Two cranes with a combined capacity of 10 tons will be used to lift a 2.75 ton manway bridge with lifting gear weighing 0.15 tons, for a total load of 2.9 tons. With a safety factor of 1.25, the total lifting weight is 3.625 tons. Calculations show the lift will require a working radius of 3 meters, lifting height of 2 meters, and boom length of 4.4 meters, with the crane's capacity of 4.9 tons exceeding the 74% required load capacity.
Two cranes with a combined capacity of 10 tons will be used to lift a 2.75 ton manway bridge with lifting gear weighing 0.15 tons, for a total load of 2.9 tons. With a safety factor of 1.25, the total lifting weight is 3.625 tons. Calculations show the lift will require a working radius of 3 meters, lifting height of 2 meters, and boom length of 4.4 meters, with the crane's capacity of 4.9 tons exceeding the 74% required load capacity.
Two cranes with a combined capacity of 10 tons will be used to lift a 2.75 ton manway bridge with lifting gear weighing 0.15 tons, for a total load of 2.9 tons. With a safety factor of 1.25, the total lifting weight is 3.625 tons. Calculations show the lift will require a working radius of 3 meters, lifting height of 2 meters, and boom length of 4.4 meters, with the crane's capacity of 4.9 tons exceeding the 74% required load capacity.
Crane TADANO1 Cap. 0 Ton Container 20' RDMP RU-V BALIKPAPAN PROJECT A. CRANE DATA B. LOAD DATA (Tons) 1 Type and Model : TADANO TM-ZT1005H 1 Load of Erection Weight : 2.750 Ton 2 Capacity : 10 TON 2 Lifting Gear (Hook & Slings) : 0.050 Ton 3 Crane Condition : 90% 3 Lifting Device : 0.100 Ton 4 Max. Lifting High : 15.92 METER (Wire rope, Chin-link, Shackle) 5 Max. Working Radius : 12 METER Total Load : 2.900 Ton 6 Crane Combine 2 Unit TMC Load with Safety Factor (*1,25) : 3.625 Ton C. LIFTING CATEGORY Low risk lifting (Safety Factor = 0,75 consider to Crane Condition) D. Lifting Condition E. Calculation 1 Working Radius : 3 METER 1 Total Lifting Weight (a) : 3.625 Ton 2 Lifting Hight : 2 METER 2 Load Chart Capacity (b) : 4.9 Ton 3 Boom Out Length : 4.4 METER 4 Out riger out : 4 METER (a) / (b) X 100 < 85% : 74% 5 Lifting Capacity (Ton) : 4.9 (see Load chart) F. Sketch