Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

KEY PLAN

START DN100
STOP RUN FAULT A/M TO SITE DRAIN NETWORK

ZS ZS ZS ZS
501 501 501 501

DN200 FROM AIR BLOWERS


P&ID-9

LT01 AIT08 AIT07 AIT06 AIT05 LCP CLARIFIER AIT04 AIT03 AIT02 AIT01 DOC
I
501 503 503 503 503 501 501 501 501 501
COD MLSS TSS NH4 NH4 MLSS PH DO DO BLOWER INTERLOCK
AE08 AE07 AE06 AE05 AE04 AE03 AE02 AE01
LE01
501 501 501 501 501 501 501 501
501
DN50

OVER FLOW

OVER FLOW TO CONTACT TANK DN100


OVER FLOW
P&ID-08

SCUM
DN100
NOTES

DN50
AERAITION TANK
BALANCE TANK CLARIFIER
SCUM TO OIL & GREASE CHAMBER DN100
P&ID-04

DN150
TO SAND FILTER FEEDING PUMP DN100
P&ID-07

DN150 RETURN ACTIVAITED SLUDGE (RAS)


TO SLUDGE DRYING BED DN150 WASTE ACTIVAITED SLUDGE (WAS) DN100

FROM EXIST INLET WORKS DISRUPTION CHANNEL


P&ID-02

START DN100
STOP RUN FAULT A/M TO SITE DRAIN NETWORK

ZS ZS ZS ZS
502 502 502 502

DN200 FROM AIR BLOWERS


P&ID-9

LT01 AIT08 AIT07 AIT06 AIT05 LCP CLARIFIER AIT04 AIT03 AIT02 AIT01 DOC
I
502 502 502 502 502 502 502 502 502 502
COD MLSS TSS NH4 NH4 MLSS PH DO DO BLOWER INTERLOCK
AE08 AE07 AE06 AE05 AE04 AE03 AE02 AE01
LE01
502 502 502 502 502 502 502 502
502
DN50

OVER FLOW

OVER FLOW TO CONTACT TANK


P&ID-08
DN100
OVER FLOW REFERENCE DRAWINGS
SCUM DRAWING TITLE DRAWING NO.
DN100

DN50
AERAITION TANK
BALANCE TANK CLARIFIER

DN300
SCUM TO OIL & GREASE CHAMBER DN100
P&ID-04

DN150
TO SAND FILTER FEEDING PUMP DN100
P&ID-07

DN150 RETURN ACTIVAITED SLUDGE (RAS)


TO SLUDGE DRYING BED DN150 WASTE ACTIVAITED SLUDGE (WAS) DN100

MAR A.S A.F N.N S.W


00 2023 ISSUED FOR TENDER PACKAGE

TED
ED

ED
NED

D
N

CKE

IEW

ROV
W

MIT
REV.NO. DATE ISSUED FOR

IG
DRA

REV
CHE
DES

SUB

APP
START DN100
STOP RUN FAULT A/M TO SITE DRAIN NETWORK

ZS ZS ZS ZS
503 503 503 503
FROM NEW INLET WORKS
DRAWING
STATUS ISSUED FOR TENDER PACKAGE
P&ID-04
DN200 FROM AIR BLOWERS
P&ID-9 CLIENT

DN300
LT01 AIT08 AIT07 AIT06 AIT05 LCP CLARIFIER AIT04 AIT03 AIT02 AIT01 DOC
I
503 503 503 503 503 503 503 503 503 503
COD MLSS TSS NH4 NH4 MLSS PH DO DO BLOWER INTERLOCK
AE08 AE07 AE06 AE05 AE04 AE03 AE02 AE01
LE01
503 503 503 503 503 503 503 503
503
DN50

OVER FLOW

OVER FLOW TO CONTACT TANK DN100


P&ID-08
OVER FLOW CONSULTANT

SCUM
DN100

& PARTNERS
DN50

CONSULTING ENGINEERS
AERAITION TANK
BALANCE TANK CLARIFIER
SCUM TO OIL & GREASE CHAMBER DN100
TENDER
P&ID-04
DN150
CONTRUCTION WORKS
TO SAND FILTER FEEDING PUMP DN100
P&ID-07
FOR THE UPGRADE OF AL WAGAN STP IN AL AIN

PIPING & INSTRUMENTATION DIAGRAM


DN150 RETURN ACTIVAITED SLUDGE (RAS)
TO SLUDGE DRYING BED DN150 WASTE ACTIVAITED SLUDGE (WAS) DN100 P&ID ( BIOLOGICAL REACTOR 1,2&3 )

TENDER NO. 0-15527

SHEET SIZE A1

SCALE DRAWING No. REV.

N.T.S IC-P&ID-05 00

You might also like