RBWR U2 SoP

Rev: 1.4

CHANGELOG: latest changes highlighted in yellow

Rev: 1, Initial version 29/06/2023


Rev: 1.1, Updated step-8: FW setup procedure
Rev: 1.2, Updated Synch procedure
Rev: 1.3, Load following, Normal unit unloading,
Turbine desynch, Mode 1 → 2, Mode 2 → 3
Rev: 1.4 INITIAL RELEASE

01/07/2023

RBWR
Authored by: ldgh_v1

1
POINT CALL CHECK.
In certain conditions the session host might choose to enforce the point call check procedure.
This procedure entails a standardized way to communicate instructions across to operators with
minimization of operator error risk. The procedure goes as follows: The shift supervisor asks an
operator to perform a certain manipulation, the respective operator reads back the instruction exactly
as the shift supervisor has requested it also clearly stating that the operator understands the action
he needs to perform, if the readback is correct and the shift supervisor is satisfied the operator
understands what action he is expected to perform he will call out: Check, this is the signal to the
operator he has correctly understood and read back the action he is to perform and gives him the
permission to execute it. An example of this procedure will be stated below for better understanding.

• [OPERATOR NAME] [please perform/Please] [State action]


• [OPERATOR STATES PANEL] preform [State action]
• [If readback was correct] Check
• Operator performs action

• Tony, please establish condenser vacuum using SJAE #1


• Tony: Establish condenser vacuum using SJAE #1
• Check.
• Tony establishes condenser vacuum using SJAE #1
• Upon completion: Tony: Condenser vacuum established using SJAE #1

2
INTENTIONALLY BLANK

3
NORMAL SITUATIONS
STEP INSTRUCTION CHECK
1 Check: CST-1 and CST-2 Tk Lvl → 7,5 m
If not satisfactory:
➢ CST Makeup pump 1 & 2 → On
pumps will automatically shut off at 7,5m.
To prevent a trip of the startup transformer it is necessary to
wait until this operation is complete before continuing.
2 RCP-1:
➢ Suction valve → Open
➢ Pump motor → Run
➢ Discharge valve → Open
➢ FCV setpoint → 28%
(During startup expect alarm: flow imbalance until RCP-2 started)

RCP-2:
➢ Suction valve → Open
➢ Pump motor → Run
➢ Discharge valve → Open
➢ FCV setpoint → 28%

Check: Flow imbalance alarm cleared


3 Offline core cooling pump-1 → Off
4 Offline core cooling pump-2 → Off
5 Observe Temperature increase due to decay heat and fission product
particle friction.
6 CAR pump 1 & 2 → On
7 Turbine Bypass valve → 100%
8 Condensate pump-1 → On
9 Preparation of the FW system:
➢ FWP-1 Suction valve → Open
➢ FWP-1 Motor → Run
➢ FWP-1 Discharge valve → Open
➢ MCC Auto ctrl mode → On
➢ Polisher selector → Polisher-1
10 Condenser circulation pump-1 → Start
11 Condenser circulation control valve → 15%
12 At 1700 kPa: SJAE-1→ On
➢ Establish condenser vacuum of 40 mBar
13 Condenser circulation control valve auto ctrl → On
➢ The condenser circulation flow will now regulate the condenser
pressure.
14 Deaerator outlet valve → 50%
15 Establish Deaerator pressure using the inlet control valve

4
Preparation of the TCR
1 AUX oil manual valve → Open 100%
Main oil manual valve → Open 100%
2 Hydraulic control oil pump selector → AUX
wait for HCO oil to reach 12 Bar
3 Lubrication oil pump selector → AUX
wait for LO pressure to reach 6 Bar
4 LO temperature auto ctrl switch → On
5 Steam sealing controller mode → Auto
6 wait for Lubrication oil to reach operating temperature
7 Turning gear → Engage
wait for lamp to go solid
8 Turning gear → Run
Observe increase in lower range RPM indication and LO temperature drop.
STARTUP OF THE REACTOR
1 Check:
➢ APRM < 1%
➢ IPR range → 1
➢ IPR indication → lower red band
➢ SRM probe depth < 10%
➢ Core temperature balancing selector → Average
➢ Operation selector → SRM
➢ Mode selector → Start
2 Control rod speed selector → Fast
3 Withdraw control rods according to pull order.
CAUTION: when pulling maintain period longer then 30s.
at 30s a short period alarm will sound followed by a short period trip at 20s
4 Maintain SRM probe depth slightly above average rod position
5 When period shortening becomes faster and period lengthening becomes
slower: Rod speed → Decrease
6 When IRM indication above red band:
Operation selector → IRM
7 Observe IRM indication:
when reading approaches blue band → Scale up
8 When ARPM reading 10%:
Auto control setp. → 10%
Reactor mode → Run
Auto control → On
9 Check system steam, feedwater and condensate system pressures and flows
Observe Deaerator RPV and hot well level still in range and stable.

