BILL OF QUANTITY

PEKERJAAN : RENOVASI VILLA DAN PEMBUATAN KOLAM RENANG


LOKASI : GUNUNG GEULIS KAB.BOGOR ###
###
NO URAIAN PEKERJAAN VOL SAT HARGA SAT JUMLAH
I PEKERJAAN PERSIAPAN
1 Mobilisasi dan demobilisasi material dan pekerja 1.00 ls 3,000,000.00 3,000,000.00
Sub total I 3,000,000.00
II PEKERJAAN KOLAM RENANG SEMI OVERFLOW
A Pekerjaan Persiapan dan Tanah ###
1 Pek. Bowplank 1.00 ls 1,500,000.00 1,500,000.00
2 Pek. Galian 36.00 m3 95,000.00 3,420,000.00
3 Pek. Urugan pasir bawah lantai 2.40 m3 330,000.00 792,000.00
B Pekerjaan Struktur ###
1 Pek. Pondasi telapak 60x60 1.80 m3 4,650,000.00 8,370,000.00
2 Pek. Bekisting 48.00 m2 195,000.00 9,360,000.00
3 Pek. Sloof 15/20 pembesian D13 beton k250 0.60 m3 6,365,000.00 3,819,000.00
4 Pek. Dinding Bata Bata Ringan t.10cm 42.75 m2 165,000.00 7,053,750.00
5 Pek. Plesteran 54.75 m2 75,000.00 4,106,250.00
6 Pek. Pelat 10 cm beton k250 D10 2 layer 1.92 m3 3,860,000.00 7,411,200.00
7 Pek. Waterproofing Sika 3x 54.00 m2 45,000.00 2,430,000.00
8 Pek. Keramik Mozaik 30x30 cm 54.00 m2 425,000.00 22,950,000.00
9 Pek. Nat Keramik (AM-53 & AM-54) 54.00 m2 15,000.00 810,000.00
10 Pek. Pemasangan bibir kolam batu alam andesit (coating+pinggul) 1.80 m2 475,000.00 855,000.00
11 Pek. Gutter batu alam andesit beserta dinding 11.30 m2 475,000.00 5,367,500.00
12 Pek. GroundTank 1x1x1M 1.00 ls 4,000,000.00 4,000,000.00
C Pompa, Filter, dan instalasi ruang pompa ###
1 Pompa Hayward 1 HP 1.00 unit 18,000,000.00 18,000,000.00
2 Ballvalve valve PVC consiting piping dia.1,5mm 1.00 ls 5,000,000.00 5,000,000.00
3 Sand filter Hayward S190 1.00 unit 8,000,000.00 8,000,000.00
4 Pemipaan diruang Pompa AW 1.00 ls 4,000,000.00 4,000,000.00
D Accesoris ###
1 Pek. Inlet Pipa 1,5" 24.00 m 115,000.00 2,760,000.00
2 Pek. Pembuangan Pipa 4" 6.00 m 165,000.00 990,000.00
3 Pek. Outlet Pipa 1,5" 24.00 m 115,000.00 2,760,000.00
4 Lampu underwater 4.00 titik 1,500,000.00 6,000,000.00
5 wall inlet 4.00 bh 450,000.00 1,800,000.00
6 cover main drain 1.00 bh 850,000.00 850,000.00
7 Vakum+Cover 1.00 bh 500,000.00 500,000.00
7 material pipa kabel dan kelistrikan 1.00 ls 4,000,000.00 4,000,000.00
F Pemasangan Dek ###
1 Decking Holowboard WPC 22.70 m2 1,250,000.00 28,375,000.00
2 Beton lantai bawah Dek 2.27 m3 3,860,000.00 8,762,200.00
G Pembuatan air terjun
1 Air terjun dinding 1.00 ls 3,000,000.00 3,000,000.00
H Pembuatan tangga Railing
1 Pek pasangan dinding tangga 3.75 m2 165,000.00 618,750.00
2 Pek. Plesteran 7.50 75,000.00 562,500.00
3 Pek. Acian expose dinding shower 7.50 55,000.00 412,500.00
4 Pek. Pasangan anak tangga 4.50 m2 165,000.00 742,500.00
5 pek lantai batu alam anak tangga 4.50 m2 475,000.00 2,137,500.00
I Pembuatan Shower
1 Pek. Pasangan bata ringan 2.79 m2 145,000.00 405,202.50
2 Pek. Plesteran 6.10 m2 75,000.00 457,650.00
3 Pek. Acian expose dinding shower 6.10 m2 55,000.00 335,610.00
4 Pek. Lantai Batu alam beserta border 1.82 m2 475,000.00 865,687.50
5 Pengadaan dan instalasi kran dan wall shower setara AER 1.00 unit 1,850,000.00 1,850,000.00
J Finishing Kolam Renang
1 Pengisian air kolam renang 30,000.00 liter 215.00 6,450,000.00
2 Paket alat perawatan kebersihan kolam 1.00 ls 3,000,000.00 3,000,000.00
Sub total II 194,879,800.00
III PEKERJAAN LAIN-LAIN ###
1 Pembersihan lokasi dan buang sampah keluar lokasi 1.00 ls 2,000,000.00 2,000,000.00
Sub total III 2,000,000.00
TOTAL 199,879,800.00
PEMBULATAN 199,879,000.00

