16 #8 @ 100 c/c #8 @ 150 c/c - - 147.0 M TOP OF BEAM
S3 S2
PB2

PB2

04 PB4 300 450 2-#16 - 2-#16 1-#16 #8 @ 150 c/c #8 @ 150 c/c - - 147.0 M TOP OF BEAM
PB4
05 PB5 300 450 2-#16 - 2-#16 3-#16 #8 @ 100 c/c #8 @ 150 c/c - - 147.0 M TOP OF BEAM
H H
PB1 PB1
06 PB6 300 450 2-#16 - 2-#16 3-#16 #8 @ 100 c/c #8 @ 150 c/c - - 147.0 M TOP OF BEAM
C11 C12
07 PB7 400 600 3-#20 - 3-#20 3-#20 #8 @ 100 c/c #8 @ 150 c/c - - 147.0 M TOP OF BEAM

PB4 08 PB8 300 450 3-#12 - 3-#12 - #8 @ 100 c/c #8 @ 150 c/c - - 147.0 M TOP OF BEAM
S3 S2
PB2

PB2

PB4 09 PB9 300 450 3-#12 - 3-#12 3-#12 #8 @ 100 c/c #8 @ 150 c/c - - 147.0 M TOP OF BEAM

G PB1 PB1 G

C13 C14

PB4

S3 S2
PB2

PB2

PB4
F
F PB1 PB1

C15 C16

PB4
S3 S2 E
PB2

PB2

PB4

PB5 PB5

PB1 PB1 C23 C24 C25


E
FOR REVIEW AND APPROVAL
PB6

C17 C18
TYPICAL DETAIL AT
PB4 COLUMN & BEAM JUNCTION LEVEL D

PB7
PB2

S3 C26
S1 S1 C27
PB2

PB4
PB6

S2
PB1 PB1
D C28 C29 C30
C19 C22 C20 REV.NO DATE REVISION STR ARCH MEP

CLIENT NAME :- C

EXECUTIVE ENGINEER, UKAI DIVISION NO-1 UKAI


PB8 PB8 PB8 PB8 PB8 PB8 PB8 PB8 PB8 PB8 PB8 PB8 PB8 PB8

C31 C32 C33 C34 C35 C36 C37 C38 C39 C40 C41 C42 C43 C44 C45

PROJECT NAME :-
CONSULTANCY SERVICE FOR SONGADH L.I. SCHEME FROM RESERVOIR
C S3 S3 S3 S3 S3 S3 S3 S3 S3 S3 S3 S3 S3 S3
PB9

PB9

PB9

PB9

PB9

PB9

PB9

PB9

PB9

PB9

PB9

PB9

PB9

PB9

PB9

TITLE :- LAYOUT & R.C.C DETAIL OF PLINTH BEAM AT (147.0 M LVL.)


TOP OF BEAM B
PB8 PB8 PB8 PB8 PB8 PB8 PB8 PB8 PB8 PB8 PB8 PB8 PB8 PB8
C60
C46 C47 C48 C49 C50 C51 C52 C53 C54 C55 C56 C57 C58 C59
FOR SUMP & PUMP HOUSE WITH CONTROL PANEL AT CHAMPAVADI POND
B-10 KRISHNA IND. ESTATE,
B GEO DESIGNS OPP. B.I.D.C GORWA ESTATE,
S3 S3 S3 S3 S3 S3 S3 S3 S3 S3 S3 S3 S3 S3
PB9

PB9

PB9

PB9

PB9

PB9

PB9

PB9

PB9

PB9

PB9

PB9

PB9

PB9

PB9

VADODARA - 390 016


& TELEFAX : 91-265-2290222
2283081,2282305
PB8 PB8 PB8 PB8 PB8 PB8 PB8 PB8 PB8 PB8 PB8 PB8 PB8 PB8
RESEARCH (P) LTD. E-mail : geotesthouse@gmail.com