5
TURBINE RUNUP
1 Slowly build pressure to 7,2 MPa using the turbine bypass valve
2 If at any point during the procedure pressure is unable to be held slowly
increase APR setpoint
CAUTION: DO NOT EXCEED 20% APR DURING RUNUP
3 Heat the turbine casing to 270°C with a max heating rate of 50 °C/s
4 Turning gear → Off
When the turbine has stopped: Turning gear → Disengage
5 Turbine valve → Open
Runup rate selector → Slow
Runup speed selector → 900 rev.min-1
Runup controller → On
Wait for turbine to reach 900 rev.min-1
Monitor Axial and radial pressure, diff expansion and turbine vibration at all
times during runup
6 Runup speed selector → 1800 rev.min-1
Wait for turbine to reach 1800 rev.min-1
7 Turbine LO pump selector → SHAFT
Turbine HCO pump selector → SHAFT
Turbine runup speed selector → 2700 rev.min-1
8 Wait for turbine speed to reach 2700 rev.min-1
9 Runup speed selector → 3600 rev.min-1
Wait for turbine to reach 3600 rev.min-1
SYNCHRONIZATION
1 Check turbine RPM 3600 rev.min-1
Turbine runup controller → Disable
Synchroscope → Enable
2 Control turbine RPM at 3600 rev.min-1 using precision valve set
3 When synchroscope turning slowly clockwise: close synchronization switch
at needle pos 12 o’clock
4 When breaker has been closed → APR setpoint 30%
Slowly close the bypass valve while opening the main valve until the
bypass valve is fully closed.
MAINTAIN 7,2 MPa main steam pressure at all times.
5 When bypass valve is fully closed → Auto pressure hold → On

6
LOAD FOLLOWING
1 Slowly increase APR setpoint in intervals of 10%

DURING POWER RAMP UP CLOSELY MONITOR PLANT PARAMETERS.


if a parameter starts to become uncontrollable give voice command:
HALT RAMP UP.
2 At 40% APR → Stabilize and prepare for Recirc flow regime.
3 FWS:
➢ FWP-2 Suction valve → Open
➢ FWP-2 Motor → Run
➢ FWP-2 Discharge valve → Open
➢ MCC Auto ctrl mode → On
Condensate pump-2 → On
Condenser circulation pump-2 → On
4 Continue ramp up in this order:
Increase RCP Flow → Increase APR setpoint.
Ramp up is limited to 10% steps and then waiting for plant stabilization due
to the fast nature of this ramp up stage

Follow power to flow operations map listed below.

7
NORMAL UNIT UNLOADING
1 RCP Flow → Decrease according to power to flow operating map for desired
APR setpoint.
APR setpoint → Decrease
CAUTION: decrease rate is limited to 10% steps and waiting for plant
stabilization.
2 At 40% APR
FWS:
➢ FWP-2 Control valve → Close
➢ FWP-2 Discharge valve → Close
➢ FWP-2 Motor → Stop
➢ FWP-2 Suction valve → Close
➢ MCC Auto ctrl mode → On
Condensate pump-2 → Off
Condenser circulation pump-2 → Off
TURBINE DESYNCH
1 Follow normal unit unloading procedure till 30% APR
2 Wait for generator output to stabilize
3 Auto pressure hold 7,2 MPa → Disable
4 Turbine main valve → Close slowly until gen output +- 20 MWe
CAUTION: USE BYPASS VALVE TO PREVENT OVERPRESSURE
5 Synchronization breaker → Off
APR setpoint → 10-15%
RCP-1 Flow control valve → 28%
RCP-2 Flow control valve → 28%
6 Turbine LO pump selector → AUX
Turbine HCO pump selector → AUX
Turning gear → Engage and enable
MODE-1 TO MODE-2
1 APR Auto control → Off
2 Slowly insert control rods until APR < 10%
3 Reactor operating mode → IRM
4 Bypass valve → maintain 7,2 MPa
MODE-2 TO MODE-3
1 RPS → Initiate SCRAM
2 Verify full rod insertion, IRM d/s , SRM d/s
3 Offline core cooling pump-1 → Start
4 Confirm RPV temperature downscale

8
5 RCP-1 Control valve → Close
RCP-1 Discharge valve → Close
RCP-1 Motor → Stop
RCP-1 Suction valve → Close
RCP-2Control valve → Close
RCP-2 Discharge valve → Close
RCP-2 Motor → Stop
RCP-2 Suction valve → Close
6 When main steam pressure < 1 kPa:
➢ SJAE 1 → Stop
➢ SJAE 2 → Stop
➢ CAR-1 → Stop
➢ CAR-2 → Stop
7 When RPV Temperature < 100°C:
➢ FWP-1 Discharge valve → Close
➢ FWP-1 Motor → Off
➢ FWP-1 Suction valve → Close
➢ Condensate pump-1 → Stop
END OF NORMAL PROCEDURES