IT PROJECT MANAGEMENT

Mobile Shop App Project


Project Carter

IT Section
Project Title Mobile Shop App Project
ITPMG4

Supervisor Name Mahmoud Rokaya

Project Team

Shahd Ahmed Al-Zahrani 44003093

Noura Khalafallah Al-Harthi 44000650

Sarah Abdullah Al-Shehri 44003672

Rawabi Hamid Al-Harthi 43900423


Table of Contents
Introduction: ..................................................... 3

Work Breakdown Structure:- .......................... 3

Purpose: ............................................................. 4

Advantages: ..................................................... 4

Feasibility study :- ............................................. 5

Project Requirements: ................................... 5

Financial Requirements:- ............................ 6

Execution:.......................................................... 7

Completion Time For Activities: ................... 7

Create CPM and PERT chart: ..................... 8

Report Summary .............................................. 8

Conclusion: ....................................................... 9
Introduction:
- In this project, we are ready to open a store and
design an app for store that sells mobile phones and
parts, as we did an in-depth study of the area to
determine acceptable prices in the absence of a
strong competitor.

Work Breakdown Structure:-


- A work breakdown structure is a project
management tool that takes a stepwise approach
to completing large projects with many moving
pieces. By breaking down the project into smaller
components, it can consolidate scope, cost, and
deliverables into a single tool.

Mobile Shop App

Initiation Planning Execution Testing

Determine Determine
Information Divide the Choose Way Choose Developing Project Discover Solve
Feasibility Project
gathering project of design Design Project testing Problems Problems
study Requirements
Purpose:
- E-commerce Apps have become a feature of the
modern digital landscape, offering a wide range
of benefits and opportunities for businesses and
consumers. Here are some of the most popular
purposes for Mobile Shop apps:
o Increase Sales.
o Improve Customer Engagement.
o Increase Efficiency.
o Provide a Competitive Advantage.
o Expand Market Reach.

Advantages:
1. Improved customer experience.
2. Increased product discovery.
3. Reach a wider audience.
4. Capitalize on impulse purchases.
5. Better pull of data and analytics.
6. Greater engagement and communication with
customers.
7. Availability of electronic payment methods.
Feasibility study:-
- In this feasibility study we are looking into 3 main
aspects:
1. Project requirements:
2. Profits assessments
3. Risk assessments

Project Requirements:
- The project required by the company is a

specialized application for selling mobile devices

only, where our product interacts with users online

and can be accessed through a web browser,

and it is used at a time when customers do not

have time to physically visit the store and they are

willing to pay more money if The product of their

choice was delivered to them wherever they

chose.
Financial Requirements:-
- The financial requirements for developing a mobile
application can vary greatly depending on the
complexity and features of the app. Some key
factors to consider include the cost of design and
development, ongoing maintenance and
updates, and any necessary infrastructure or
hosting fees.
- The company give us 100000$ for this project this
table show the details of the cost.
- Here are some rough estimates of some common
development costs:
o Design: $1,000 - $5,000
o Development: $10,000 - $50,000
o Ongoing maintenance: $5,000 - $20,000 per
year
o Infrastructure and hosting: $500 - $10,000 per
year
Execution:
Completion Time For Activities:
Completion Immediate
Activity Description Activity
Time (Weeks) Predecessor

1 - Information Gathering 1

1 1 Determine Feasibility Study 2

Determine Project
1 2 3
Requirements

2 2 Divide The Project 4

1 3 Choose Way of design 5

2 4,5 Choose Design Application 6

6 6 Develop Application 7

1 7 Testing Application 8

Discover Problems and


2 8 9
Solving It

1 9 Project Publishing 10
Create CPM and PERT chart:

Report Summary
- A company wants to design an application to sell
its mobile phones or parts through it, reach
consumers faster, and present their best to
persuade them to buy.
- The company set a reasonable budget for the
project, which is $100,000
- We determined the requirements of the project,
and we presented some designs to the company
to choose between them and start implementing
them. Then we started developing the application
after making a report of all that was required by
the company to be available within the
application. Then we tested the application and
discovered its problems and solved them.
- On 8/25/1442, we implemented the project and
handed it over to the company

Conclusion:
- At the end of our report, I hope that we have
succeeded in presenting the project, its
requirements, features, and the time in which it will
be implemented. Our project will benefit
consumers and those interested in buying mobile
phones or parts for them.

You might also like