LOGO

A-1
A-2
A-3
A-4
A-5
A-6
A-7
A-8
A-9
A-10
A-11
A-12
A-13
A-14
A-15
A-16
A-17
A-18
A-19
A-20
A-21
A-22
A-23

B-1
B-2
B-3
B-4
B-5
B-6
B-7
B-8

C
C-1
C-2
C-3
C-4
C-5
C-6
C-7
C-8
C-9
C-10
C-11
C-12

D-1
D-2
D-3

E-1
E-2
E-3
E-4
E-5
E-6

E-7

F-1
F-2
F-3
F-4
F-5
F-6
F-7
F-8
F-9
F-10
F-11
F-12
F-13

G-1
G-2
G-3

H-1

H-2

H-3

I-1

I-2

I-3

I-4

I-5

I-6
I-7

L-1

L-2

L-3

L-4

L-5

L-6

L-7

M
M-1
M-2
M-3

M-4

M-5

M-6

M-7

M-8
M-9

M-10

N-1

N-2

N-3

N-4

N-5

N-6
O

O-1

O-2

O-3
O-4
O-5
O-6
O-7
O-8

O-9

P-1

P-2

P-3

P-4

Q-1

Q-2

Q-3

Q-4
Q-5

Q-6

Q-7

R-1

R-2

R-3
R-4
R-5

R-6

R-7

R-8

R-9

R-10

R-11

R-12

R-13

R-14

R-15

R-16

R-17
‫ مشروع انشاء مبني‬Community
‫حصر االعمال الكهربائية بالدور االرضي‬

Sunny SM LIGHT FIXTURES:-

Supply, install connect and test lighting fixtures complete with all required accessories for complete
installation as per drawings and specs

Light fixture model (F1)


Light fixture model (F1E)
Light fixture model (F2)
Light fixture model (F2E)
Light fixture model (F3)
Light fixture model (F4) (Cove light)
Light fixture model (F5)
Light fixture model (F6)
Light fixture model (F6E)
Light fixture model (F7)
Light fixture model (F7E)
Light fixture model (F8)
Light fixture model (F9)
Light fixture model (F10)
Light fixture model (F11)
Light fixture model (F12)
Light fixture model (F12E)
Light fixture model (F13)
Light fixture model (F13E)
Light fixture model (F14)
Light fixture model (F15)
Light fixture model (F15E)
Exit sign complete with13 watt lamp & battery back.

LIGHT SWITCHES
Supply, install connect and test light switches complete including, conduits, conduit fittings,
switches, terminations, earthing, wiring from switches to branch circuit according to specifications
and as shown on drawings.
Switches should be products of :-
One pole, one way one gang 10A modular switch
One pole, one way one gang 10A modular switch (water proof)
One pole, one way two gang 10A modular switch outlet
One pole, one way two gang 10A modular switch outlet(water proof)
One pole, two way one gang 10A modular switch
One pole, two way three gang 10A modular switch
Fan speed control switch
over ride switch with motion sensor

SOCKET OUTLETS
Supply, install, connect and test socket outlets complete including terminations, socket plate, cover,
plugs all necessary accessories and ancillary work according to specification and schedules.

16A wall single socket outlet


16A wall single socket outlet (water proof)
16A wall duplex socket outlet
16A wall duplex socket outlet (water proof)
16A floor duplex socket outlet (water proof)
16A floor( duplex socket outlet at ups+single socket +1data+1tel) at the same floorbox (water
proof)
-Single socket outlet double pole + earth 16A,220V for electric water heater (water proof).
16A Ceiling or wall single socket outlet for camera
16A Ceiling or wall single socket outlet for camera (water proof)
16A Ceiling duplex socket outlet (water proof)
16A floor single socket outlet
16A floor single socket outlet (water proof)

SWITCH FUSE POWER OUTLET

Supply, install, connect and test switch fuses complete including terminations, socket plate, cover,
plugs all necessary accessories and ancillary work according to specification and schedules.

16A switch fuse with two pole.(water proof)


16A switch fuse with two pole above false ceiling.
32A switch fuse with two pole.(water proof)

LIGHTING AND POWER POINTS


Supply, install, connect and test lighting and power points complete including conduits, conduit
fittings, wiring, earthing back to panel board or to branch circuit complete including plaster rings,
wiring, earthing and all necessary ancillary works and materials required for the specified
installation as indicated on the drawings.
Embedded or concealed surface mounted conduits should be rigid U PVC. Exposed mounted
conduits should be heavy gauge galvanized steel.
3x2.5mm² Lighting or fan outlet or Logo
3x4mm² power outlet
3x4mm² water heater outlet
3x4mm² hand dryer outlet
3x4mm² camera outlet
3x6mm² Ac outlet
Supplying, installing AC thermostat outlets back box, pulling steel string, conduits to AC unit
location without control wires and all necessary ancillary works and materials required for the
specified installation as indicated on the drawings.

BRANCH CIRCUIT DISTRIBUTION PANEL BOARDS


Supply, install, connect and test the following panel boards complete with circuit breakers, bus bars
cabinets, conductors relays, residual current devices, indicator lamps and all necessary accessories
and ancillary works required in accordance with the specification, tender drawings & attached
schedules.
BCP-CCL
BCP-ECCL
BCP-CCP
BCP-UCCP
BCP-LSP
BCP-PH (WITH KWH METER)
BCP-SM (WITH KWH METER)
BCP-AR (WITH KWH METER)
BCP-TA (WITH KWH METER)
BCP-LU (WITH KWH METER)
BCP-PPG
UDP-1
UDP-CO

MAIN DISTRIBUTION BOARDS


Supply, Install , connect and test sub-feeder distribution boards with all necessary accessories
circuit breakers, contractors, relays, indicator lamps, cable terminals & all ancillary works required
for complete operative system according to the specifications
MDB (WITH KWH METER)
EMDB
MDB-CIB (WITH KWH METER)

UPS
Supply install, connect and test uninterruptible 40 KVA power supply(ups) 30 minutes complete
including rectifier,control,charger,wave form,earthing and all necessary accessories & all ancillary
works required for complete operative system according to the specifications & as shown on
drawings.
Supply install, connect and test uninterruptible 15 KVA power supply(ups) 30 minutes complete
including rectifier,control,charger,wave form,earthing and all necessary accessories & all ancillary
works required for complete operative system according to the specifications & as shown on
drawings.
Supply install, connect and test uninterruptible 5 KVA power supply(ups) 30 minutes complete
including rectifier,control,charger,wave form,earthing and all necessary accessories & all ancillary
works required for complete operative system according to the specifications & as shown on
drawings.

CABLE FEEDER
Install , connect and test 600/1000V cables . The item shall include all necessary reinforced
concrete cross roads sleeves, warning tape, manholes, conduits, cable trays & covering bricks .
Cable lengths inside the substations are included. The works include excavation, backfilling &
excess soil removal outside the site . The works shall be complete as per the project specifications,
the Egyptian code rules.
Supply Install , connect and test CU PVC/PVC cable [(4x10)mm2 + 10mm2)] and all necessary
accessories and ancillary works required as specified and as shown on drawings.
Supply Install , connect and test CU PVC/PVC cable [(4x16)mm2 + 16mm2)] and all necessary
accessories and ancillary works required as specified and as shown on drawings.
Supply Install , connect and test CU PVC/PVC cable [(3x25+16)mm2 + 16mm2)] and all necessary
accessories and ancillary works required as specified and as shown on drawings.
Supply Install , connect and test CU PVC/PVC cable [(3x70+35)mm2 + 35mm2)] and all necessary
accessories and ancillary works required as specified and as shown on drawings.
Supply Install , connect and test CU PVC/PVC cable [(3x95+50)mm2 + 50mm2)] and all necessary
accessories and ancillary works required as specified and as shown on drawings.
Supply Install , connect and test CU PVC/PVC cable [(3x120+70)mm2 + 70mm2)] and all
necessary accessories and ancillary works required as specified and as shown on drawings.
Supply Install , connect and test CU XLPE/PVC cable [(3x1x120+70)mm2 + 70mm2)] and all
necessary accessories and ancillary works required as specified and as shown on drawings.

POWER EARTHING (GROUNDING) SYSTEM


Furnishing, supplying, installing and testing a complete protective earthing (PE) system complete
with earthing pits, earthing electrodes, equalizer bars, earth continuity conductor, and earthing
conductor to switchboards, diesel generator set and transformers complete with all accessories,
fixing brackets, test links, complete with all accessories, fixing brackets, test links suspensions,
drilling and cutting for complete installation all in accordance with technical specifications and
drawings

NB
Earthing impedance must be <= 2 ohm
LIGHT CURRENT SYSTEM EARTHING (GROUNDING) SYSTEM
Furnishing, supplying, installing and testing a complete protective earthing (PE) system complete
with earthing pits, earthing electrodes, equalizer bars, earth continuity conductor, and earthing
conductor to switchboards, diesel generator set and transformers complete with all accessories,
fixing brackets, test links, complete with all accessories, fixing brackets, test links suspensions,
drilling and cutting for complete installation all in accordance with technical specifications and
drawings

NB
Earthing impedance must be <= 0.5 ohm
TELECOMMUNICATION SYSTEM
Supply, install, connect and test Telephone System complete including conduits, conduit fittings,
Cat 6 cabling, earthing complete including plaster rings, wiring, earthing, terminations, socket
plate, cover, plugs all necessary accessories and ancillary
Supply, install, connect and test socket RJ-45 wall telephone outlets complete including conduits,
conduit fittings, Cat 6 cabling, earthling complete including plaster rings, wiring, earthling,
terminations, socket plate, cover, plugs all necessary acc
Supply, install, connect and test socket RJ-45 wall telephone outlets water proof complete including
conduits, conduit fittings, Cat 6 cabling, earthling complete including plaster rings, wiring,
earthling, terminations, socket plate, cover, plugs all necessary acc
Supply, install, connect and test socket RJ-45 wall data outlets complete including conduits, conduit
fittings, Cat 6 cabling, earthling complete including plaster rings, wiring, earthling, terminations,
socket plate, cover, plugs all necessary acc
Supply, install, connect and test socket RJ-45 wall data outlets water proof complete including
conduits, conduit fittings, Cat 6 cabling, earthling complete including plaster rings, wiring,
earthling, terminations, socket plate, cover, plugs all necessary acc
Supply, install, connect and test socket RJ-45 wall TV outlets complete including conduits, conduit
fittings, Cat 6 cabling, earthling complete including plaster rings, wiring, earthling, terminations,
socket plate, cover, plugs all necessary works according to the specifications & the tender drawings.