C61 C62 C63 C64 C65 C66 C67 C68 C69 C70 C71 C72 C73 C74 C75 DRAWN BY NAITIK PATEL APPROVED BY DRG. NO. GDR-2017-EE-01-STR-PB-05
DESIGNED BY SADDAM BANDI PROJECT NO SHEET NO REVISION A
LAYOUT OF PLINTH BEAM AT (147.0 M LVL.) TOP OF BEAM
A SLAB S1 & S2 - 150mm THK. , S3 - 100mm THK. REVIEWED BY MEHUL PATEL
GRADE OF CONCRETE - M:30 SCALE N.T.S 2017 01 OF 01 R0
GRADE OF STEEL Fe-500 DATE 03-08-2018 DESIGN HEAD
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
.

THIS DRAWING IS THE PROPERTY OF GEO DESIGNS & RESEARCH (P) LTD. (GDR) AND SHALL NOT BE COPIED OR LENT WITHOUT THE WRITTEN PERMISSION OF GDR. .
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

TB1 TB1 LAYOUT OF TIE BEAM AT (149.72 TOP OF BEAM)


C1 C21 C2
M M
TB2

TB2
C3 C4
L L
TB2

TB2
SECTION 1-1 SECTION 1A-1A

C5 C6
K K
L1 L2 L3

TYPICAL DETAIL OF CONTINUOUS BEAM TYPICAL DETAIL AT


TB2

TB2

COLUMN & BEAM JUNCTION LEVEL

C7 C8 SCHEDULE OF BEAM
J J
SIZE OF BEAM REINFORCEMENT

SPACER BARS
BOTTOM BARS TOP BARS STIRRUPS

@ 1000 C/C
TB2

TB2

SIDE FACE REMARKS


SR. BEAM BREADTH DEPTH THROUGHOUT EXTRA BAR AT THROUGHOUT EXTRA BAR BALANCE PORTION REINF. ON
AT SUPPORT
NO. NO. MIDDLE EACH FACE
AT SUPPORT (FOR LENGTH 2D) (AT MIDDLE)

01 TB1 300 450 4-#20 - 2-#20 3-#20 #8 @ 100 c/c #8 @ 150 c/c - - 149.72 M TOP OF BEAM
C9 C10
I 02 TB2 300 450 3-#16 - 2-#16 3-#16 #8 @ 100 c/c #8 @ 150 c/c - - 149.72 M TOP OF BEAM I

03 B1 300 500 3-#16 - 2-#16 3-#16 #8 @ 100 c/c #8 @ 150 c/c - - 151.15 M TOP OF BEAM
TB2

TB2

04 B2 300 500 3-#16 - 3-#16 - #8 @ 100 c/c #8 @ 150 c/c - - 151.15 M TOP OF BEAM

05 B3 400 600 4-#20 - 2-#20 3-#20 #8 @ 100 c/c #8 @ 150 c/c - - 151.15 M TOP OF BEAM

06 B4 300 500 4-#12 - 3-#12 2-#12 #8 @ 100 c/c #8 @ 150 c/c - - 152.60 M TOP OF BEAM
C11 C12
H 07 B5 300 500 4-#12 - 3-#12 2-#12 #8 @ 100 c/c #8 @ 150 c/c - - 152.60 M TOP OF BEAM H
TB2

TB2

C13 C14
G G
TB2

TB2

F
C15 C16
F
TB2

TB2

E
B1 B1

C23 C24 C25

C17 C18

B2

B2
E
FOR REVIEW AND APPROVAL
C26 D
S1 S1 C27
TB2

TB2

B3
B2

B2
TB1 TB1
B1 B1
C19 C22 C20 C30
D C28 C29 LAYOUT OF SLAB AT (151.15 TOP OF BEAM) REV.NO DATE REVISION STR ARCH MEP

CLIENT NAME :- C
B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4
EXECUTIVE ENGINEER, UKAI DIVISION NO-1 UKAI
C31 C32 C33 C34 C35 C36 C37 C38 C39 C40 C41 C42 C43 C44 C45

