Professional Documents
Culture Documents
146 - Ic-P&id-04 (Sand and Grease Removal)
146 - Ic-P&id-04 (Sand and Grease Removal)
146 - Ic-P&id-04 (Sand and Grease Removal)
VENDOR PACKAGE
KEY PLAN
START
STOP RUN FAULT A/M
ZS ZS ZS ZS
403 403 403 403
LCP
WS-01 WS SWC
LT01
M
400
GV-01
HH
LE02
LS02
400
400
NOTES
SAND WASHING
GREASE CHAMBER
TO SITE DRAIN NETWORK
START
STOP RUN FAULT A/M
ZS ZS ZS ZS
401 401 401 401
LCP
401-SCP-01
M
M
DN100
AIR LIFT PUMP REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.
DN50
SAND GV-02
GRT-A PI01
403
DN100
NV-01
403
AB-01-403
BFV-01
403
DN100
PI02
403
SCRAPER VENDOR PACKAGE PT01
NV-02
403
403
START AB-02-403
STOP RUN FAULT A/M
MAR A.S A.F N.N S.W
TT01 00 2023 ISSUED FOR TENDER PACKAGE
ZS ZS ZS ZS 403
ED
WED
ED
NED
D
WN
SANDY MIXTURE
T
CKE
ROV
402 402 402 402 AIR LIFT
MIT
BFV-02 REV.NO. DATE ISSUED FOR
IE
IG
DRA
REV
CHE
403
DES
SUB
DN100
APP
AIR BLOWERS
LCP
DRAWING
STATUS ISSUED FOR TENDER PACKAGE
DN100
CLIENT
402-SCP-02
PNS-05
TO NEW INLET WORKS DISTRIBUTION CHAMBER
P&ID-03 DN100
OUTPUT
DN100
CHANNEL DN50
GREASE
& PARTNERS
CONSULTING ENGINEERS
TENDER
GV-03
CONTRUCTION WORKS
SAND FOR THE UPGRADE OF AL WAGAN STP IN AL AIN
GRT-B
SHEET SIZE A1
N.T.S IC-P&ID-04 00