Supply, install, connect and test socket RJ-45 wall TV outlets water proof complete including
conduits, conduit fittings, Cat 6 cabling, earthling complete including plaster rings, wiring,
earthling, terminations, socket plate, cover, plugs all necessary works according to the specifications
& the tender drawings.
Supply, install, connect and test main patch panel data rack (3x24) port switch complete as
specified and indicated in the drawings with all necessary termination, conduits,
raceways,switches,servers, patch cords, cables and all necessary accessories required to complete
operation
CCTV SYSTEM
Supplying, installing, connecting and testing CCTV outlets by 75 Ohm RG-6 Co-axial cable
cabling, fire retardant PVC conduits, conduit fittings back to DVR and all necessary accessories and
ancillary materials and works required for complete installation as specified and as indicated on the
drawings.
Fixed wall mounted color camera, indoor type , 540 TVL, Day/Night vision , with wall mount
bracket.
Fixed Dome ceiling mounted color camera, indoor type , 540 TVL, Day/Night vision.
Fixed wall mounted color camera, outdoor type , 540 TVL, Day/Night vision , with wall mount
bracket.
Fixed wall mounted color camera, outdoor type , 540 TVL, Day/Night vision , with wall mount
bracket.
Supply install, connect and test DX4600 entry level DVR,16camera inputs with CDRW,1TB of
storage,MPEG4 compression,CIF,2CIF,4CIF programmable by channel,480IPS,pixel search,4
audio in,1 out, 16 alarm in,4 relay out & all necessary accessories as shown in tender drawings.
Supply install, connect and test DX4600 entry level DVR,8camera inputs with CDRW,1TB of
storage,MPEG4 compression,CIF,2CIF,4CIF programmable by channel,480IPS,pixel search,4
audio in,1 out, 16 alarm in,4 relay out & all necessary accessories as shown in tender drawings.
Supply install, connect and test wall mounted push button control keypad w\three axis variable
speed joystick, provides programming & all necessary accessories as shown in tender drawings.

Supply install, connect and test 32 inch LED monitor& all necessary accessories as shown in tender
drawings.
Supply rack& all necessary accessories as shown in tender drawings.
Supply install, connect and test complete CCTV cable network including all necessary cabling,
raceways & accessories. The item shall be complete with all necessary works according to the
specifications & the tender drawings.

SOUND SYSTEM
Supplying, installing, connecting and testing sound system rack including rack cabinet, power
conditioners, monitor panel , Matrix , monitor panel(s), distribution units, power amplifiers,
internal cabling, interface with fire alarm system and all necessary accessories and ancillary works
and materials required for complete installation as specified and as indicated on the drawings.

Ceiling mounted loud speaker (3/6/12 watts)


Supplying, installing, connecting and testing of sound system outlets including conduits, conduit
fittings, cable trunking, terminations, cabling (2*1.5 mm2), back boxes and all necessary
accessories and ancillary works and materials required for complete installation as shown on the
drawings and Single Line Diagrams and as specified starting from the loudspeakers and back to the
equipment rack.
Supply install, connect and test sound system rack including:'AM/FMTuner, 'Cassette Player,'CD
Player,1 Number Zone Amplifiers (amp 150w),PAGING MICROPHONE The rack shall be
equipped with a preset evacuation message that shall be announced upon receive of a signal from
the fire alarm panel.
Supply install, connect and test sound system rack including:'AM/FMTuner, 'Cassette Player,'CD
Player,1 Number Zone Amplifiers (amp 180w),PAGING MICROPHONE The rack shall be
equipped with a preset evacuation message that shall be announced upon receive of a signal from
the fire alarm panel.
Supply install, connect and test sound system rack including:'AM/FMTuner, 'Cassette Player,'CD
Player,1 Number Zone Amplifiers (amp 50w),PAGING MICROPHONE The rack shall be equipped
with a preset evacuation message that shall be announced upon receive of a signal from the fire
alarm panel.
Volume Control
FIRE ALARM SYSTEM
Supply, installing, connecting & testing fire alarm control system complete including conduits,
conduit fittings , cabling, complete with all necessary accessories and ancillary works as shown on
drawings and as specified in the technical specification in order to provide a complete system up to
the main fire alarm control panel (MFACP) .

Supply, Install , connect and test of UL LISTED main fire addressable alarm station (2 loops)
complete with conduits, conduit fittings, boxes, wiring up to fire alarm detectors, Pc, printer fixing
and all necessary accessories and ancillary works as specified and as shown on the drawings.

Supply, Install , connect and test of UL LISTED repeater fire addressable alarm station (2 loops)
complete with conduits, conduit fittings, boxes, wiring up to fire alarm detectors, Pc, printer fixing
and all necessary accessories and ancillary works as specified and as shown on the drawings.

Supply, 'Install , connect and test addressable fire alarm optical ceiling smoke detector
Supply, Install , connect and test addressable fire alarm optical heat detector
Supply, 'Install , connect and test addressable break glass manual station
Supply, Install , connect and test addressable fire alarm siren
Supply, 'Install , connect and test addressable control modules
Supply, Install , connect and test addressable monitor modules
Supply, install, connect and test of fire alarm circuits serving the shown detectors complete with
duct banks, raceways & raceways supports. The works may include excavation in different soils &
backfilling complete with inspection manholes.

AUTOMATIC CALLING SYSTEM

'Supply install, connect and test automatic calling system The item shall include conduits, conduit
fittings , cabling, complete with all necessary accessories and ancillary works as shown on drawings
and as specified in the technical specification in order to provide a complete system.

Supply install, connect and test counter display connect to main panel & all ancillary works required
for complete operative system according to the specifications & as shown on drawings.
Supply install, connect and test 'Ceiling mounted loud speaker (3/6/12 watts) connect to main panel
& all ancillary works required for complete operative system according to the specifications & as
shown on drawings.
'Supply install, connect and test main rack of calling system complete with all necessary accessories
and ancillary works as shown on drawings and as specified in the technical specification in order to
provide a complete system.

ACCESS CONTROL SYSTEM :-


Supply install, connect and test access control system complete including head end equipments.
The item shall include conduits, conduit fittings , cabling, complete with all necessary accessories
and ancillary works as shown on drawings and as specified in the technical specification in order to
provide a complete system.
Supply install, connect and test one door access control interface module connect to main panel &
all ancillary works required for complete operative system according to the specifications & as
shown on drawings.
Supply install, connect and test request to exit push buttons & all ancillary works required for
complete operative system according to the specifications & as shown on drawings.
Supply install, connect and test electro magnetic lock & all ancillary works required for complete
operative system according to the specifications & as shown on drawings.
Supply install, connect and test emergency exit break glass&sounders& all ancillary works required
for complete operative system according to the specifications & as shown on drawings.

Supply install, connect and test proximity card reader with pin code& all ancillary works required
for complete operative system according to the specifications & as shown on drawings.
Supply install, connect and test proximity card & all ancillary works required for complete operative
system according to the specifications & as shown on drawings.

INTRUSION SYSTEM
'Supply install, connect and test secuirity system The item shall include conduits, conduit
fittings , cabling, complete with all necessary accessories and ancillary works as shown on drawings
and as specified in the technical specification in order to provide a complete system.
Supply install, connect and test main security alarm complete with power supply , backup battery ,
auto dailler & all ancillary works required for complete operative system according to the
specifications & as shown on drawings.
Supply install, connect and test 8 zone expantion module& all ancillary works required for complete
operative system according to the specifications & as shown on drawings.
Supply install, connect and test intgrated software
Supply install, connect and test keypad controller& all ancillary works required for complete
operative system according to the specifications & as shown on drawings.
Supply install, connect and test communication module& all ancillary works required for complete
operative system according to the specifications & as shown on drawings.
Supply install, connect and test alarm outdoor strobe siren(ADI)& all ancillary works required for
complete operative system according to the specifications & as shown on drawings.
Supply install, connect and test panic button(Enforcer)& all ancillary works required for complete
operative system according to the specifications & as shown on drawings.
Supply install, connect and test breake glass sensor & all ancillary works required for complete
operative system according to the specifications & as shown on drawings.
Supply install, connect and test wall vibraton detector & all ancillary works required for complete
operative system according to the specifications & as shown on drawings.
Supply install, connect and test celling vibraton detector & all ancillary works required for complete
operative system according to the specifications & as shown on drawings.
Supply install, connect and test floor vibraton detector & all ancillary works required for complete
operative system according to the specifications & as shown on drawings.
Supply install, connect and test motion detector & all ancillary works required for complete
operative system according to the specifications & as shown on drawings.
Supply install, connect and test knee rail switch& all ancillary works required for complete
operative system according to the specifications & as shown on drawings.
Supply install, connect and test indoor break glass& all ancillary works required for complete
operative system according to the specifications & as shown on drawings.
Supply install, connect and test PC computer with LCD 23 inch monitor IBM compatible, Graphic
presentation software & all ancillary works required for complete operative system according to the
specifications & as shown on drawings.
Supplying, installing, connecting and testing of sound system outlets including conduits, conduit
fittings, cable trunking, terminations, cabling (2*1.5 mm2), back boxes and all necessary
accessories and ancillary works and materials required for complete installation as shown on the
drawings and Single Line Diagrams and as specified starting from the loudspeakers and back to the
equipment rack.