Catatan : Depok, 30 Januari 2023 ###


1 Pekerjaan diluar RAB diatas Akan masuk kedalam addendum tambah pekerjaan Hormat kami ###

Khairul Akbar
Direktur
BILL OF QUANTITY

PEKERJAAN : RENOVASI VILLA DAN PEMBUATAN KOLAM RENANG


LOKASI : LIMO KOTA DEPOK

NO URAIAN PEKERJAAN VOL SAT HARGA SAT JUMLAH


I PEKERJAAN PERBAIKAN VILLA
A PEKERJAAN ARSITEKTUR
1 Pek. Atap Spandeks Pasir Area Toilet dan dapur 34.00 m2 160,000.00 5,440,000.00
2 Pek. Perbaikan Kuda Kuda Kayu Kanopi Depan 1.00 ls 1,000,000.00 1,000,000.00
3 Pek. Penambahan struktur kayu villa 2 lantai 1.00 ls 3,000,000.00 3,000,000.00
4 Pek. Kolam ikan mini area barbeque 1.00 ls 2,500,000.00 2,500,000.00
5 Pek. Lantai batu alam Andesit area barbeque 7.70 m2 325,000.00 2,502,500.00
6 Pek. Penambahan struktur beton meja laptop 1.00 ls 1,000,000.00 1,000,000.00
7 Pek. Pasang kisi-kisi kayu depan kanopi+papan nama acrilic 1.00 ls 6,000,000.00 6,000,000.00
8 Pek. papan nama acrilic menghadap jalan akses masuk 1.00 ls 2,000,000.00 2,000,000.00
Sub total II.A 23,442,500.00
II PEKERJAAN KOLAM RENANG SEMI OVERFLOW
A Pekerjaan Persiapan dan Tanah
1 Pek. Bowplank 1.00 ls 1,000,000.00 1,000,000.00
2 Pek. Galian 36.00 m3 95,000.00 3,420,000.00
3 Pek. Urugan pasir bawah lantai 2.40 m3 330,000.00 792,000.00
B Pekerjaan Struktur
1 Pek. Pondasi telapak 60x60 1.80 m3 4,650,000.00 8,370,000.00
2 Pek. Bekisting 48.00 m2 125,000.00 6,000,000.00
3 Pek. Sloof 15/20 pembesian D13 beton k250 0.60 m3 6,365,000.00 3,819,000.00
4 Pek. Dinding Bata Merah 1/2 bata 1:4 42.75 m2 165,000.00 7,053,750.00
5 Pek. Plesteran 54.75 m2 75,000.00 4,106,250.00
6 Pek. Pelat 10 cm beton k250 D10 2 layer 1.92 m3 3,860,000.00 7,411,200.00
7 Pek. Waterproofing Sika 3x 54.00 m2 45,000.00 2,430,000.00
8 Pek. Keramik Mozaik 30x30 cm 54.00 m2 265,000.00 14,310,000.00
9 Pek. Nat Keramik (AM-53 & AM-54) 54.00 m2 15,000.00 810,000.00
10 Pek. Pemasangan bibir kolam batu alam andesit (coating+pinggul) 1.80 m2 475,000.00 855,000.00
11 Pek. Gutter batu alam andesit beserta dinding 11.30 m2 475,000.00 5,367,500.00
