Professional Documents
Culture Documents
Etihad Rail - 2F2 Package - Protection & Rerouting of Existing 400 Dia GRP Pipe in 3 Locations - Detail 1&2 - Sheet-2 - Design Drawing - Reviewed
Etihad Rail - 2F2 Package - Protection & Rerouting of Existing 400 Dia GRP Pipe in 3 Locations - Detail 1&2 - Sheet-2 - Design Drawing - Reviewed
A A
IRRIGATION NETWORK STYLE:-
400 MM EX. 400 MM DIA IRRIGATION
LINE
EX. 400 MM DIA IRRIGATION
LINE TO BE RELOCATED
200 MM EX. 200 MM DIA IRRIGATION
EXISTING FUTURE CONNECTION LINE
CHAMBER TO BE RELOCATED 600 MM PR. 600 MM DIA IRRIGATION
LINE
FUTURE CONNECTION
ERA ROW 400 MM PR. 400 MM DIA IRRIGATION
LINE
A
-
B CHAMBER 300 MM PR. 300 MM DIA IRRIGATION B
LINE
E=474249.029
200 MM PR. 200 MM DIA IRRIGATION
N=2745182.406 LINE
CH. 2+584.18
150 MM PR. 150 MM DIA IRRIGATION
PROPOSED 600mm DIA GRP E=474776.726 LINE
IRRIGATION PIPE (LENGTH = 56.0m) N=2744438.101 PROPOSED CONCRETE
SURROUND
WITH PROPOSED CONCRETE SURROUND
(LENGTH = 53.0 m) PROPOSED JUNCTION CHAMBER
IL 46.771 2+650 FOR FUTURE CONNECTION
2.87
PROPOSED 1x300+2x150 GRP DUCT (LENGTH = 56.0m) E=474250.999
EXISTING 200mm DIA 2+600 2+550 EXISTING FUTURE
3.00
IRRIGATION LINE (TO BE RELOCATED) CONNECTION CHAMBER
C WITH PROPOSED CONCRETE SURROUND N=2745171.280 C
EXISTING WASH OUT CHAMBER
(LENGTH = 53.0 m)
PROPOSED ISOLATION VALVE
CHAMBER
ERA ROW PROPOSED WASH OUT CHAMBER
6.00
5.85
1.50
CH. 3+486.85 LEGEND:-
E=474233.268 PLOT BOUNDARY
N=2745158.785 0+00
D
3+550 3+500 RAIL ALIGNMENT
D
3+450 ERA ROW ERA ROW
B B 45° BEND
3+550 Sheet-3
3+500 Sheet-3 IL 48.051
SEND MITIGATION FENCE
E E
127.20
ERA ROW
Note 02
45° BEND
EXISTING 400mm DIA IL 47.760
1.50
IRRIGATION LINE
-
Approved as noted
(TO BE RELOCATED OUTSIDE OF 127.20 m LENGTH
PROPOSED RAIL ALIGNMENT)
Detail 1
END CAP
WITH THRUST BLOCK
DETAIL -2
1. Make sure all irrigation future ducts are pressure tested as per DM standards.
E=474204.344, N=2745148.644 SCALE - 1 : 500
Pipe repairing incase of leakage in the pipe under the access road.
TH = 56.0m
H 4. Make sure all the pipe joints are laminated by the manufacture and the entire pipe is protected by reinforced concrete surround with expansion/contraction joint @6m. H
DETAIL -1
General comments –applicable for all 3 details & overall drawing SCALE - 1 : 500
5. Subjected to the condition that the consultant & contractor will be responsible for the Decennial ARRIVAL Liability -i.e. 10DETECTIVE
/ DEPARTURE ROAD1 year Warranty
WAGON SLIDING for
Workman ship and material used, As per sub clause 17.7(Decennial liability) of general condition3.350of contracts. C
L OF TRACK C
L OF TRACK
6. All Civil structural design should checked and approved by consultancy’s civil Engr. including Thrust blocks/supports /concrete
7.000 3.350
7. Separate profile drawing to be submitted for DM-AID approval and Consultant to study the profile drawing propose
FACILITY FENCE
CORE EMBANKMENT
the Air Valve if required, and make sure that the slope is not more than 3% without fittings. DITCH
ACCESS ROAD
0.950
8.EXISTING
All irrigation works should be executed by DM-AID approved contractor ( category wise).
2.5% 2.5%
2.5% 2.5%
:1 2.5
2.5
GROUND LEVEL 0.0% 1.5 :1
0.0%
:1
2.5
:1
:1 1.5 1.5
0.0% 0.0%
:1
9. All irrigation related construction should happen only with DM-AID approved shop drawing & materialTOPapproval.
:1 1.5
2.250
2.0 :1
:1 2.0
0.0%
0.0%
1.500 1.500
0.0%
1.500 1.500 FUTURE CONNECTION
10. Consultant will be responsible to check all above points are compiled or not.
OF STEEL SLEEVE (+47.450) CHAMBER
K K
SECTION A-A
L SCALE - 1 : 100 L
TIE IN POINT 2F2/2C
ROW = RIGHT OF WAY DIMENSIONS SHALL BE FOLLOWED. CLIENT EXISTING & PROPOSED DM IRRIGATION NETWORK PLAN & DETAIL
EX. = EXISTING 3) ANY DISCREPANCY FOUND IN THE DRAWING IS TO BE IMMEDIATELY CHAINAGE 2+584.18 AND 3+486.85
PR. = PROPOSED CLARIFIED WITH THE ENGINEER OR HIS REPRESENTATIVE AT THE SITE AB 08/04/2021 ISSUED FOR DESIGN NOC AKS MR MR
SHEET No SCALE ORIGINAL SIZE
BEFORE COMMENCEMENT OF RELATED ITEMS OF WORK.
4) THE COORDINATE SYSTEM RELATES TO DLTM SYSTEM. DUBAI INDUSTRIAL CITY
AC 30/06/2021 REVISED AS PER AUTHORITY COMMENTS AKS APL MR 2 OF 3 AS SHOWN A1
EXCAVATOR
ENTRY
RB1
PMC ENGINEER
RB1