Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

NOTES:-

NGANGLAM DEWATHANG

LEGENDS
Note-
*THIS DRAWING IS FOR QUANTITY PURPOSE ONLY DIMENSION
SHOWN IN THE DRAWING ARE SUBJECTED TO CHANGE IN DETAIL
DESIGN DRAWING.

KEY PLAN
CLIENT: PROJECT: DESIGN CONSULTANTS :- TITLE:
DRAWN BY AMIT

BORDER ROADS ORGANISATION "Survey,Investigation and Preparation of Feasibility Report and Detailed Project Report DESIGN BY AMIT
FOR MNB AT PROPOSED CH-25+270
SPAN (1 X 30 M)
CHIEF ENGINEER For Construction of Road Nganglam-Dewathang From KM.24.000 To KM.68.000(Approx
PROJECT DANTAK, C/O 99 APO Length 44.000 KM) To PNH Specification Under 19 BRTF (P) Dantak In Eastern Bhutan." CHECKED BY A.G.
REAL STRENGTH INFRASTRUCTURE
R0 JUNE 2023 DRAFT FEASIBILITY REPORT DRAWING NO.
KOTHRUD, PUNE-411038 A3
PNH/BRTF-19/MNB/
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 01 of 02
GL GL

DETAIL OF TOE WALL

NOTES:-

CLIENT: PROJECT: DESIGN CONSULTANTS :- TITLE:


DRAWN BY AMIT

BORDER ROADS ORGANISATION "Survey,Investigation and Preparation of Feasibility Report and Detailed Project Report DESIGN BY AMIT
FOR MNB AT PROPOSED CH-25+270
SPAN (1 X 30 M)
CHIEF ENGINEER For Construction of Road Nganglam-Dewathang From KM.24.000 To KM.68.000(Approx
PROJECT DANTAK, C/O 99 APO Length 44.000 KM) To PNH Specification Under 19 BRTF (P) Dantak In Eastern Bhutan." CHECKED BY A.G.
REAL STRENGTH INFRASTRUCTURE
R0 JUNE 2023 DRAFT FEASIBILITY REPORT DRAWING NO.
KOTHRUD, PUNE-411038 A3
PNH/BRTF-19/MNB/
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 02 of 02

You might also like