Buckley Elementary School

250 Vernon
The
Groton St,
Gunnery Manchester,
Consolidated
Bristol Ambulatory CT
Art & Community
Middle Center
School
Care Center
Groton Middle School
SUBMITTAL
SUBMITTAL COVER COVER
TRANSMITTAL SHEET SHEET

O&G Project
Project:& Address: O&G
Bristol Industries,
Ambulatory CareInc. 112 Wall St, Torrington, CT 06790
Center

City/State Project
Project:& Address: Town of Manchester
Bristol, Connecticut
Architect Project & Address: TSKP Studio - ONE Hartford Square West, Hartford, CT 06106

THE SECTION BELOW


INFORMATION IN THISTO BE FILLED
SECTION OUT
TO BE BY TRADE
FILLED PRIOR
OUT BY TO PRIOR
TRADE SUBMISSION:
TO SUBMISSION:
Trade Contractor Name: Earthlight Technolgies
Specification Section Number & Item: 017419-501-002
Specification Section Title: Waste Management progress report
Title:
Submittal Transmittal Title:
Material Lead Time: N/A
Is
Is ThisaA
Is This
this ACT
CTHigh
LEEDHigh Performance
Submittal?
PerformanceIf yes,
Building
Building
complete Standards
Standards&submittal? Submittal?
attach LEED If yes,
submittal
If yes, complete
complete
cover
& attach &
sheet.attach CTHPB submittal
CTHPB submittal cover sheet.
cover sheet.
Submittal Comments:
Comments & Signatures:

THE SECTION BELOW TO BE FILLED OUT BY O&G:


Review is for general arrangement only and does not release the trade contractor
and/or supplier from responsibilities for quantities, dimensions, performance or other
requirements of the contract documents.

NE

Reviewed Reviewed As Noted Correct & Resubmit

017419-501-002
O&G Submittal Number: ______________________________________________
Reviewed By: NE
By: ________________ Date: 1/28/2021
Date:________________
Comments
Comments: & Signatures:_____________________________________________
,

THE SECTION BELOW TO BE FILLED


FILLED OUT
OUT BY
BY[Davis
OWNER, OWNER'S
Stokes REP, :AND OR ARCHITECT:
Collabrative]
Comments & Signatures:

CES Review: No comments offered


TSKP Studio notes:
- No additional comments JMP 2-18-2022

02/22/2022 MMS

HE SECTION BELOW TO BE FILLED OUT BY O&G:


Issued Date: 6/9/17
Rev. #1
Waste Management Report
.

Project: BUCKLEY ELEMENTARY SCHOOL

Site address: 250 VERNON ST, MANCHESTER CT

Subcontractors involved: EARTHLIGHT TECHNOLOGIES

Responsible site manager:


O&G

Material Quantity
Total waste Re‐used Re‐used Recycled for Recycled Sent to Sent to Contractor
on‐site off‐site use on‐site for use recycling landfill used
off‐site facility

Soil/fill sand

Rock/rubble

Concrete

Plaster/Plasterboard

Tiles

Bricks & pavers

Timber

Plastics/PVC

Metal

Green waste

Paper + Cardboard

Glass

Other

Hazardous
(paint, oil,
asbestos)
Totals

% of total

Target %