LIFTING PLAN INSTALLATION OF

HELIPAD MANWAY BRIDGE


Crane TADANO1 Cap. 0 Ton Container 20'
RDMP RU-V BALIKPAPAN PROJECT
A. CRANE DATA B. LOAD DATA (Tons)
1 Type and Model : TADANO TM-ZT1005H 1 Load of Erection Weight : 2.750 Ton
2 Capacity : 10 TON 2 Lifting Gear (Hook & Slings) : 0.050 Ton
3 Crane Condition : 90% 3 Lifting Device : 0.100 Ton
4 Max. Lifting High : 15.92 METER (Wire rope, Chin-link, Shackle)
5 Max. Working Radius : 12 METER Total Load : 2.900 Ton
6 Crane Combine 2 Unit TMC Load with Safety Factor (*1,25) : 3.625 Ton
C. LIFTING CATEGORY Low risk lifting (Safety Factor = 0,75 consider to Crane Condition)
D. Lifting Condition E. Calculation
1 Working Radius : 3 METER 1 Total Lifting Weight (a) : 3.625 Ton
2 Lifting Hight : 2 METER 2 Load Chart Capacity (b) : 4.9 Ton
3 Boom Out Length : 4.4 METER
4 Out riger out : 4 METER (a) / (b) X 100 < 85% : 74%
5 Lifting Capacity (Ton) : 4.9
(see Load chart)