Compliance CRB Inspection 14-04-23

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

COMPLIANCE OF INSPECTION NOTE OF SHRI ANIL KUMAR LAHOTI, CRB & CEO, RAILWAY BOARD OF NORTH EAST FRONTIER

RAILWAY ON 14-04-2023

SN Description of item discussed & action required Action by Compliance


A. Performance Review of NFR
5. NFR should target loading of minimum 15MT during current FY. Sr.DOM Target of APDJ division for the year 2023-24 is 3.20MT.
NFR’s proposal for attracting Bamboo traffic in normal empty DCM/IC Division has also proposed for STS from BNV & HAS station for
flow direction may be examined. Stone Chips.
6. Besides loading, zone wise and month wise targets for Sr.DOM Noted.
unloading can also be fixed and monitored. NFR should target DCM/IC
unloading of 40MT in 2023-24.
12. With faster acceleration and braking capabilities, time taken by Sr.DOM Time table of Vande Bharat express has been made by HQ.
Vande Bharat Express to negotiate PSRs and halts is Time table of Vande Bharat to be examined during preparation
considerably less. This should be accounted for while working of Time Table to reduce the running time.
out time table of VB express.
14. Scope of work for development of Gati Shakti Terminals should Sr.DOM Target of HPCL siding under Gati Shakti scheme delayed due to
be properly specified. Month wise target for commissioning of DCM/IC land accusation by HPCL authority. Division is in touch with
06 GC terminals should be made, monitored and ensured. HPCL authority for commissioning of HPCL siding.

You might also like