Sub: Construction of Elevated Structures (viaduct) of Length 4.8 km (approx) from
Yeshwanthpur station to Peenya Depot and Construction of 3 nos. of Elevated Metro
Stations viz Outer Ring Road Station, Peenya Industrial Area Station and Peenya
Village Station in the extension of North side of N-S Corridor of Bangalore Metro Rail
Project — Use of Polymer
Ref. letters:
1) LOA No. BMRIVIA & 3Sins/R3a/Extension/2009 5410 dated 17.12.2009.
2) Contract agreement no. BMR/VIA & 3Stns/R3a/Extension/2009 dated 05.03.2010
3) LAT Letter No: LTCG/BMRCLIR3A/750 dated 24.07.2010.
4) L&T Letter No: LTCG/BMRCLR3A412 dated 24.11.2010.
5) GC letter NO.GC-BMRCLICRE/R3A/Approvals/206 dated 23.12.2010.
6) L&T Letter no: L&T Letter No: LTCG/BMRCLIR3A/592 dated 23.02.2011.
7) L&T Letter no: L&T Letter No: LTCG/BMRCLIR3A/704 dated 13.04.2011.
Dear Sir,
With reference to the technical Proposal of by Dr. K. S. Ramakrishna (General Manager &
Head, Foundation & Geotechnical Engineering Cell) via letter cited above under reference
no (3) and also further to the subsequent discussions, we have successfully carried out
load tests and executed another 3 piles by using polymer as the replacement for bentonite.
The following two load tests were conducted on the below mentioned piles which was
successful and satisfies the acceptance criteria as per the technical specification.
it Termination
sn | Pile Location _| Type of pile Type of Test depth inmm | Result
Routine Vertical
1 | P393/4 Friction toad Test 35 | Successful
2 | 16 | end Bearing Initial Load Test 215 | successful
Headquarters: Mount Poonamallee Road, Menapakcam, P 8. No. 979, Chonnai ~ 600 089, Tel: 22528000 / 22528000
Fax: + 044.249 3917 E-Mall:es@intese.com Website: youu ntece.som
Regd. Office: LAT House, Balad Estate, P.O, Box 278, Mumbal ~ 400 001. Tek: 264 8181 / 82 Faxc+ 022-262 0223
‘Website: wie larsentoubro.comLARSEN & TOUBRO LIMITED
ENGINEERING CONSTRUCTION & CONTRACTS DIVISION
Infrastructure Operating Company
Office: #47, C2t eter Bung, tl, Tank ta Re, aga 560022 Tet 08049592500
Further to this, we wish to highlight the follo\
usage’
19 advantages of polymer over bentonite
Time for hydration is not required, Polymer can be used directly.
Flushing time is only 30 min where as its 120 min for bentonite.
Tos cleaning is ensured.
Very minimal wastage through slush in comparison to bentonite.
Productivity relatively high in comparison to bentonite,
Itrequires small set up.
Good housekeeping.
NOgAeNe
Hence we propose to use polymer as a replacement of bentonite for part of the
work.
We request you to review and approve the same.
Thanking you and assuring you the best services at all times.
Yours faithfully,
For Larsen & Toubro Limited,
jindarrajan S
Project Manager
Reach 3A package
Co: The Chief Engineer, Reach 3A, BMRCL.
Co: The Chief Resident Engineer, Reach 3A - GC to BMRCL
Ce: The Resident Engineer, Reach 3 A ~ GC to BMRCL.
Headquarters: Mount Poonamalles Road, Manapakkam, P.8. No. 978, Chennal ~ 600 089. Tel: 22526000 / 22528000
Fox + 044-249 3917 E-Mait lcg@lnecccom Website: yorsJntecom
Regd. Office: L&T Houso, Ballard Estate, P.O, Box 278, Mumbal - 400 001. Te: 261 8181 / 82 Faxc+ 022-262 0223
‘Website: win larantesten rm