S1 PROJECT NAME :-
S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S1 CONSULTANCY SERVICE FOR SONGADH L.I. SCHEME FROM RESERVOIR
B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

LAYOUT OF SLAB AT (152.60 TOP OF BEAM)


B5

TITLE :-
LAYOUT & R.C.C DETAIL AT (149.72 M,151.15 M,152.60 M LVL.)
B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B
C60
C46 C47 C48 C49 C50 C51 C52 C53 C54 C55 C56 C57 C58 C59 FOR SUMP & PUMP HOUSE WITH CONTROL PANEL AT CHAMPAVADI POND
B5

S1 B-10 KRISHNA IND. ESTATE,


B S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S1 GEO DESIGNS OPP. B.I.D.C GORWA ESTATE,
B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

VADODARA - 390 016


& TELEFAX : 91-265-2290222
2283081,2282305
B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 B4 RESEARCH (P) LTD. E-mail : geotesthouse@gmail.com
C61 C62 C63 C64 C65 C66 C67 C68 C69 C70 C71 C72 C73 C74 C75 DRAWN BY NAITIK PATEL APPROVED BY DRG. NO. GDR-2017-EE-01-STR-S-06
DESIGNED BY SADDAM BANDI PROJECT NO SHEET NO REVISION A
LAYOUT OF SLAB AT (152.60 M LVL.) TOP OF BEAM
A SLAB S1 & S2 - 150mm THK. , S3 - 125mm THK. REVIEWED BY MEHUL PATEL

GRADE OF CONCRETE - M:30 SCALE N.T.S 2017 01 OF 01 R0


GRADE OF STEEL Fe-500 DATE 03-08-2018 DESIGN HEAD
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
.

THIS DRAWING IS THE PROPERTY OF GEO DESIGNS & RESEARCH (P) LTD. (GDR) AND SHALL NOT BE COPIED OR LENT WITHOUT THE WRITTEN PERMISSION OF GDR. .
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

M TB1 TB1 B1 B1 B3 B3 M
TB2
C1 C21 C2 C1 C21 C2 C1 C21 C2

TB2

S1
B2

B2

B5

B5
L (*)BR1 (*)BR1 B4 L

400
C3 C4 C3
450 C4 C3 C4
TB2

TB2

S2
B2

B2

B5

B5
SECTION 1-1 SECTION 1A-1A

K (*)BR1 (*)BR1 B4 K
L1 L2 L3

C5 C6 C5 C6 C5 C6 TYPICAL DETAIL OF CONTINUOUS BEAM


TB2

TB2

S2
B2

B2

B5

B5
SCHEDULE OF BEAM
J (*)BR1 (*)BR1 B4 J
SIZE OF BEAM REINFORCEMENT
C7 C8 C7 C8 C7 C8

SPACER BARS
BOTTOM BARS TOP BARS STIRRUPS

@ 1000 C/C
SIDE FACE REMARKS
SR. BEAM BREADTH DEPTH THROUGHOUT EXTRA BAR AT THROUGHOUT EXTRA BAR BALANCE PORTION REINF. ON
AT SUPPORT
NO. NO.
TB2

TB2

EACH FACE

S2
B2

B2

B5

B5
MIDDLE AT SUPPORT (FOR LENGTH 2D) (AT MIDDLE)