TOTAL ELECTRICAL WORKS


‫مشروع انشاء مبني‬
LOGO ‫الكهربائية بالدور االرضي‬

Public Area CIB Bank Laundry Tabibi Argela Café Pharmacy PH


‫‪LOGO‬‬

‫حصر الدور‬
‫االرضي‬

‫‪123‬‬
‫‪0‬‬
‫‪65‬‬
‫‪0‬‬
‫‪28‬‬

‫‪9‬‬
‫‪122‬‬
‫‪0‬‬
‫‪19‬‬
‫‪0‬‬
‫‪84‬‬
‫‪42‬‬
‫‪11‬‬
‫‪47‬‬
‫‪4‬‬
‫‪0‬‬
‫‪4‬‬
‫‪0‬‬
‫‪28‬‬
‫‪28‬‬
‫‪0‬‬
‫‪17‬‬

‫‪35‬‬
‫‪4‬‬
‫‪1‬‬
‫‪1‬‬
‫‪1‬‬
‫‪2‬‬
‫‪1‬‬
LOGO

A-1
A-2
A-3
A-4
A-5
A-6
A-7
A-8
A-9
A-10
A-11
A-12
A-13
A-14
A-15
A-16
A-17
A-18
A-19
A-20
A-21
A-22
A-23

B-1
B-2
B-3
B-4
B-5
B-6
B-7
B-8
C

C-1
C-2
C-3
C-4
C-5
C-6
C-7
C-8
C-9
C-10
C-11
C-12

D-1
D-2
D-3

E-1
E-2
E-3
E-4
E-5
E-6

E-7

F-1
F-2
F-3
F-4
F-5
F-6
F-7
F-8
F-9
F-10
F-11
F-12
F-13

G-1
G-2
G-3

H-1

H-2

H-3

I-1

I-2

I-3

I-4

I-5
I-6

I-7

L-1

L-2

L-3

L-4

L-5

L-6

L-7

M
M-1
M-2
M-3

M-4

M-5

M-6

M-7

M-8
M-9

M-10

N-1

N-2

N-3

N-4

N-5

N-6
O

O-1

O-2

O-3
O-4
O-5
O-6
O-7
O-8

O-9
‫ مشروع انشاء مبني‬Community
‫نسب صرف البنود‬

‫اعمال السقف‬
LIGHT FIXTURES:-
Supply, install connect and test lighting fixtures complete with all required accessories for complete
installation as per drawings and specs

0% Light fixture model (F1)


0% Light fixture model (F1E)
0% Light fixture model (F2)
0% Light fixture model (F2E)
0% Light fixture model (F3)
0% Light fixture model (F4) (Cove light)
0% Light fixture model (F5)
0% Light fixture model (F6)
0% Light fixture model (F6E)
0% Light fixture model (F7)
0% Light fixture model (F7E)
0% Light fixture model (F8)
0% Light fixture model (F9)
0% Light fixture model (F10)
0% Light fixture model (F11)
0% Light fixture model (F12)
0% Light fixture model (F12E)
0% Light fixture model (F13)
0% Light fixture model (F13E)
0% Light fixture model (F14)
0% Light fixture model (F15)
0% Light fixture model (F15E)
0% Exit sign complete with13 watt lamp & battery back.

LIGHT SWITCHES
Supply, install connect and test light switches complete including, conduits, conduit fittings,
switches, terminations, earthing, wiring from switches to branch circuit according to specifications
and as shown on drawings.
Switches should be products of :-
0% One pole, one way one gang 10A modular switch
0% One pole, one way one gang 10A modular switch (water proof)
0% One pole, one way two gang 10A modular switch outlet
0% One pole, one way two gang 10A modular switch outlet(water proof)
0% One pole, two way one gang 10A modular switch
0% One pole, two way three gang 10A modular switch
0% Fan speed control switch
0% over ride switch with motion sensor
SOCKET OUTLETS
Supply, install, connect and test socket outlets complete including terminations, socket plate, cover,
plugs all necessary accessories and ancillary work according to specification and schedules.

0% 16A wall single socket outlet


0% 16A wall single socket outlet (water proof)
0% 16A wall duplex socket outlet
0% 16A wall duplex socket outlet (water proof)
0% 16A floor duplex socket outlet (water proof)
16A floor( duplex socket outlet at ups+single socket +1data+1tel) at the same floorbox (water
0% proof)
0% -Single socket outlet double pole + earth 16A,220V for electric water heater (water proof).
0% 16A Ceiling or wall single socket outlet for camera
0% 16A Ceiling or wall single socket outlet for camera (water proof)
0% 16A Ceiling duplex socket outlet (water proof)
0% 16A floor single socket outlet
0% 16A floor single socket outlet (water proof)

SWITCH FUSE POWER OUTLET

Supply, install, connect and test switch fuses complete including terminations, socket plate, cover,
plugs all necessary accessories and ancillary work according to specification and schedules.

0% 16A switch fuse with two pole.(water proof)


0% 16A switch fuse with two pole above false ceiling.
0% 32A switch fuse with two pole.(water proof)

LIGHTING AND POWER POINTS


Supply, install, connect and test lighting and power points complete including conduits, conduit
fittings, wiring, earthing back to panel board or to branch circuit complete including plaster rings,
wiring, earthing and all necessary ancillary works and materials required for the specified
installation as indicated on the drawings.
Embedded or concealed surface mounted conduits should be rigid U PVC. Exposed mounted
conduits should be heavy gauge galvanized steel.
20% 3x2.5mm² Lighting or fan outlet or Logo
20% 3x4mm² power outlet
20% 3x4mm² water heater outlet
20% 3x4mm² hand dryer outlet
20% 3x4mm² camera outlet
20% 3x6mm² Ac outlet
Supplying, installing AC thermostat outlets back box, pulling steel string, conduits to AC unit
location without control wires and all necessary ancillary works and materials required for the
specified installation as indicated on the drawings.

BRANCH CIRCUIT DISTRIBUTION PANEL BOARDS


Supply, install, connect and test the following panel boards complete with circuit breakers, bus bars
cabinets, conductors relays, residual current devices, indicator lamps and all necessary accessories
and ancillary works required in accordance with the specification, tender drawings & attached
schedules.
0% BCP-CCL
0% BCP-ECCL
0% BCP-CCP
0% BCP-UCCP
0% BCP-LSP
0% BCP-PH (WITH KWH METER)
0% BCP-SM (WITH KWH METER)
0% BCP-AR (WITH KWH METER)
0% BCP-TA (WITH KWH METER)
0% BCP-LU (WITH KWH METER)
0% BCP-PPG
0% UDP-1
0% UDP-CO

MAIN DISTRIBUTION BOARDS


Supply, Install , connect and test sub-feeder distribution boards with all necessary accessories
circuit breakers, contractors, relays, indicator lamps, cable terminals & all ancillary works required
for complete operative system according to the specifications
0% MDB (WITH KWH METER)
0% EMDB
0% MDB-CIB (WITH KWH METER)

UPS
Supply install, connect and test uninterruptible 40 KVA power supply(ups) 30 minutes complete
including rectifier,control,charger,wave form,earthing and all necessary accessories & all ancillary
0% works required for complete operative system according to the specifications & as shown on
drawings.
Supply install, connect and test uninterruptible 15 KVA power supply(ups) 30 minutes complete
including rectifier,control,charger,wave form,earthing and all necessary accessories & all ancillary
0% works required for complete operative system according to the specifications & as shown on
drawings.
Supply install, connect and test uninterruptible 5 KVA power supply(ups) 30 minutes complete
including rectifier,control,charger,wave form,earthing and all necessary accessories & all ancillary
0% works required for complete operative system according to the specifications & as shown on
drawings.

CABLE FEEDER
Install , connect and test 600/1000V cables . The item shall include all necessary reinforced
concrete cross roads sleeves, warning tape, manholes, conduits, cable trays & covering bricks .
Cable lengths inside the substations are included. The works include excavation, backfilling &
excess soil removal outside the site . The works shall be complete as per the project specifications,
the Egyptian code rules.
Supply Install , connect and test CU PVC/PVC cable [(4x10)mm2 + 10mm2)] and all necessary
0% accessories and ancillary works required as specified and as shown on drawings.
Supply Install , connect and test CU PVC/PVC cable [(4x16)mm2 + 16mm2)] and all necessary
0% accessories and ancillary works required as specified and as shown on drawings.
Supply Install , connect and test CU PVC/PVC cable [(3x25+16)mm2 + 16mm2)] and all necessary
0% accessories and ancillary works required as specified and as shown on drawings.
Supply Install , connect and test CU PVC/PVC cable [(3x70+35)mm2 + 35mm2)] and all necessary
0% accessories and ancillary works required as specified and as shown on drawings.
Supply Install , connect and test CU PVC/PVC cable [(3x95+50)mm2 + 50mm2)] and all necessary
0% accessories and ancillary works required as specified and as shown on drawings.
Supply Install , connect and test CU PVC/PVC cable [(3x120+70)mm2 + 70mm2)] and all
0% necessary accessories and ancillary works required as specified and as shown on drawings.
Supply Install , connect and test CU XLPE/PVC cable [(3x1x120+70)mm2 + 70mm2)] and all
0% necessary accessories and ancillary works required as specified and as shown on drawings.

POWER EARTHING (GROUNDING) SYSTEM


Furnishing, supplying, installing and testing a complete protective earthing (PE) system complete
with earthing pits, earthing electrodes, equalizer bars, earth continuity conductor, and earthing
conductor to switchboards, diesel generator set and transformers complete with all accessories,
0% fixing brackets, test links, complete with all accessories, fixing brackets, test links suspensions,
drilling and cutting for complete installation all in accordance with technical specifications and
drawings

NB
Earthing impedance must be <= 2 ohm
LIGHT CURRENT SYSTEM EARTHING (GROUNDING) SYSTEM
Furnishing, supplying, installing and testing a complete protective earthing (PE) system complete
with earthing pits, earthing electrodes, equalizer bars, earth continuity conductor, and earthing
conductor to switchboards, diesel generator set and transformers complete with all accessories,
0% fixing brackets, test links, complete with all accessories, fixing brackets, test links suspensions,
drilling and cutting for complete installation all in accordance with technical specifications and
drawings

NB
Earthing impedance must be <= 0.5 ohm
TELECOMMUNICATION SYSTEM
Supply, install, connect and test Telephone System complete including conduits, conduit fittings,
Cat 6 cabling, earthing complete including plaster rings, wiring, earthing, terminations, socket
plate, cover, plugs all necessary accessories and ancillary
Supply, install, connect and test socket RJ-45 wall telephone outlets complete including conduits,
20% conduit fittings, Cat 6 cabling, earthling complete including plaster rings, wiring, earthling,
terminations, socket plate, cover, plugs all necessary acc
Supply, install, connect and test socket RJ-45 wall telephone outlets water proof complete including
20% conduits, conduit fittings, Cat 6 cabling, earthling complete including plaster rings, wiring,
earthling, terminations, socket plate, cover, plugs all necessary acc
Supply, install, connect and test socket RJ-45 wall data outlets complete including conduits, conduit
20% fittings, Cat 6 cabling, earthling complete including plaster rings, wiring, earthling, terminations,
socket plate, cover, plugs all necessary acc
Supply, install, connect and test socket RJ-45 wall data outlets water proof complete including
20% conduits, conduit fittings, Cat 6 cabling, earthling complete including plaster rings, wiring,
earthling, terminations, socket plate, cover, plugs all necessary acc
Supply, install, connect and test socket RJ-45 wall TV outlets complete including conduits, conduit
fittings, Cat 6 cabling, earthling complete including plaster rings, wiring, earthling, terminations,
20% socket plate, cover, plugs all necessary works according to the specifications & the tender drawings.

