Go No Go Document
Go No Go Document
CONTRACT ID 307465
1 HSSE Management
Procedures/Work Method
1.2 Developed by contractor, reviewed and approved by CH
Statement
1.3 Safety Leadership Starting Strong Workshop held for all workforce
2.1 HSSE Coaches HSSE Coaches engaged and in place (ratio 1:50 personnel)
Camp/Accommodation
3.1 Accommodation readiness
readiness
3.2 Personnel welfare Personnel remuneration for the last 3 months
4 PPE
5 Road Transport
IVMS installed
In Vehicle Monitoring System
5.1
(IVMS) Data download infrastructure in place
Generic Lift plan prepared by competent PIC is in place for routine and
6.1 Lifting and Hoisting
non-routine simple lifts
hukwumamkpam Ijeoma;
Prior To
During Execution Audit Assessment
Prior to Mob Start of Completion Date
of Work Outcome
Work
0 0 0
Completed
Completed
Completed
Not Started
In Progress
Not Started
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Completed
0 0 0 0
Not Applicable
0 0 0 0
In Progress
In Progress
0 0 0 0
Completed
0 0 0 0
Not Applicable
Not Applicable
Not Applicable
Not Applicable
0 0 0 0
In Progress
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
In Progress In Progress
Completed
Completed
Completed
0 0 0 0
Not Applicable
Not Applicable
Completed
Completed
0 0 0 0
Completed
ture installation)
Comments
Completed
In Progress
Not Started
Not Applicable
Go / No-Go Criteria - Mobilisation and Readiness to S
CONTRACT ID
CONTRACT TITLE :
CONTRACTOR :
CONTRACT HOLDER:
ASSESSOR(S)
Requirement
1 HSSE Management
1.1 Activity HSE Plan
2 TRAINING AND HSSE RESOURCES
3.1 Water
Heavy Equipment
4.1
Vehicle Operations
5 Security
5.`
5.2
6 COVID- 19
6.1
12.5 COVID- 19
12.9
7 Others
0 0
Communicated to work crew
SSE RESOURCES 0 0
Fit for purpose temporary shelter/work area inspected and adequate for
personnel.Rest shelter must meet specific standard
0
Completed
0 0
Completed
Completed
Not Applicable
Completed
0 0
Completed
Not Applicable
Not Applicable
Completed
0 0
In Progress
Not Applicable
Not Applicable
0 0
Not Applicable
Not Applicable
0 0
Not Applicable
Not Applicable
Not Applicable
0 0
Completed
ucture installation)
Comments
Completed
In Progress
Not Started
Not Applicable
Not Started In Progress Not Applicable Completed
Prep to Mob 4 4 16 11
Prep for Prior to SOW 0 1 10 7
Percent Status
60.0
50.0
40.0
30.0
20.0
10.0
0.0
Prep to Mob Prep for Prior to SOW
ed