C Pompa, Filter, dan instalasi ruang pompa
1 Pompa Hayward 1 HP Swimpro 1.00 unit 15,500,000.00 15,500,000.00
2 Ballvalve valve PVC consiting piping dia.1,5mm 1.00 ls 3,000,000.00 3,000,000.00
3 Sand filter Hayward S190 1.00 unit 8,000,000.00 8,000,000.00
4 Pemipaan diruang Pompa AW 1.00 ls 3,000,000.00 3,000,000.00
D Pemipaan
1 Pek. Inlet Pipa 2,5" 24.00 m 85,000.00 2,040,000.00
2 Pek. Pembuangan Pipa 4" 6.00 m 165,000.00 990,000.00
3 Pek. Outlet Pipa 2,5" 24.00 m 85,000.00 2,040,000.00
E Accesoris
1 Lampu underwater 4.00 titik 1,500,000.00 6,000,000.00
2 wall inlet+cover 4.00 bh 200,000.00 800,000.00
3 cover main drain 1.00 bh 500,000.00 500,000.00
4 material pipa kabel dan kelistrikan 1.00 ls 2,000,000.00 2,000,000.00
F Pemasangan Dek
1 Decking WPC 22.70 m2 850,000.00 19,295,000.00
2 Beton lantai bawah Dek 2.27 m3 3,860,000.00 8,762,200.00
G Pembuatan air terjun
1 Air terjun dinding 1.00 ls 3,000,000.00 3,000,000.00
H Pembuatan tangga
1 Pek pasangan dinding tangga 3.75 m2 165,000.00 618,750.00
2 Pek. Plesteran 7.50 75,000.00 562,500.00
3 Pek. Acian expose dinding shower 7.50 55,000.00 412,500.00
4 Pek. Pasangan anak tangga 4.50 m2 165,000.00 742,500.00
5 pek lantai batu alam anak tangga 4.50 m2 475,000.00 2,137,500.00
I Pembuatan Shower
1 Pek. Pasangan bata ringan 2.79 m2 145,000.00 405,202.50
2 Pek. Plesteran 6.10 m2 75,000.00 457,650.00
3 Pek. Acian expose dinding shower 6.10 m2 55,000.00 335,610.00
4 Pek. Lantai Batu alam beserta border 1.82 m2 475,000.00 865,687.50
5 Pengadaan dan instalasi kran dan wall shower setara AER 1.00 unit 1,350,000.00 1,350,000.00
J Finishing Kolam Renang
1 Pengisian air kolam renang 30,000.00 liter 215.00 6,450,000.00
2 Paket alat perawatan kebersihan kolam 1.00 ls 3,000,000.00 3,000,000.00
Sub total III 158,009,800.00
E PEKERJAAN LAIN-LAIN
1 Pembersihan lokasi dan buang sampah keluar lokasi 1.00 ls 2,000,000.00 2,000,000.00
Sub total IV 2,000,000.00
TOTAL 183,452,300.00
PEMBULATAN 183,000,000.00

Depok, 30 Januari 2023


Hormat kami

Khairul Akbar
Direktur