Supply, install, connect and test socket RJ-45 wall TV outlets water proof complete including
conduits, conduit fittings, Cat 6 cabling, earthling complete including plaster rings, wiring,
20% earthling, terminations, socket plate, cover, plugs all necessary works according to the specifications
& the tender drawings.
Supply, install, connect and test main patch panel data rack (3x24) port switch complete as
specified and indicated in the drawings with all necessary termination, conduits,
0% raceways,switches,servers, patch cords, cables and all necessary accessories required to complete
operation
CCTV SYSTEM
Supplying, installing, connecting and testing CCTV outlets by 75 Ohm RG-6 Co-axial cable
cabling, fire retardant PVC conduits, conduit fittings back to DVR and all necessary accessories and
20% ancillary materials and works required for complete installation as specified and as indicated on the
drawings.
Fixed wall mounted color camera, indoor type , 540 TVL, Day/Night vision , with wall mount
0% bracket.
0% Fixed Dome ceiling mounted color camera, indoor type , 540 TVL, Day/Night vision.
Fixed wall mounted color camera, outdoor type , 540 TVL, Day/Night vision , with wall mount
0% bracket.
Fixed wall mounted color camera, outdoor type , 540 TVL, Day/Night vision , with wall mount
0% bracket.
Supply install, connect and test DX4600 entry level DVR,16camera inputs with CDRW,1TB of
0% storage,MPEG4 compression,CIF,2CIF,4CIF programmable by channel,480IPS,pixel search,4
audio in,1 out, 16 alarm in,4 relay out & all necessary accessories as shown in tender drawings.
Supply install, connect and test DX4600 entry level DVR,8camera inputs with CDRW,1TB of
0% storage,MPEG4 compression,CIF,2CIF,4CIF programmable by channel,480IPS,pixel search,4
audio in,1 out, 16 alarm in,4 relay out & all necessary accessories as shown in tender drawings.
Supply install, connect and test wall mounted push button control keypad w\three axis variable
0% speed joystick, provides programming & all necessary accessories as shown in tender drawings.

Supply install, connect and test 32 inch LED monitor& all necessary accessories as shown in tender
0% drawings.
0% Supply rack& all necessary accessories as shown in tender drawings.
Supply install, connect and test complete CCTV cable network including all necessary cabling,
20% raceways & accessories. The item shall be complete with all necessary works according to the
specifications & the tender drawings.

SOUND SYSTEM
Supplying, installing, connecting and testing sound system rack including rack cabinet, power
conditioners, monitor panel , Matrix , monitor panel(s), distribution units, power amplifiers,
0% internal cabling, interface with fire alarm system and all necessary accessories and ancillary works
and materials required for complete installation as specified and as indicated on the drawings.

0% Ceiling mounted loud speaker (3/6/12 watts)


Supplying, installing, connecting and testing of sound system outlets including conduits, conduit
fittings, cable trunking, terminations, cabling (2*1.5 mm2), back boxes and all necessary
20% accessories and ancillary works and materials required for complete installation as shown on the
drawings and Single Line Diagrams and as specified starting from the loudspeakers and back to the
equipment rack.
Supply install, connect and test sound system rack including:'AM/FMTuner, 'Cassette Player,'CD
Player,1 Number Zone Amplifiers (amp 150w),PAGING MICROPHONE The rack shall be
0% equipped with a preset evacuation message that shall be announced upon receive of a signal from
the fire alarm panel.
Supply install, connect and test sound system rack including:'AM/FMTuner, 'Cassette Player,'CD
Player,1 Number Zone Amplifiers (amp 180w),PAGING MICROPHONE The rack shall be
0% equipped with a preset evacuation message that shall be announced upon receive of a signal from
the fire alarm panel.
Supply install, connect and test sound system rack including:'AM/FMTuner, 'Cassette Player,'CD
Player,1 Number Zone Amplifiers (amp 50w),PAGING MICROPHONE The rack shall be equipped
0% with a preset evacuation message that shall be announced upon receive of a signal from the fire
alarm panel.
0% Volume Control
FIRE ALARM SYSTEM
Supply, installing, connecting & testing fire alarm control system complete including conduits,
conduit fittings , cabling, complete with all necessary accessories and ancillary works as shown on
drawings and as specified in the technical specification in order to provide a complete system up to
the main fire alarm control panel (MFACP) .

Supply, Install , connect and test of UL LISTED main fire addressable alarm station (2 loops)
0% complete with conduits, conduit fittings, boxes, wiring up to fire alarm detectors, Pc, printer fixing
and all necessary accessories and ancillary works as specified and as shown on the drawings.

Supply, Install , connect and test of UL LISTED repeater fire addressable alarm station (2 loops)
0% complete with conduits, conduit fittings, boxes, wiring up to fire alarm detectors, Pc, printer fixing
and all necessary accessories and ancillary works as specified and as shown on the drawings.

0% Supply, 'Install , connect and test addressable fire alarm optical ceiling smoke detector
0% Supply, Install , connect and test addressable fire alarm optical heat detector
0% Supply, 'Install , connect and test addressable break glass manual station
0% Supply, Install , connect and test addressable fire alarm siren
0% Supply, 'Install , connect and test addressable control modules
0% Supply, Install , connect and test addressable monitor modules
Supply, install, connect and test of fire alarm circuits serving the shown detectors complete with
20% duct banks, raceways & raceways supports. The works may include excavation in different soils &
backfilling complete with inspection manholes.

TOTAL ELECTRICAL WORKS


‫مبني‬
‫‪LOGO‬‬

‫سحب االسالك وحوامل‬


‫تركيب االكسسوارات اختبار وتسليم‬ ‫اعمال التبوير‬ ‫االعمال الداخلية‬
‫الكابالت‬

‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬


‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬
‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬
‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬
‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬
‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬
‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬
‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬
‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬
‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬
‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬
‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬
‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬
‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬
‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬
‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬
‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬
‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬
‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬
‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬
‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬
‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬
‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬

‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬


‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬
‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬
‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬
‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬
‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬
‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬
‫‪10%‬‬ ‫‪90%‬‬ ‫‪0%‬‬ ‫‪0%‬‬ ‫‪0%‬‬
10% 90% 0% 0% 0%
10% 90% 0% 0% 0%
10% 90% 0% 0% 0%
10% 90% 0% 0% 0%
10% 90% 0% 0% 0%
10% 90% 0% 0% 0%
10% 90% 0% 0% 0%
10% 90% 0% 0% 0%
10% 90% 0% 0% 0%
10% 90% 0% 0% 0%
10% 90% 0% 0% 0%
10% 90% 0% 0% 0%

10% 90% 0% 0% 0%
10% 90% 0% 0% 0%
10% 90% 0% 0% 0%

10% 0% 0% 40% 30%


10% 0% 0% 40% 30%
10% 0% 0% 40% 30%
10% 0% 0% 40% 30%
10% 0% 0% 40% 30%
10% 0% 0% 40% 30%

10% 0% 30% 0% 60%


10% 0% 30% 0% 60%
10% 0% 30% 0% 60%
10% 0% 30% 0% 60%
10% 0% 30% 0% 60%
10% 0% 30% 0% 60%
10% 0% 30% 0% 60%
10% 0% 30% 0% 60%
10% 0% 30% 0% 60%
10% 0% 30% 0% 60%
10% 0% 30% 0% 60%
10% 0% 30% 0% 60%
10% 0% 30% 0% 60%

10% 0% 30% 0% 60%


10% 0% 30% 0% 60%
10% 0% 30% 0% 60%

10% 90% 0% 0% 0%

10% 90% 0% 0% 0%

10% 90% 0% 0% 0%

10% 0% 30% 60% 0%

10% 0% 30% 60% 0%

10% 0% 30% 60% 0%

10% 0% 30% 60% 0%

10% 0% 30% 60% 0%


10% 0% 30% 60% 0%

10% 0% 30% 60% 0%

10% 90% 0% 0% 0%

10% 90% 0% 0% 0%

10% 20% 0% 30% 20%

10% 20% 0% 30% 20%

10% 20% 0% 30% 20%

10% 20% 0% 30% 20%

10% 20% 0% 30% 20%

10% 20% 0% 30% 20%

10% 90% 0% 0% 0%
10% 0% 0% 40% 20%

10% 90% 0% 0% 0%
10% 90% 0% 0% 0%
10% 90% 0% 0% 0%

10% 90% 0% 0% 0%

10% 90% 0% 0% 0%

10% 90% 0% 0% 0%

10% 90% 0% 0% 0%

10% 90% 0% 0% 0%
10% 90% 0% 0% 0%

10% 0% 0% 50% 20%

10% 90% 0% 0% 0%

10% 90% 0% 0% 0%

10% 0% 0% 40% 30%

10% 90% 0% 0% 0%

10% 90% 0% 0% 0%

10% 90% 0% 0% 0%

10% 90% 0% 0% 0%
10% 0% 30% 0% 60%

10% 0% 30% 0% 60%

10% 90% 0% 0% 0%
10% 90% 0% 0% 0%
10% 90% 0% 0% 0%
10% 90% 0% 0% 0%
10% 90% 0% 0% 0%
10% 90% 0% 0% 0%

10% 0% 10% 30% 30%


Community
‫بيان االع‬ LOGO
‫) ( الدر‬

LIGHT FIXTURES:- A
Supply, install connect and test lighting fixtures complete with all required
accessories for complete installation as per drawings and specs

Light fixture model (F1) A-1


Light fixture model (F1E) A-2
Light fixture model (F2) A-3
Light fixture model (F2E) A-4
Light fixture model (F3) A-5
Light fixture model (F4) (Cove light) A-6
Light fixture model (F5) A-7
Light fixture model (F6) A-8
Light fixture model (F6E) A-9
Light fixture model (F7) A-10
Light fixture model (F7E) A-11
Light fixture model (F8) A-12
Light fixture model (F9) A-13
Light fixture model (F10) A-14
Light fixture model (F11) A-15
Light fixture model (F12) A-16
Light fixture model (F12E) A-17
Light fixture model (F13) A-18
Light fixture model (F13E) A-19
Light fixture model (F14) A-20
Light fixture model (F15) A-21
Light fixture model (F15E) A-22
Exit sign complete with13 watt lamp & battery back. A-23

