Intertank Flanges
Intertank Flanges
The beam instrumentation layout in the ESS DTL section is shown in Fig. 1.
BPM BPM BPM BPM BCM BPM BPM BPM BPM FC BCM BPM BPM BPM
TNK TNK
o 4 Beam Position Monitors (BPM) in the first and the second tank, 3 BPMs
in the other tanks (in total 17)
o 5 Beam current monitors (BCM)
o 2 Faraday cups (FC) after DTL tank 2 and tank 4
o Few Beam Loss Monitor (BLM)
Mechanical integration issues might change the number and/or the position of the
diagnostics. The position of the BCMs is done according the DTL lattice v84 and
corresponds to empty half drift tubes.
Due to cost reduction 4 WS, 4 NPMs and 2 FCs have been removed from the lattice,
nevertheless, the intertank chamber shall be design in order to allow later installation of
these components.
Document Number ESS-0035494
Date Jan 27, 2016
Revision 2
State Released
In general, INFN Legnaro is in charge of the mechanical integration and the design of the
different diagnostics foreseen to be installed in the drift tubes (BPMs and BCMs), as well
as the design and fabrication of the vacuum chambers required for the installation of the
diagnostics.
WS, FC and BLM are not in the scope of the INFN Legnaro in kind contribution as well
as the electronic acquisition for the different diagnostics.
Technical scope:
- INFN Legnaro designs the DTL BPMs electrodes, these include the
electromagnetic simulation for a proton beam in a range from 3.63 MeV to 90
MeV and the full mechanical design, based on ESS specifications.
- Fabrication, assembly and integration in the DTL drift tubes are in the scope
of INFN Legnaro.
- Cabling in the drift tube shaft, up to the outside of the DTL tank shall be the
responsibility of INFN Legnaro
- Cabling from the DTL tank to the klystron gallery and connection to the
electronic shall be the responsibility of ESS
- ESS and INFN shall agree on the interface connection.
Note: Female SMA type connectors shall be used for the BPMs outside of the DTL tanks,
the BPM signal with the nominal beam being at the center of the beam pipe shall be 300
mVpeak for a frequency of 704 MHz.
- INFN Legnaro shall design and built the sensors based on ESS specifications.
- Mechanical integration in the empty half DTL drift tubes is in the scope of
INFN Legnaro.
- Cabling in the DTL wall, up to the outside of the DTL tank shall be the
responsibility of INFN Legnaro
Document Number ESS-0035494
Date Jan 27, 2016
Revision 2
State Released
- Cabling from the DTL tank to the klystron gallery and connection to the
electronic shall be the responsibility of ESS
- ESS and INFN shall agree on the interface connection
Note: the ACCT output as well as the input for calibration (see the following picture for
example) shall be preferably BNO connector at the outside of the DTL tank. In case BNO
is not possible, the ACCT output shall be BNC (x2) and the calibration input shall also be
BNC (x2).
For the flanges, the ESS beam instrumentation requests as clear aperture a square section
with a minimum dimension equal to 110x36 mm2 for the FC, NPM and the WS after
DTL tank1. The flanges shall be centred with respect to the reference beam axis.
Figure 2 Flanges layout DTL intertank instrumentation (courtesy of INFN Legnaro and D. Lundgren)