Project Location:

Subject: Bill of Quantity


Date:

Scope of Works: Supply and Installation of 2-3.15M

Exclusions: Other scope not stated in the BOQ

ITEM SCOPE OF WORKS Qty Unit

I GENERAL REQUIREMENTS

a. Mobilization/Demobilization 1 lot

b. Electrical Engineering Management/Supervision 1 lot

c. Temporary Facilities/Safety PPE's 1 lot

d. Bonds and Insurances 1 lot


e. Testing & Commisioning
Sub-total I
II Electrical Works
1.0 Main ACB Replacement @ 2500AT
2500AT ACB Breaker 1 set
250mm2 Terminal Lugs at Line Side 21 pcs
250mm2 Terminal Lugs at Load Side 60 pcs

2.0 Dismantling of existing 1600AT ACB Breaker (Labor Only) 1 lot

3.0 Modification of Deadfront and Busbar 1 lot


Additional Hole for Busbar 1 lot
Sub-total II
III Additional Works
1.0 Installation of Grounding Rod at MCB
Grounding Rod 1 pcs
100mm2 Bare Copper Wire 1 lm
2.0 Installation of OCTC box (OSM)
Installation and Termination of 250mm2 cable (OSM)
3.0 Repainting of Conduits 1 lot
Supply and Installation of 10 sets of 250mm2 cables at
4.0
Load Side of ACB of to Busbar Gutter
250mm2 THHN 150 lm
50mm2 THHN 50 lm
5.0 Miscellaneous 1 lot
Sub-total III
TOTAL COST (VAT EX.)
12% VAT
TOTAL COST (VAT INC.)

Prepared By: Checked By:


ply and Installation of 2-3.15MW Load Bank

er scope not stated in the BOQ

Total Cost/Unit Total Cost Total Selling/Unit Total Selling Profit

₱ - ₱ - ₱ - ₱ -

₱ - ₱ - ₱ - ₱ -

₱ - ₱ - ₱ - ₱ -

₱ - ₱ - ₱ -

₱ - ₱ - ₱ - ₱ -

₱ - ₱ - ₱ - ₱ -
₱ - ₱ - ₱ - ₱ -

₱ - ₱ - ₱ - ₱ -

₱ - ₱ - ₱ - ₱ -
₱ -
₱ - ₱ - ₱ -
₱ - ₱ - ₱ -
₱ - ₱ - ₱ -
₱ - ₱ - ₱ -

Approved By:
% GP

#DIV/0! 0.7

#DIV/0! 0.7

#DIV/0! 0.7

#DIV/0!

#DIV/0! 0.7

#DIV/0! 0.7
#DIV/0! 0.7

#DIV/0! 0.7

#DIV/0! 0.7

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

You might also like