LIGHT SWITCHES B
Supply, install connect and test light switches complete including, conduits,
conduit fittings, switches, terminations, earthing, wiring from switches to branch
circuit according to specifications and as shown on drawings.
Switches should be products of :-
One pole, one way one gang 10A modular switch B-1
One pole, one way one gang 10A modular switch (water proof) B-2
One pole, one way two gang 10A modular switch outlet B-3
One pole, one way two gang 10A modular switch outlet(water proof) B-4
One pole, two way one gang 10A modular switch B-5
One pole, two way three gang 10A modular switch B-6
Fan speed control switch B-7
over ride switch with motion sensor B-8

SOCKET OUTLETS C
Supply, install, connect and test socket outlets complete including terminations,
socket plate, cover, plugs all necessary accessories and ancillary work according to
specification and schedules.
16A wall single socket outlet C-1
16A wall single socket outlet (water proof) C-2
16A wall duplex socket outlet C-3
16A wall duplex socket outlet (water proof) C-4
16A floor duplex socket outlet (water proof) C-5
16A floor( duplex socket outlet at ups+single socket +1data+1tel) at the same
floorbox (water proof) C-6
-Single socket outlet double pole + earth 16A,220V for electric water heater (water
C-7
proof).
16A Ceiling or wall single socket outlet for camera C-8
16A Ceiling or wall single socket outlet for camera (water proof) C-9
16A Ceiling duplex socket outlet (water proof) C-10
16A floor single socket outlet C-11
16A floor single socket outlet (water proof) C-12

SWITCH FUSE POWER OUTLET D


Supply, install, connect and test switch fuses complete including terminations,
socket plate, cover, plugs all necessary accessories and ancillary work according to
specification and schedules.
16A switch fuse with two pole.(water proof) D-1
16A switch fuse with two pole above false ceiling. D-2
32A switch fuse with two pole.(water proof) D-3

LIGHTING AND POWER POINTS E

Supply, install, connect and test lighting and power points complete including
conduits, conduit fittings, wiring, earthing back to panel board or to branch circuit
complete including plaster rings, wiring, earthing and all necessary ancillary works
and materials required for the specified installation as indicated on the drawings.
Embedded or concealed surface mounted conduits should be rigid U PVC.
Exposed mounted conduits should be heavy gauge galvanized steel.

3x2.5mm² Lighting or fan outlet or Logo E-1

3x2.5mm² Lighting or fan outlet or Logo E-1

3x2.5mm² Lighting or fan outlet or Logo E-1


3x2.5mm² Lighting or fan outlet or Logo E-1

3x4mm² power outlet E-2

3x4mm² water heater outlet E-3

3x4mm² hand dryer outlet E-4

3x4mm² camera outlet E-5

3x6mm² Ac outlet E-6

BRANCH CIRCUIT DISTRIBUTION PANEL BOARDS F


Supply, install, connect and test the following panel boards complete with circuit
breakers, bus bars cabinets, conductors relays, residual current devices, indicator
lamps and all necessary accessories and ancillary works required in accordance
with the specification, tender drawings & attached schedules.

BCP-CCL F-1

BCP-ECCL F-2

BCP-CCP F-3

BCP-LSP F-4

BCP-PH (WITH KWH METER) F-5

BCP-SM (WITH KWH METER) F-6

BCP-AR (WITH KWH METER) F-7

BCP-TA (WITH KWH METER) F-8

BCP-LU (WITH KWH METER) F-9

BCP-PPG F-10

UDP-1 F-11
UDP-CO F-12

MAIN DISTRIBUTION BOARDS G


Supply, Install , connect and test sub-feeder distribution boards with all necessary
accessories circuit breakers, contractors, relays, indicator lamps, cable terminals &
all ancillary works required for complete operative system according to the
specifications

MDB (WITH KWH METER) G-1

MDB-CIB (WITH KWH METER) G-2

UPS H
Supply install, connect and test uninterruptible 40 KVA power supply(ups) 30
minutes complete including rectifier,control,charger,wave form,earthing and all
necessary accessories & all ancillary works required for complete operative system H-1
according to the specifications & as shown on drawings.
Supply install, connect and test uninterruptible 15 KVA power supply(ups) 30
minutes complete including rectifier,control,charger,wave form,earthing and all
necessary accessories & all ancillary works required for complete operative system H-2
according to the specifications & as shown on drawings.
Supply install, connect and test uninterruptible 5 KVA power supply(ups) 30
minutes complete including rectifier,control,charger,wave form,earthing and all
necessary accessories & all ancillary works required for complete operative system H-3
according to the specifications & as shown on drawings.

CABLE FEEDER I
Install , connect and test 600/1000V cables . The item shall include all necessary
reinforced concrete cross roads sleeves, warning tape, manholes, conduits, cable
trays & covering bricks . Cable lengths inside the substations are included. The
works include excavation, backfilling & excess soil removal outside the site . The
works shall be complete as per the project specifications, the Egyptian code rules.

Supply Install , connect and test CU PVC/PVC cable [(4x10)mm2 + 10mm2)] and
all necessary accessories and ancillary works required as specified and as shown on I-1
drawings.

Supply Install , connect and test CU PVC/PVC cable [(4x16)mm2 + 16mm2)] and
all necessary accessories and ancillary works required as specified and as shown on I-2
drawings.

Supply Install , connect and test CU PVC/PVC cable [(3x25+16)mm2 + 16mm2)]


and all necessary accessories and ancillary works required as specified and as I-3
shown on drawings.

Supply Install , connect and test CU PVC/PVC cable [(3x70+35)mm2 + 35mm2)]


and all necessary accessories and ancillary works required as specified and as I-4
shown on drawings.
Supply Install , connect and test CU PVC/PVC cable [(3x70+35)mm2 + 35mm2)]
and all necessary accessories and ancillary works required as specified and as I-4
shown on drawings.

Supply Install , connect and test CU PVC/PVC cable [(3x95+50)mm2 + 50mm2)]


and all necessary accessories and ancillary works required as specified and as I-5
shown on drawings.

Supply Install , connect and test CU PVC/PVC cable [(3x120+70)mm2 + 70mm2)]


and all necessary accessories and ancillary works required as specified and as I-6
shown on drawings.

Supply Install , connect and test CU XLPE/PVC cable [(3x1x120+70)mm2 +


70mm2)] and all necessary accessories and ancillary works required as specified I-7
and as shown on drawings

POWER EARTHING (GROUNDING) SYSTEM J


Furnishing, supplying, installing and testing a complete protective earthing (PE)
system complete with earthing pits, earthing electrodes, equalizer bars, earth
continuity conductor, and earthing conductor to switchboards, diesel generator set
and transformers complete with all accessories, fixing brackets, test links, complete
with all accessories, fixing brackets, test links suspensions, drilling and cutting for
complete installation all in accordance with technical specifications and drawings

NB
Earthing impedance must be <= 2 ohm
LIGHT CURRENT SYSTEM EARTHING (GROUNDING) SYSTEM K
Furnishing, supplying, installing and testing a complete protective earthing (PE)
system complete with earthing pits, earthing electrodes, equalizer bars, earth
continuity conductor, and earthing conductor to switchboards, diesel generator set
and transformers complete with all accessories, fixing brackets, test links, complete
with all accessories, fixing brackets, test links suspensions, drilling and cutting for
complete installation all in accordance with technical specifications and drawings

NB
Earthing impedance must be <= 0.5 ohm
TELECOMMUNICATION SYSTEM L
Supply, install, connect and test Telephone System complete including conduits,
conduit fittings, Cat 6 cabling, earthing complete including plaster rings, wiring,
earthing, terminations, socket plate, cover, plugs all necessary accessories and
ancillary

Supply, install, connect and test socket RJ-45 wall telephone outlets complete
including conduits, conduit fittings, Cat 6 cabling, earthling complete including
L-1
plaster rings, wiring, earthling, terminations, socket plate, cover, plugs all necessary
acc

Supply, install, connect and test socket RJ-45 wall telephone outlets water proof
complete including conduits, conduit fittings, Cat 6 cabling, earthling complete
L-2
including plaster rings, wiring, earthling, terminations, socket plate, cover, plugs all
necessary acc
Supply, install, connect and test socket RJ-45 wall data outlets complete including
conduits, conduit fittings, Cat 6 cabling, earthling complete including plaster rings, L-3
wiring, earthling, terminations, socket plate, cover, plugs all necessary acc

Supply, install, connect and test socket RJ-45 wall data outlets water proof
complete including conduits, conduit fittings, Cat 6 cabling, earthling complete
including plaster rings, wiring, earthling, terminations, socket plate, cover, plugs all L-4
necessary acc
Supply, install, connect and test socket RJ-45 wall TV outlets complete including
conduits, conduit fittings, Cat 6 cabling, earthling complete including plaster rings,
wiring, earthling, terminations, socket plate, cover, plugs all necessary works L-5
according to the specifications & the tender drawings.
Supply, install, connect and test socket RJ-45 wall TV outlets water proof
complete including conduits, conduit fittings, Cat 6 cabling, earthling complete
including plaster rings, wiring, earthling, terminations, socket plate, cover, plugs all L-6
necessary works according to the specifications & the tender drawings.

Supply, install, connect and test main patch panel data rack (3x24) port switch
complete as specified and indicated in the drawings with all necessary termination,
conduits, raceways,switches,servers, patch cords, cables and all necessary L-7
accessories required to complete operation
CCTV SYSTEM M
Supplying, installing, connecting and testing CCTV outlets by 75 Ohm RG-6 Co-
axial cable cabling, fire retardant PVC conduits, conduit fittings back to DVR and
all necessary accessories and ancillary materials and works required for complete
installation as specified and as indicated on the drawings.
Fixed wall mounted color camera, indoor type , 540 TVL, Day/Night vision , with
M-1
wall mount bracket.
Fixed Dome ceiling mounted color camera, indoor type , 540 TVL, Day/Night
M-2
vision.
Fixed wall mounted color camera, outdoor type , 540 TVL, Day/Night vision , with
M-3
wall mount bracket.
Fixed wall mounted color camera, outdoor type , 540 TVL, Day/Night vision , with
M-4
wall mount bracket.
Supply install, connect and test DX4600 entry level DVR,16camera inputs with
CDRW,1TB of storage,MPEG4 compression,CIF,2CIF,4CIF programmable by
M-5
channel,480IPS,pixel search,4 audio in,1 out, 16 alarm in,4 relay out & all
necessary accessories as shown in tender drawings.
Supply install, connect and test DX4600 entry level DVR,8camera inputs with
CDRW,1TB of storage,MPEG4 compression,CIF,2CIF,4CIF programmable by
channel,480IPS,pixel search,4 audio in,1 out, 16 alarm in,4 relay out & all M-6
necessary accessories as shown in tender drawings.
Supply install, connect and test wall mounted push button control keypad w\three
axis variable speed joystick, provides programming & all necessary accessories as M-7
shown in tender drawings.
Supply install, connect and test 32 inch LED monitor& all necessary accessories as
M-8
shown in tender drawings.
Supply rack& all necessary accessories as shown in tender drawings. M-9
Supply install, connect and test complete CCTV cable network including all
necessary cabling, raceways & accessories. The item shall be complete with all M-10
necessary works according to the specifications & the tender drawings.
SOUND SYSTEM N
Supplying, installing, connecting and testing sound system rack including rack
cabinet, power conditioners, monitor panel , Matrix , monitor panel(s), distribution
units, power amplifiers, internal cabling, interface with fire alarm system and all
necessary accessories and ancillary works and materials required for complete
installation as specified and as indicated on the drawings.

