AUDIT REPORT
AUDIT SUMMARY
The compliance audit for HAN station is completed with 2 level-2 findings as follow
The Corrective Action Requests have been raised accordingly.
Finding: At the time of the audit, there is no record of Station Introduction for those Mechanics relief from 2
other stations as required in the LMSOP 4.4
Finding: Sample check on the technical log of VU and found many tasks of engine oil servicing for both
engines did not performed independence inspection or Re-Inspection as required in the MOE 2.25 (TLG# 2
16453, 16461, 16263, 16442, 16370)
11. Reported by: Nguyen Hoang Son 13. Reviewed by QSM: Tran Trieu Phong
Digitally signed by
Trần Triệu Phong
Date: 2023.05.13
14. Date: 17:48:04 +07'00'
12. Date: 12 May 2023