Mangla Refurbishment Project (MRPS - JV)

SITE PROGRESS REPORT June 2023

U3: Stator lowering completed in the generator pit. U3: Stator lowering completed in the generator pit.

U4: Hole drilling in outer head cover for line boring is in progress U3: Preparation for Installation of air cooler on stator frame in
progress.

U4: Machining of facing plates seating surface on bottom ring


U3: Preparation for line boring in progress
in progress.

Page 1 of 2
Mangla Refurbishment Project (MRPS - JV)
SITE PROGRESS REPORT June 2023

Punch points rectification is in progress. Day work of temporary connections to inlet fans.

Pickling and flushing of lower bearing bracket piping at GE


Installation of Inline fans for HVAC camp in progress.

U3: Final grinding of water hydraulic guides in progress


Unit 3- Rotor assembly completed.

Page 2 of 2