Ceiling mounted loud speaker (3/6/12 watts) N-1

Supplying, installing, connecting and testing of sound system outlets including


conduits, conduit fittings, cable trunking, terminations, cabling (2*1.5 mm2), back N-2
boxes and all necessary accessories and ancillary works and materials required for
complete installation as shown on the drawings and Single Line Diagrams and as
specified starting from the loudspeakers and back to the equipment rack.
Supply install, connect and test sound system rack including:'AM/FMTuner,
'Cassette Player,'CD Player,1 Number Zone Amplifiers (amp 150w),PAGING
MICROPHONE The rack shall be equipped with a preset evacuation message that N-3
shall be announced upon receive of a signal from the fire alarm panel.
Supply install, connect and test sound system rack including:'AM/FMTuner,
'Cassette Player,'CD Player,1 Number Zone Amplifiers (amp 180w),PAGING
MICROPHONE The rack shall be equipped with a preset evacuation message that N-4
shall be announced upon receive of a signal from the fire alarm panel.
Supply install, connect and test sound system rack including:'AM/FMTuner,
'Cassette Player,'CD Player,1 Number Zone Amplifiers (amp 50w),PAGING
MICROPHONE The rack shall be equipped with a preset evacuation message that N-5
shall be announced upon receive of a signal from the fire alarm panel.
Volume Control N-6

FIRE ALARM SYSTEM O


Supply, installing, connecting & testing fire alarm control system complete
including conduits, conduit fittings , cabling, complete with all necessary
accessories and ancillary works as shown on drawings and as specified in the
technical specification in order to provide a complete system up to the main fire
alarm control panel (MFACP) .
Supply, Install , connect and test of UL LISTED main fire addressable alarm station
(2 loops) complete with conduits, conduit fittings, boxes, wiring up to fire alarm
O-1
detectors, Pc, printer fixing and all necessary accessories and ancillary works as
specified and as shown on the drawings.
Supply, Install , connect and test of UL LISTED repeater fire addressable alarm
station (2 loops) complete with conduits, conduit fittings, boxes, wiring up to fire
O-2
alarm detectors, Pc, printer fixing and all necessary accessories and ancillary works
as specified and as shown on the drawings.
Supply, 'Install , connect and test addressable fire alarm optical ceiling smoke
O-3
detector
Supply, Install , connect and test addressable fire alarm optical heat detector O-4
Supply, 'Install , connect and test addressable break glass manual station O-5
Supply, Install , connect and test addressable fire alarm siren O-6
Supply, 'Install , connect and test addressable control modules O-7
Supply, Install , connect and test addressable monitor modules O-8
Supply, install, connect and test of fire alarm circuits serving the shown detectors
complete with duct banks, raceways & raceways supports. The works may include
excavation in different soils & backfilling complete with inspection manholes. O-9

TOTAL ELECTRICAL WORKS


‫‪ Community‬مشروع انشاء مبني‬
‫بيان االعمال الكهربائية‬
‫) ( الدراجه بمستخلص‬

‫حصر الدور‬
‫عدد الدور االرضي حصر الدور االول عدد الدور االول‬ ‫نشاط البند‬ ‫الوحدة‬
‫االرضي‬

‫‪123‬‬ ‫تركيب االكسسوارات‬ ‫‪No.‬‬


‫‪0‬‬ ‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫‪65‬‬ ‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫‪0‬‬ ‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫‪28‬‬ ‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫‪60‬‬ ‫تركيب االكسسوارات‬ ‫‪Mt‬‬
‫‪9‬‬ ‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫‪122‬‬ ‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫‪0‬‬ ‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫‪19‬‬ ‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫‪0‬‬ ‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫‪84‬‬ ‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫‪42‬‬ ‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫‪11‬‬ ‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫‪47‬‬ ‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫‪4‬‬ ‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫‪0‬‬ ‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫‪4‬‬ ‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫‪0‬‬ ‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫‪28‬‬ ‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫‪28‬‬ ‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫‪0‬‬ ‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫‪17‬‬ ‫تركيب االكسسوارات‬ ‫‪No.‬‬

‫‪35‬‬ ‫تركيب االكسسوارات‬ ‫‪No.‬‬


‫‪4‬‬ ‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫‪1‬‬ ‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫‪1‬‬ ‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫‪1‬‬ ‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫‪2‬‬ ‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫‪1‬‬ ‫تركيب االكسسوارات‬ ‫‪No.‬‬

‫تركيب االكسسوارات‬ ‫‪No.‬‬


‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫تركيب االكسسوارات‬ ‫‪No.‬‬

‫تركيب االكسسوارات‬ ‫‪No.‬‬

‫تركيب االكسسوارات‬ ‫‪No.‬‬

‫تركيب االكسسوارات‬ ‫‪No.‬‬


‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫تركيب االكسسوارات‬ ‫‪No.‬‬

‫تركيب االكسسوارات‬ ‫‪No.‬‬


‫تركيب االكسسوارات‬ ‫‪No.‬‬
‫تركيب االكسسوارات‬ ‫‪No.‬‬

‫‪30‬‬ ‫‪115‬‬ ‫‪5‬‬ ‫‪122‬‬ ‫أعمال السقف‬


‫‪10‬‬ ‫‪115‬‬ ‫‪5‬‬ ‫‪122‬‬ ‫االعمال الداخلية‬ ‫‪No.‬‬
‫‪6‬‬ ‫‪115‬‬ ‫‪2‬‬ ‫‪122‬‬ ‫سحب االسالك‬
‫‪35‬‬ ‫‪115‬‬ ‫‪12‬‬ ‫‪122‬‬ ‫أعمال السقف‬
‫‪18‬‬ ‫‪115‬‬ ‫‪8‬‬ ‫‪122‬‬ ‫االعمال الداخلية‬ ‫‪No.‬‬
‫‪13‬‬ ‫‪115‬‬ ‫‪8‬‬ ‫‪122‬‬ ‫سحب االسالك‬
‫‪40‬‬ ‫‪115‬‬ ‫‪15‬‬ ‫‪122‬‬ ‫أعمال السقف‬
‫‪30‬‬ ‫‪115‬‬ ‫‪12‬‬ ‫‪122‬‬ ‫االعمال الداخلية‬ ‫‪No.‬‬
‫‪25‬‬ ‫‪115‬‬ ‫‪10‬‬ ‫‪122‬‬ ‫سحب االسالك‬
‫‪40‬‬ ‫‪115‬‬ ‫‪15‬‬ ‫‪122‬‬ ‫أعمال السقف‬
‫‪40‬‬ ‫‪115‬‬ ‫‪15‬‬ ‫‪122‬‬ ‫االعمال الداخلية‬ ‫‪No.‬‬
‫‪40‬‬ ‫‪115‬‬ ‫‪15‬‬ ‫‪122‬‬ ‫سحب االسالك‬
‫أعمال السقف‬
‫االعمال الداخلية‬ ‫‪No.‬‬
‫سحب االسالك‬
‫أعمال السقف‬
‫االعمال الداخلية‬ ‫‪No.‬‬
‫سحب االسالك‬
‫أعمال السقف‬
‫االعمال الداخلية‬ ‫‪No.‬‬
‫سحب االسالك‬
‫أعمال السقف‬
‫االعمال الداخلية‬ ‫‪No.‬‬
‫سحب االسالك‬
‫أعمال السقف‬
‫االعمال الداخلية‬ ‫‪No.‬‬
‫سحب االسالك‬

‫االعمال الداخلية‬
‫‪No.‬‬
‫أعمال التبوير‬
‫االعمال الداخلية‬
‫‪No.‬‬
‫أعمال التبوير‬
‫االعمال الداخلية‬
‫‪No.‬‬
‫أعمال التبوير‬
‫االعمال الداخلية‬
‫‪No.‬‬
‫أعمال التبوير‬
‫االعمال الداخلية‬
‫‪No.‬‬
‫أعمال التبوير‬
‫االعمال الداخلية‬
‫‪No.‬‬
‫أعمال التبوير‬
‫االعمال الداخلية‬
‫‪No.‬‬
‫أعمال التبوير‬
‫االعمال الداخلية‬
‫‪No.‬‬
‫أعمال التبوير‬
‫االعمال الداخلية‬
‫‪No.‬‬
‫أعمال التبوير‬
‫االعمال الداخلية‬
‫‪No.‬‬
‫أعمال التبوير‬
‫االعمال الداخلية‬
‫‪No.‬‬
‫أعمال التبوير‬
‫االعمال الداخلية‬
‫‪No.‬‬
‫أعمال التبوير‬

‫االعمال الداخلية‬
‫‪No.‬‬
‫أعمال التبوير‬
‫االعمال الداخلية‬
‫‪No.‬‬
‫أعمال التبوير‬

‫تركيب االكسسوارات‬ ‫‪No.‬‬

‫تركيب االكسسوارات‬ ‫‪No.‬‬

‫تركيب االكسسوارات‬ ‫‪No.‬‬

‫سحب االسالك‬
‫‪Mt‬‬
‫أعمال التبوير‬

‫سحب االسالك‬
‫‪Mt‬‬
‫أعمال التبوير‬

‫سحب االسالك‬
‫‪Mt‬‬
‫أعمال التبوير‬

‫سحب االسالك‬
‫‪Mt‬‬
‫‪Mt‬‬
‫أعمال التبوير‬

‫سحب االسالك‬
‫‪Mt‬‬
‫أعمال التبوير‬

‫سحب االسالك‬
‫‪Mt‬‬
‫أعمال التبوير‬

‫سحب االسالك‬
‫‪Mt‬‬
‫أعمال التبوير‬

‫تركيب االكسسوارات‬ ‫‪LS‬‬

‫تركيب االكسسوارات‬ ‫‪LS‬‬

‫أعمال السقف‬
‫االعمال الداخلية‬
‫‪No.‬‬
‫سحب االسالك‬
‫تركيب االكسسوارات‬
‫أعمال السقف‬
‫االعمال الداخلية‬
‫‪No.‬‬
‫سحب االسالك‬
‫تركيب االكسسوارات‬
‫أعمال السقف‬
‫االعمال الداخلية‬
‫‪No.‬‬
‫سحب االسالك‬
‫تركيب االكسسوارات‬
‫‪LOGO‬‬

