Progress - 06-June-2023
100 3/4" PVC pipe to be buried under floor while filling the border for A/C drain.
101 Shutterinhg for Slab
102 Slab Pouring
103 MZ Floor Brick Work
104 Plaster
105 Repair Works
106 Brick Work (1 Span of Wall half heighted + 1 Span is on hold due to the Elevation) Discussion/Decision Required
107 Plaster Work (Walls)
109 Plaster Couving (Walls) Will be done during Paintjob
Corridor 8'
110 Floor Border & Couving
111 Floor Scratching/Finishing Polishing
112 Repair Works
The top layer of black chip already poured in Executive Change Room would be scrapped off and would
114
be poured witht the White Chips.
115 Plaster Work (Walls)
116 Floor Border & Couving
117 Plaster Couving (Walls) Will be done during Paintjob
118 Floor Scratching/Finishing Polishing
119 Repair Works
120 Plaster Work (Walls)
121 Floor Border & Couving
122 Plaster Couving (Walls) Will be done during Paintjob
123 Office-1 Floor Scratching/Finishing Polishing
124 Repair Works
125 3/4" PVC pipe to be buried under floor while filling the border for A/C drain.
126 Black Chips in Office is okay but the Borders in and adjacent shall be poured with white chips.
127 Brick Work (1 Partition Remaining)
128 Plaster Work Remaining
129 Floor Border & Couving
Office-2
130 Plaster Couving (Walls) Will be done during Paintjob
131 Floor Scratching/Finishing Polishing
132 Repair Works
133 Brick Work (1 Front Span Remaining)
134 Plaster Work (Walls)
135 Flooring (Decision Yet to be made) Discussion/Decision Required
Reception
136 Plaster Couving (Walls) Will be done during Paintjob
137 Floor Couving
138 Reapair Works
139 Layout
140 Demarcation
141 Stairs Shuttering
142 Pouring
143 Finishing and Repair Works
144 Plaster Work (Walls) 55% Completed
145 Layout and Installation & Construction of Site Sewerage Network
146 Levelling, Dredging & Compaction of Outer Streets
147 External Building Pavement/Concreting of streets Discussion/Decision Required
148 Repair Works
RainWater Drain System & Rain Drain network around the building needs to be further discussed with
149 Discussion/Decision Required
the expert for the calculation of rainwater to be run off and to be taken care of.
150 Door Fixing for 3 Rooms 75% Completed
Exhaist (24" x 24") in Transformer Room near ATS partition & the same size hole needs to done in the
151 Electrical Rooms (Ground
ATS Partition on the opposoite side so that the air flow may be maintained.
Floor)
12Watt Bulbs need to be provisoned to the Transformer/HT Panel Rooms energized by WAPDA & UPS
152
both.