01 TB1 300 450 4-#20 - 2-#20 3-#20 #8 @ 100 c/c #8 @ 150 c/c - - 152.05 M TOP OF BEAM

I (*)BR1 (*)BR1 B4 02 TB2 300 450 3-#16 - 2-#16 3-#16 #8 @ 100 c/c #8 @ 150 c/c - - 152.05 M TOP OF BEAM I

C9 C10 C9 C10 C9 C10 03 B1 300 750 4-#25 - 2-#20 4-#25 #12 @ 100 c/c #10 @ 150 c/c - - 156.50 M TOP OF BEAM

04 B2 300 450 2-#16+1-#12 - 2-#16 3-#20 #8 @ 100 c/c #8 @ 150 c/c - - 156.50 M TOP OF BEAM
TB2

TB2

S2
B2

B2

B5

B5
05 B3 300 600 4-#16 - 3-#16 2-#20 #8 @ 100 c/c #8 @ 150 c/c - - 156.50 M TOP OF BEAM

06 B4 400 900 4-#25 - 3-#20 2-#25 #10 @ 100 c/c #10 @ 150 c/c - - 156.50 M TOP OF BEAM

07 B5 300 600 3-#16 - 3-#16 2-#16 #8 @ 100 c/c #8 @ 150 c/c - - 156.50 M TOP OF BEAM TYPICAL DETAIL AT
H (*)BR1 (*)BR1 B4 H
COLUMN & BEAM JUNCTION LEVEL
C11 C12 C11 C12 C11 C12
TB2

TB2

S2
B2

B2

B5

B5
G (*)BR1 (*)BR1 B4 G

C13 C14 C13 C14 C13 C14


TB2

TB2

S2
B2

B2

B5

B5
F
F (*)BR1 (*)BR1 B4

C15 C16 C15 C16 C15 C16


X X
E
TB2

TB2

B2

B2

B5

B5
S2

E (*)BR1 (*)BR1 B4
FOR REVIEW AND APPROVAL
C17 C18 C17 C18 C17 C18
D
B2
TB2

TB2

B2

B5

B5
S1

D TB1 TB1 B1 B1 B3 B3
REV.NO DATE REVISION STR ARCH MEP
C19 C22 C20 C19 C22 C20 C19 C22 C20
CLIENT NAME :- C

EXECUTIVE ENGINEER, UKAI DIVISION NO-1 UKAI

LAYOUT OF TIE BEAM AT (152.05 M LVL.) TOP OF BEAM LAYOUT OF TIE BEAM AT (156.50 M LVL.) TOP OF BEAM LAYOUT OF ROOF SLAB AT (159.50 M LVL.) TOP OF BEAM
GRADE OF CONCRETE - M:30 GRADE OF CONCRETE - M:30 ALL SLAB ARE 150mm THK. PROJECT NAME :-

GRADE OF STEEL Fe-500 GRADE OF STEEL Fe-500 GRADE OF CONCRETE - M:30 CONSULTANCY SERVICE FOR SONGADH L.I. SCHEME FROM RESERVOIR
C
GRADE OF STEEL Fe-500

TITLE :-
LAYOUT & R.C.C DETAIL AT (152.05 M,156.50 M,159.50 M LVL.)
B
FOR SUMP & PUMP HOUSE WITH CONTROL PANEL AT CHAMPAVADI POND

156.50 M LVL. B-10 KRISHNA IND. ESTATE,


B GEO DESIGNS OPP. B.I.D.C GORWA ESTATE,
VADODARA - 390 016
& TELEFAX : 91-265-2290222
2283081,2282305
RESEARCH (P) LTD. E-mail : geotesthouse@gmail.com
DRAWN BY NAITIK PATEL APPROVED BY DRG. NO. GDR-2017-EE-01-STR-S-07
DESIGNED BY SADDAM BANDI PROJECT NO SHEET NO REVISION A
A REVIEWED BY MEHUL PATEL
SECTION-X-X
DETAIL OF BR1 SCALE N.T.S 2017 01 OF 01 R0
DATE 03-08-2018 DESIGN HEAD
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
.

THIS DRAWING IS THE PROPERTY OF GEO DESIGNS & RESEARCH (P) LTD. (GDR) AND SHALL NOT BE COPIED OR LENT WITHOUT THE WRITTEN PERMISSION OF GDR. .

You might also like