‫النسبة النهائية‬ ‫نسبة الصرف للنشاط‬ ‫اجمالي الكمية‬


‫للمستخلص‬ ‫الواحد‬ ‫المنفذة‬

‫‪90%‬‬ ‫‪0‬‬
‫‪90%‬‬ ‫‪0‬‬
‫‪90%‬‬ ‫‪0‬‬
‫‪90%‬‬ ‫‪0‬‬
‫‪90%‬‬ ‫‪0‬‬
‫‪90%‬‬ ‫‪0‬‬
‫‪90%‬‬ ‫‪0‬‬
‫‪90%‬‬ ‫‪0‬‬
‫‪90%‬‬ ‫‪0‬‬
‫‪90%‬‬ ‫‪0‬‬
‫‪90%‬‬ ‫‪0‬‬
‫‪90%‬‬ ‫‪0‬‬
‫‪90%‬‬ ‫‪0‬‬
‫‪90%‬‬ ‫‪0‬‬
‫‪90%‬‬ ‫‪0‬‬
‫‪90%‬‬ ‫‪0‬‬
‫‪90%‬‬ ‫‪0‬‬
‫‪90%‬‬ ‫‪0‬‬
‫‪90%‬‬ ‫‪0‬‬
‫‪90%‬‬ ‫‪0‬‬
‫‪90%‬‬ ‫‪0‬‬
‫‪90%‬‬ ‫‪0‬‬
‫‪90%‬‬ ‫‪0‬‬

‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬

‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬

‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬

‫‪0‬‬
‫‪0‬‬
‫‪0‬‬

‫‪20%‬‬ ‫‪4060‬‬
‫بيان اعمال ‪1‬‬ ‫‪42.21%‬‬ ‫‪30%‬‬ ‫‪1760‬‬
‫‪40%‬‬ ‫‪934‬‬
‫‪20%‬‬ ‫‪5489‬‬
‫بيان اعمال ‪2‬‬ ‫‪54.65%‬‬ ‫‪30%‬‬ ‫‪3046‬‬
‫‪40%‬‬ ‫‪2471‬‬
‫‪20%‬‬ ‫‪6430‬‬
‫بيان اعمال ‪3‬‬ ‫‪68.40%‬‬ ‫‪30%‬‬ ‫‪4914‬‬
‫‪40%‬‬ ‫‪4095‬‬
‫‪20%‬‬ ‫‪6430‬‬
‫بيان اعمال ختامي‬ ‫‪90.00%‬‬ ‫‪30%‬‬ ‫‪6430‬‬
‫‪40%‬‬ ‫‪6430‬‬

‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬

‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
0
0

0
0
0
0

0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0
mmunity
‫بيان‬ LOGO
( )

LIGHT FIXTURES:- A
Supply, install connect and test lighting fixtures complete with all required
accessories for complete installation as per drawings and specs

Light fixture model (F1) A-1


Light fixture model (F1E) A-2
Light fixture model (F2) A-3
Light fixture model (F2E) A-4
Light fixture model (F3) A-5
Light fixture model (F4) (Cove light) A-6
Light fixture model (F5) A-7
Light fixture model (F6) A-8
Light fixture model (F6E) A-9
Light fixture model (F7) A-10
Light fixture model (F7E) A-11
Light fixture model (F8) A-12
Light fixture model (F9) A-13
Light fixture model (F10) A-14
Light fixture model (F11) A-15
Light fixture model (F12) A-16
Light fixture model (F12E) A-17
Light fixture model (F13) A-18
Light fixture model (F13E) A-19
Light fixture model (F14) A-20
Light fixture model (F15) A-21
Light fixture model (F15E) A-22
Exit sign complete with13 watt lamp & battery back. A-23

LIGHT SWITCHES B
Supply, install connect and test light switches complete including, conduits,
conduit fittings, switches, terminations, earthing, wiring from switches to branch
circuit according to specifications and as shown on drawings.
Switches should be products of :-
One pole, one way one gang 10A modular switch B-1
One pole, one way one gang 10A modular switch (water proof) B-2
One pole, one way two gang 10A modular switch outlet B-3
One pole, one way two gang 10A modular switch outlet(water proof) B-4
One pole, two way one gang 10A modular switch B-5
One pole, two way three gang 10A modular switch B-6
Fan speed control switch B-7
over ride switch with motion sensor B-8

SOCKET OUTLETS C
Supply, install, connect and test socket outlets complete including terminations,
socket plate, cover, plugs all necessary accessories and ancillary work according to
specification and schedules.
16A wall single socket outlet C-1
16A wall single socket outlet (water proof) C-2
16A wall duplex socket outlet C-3
16A wall duplex socket outlet (water proof) C-4
16A floor duplex socket outlet (water proof) C-5
16A floor( duplex socket outlet at ups+single socket +1data+1tel) at the same
floorbox (water proof) C-6
-Single socket outlet double pole + earth 16A,220V for electric water heater (water
C-7
proof).
16A Ceiling or wall single socket outlet for camera C-8
16A Ceiling or wall single socket outlet for camera (water proof) C-9
16A Ceiling duplex socket outlet (water proof) C-10
16A floor single socket outlet C-11
16A floor single socket outlet (water proof) C-12

SWITCH FUSE POWER OUTLET D


Supply, install, connect and test switch fuses complete including terminations,
socket plate, cover, plugs all necessary accessories and ancillary work according to
specification and schedules.
16A switch fuse with two pole.(water proof) D-1
16A switch fuse with two pole above false ceiling. D-2
32A switch fuse with two pole.(water proof) D-3

LIGHTING AND POWER POINTS E

Supply, install, connect and test lighting and power points complete including
conduits, conduit fittings, wiring, earthing back to panel board or to branch circuit
complete including plaster rings, wiring, earthing and all necessary ancillary works
and materials required for the specified installation as indicated on the drawings.
Embedded or concealed surface mounted conduits should be rigid U PVC.
Exposed mounted conduits should be heavy gauge galvanized steel.
3x2.5mm² Lighting or fan outlet or Logo E-1
3x2.5mm² Lighting or fan outlet or Logo E-1
3x2.5mm² Lighting or fan outlet or Logo E-1
3x2.5mm² Lighting or fan outlet or Logo E-1
3x4mm² power outlet E-2
3x4mm² water heater outlet E-3
3x4mm² hand dryer outlet E-4
3x4mm² camera outlet E-5
3x6mm² Ac outlet E-6
BRANCH CIRCUIT DISTRIBUTION PANEL BOARDS F
Supply, install, connect and test the following panel boards complete with circuit
breakers, bus bars cabinets, conductors relays, residual current devices, indicator
lamps and all necessary accessories and ancillary works required in accordance
with the specification, tender drawings & attached schedules.

BCP-CCL F-1
BCP-ECCL F-2
BCP-CCP F-3
BCP-LSP F-4

BCP-PH (WITH KWH METER) F-5

BCP-SM (WITH KWH METER) F-6

BCP-AR (WITH KWH METER) F-7

BCP-TA (WITH KWH METER) F-8

BCP-LU (WITH KWH METER) F-9

BCP-PPG F-10

UDP-1 F-11

UDP-CO F-12

MAIN DISTRIBUTION BOARDS G


Supply, Install , connect and test sub-feeder distribution boards with all necessary
accessories circuit breakers, contractors, relays, indicator lamps, cable terminals &
all ancillary works required for complete operative system according to the
specifications

MDB (WITH KWH METER) G-1

MDB-CIB (WITH KWH METER) G-2

UPS H
Supply install, connect and test uninterruptible 40 KVA power supply(ups) 30
minutes complete including rectifier,control,charger,wave form,earthing and all
necessary accessories & all ancillary works required for complete operative system H-1
according to the specifications & as shown on drawings.
Supply install, connect and test uninterruptible 15 KVA power supply(ups) 30
minutes complete including rectifier,control,charger,wave form,earthing and all
necessary accessories & all ancillary works required for complete operative system H-2
according to the specifications & as shown on drawings.
Supply install, connect and test uninterruptible 5 KVA power supply(ups) 30
minutes complete including rectifier,control,charger,wave form,earthing and all
necessary accessories & all ancillary works required for complete operative system H-3
according to the specifications & as shown on drawings.

CABLE FEEDER I
Install , connect and test 600/1000V cables . The item shall include all necessary
reinforced concrete cross roads sleeves, warning tape, manholes, conduits, cable
trays & covering bricks . Cable lengths inside the substations are included. The
works include excavation, backfilling & excess soil removal outside the site . The
works shall be complete as per the project specifications, the Egyptian code rules.

Supply Install , connect and test CU PVC/PVC cable [(4x10)mm2 + 10mm2)] and
all necessary accessories and ancillary works required as specified and as shown on I-1
drawings.
Supply Install , connect and test CU PVC/PVC cable [(4x16)mm2 + 16mm2)] and
all necessary accessories and ancillary works required as specified and as shown on I-2
drawings.
Supply Install , connect and test CU PVC/PVC cable [(3x25+16)mm2 + 16mm2)]
and all necessary accessories and ancillary works required as specified and as I-3
shown on drawings.
Supply Install , connect and test CU PVC/PVC cable [(3x70+35)mm2 + 35mm2)]
and all necessary accessories and ancillary works required as specified and as I-4
shown on drawings.
Supply Install , connect and test CU PVC/PVC cable [(3x95+50)mm2 + 50mm2)]
and all necessary accessories and ancillary works required as specified and as I-5
shown on drawings.
Supply Install , connect and test CU PVC/PVC cable [(3x120+70)mm2 + 70mm2)]
and all necessary accessories and ancillary works required as specified and as I-6
shown on drawings.
Supply Install , connect and test CU XLPE/PVC cable [(3x1x120+70)mm2 +
70mm2)] and all necessary accessories and ancillary works required as specified I-7
and as shown on drawings

POWER EARTHING (GROUNDING) SYSTEM J


Furnishing, supplying, installing and testing a complete protective earthing (PE)
system complete with earthing pits, earthing electrodes, equalizer bars, earth
continuity conductor, and earthing conductor to switchboards, diesel generator set
and transformers complete with all accessories, fixing brackets, test links, complete
with all accessories, fixing brackets, test links suspensions, drilling and cutting for
complete installation all in accordance with technical specifications and drawings

