Professional Documents
Culture Documents
Risk Assessment Revision
Risk Assessment Revision
Risk Rating
Probability
Probability
Aspect requi ti
reme o
nts n
N
1 Visual Slip, Obtain permit to work Carry out the JST to Cop- Plant
Inspection Trip & prior to start the work. the team prior to start 15 Manager,
of the Provide personal the task. Cop- Engineer,
Fall.
equipmen protective equipment 2 2 4 Ensure the work 1 2 2 21 HSE
t. (PPE) that is specific to carried out under the
the job. competent
Supervisor performing supervisor.
the initial inspection of Ensure adequate
the equipment prior to demarcation to
start the PPM. prevent unauthorized
Provide adequate entry.
barricades and signage Ensure the task
where required. specific PPE
Conform the work area is provided and enforce
free from any slip trip the use.
and fall hazard. Ensure the guard on
All the rotating parts rotating parts not
protected with guard. removed by the
operators before the
equipment isolated.
S T Initial Risk Residual Risk Policy
I ask/ Hazard / Action Ta
2No Isolation
Activityof Human
/ Risk/ WorkExisting
permit shall be
Control Ensure
Actionthe
toPTW
be taken Cop-
Legal Plant
Taker rg
the injury 1 3 3 24 Manager,
Environ prepared and signed by approved by the site
(SOP#) & et
equipment /fire, the same technician 2 3 6 Engineer and HSE. Engineer,
. mental responsible for the work
electrica Supervisor ensures the other HSE Ac
lAspect
shock, Work Permit to be checked correct equipment for requi ti
death, by Operator, confirmed by the task by using reme o
Propert Plant Engineer and single line diagram nts n
y authorized to work by prior to performing the
damage Plant HSE. LOTO procedure.
. Follow the PTW procedure Ensure the competent
Using single line diagram person performing the
to find out the correct LOTO procedure.
equipment. Ensure the task
Communicate with all specific PPE provided
related parties to assure and enforce the use.
LOTO of the correct
equipment.
Adequate demarcation to
prevent unauthorized
entry.
Provide personal
protective equipment
(PPE) that is specific to
perform power isolation of
the equipment.
3 Scaffoldin Falls, Conduct JSA training prior 2 3 6 Ensure unauthorized 1 3 3 Cop- Plant
g erection Scaffold to start the activity. persons removed from 26 Manager,
and ing Scaffolding erection and the scaffolding Engineer,
dismantlin collapse dismantling performed by erection and HSE
g. , Struck certified scaffolding dismantling area.
by erector. Ensure all operative
falling Wearing adequate PPE wearing had hat.
material while perming the task. Ensure no activity
s. Provide adequate performed during
demarcation to prevent adverse weather.
unauthorized entry. Ensure not dropping or
Performing visual throw scaffolding
inspection to ensure the material.
componence are in good Ensure certified
condition. Scaffolding inspector
Using safety harness with performing the
double lanyard while inspection and tagging
working above 1.8 meter of scaffold prior to start
height. the work.
Using material bag/bucket 1.Green tag - Safe for use
for transferring materials (Valid for 7 consecutive
up/down. days, signed by
competent Scaffolding
Certified Scaffolding
Inspector).
inspector performing the
2. Red tag – Danger.
inspection and tagging of
scaffold after the erection.
4 Performin Human Task specific Instruction, Carry out the JST to Cop- Plant
g the injury, Information and Training the team prior to start 15 Manager,
PPM. cut, must be provided prior to the task. Cop- Engineer,
wound. start the activity. 2 2 4 Ensure the correct 1 2 2 21 HSE
Propert Adequate demarcation to tools used for the
y prevent unauthorized task.
damag entry. Ensure no manual
e.
S T Initial Risk Residual Risk Policy
I ask/ Hazard Provide PPE that is interaction or work / Action Ta
No Activity / Risk/ Existing
specific Control
to perform the with running
Action to beparts
takenof Legal Taker rg
Environ task. the machine.
(SOP#) & et
mental Using Calibrated Ensure the operatives other Ac
equipment during the aware of safe manual
Aspect handling procedure. requi ti
maintenance activity.
Conform the work area Ensure the calibration reme o
free from any slip trip date of the nts n
and fall hazard. equipment not
Using scissor lift trolley to expired.
lift and reposition heavy Ensure the PAT test
objects to limit force performed for the
exertion. power tools.
Reposition to eliminate a
long/excessive reach
and enable working in
natural postures.
7 Working Human Safe use of ladder 2 3 6 Ensure the ladder 1 3 3 Cop- Plant
on Injury & training provided to the free of grease or oil 37. Manager,
ladders. Propert operatives. or other slippery Engineer,
y Check the ladder substances. HSE
Damag inspection tag updated. Ensure the Ladder is
e, Carryout visual safe for use and well
inspection to ensure the secured with
ladder components are structure.
free from damage for Ensure the
correct function and use. stepladders
Never carry other objects spreaders fully
in hands while climbing opened and lock the
the ladders. braces.
Maintain 3-point contact Ensure the ladder
while climbing ladders placed on frim, level,
(2hands and 1foot or and non-slippery
2feet and 1hand). surface.
Must provide manual Ensure operative not
help to hold the ladder climb past the
where ladder cannot be second top steps of
secured. the ladder.
Set up suitable barriers Ensure the operatives
or lock doors shut while not overreached from
working in passage the ladder.
ways, doorways.
S T Initial Risk Residual Risk Policy
I ask/ Hazard / Action Ta
8No Lifting
Activity Human
/ Risk/ Carryout
Existing
TaskControl
specific Actionadequate
Ensure to be taken Legal Taker rg
Operation Injury
2 3 6 1 3 3 Cop- Plant
Environ training and TBT prior to demarcation
(SOP#)provided
34& et
and Manager,
mental start lifting operation. to the lifting area. other Ac
propert Using lifting tools, Ensure the lifting Engineer,
yAspect Tackles, belts and tools, de-shackles,
requi
HSE
ti
damag Chains etc. are belts and Chains are reme o
e and inspected and calibrated inspected and nts n
also by competent third party certified by
possibl before use. competent third party
e Carryout visual before use.
fatality. Inspection of all lifting Ensure the tag line
equipment’s before use. attached with the
Securing the loads load to control the
uniformly. movements.
Check the lifting capacity Ensure if the load is
of equipment and weight to be handled,
of the load properly. operatives should
Barricade the area ensure that no part of
underneath the load or their bodies are
within the radius or rout trapped between it
of suspended load. and the surrounding
Close monitoring to avoid structures.
human entry under the Ensure suspended
suspended load load never leave on
Tag Line must be used an unattended carne.
while guiding handling
the load.