NIGHT WORK PERMIT Date:

Night work permit can be used where work to be carry after 6:00pm and high risks that need to
be
controlled the type of operation for which this permit could be used includes:
All works
Part A-issue Part D- completion of work
permit is issued to: The work has been completed and the work and
Adjacent areas have been thoroughly inspected to
Ensure no hazard remains
for (specific work to be done) : the work has been completed and I have undertaken
the checks and safety measures
undertaken the checks and safety measures After work materials stacked properly at the designate
at (location of work)
Closing Permit
The work has been completed and I have undertaken
valid from: _______ Am/Pm To: Am/Pm the checks and safety measures i issued this permit
subject to the minimum precaution I have ticked in
Part B- Precaution Part D of this permit
Required illumination for the assigned work Time ___/_____/______
Date:___/____/ ____
Signed:
PMC (Gleeds):
Required PPEs are issued
(Subcontractor once completed work)
Required respective work permit issued Part E- Cancellation of permit
This permit to work is cancelled and staffs have
been notified. no more work permit
Tool box talk conducted Time:_____/_____/______
Signed:
PMC (Gleeds):
Availability of emergency vehicle and driver No:

First aider name and phone number:

Electrician name and phone no:

PART-C ACCEPTENCE

I accept this permit and will ensure the precautions ticked above on part B have been undertaken before
starting work. I also understand the checks and safety measures I am required to undertake after
completion of work
Signed(URC Engineer):______________ Project Manager(URC)_______________ PMC (Gleeds)_______________