NB
Earthing impedance must be <= 2 ohm
LIGHT CURRENT SYSTEM EARTHING (GROUNDING) SYSTEM K
Furnishing, supplying, installing and testing a complete protective earthing (PE)
system complete with earthing pits, earthing electrodes, equalizer bars, earth
continuity conductor, and earthing conductor to switchboards, diesel generator set
and transformers complete with all accessories, fixing brackets, test links, complete
with all accessories, fixing brackets, test links suspensions, drilling and cutting for
complete installation all in accordance with technical specifications and drawings

NB
Earthing impedance must be <= 0.5 ohm
TELECOMMUNICATION SYSTEM L
Supply, install, connect and test Telephone System complete including conduits,
conduit fittings, Cat 6 cabling, earthing complete including plaster rings, wiring,
earthing, terminations, socket plate, cover, plugs all necessary accessories and
ancillary

Supply, install, connect and test socket RJ-45 wall telephone outlets complete
including conduits, conduit fittings, Cat 6 cabling, earthling complete including
L-1
plaster rings, wiring, earthling, terminations, socket plate, cover, plugs all necessary
acc

Supply, install, connect and test socket RJ-45 wall telephone outlets water proof
complete including conduits, conduit fittings, Cat 6 cabling, earthling complete
L-2
including plaster rings, wiring, earthling, terminations, socket plate, cover, plugs all
necessary acc

Supply, install, connect and test socket RJ-45 wall data outlets complete including
conduits, conduit fittings, Cat 6 cabling, earthling complete including plaster rings, L-3
wiring, earthling, terminations, socket plate, cover, plugs all necessary acc

Supply, install, connect and test socket RJ-45 wall data outlets water proof
complete including conduits, conduit fittings, Cat 6 cabling, earthling complete
including plaster rings, wiring, earthling, terminations, socket plate, cover, plugs all L-4
necessary acc
Supply, install, connect and test socket RJ-45 wall TV outlets complete including
conduits, conduit fittings, Cat 6 cabling, earthling complete including plaster rings,
wiring, earthling, terminations, socket plate, cover, plugs all necessary works L-5
according to the specifications & the tender drawings.
Supply, install, connect and test socket RJ-45 wall TV outlets water proof
complete including conduits, conduit fittings, Cat 6 cabling, earthling complete
including plaster rings, wiring, earthling, terminations, socket plate, cover, plugs all L-6
necessary works according to the specifications & the tender drawings.

Supply, install, connect and test main patch panel data rack (3x24) port switch
complete as specified and indicated in the drawings with all necessary termination,
conduits, raceways,switches,servers, patch cords, cables and all necessary L-7
accessories required to complete operation
CCTV SYSTEM M
Supplying, installing, connecting and testing CCTV outlets by 75 Ohm RG-6 Co-
axial cable cabling, fire retardant PVC conduits, conduit fittings back to DVR and
all necessary accessories and ancillary materials and works required for complete
installation as specified and as indicated on the drawings.
Fixed wall mounted color camera, indoor type , 540 TVL, Day/Night vision , with
M-1
wall mount bracket.
Fixed Dome ceiling mounted color camera, indoor type , 540 TVL, Day/Night
M-2
vision.
Fixed wall mounted color camera, outdoor type , 540 TVL, Day/Night vision , with
M-3
wall mount bracket.
Fixed wall mounted color camera, outdoor type , 540 TVL, Day/Night vision , with
M-4
wall mount bracket.
Supply install, connect and test DX4600 entry level DVR,16camera inputs with
CDRW,1TB of storage,MPEG4 compression,CIF,2CIF,4CIF programmable by
M-5
channel,480IPS,pixel search,4 audio in,1 out, 16 alarm in,4 relay out & all
necessary accessories as shown in tender drawings.
Supply install, connect and test DX4600 entry level DVR,8camera inputs with
CDRW,1TB of storage,MPEG4 compression,CIF,2CIF,4CIF programmable by
channel,480IPS,pixel search,4 audio in,1 out, 16 alarm in,4 relay out & all M-6
necessary accessories as shown in tender drawings.
Supply install, connect and test wall mounted push button control keypad w\three
axis variable speed joystick, provides programming & all necessary accessories as M-7
shown in tender drawings.
Supply install, connect and test 32 inch LED monitor& all necessary accessories as
M-8
shown in tender drawings.
Supply rack& all necessary accessories as shown in tender drawings. M-9
Supply install, connect and test complete CCTV cable network including all
necessary cabling, raceways & accessories. The item shall be complete with all M-10
necessary works according to the specifications & the tender drawings.

SOUND SYSTEM N
Supplying, installing, connecting and testing sound system rack including rack
cabinet, power conditioners, monitor panel , Matrix , monitor panel(s), distribution
units, power amplifiers, internal cabling, interface with fire alarm system and all
necessary accessories and ancillary works and materials required for complete
installation as specified and as indicated on the drawings.

Ceiling mounted loud speaker (3/6/12 watts) N-1

Supplying, installing, connecting and testing of sound system outlets including


conduits, conduit fittings, cable trunking, terminations, cabling (2*1.5 mm2), back N-2
boxes and all necessary accessories and ancillary works and materials required for
complete installation as shown on the drawings and Single Line Diagrams and as
specified starting from the loudspeakers and back to the equipment rack.
Supply install, connect and test sound system rack including:'AM/FMTuner,
'Cassette Player,'CD Player,1 Number Zone Amplifiers (amp 150w),PAGING
MICROPHONE The rack shall be equipped with a preset evacuation message that N-3
shall be announced upon receive of a signal from the fire alarm panel.
Supply install, connect and test sound system rack including:'AM/FMTuner,
'Cassette Player,'CD Player,1 Number Zone Amplifiers (amp 180w),PAGING
MICROPHONE The rack shall be equipped with a preset evacuation message that N-4
shall be announced upon receive of a signal from the fire alarm panel.
Supply install, connect and test sound system rack including:'AM/FMTuner,
'Cassette Player,'CD Player,1 Number Zone Amplifiers (amp 50w),PAGING
MICROPHONE The rack shall be equipped with a preset evacuation message that N-5
shall be announced upon receive of a signal from the fire alarm panel.
Volume Control N-6

FIRE ALARM SYSTEM O


Supply, installing, connecting & testing fire alarm control system complete
including conduits, conduit fittings , cabling, complete with all necessary
accessories and ancillary works as shown on drawings and as specified in the
technical specification in order to provide a complete system up to the main fire
alarm control panel (MFACP) .
Supply, Install , connect and test of UL LISTED main fire addressable alarm station
(2 loops) complete with conduits, conduit fittings, boxes, wiring up to fire alarm
O-1
detectors, Pc, printer fixing and all necessary accessories and ancillary works as
specified and as shown on the drawings.
Supply, Install , connect and test of UL LISTED repeater fire addressable alarm
station (2 loops) complete with conduits, conduit fittings, boxes, wiring up to fire
O-2
alarm detectors, Pc, printer fixing and all necessary accessories and ancillary works
as specified and as shown on the drawings.
Supply, 'Install , connect and test addressable fire alarm optical ceiling smoke
O-3
detector
Supply, Install , connect and test addressable fire alarm optical heat detector O-4
Supply, 'Install , connect and test addressable break glass manual station O-5
Supply, Install , connect and test addressable fire alarm siren O-6
Supply, 'Install , connect and test addressable control modules O-7
Supply, Install , connect and test addressable monitor modules O-8
Supply, install, connect and test of fire alarm circuits serving the shown detectors
complete with duct banks, raceways & raceways supports. The works may include
excavation in different soils & backfilling complete with inspection manholes. O-9

TOTAL ELECTRICAL WORKS


‫‪ Community‬مشروع انشاء مبني‬
‫بيان االعمال الكهربائية‬
‫) ( مستخلص جاري رقم‬

‫نسبة االنجاز‬ ‫الكمية االجمالية‬ ‫الكمية الحالية‬ ‫الكمية السابقة‬ ‫الفئة‬ ‫الوحدة‬

‫‪90%‬‬ ‫‪35‬‬ ‫‪15‬‬ ‫‪20‬‬ ‫‪500‬‬ ‫‪No.‬‬


‫‪0‬‬ ‫‪750‬‬ ‫‪No.‬‬
‫‪0‬‬ ‫‪450‬‬ ‫‪No.‬‬
‫‪0‬‬ ‫‪650‬‬ ‫‪No.‬‬
‫‪0‬‬ ‫‪350‬‬ ‫‪No.‬‬
‫‪0‬‬ ‫‪299‬‬ ‫‪Mt‬‬
‫‪0‬‬ ‫‪328‬‬ ‫‪No.‬‬
‫‪0‬‬ ‫‪415‬‬ ‫‪No.‬‬
‫‪0‬‬ ‫‪813.2‬‬ ‫‪No.‬‬
‫‪0‬‬ ‫‪530.66‬‬ ‫‪No.‬‬
‫‪0‬‬ ‫‪960.54‬‬ ‫‪No.‬‬
‫‪No.‬‬
‫‪No.‬‬
‫‪No.‬‬
‫‪No.‬‬
‫‪No.‬‬
‫‪No.‬‬
‫‪No.‬‬
‫‪No.‬‬
‫‪No.‬‬
‫‪No.‬‬
‫‪No.‬‬
‫‪No.‬‬

‫‪No.‬‬
‫‪No.‬‬
‫‪No.‬‬
‫‪No.‬‬
‫‪No.‬‬
‫‪No.‬‬
No.

No.
No.
No.
No.
No.

No.

No.

No.
No.
No.
No.
No.

No.
No.
No.

42.21% 4060 4060 0 340.16 No.


54.65% 5489 1429 4060 340.16 No.
68.40% 6430 941 5489 340.16 No.
90.00% 6430 0 6430 340.16 No.
330 No.
360.12 No.
225.75 No.
290.3 No.
420.89 No.
No.
No.
No.
No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.
No.

Mt

Mt

Mt

Mt

Mt

Mt

Mt

LS

LS
No.

No.

No.
‫‪LOGO‬‬

‫مالحظات‬ ‫القيمة االجمالية‬

‫‪15750‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫‪0‬‬
‫مستخلص ‪1‬‬ ‫‪582,941.04‬‬
‫مستخلص ‪2‬‬ ‫‪1,020,391.05‬‬
‫مستخلص ‪3‬‬ ‫‪1,496,064.50‬‬
‫مستخلص ختامي‬ ‫‪1,968,505.92‬‬